NOISE MANAGEMENT STRATEGY
For Boggabri - Tarrawonga - Maules Creek Complex
AP R I L 2 02 4
Idemitsu Australia Pty Ltd
Boggabri Coal Operations Pty Ltd
Whitehaven Coal Limited Tarrawonga Coal Pty Ltd, Maules Creek Coal Pty Ltd
DOCUMENT CONTROL | ||||||
Version | Date | Prepared by | Reviewed by | Approved by | ||
01 | 4 Nov 11 | N Pennington | D Young | |||
02 | 14 | Nov 11 | N Pennington | W Jones | ||
03 | 21 | Nov 11 | N Pennington | W Jones | ||
04 | 21 | Sep 12 | N Pennington | B Bird | J Green / D | |
Martin / | ||||||
D Young | ||||||
05 | 20 | Mar 14 | N Pennington / B | J Green / D Martin / | J Green / D | |
Bird | D Young | Martin / | ||||
D Young | ||||||
06 | 17 | July 14 | N Pennington | B Bird / J Green / D | J Green / D | |
Martin / L Johnson | Martin / | |||||
L Johnson | ||||||
07 | 16 | December 14 | S Crick | J Green / D Martin / | J Green / D | |
L Johnson | Martin / L | |||||
Johnson | ||||||
08 | 4 March 2016 | S.Crick/ J Watson | C Simmons/L | H. Russell / J | ||
Johnson / T Dwyer | Johnson | |||||
09 | 17 | May 2017 | T Dwyer | S Mitchell / D Martin | D Martin / J | |
/ L Johnson | Johnson & | |||||
DPE (6/6/2017) | ||||||
10 | 8 April 2024 | E. Bulkeley | T. McDermott/M. | BTM | ||
Wright |
Contents
Page Number | |||
1. | Introduction | 1 | |
1.1 | Background and purpose | 1 | |
1.2 | Document structure | 3 | |
1.3 | Scope | 4 | |
2. | BTM Complex | 5 | |
2.1 | Boggabri Coal Mine | 5 | |
2.2 | Tarrawonga Coal Mine | 5 | |
2.3 | Maules Creek Coal Mine | 5 | |
3. | Noise criteria | 8 | |
3.1 | Cumulative noise assessment criteria | 8 | |
4. | Monitoring Network | 9 | |
5. | Data Sharing | 10 | |
6. | Non compliance notifications | 10 | |
7. | Review and revision | 12 | |
8. | References | 13 |
Tables
Table 1.1 Management and Ownership of BTM Complex Mines | 1 | |
Table 1.2 Approval requirements for cumulative noise impact management | 2 | |
Table 3.1 | Cumulative noise assessment criteria | 8 |
Table 6.1 | Boggabri Coal Reporting Obligations for Non-Compliances | 10 |
Table 6.2 | Tarrawonga Coal Mine Reporting Obligations for Non-Compliances | 11 |
Table 6.3 | Maules Creek Coal Mine Reporting Obligations for Non-Compliances | 11 |
Figures
Figure 2.1 Project boundaries and noise monitoring locations for the BTM Complex Mines 7
BTM COMPLEX | Noise Management Strategy i
Glossary
Glossary | |
AQMS | Air Quality Management Strategy |
BCOPL | Boggabri Coal Operations Pty Ltd |
BTM Complex | Boggabri-Tarrawonga-Maules Creek Complex (previously Leard Forest Mining |
Precinct) | |
CCC | Community Consultative Committee |
CL | Coal Lease |
DA | Development Application |
dB(A) | A-weighted Decibel |
DCCEEW | Commonwealth Department of Climate Change, Energy, the Environment and Water |
DoEE | Commonwealth Department of the Environment and Energy (Now DCCEEW) |
DP&E | NSW Department of Planning and Environment (Now DPHI) |
DPHI | NSW Department of Planning, Housing and Infrastructure |
EA | Environmental Assessment |
EPA | NSW Environmental Protection Agency |
EP&A Act | Environmental Planning and Assessment Act, 1979 |
IA | Idemitsu Australia Pty Limited |
MCCM | Maules Creek Coal Mine |
Mtpa | Million Tonnes Per Annum |
NMP | Noise Management Plan |
NMS | Noise Management Strategy |
OEA | Overburden Emplacement Area |
OEH | NSW Office of Environment and Heritage |
PAC | NSW Planning Assessment Commission |
ROM | Run of Mine |
SCADA | Supervisory Control and Data Acquisition |
TCM | Tarrawonga Coal Mine |
TCPL | Tarrawonga Coal Pty Ltd - Tarrawonga Joint Venture |
the Strategy | BTM Complex Noise Management Strategy |
WRF | Weather Research and Forecasting |
BTM COMPLEX | Noise Management Strategy ii
1.Introduction
1.1 Background and purpose
The purpose of this cumulative noise management strategy (NMS) is to document the approach that will be taken by mines within the Boggabri-Tarrawonga-Maules Creek Complex (BTM Complex)1 to monitor and collectively manage the cumulative noise impacts of their operations. The NMS outlines the cumulative noise management protocols that will be implemented within the BTM Complex.
The BTM Complex is an existing mining precinct located within and around the Leard State Forest, approximately 15 kilometres (km) northeast of Boggabri in the Narrabri Local Government Area (LGA). The BTM Complex includes the Tarrawonga Coal Mine (TCM) in the south, the Boggabri Coal Mine (BCM) to the north and the Maules Creek Coal Mine (MCCM) to the northwest. The extent of the relevant tenements for each of the mines that comprise the BTM Complex are presented in Figure 2.1. BCM is managed by Boggabri Coal Operations Pty Limited (BCOPL), a wholly owned subsidiary of Idemitsu Australia Pty Limited (IA). TCM is managed by Tarrawonga Coal Pty Ltd, a wholly owned subsidiary of Whitehaven. MCCM is managed by Maules Creek Coal Pty Ltd, a wholly owned subsidiary of Whitehaven Coal Mining Limited (Whitehaven). A Summary of the ownership details for the mines within the BTM Complex is provided below in Table 1.1 Management and Ownership of BTM Complex Mines.
Table 1.1 | Management and Ownership of BTM Complex Mines | |||
Mine | Management | Ownership | Share | |
Boggabri Coal Mine | Boggabri Coal Operations Pty | Idemitsu Australia | 80% | |
Ltd | ||||
Chugoku Electric Power | 10% | |||
NS Boggabri Pty Limited | 10% | |||
Tarrawonga Coal Mine | Tarrawonga Coal Pty Limited | Whitehaven Coal Mining Limited | 100% | |
Maules Creek Coal Mine | Maules Creek Coal Pty | Aston Coal 2 Pty Limited | 75% | |
(owned 100% by Whitehaven | ||||
Limited | Coal Limited) | |||
Itochu Coal Resources Australia | 15% | |||
Maules Creek Pty Ltd (ICRA | ||||
MC) | ||||
J-Power Australia (J-Power) | 10% |
Project applications for the continued operation of BCM (application number 09_0182) and the development of the MCCM (application number 10_0138) were determined by the NSW Planning Assessment Commission (PAC) in July and October 2012 respectively, under delegation by the NSW Minister for Planning and Infrastructure. Subsequent to this, the (then) Commonwealth Department of Sustainability, Environment, Water, Population and Communities (SEWPAC), now the Commonwealth Department of Climate Change, Energy, the Environment and Water DCCEEW ) granted conditional approval for both the BCM Extension (EPBC 2009/5256) and the MCCM Project (EPBC 2010/5566) on
- In previous environmental assessments and approval documents this group of mines has been referred to as the Leard Forest Mining Precinct. For the purposes of this strategy and all other relevant cumulative impact management documents, all references to the 'Leard Forest Mining Precinct' have been replaced with the term 'BTM Complex'.
BTM COMPLEX | Noise Management Strategy 1
11 February 2013. These projects were granted approval subject to stringent conditions related to the management of cumulative impacts.
The TCM application for continuation of mining was approved on 22 January 2013, with similar cumulative impact management conditions to those detailed in the BCM and MCCM. The (now) DDCCEEW granted EPBC approval (EPBC 2011/5923) to the Tarrawonga project on 11 March 2013.
Approval conditions require the preparation of a suite of regional strategies, developed in partnership by all three mines of the BTM Complex. This NMS has been developed to satisfy each mine's project approval conditions , and should be considered in conjunction with other BTM Complex Strategies, in particular the Air Quality Management Strategy (AQMS) that describes the predictive meteorological forecasting system for the Complex.
Approval conditions relevant to the management of cumulative noise impacts within the BTM Complex are detailed in Table 1.2.
Table 1.2 Approval requirements for cumulative noise impact management
Boggabri | Maules Creek | Tarrawonga | Details | Section |
Coal Mine | Coal Mine | Coal Mine | reference | |
Project | Project | Project | in NMS | |
Approval | Approval | Approval | ||
09_0182 | 10_0138 | 11_0047 | ||
Condition | Condition | Condition | ||
Schedule 3 | Schedule 3 | 11 (b) | Operate a comprehensive noise management | Whole of |
Condition | Condition15 | system on site that uses a combination of | NMS along | |
12 (b) | (b) | predictive meteorological forecasting and real | with | |
time noise monitoring data to guide the day-to- | respective | |||
day planning of mining operations and | site NMP's | |||
implementation of both proactive and reactive | and the | |||
noise mitigation measures to ensure compliance | AQMS | |||
with the relevant conditions of this approval | ||||
Schedule 3 | Schedule 3 | 11 (h) | Co-ordinate the noise management on site with | Whole of |
Condition | Condition15 | the noise management at other mines within the | NMS, | |
12 (j) | 15 (i) | Leard Forest Mining Precinct to 2inimize the | including | |
cumulative noise impacts of these mines | Section 4 | |||
Schedule 3 | 12 (g) | Prepare and implement a Noise Management | Whole of | |
Condition 16 | Plan that… | NMS. | ||
(g) | includes a Leard Forest Mining Precinct Noise | |||
Management Strategy that has been prepared in | ||||
consultation with other coal mines in the Precinct | ||||
to minimise the cumulative noise impacts of all | ||||
mines within the Complex Precinct, and | ||||
includes: | ||||
A description of the measures that would be | ||||
implemented to ensure that the noise | ||||
management of the mines is properly | ||||
coordinated to ensure compliance with the | ||||
relevant noise criteria; | ||||
a suitable monitoring network for the | ||||
Precinct; | ||||
protocols for data sharing; and | ||||
procedures for identifying and apportioning | ||||
the source/s and contribution/s to cumulative | ||||
noise impacts for the operating mines and | ||||
other sources, using the noise and |
BTM COMPLEX | Noise Management Strategy 2
Boggabri | Maules Creek | Tarrawonga Details |
Coal Mine | Coal Mine | Coal Mine |
Project | Project | Project |
Approval | Approval | Approval |
09_0182 | 10_0138 | 11_0047 |
Condition | Condition | Condition |
meteorological monitoring network and | |
appropriate investigative tools. | |
Note: The Leard Forest Mining Precinct Noise | |
Management Strategy can be developed in | |
stages and will need to be subject to ongoing | |
review dependent upon the determination and | |
commencement of other mining projects in the | |
area. | |
Schedule 3 | Prepare and implement a Noise Management |
Condition | Plan that… |
13 (g) | includes a Leard Forest Mining Precinct Noise |
Management Strategy that has been prepared in | |
consultation with other coal mines in the Precinct | |
to minimise the cumulative noise impacts of all | |
mines within the Precinct, that includes: | |
Systems and processes to ensure that all | |
mines are managed to achieve their noise | |
criteria; | |
a shared environmental monitoring network | |
and data sharing protocol; and | |
procedures for identifying and apportioning | |
the source/s and contribution/s to cumulative | |
noise impacts for operating mines and other | |
sources, using the noise and meteorological | |
monitoring network and appropriate | |
investigative tools. | |
Note: The Leard Forest Mining Precinct Noise | |
Management Strategy can be developed in | |
stages and will need to be subject to ongoing | |
review dependent upon the determination and | |
commencement of other mining projects in the | |
area. |
Section reference in NMS
Whole of NMS, specifically Sections 4 and 5
1.2 Document structure
The structure of this strategy is as follows:
Section 1 provides an introduction to the NMS, including the background to the NMS, and the scope of the NMS.
Section 2 provides an overview of the BTM Complex mines (BCM, TCM, MCCM).
Section 3 describes the cumulative noise criteria applicable to each of the mines in the BTM Complex
Section 4 describes existing monitoring networks, sets objectives for cumulative noise monitoring, responsibilities of each mine, data interpretation, noise triggers for each individual mine and mitigation measures and processes to mitigate outcomes for the BTM Complex.
Section 5 describes data management
Section 6 describes the review and revision of the NMS
BTM COMPLEX | Noise Management Strategy 3
- Section 7 provides a list of references used in this document.
1.3 Scope
This document is the overarching strategy for management of cumulative noise for the BTM Complex.
Individual mines will manage their ongoing operations and associated noise emissions in accordance with their site-specific Noise Management Plans (NMPs) that will, by default, ensure that the cumulative noise criteria of the BTM Complex will be met. Statutory requirements relating to noise will be provided in each individual mine's NMP.
BTM COMPLEX | Noise Management Strategy 4
2.BTM Complex
The BTM Complex is centred within and around the Leard State Forest, approximately 15 km northeast of Boggabri in the Narrabri Shire local government area. The current mines within the Complex include TCM in the south, the BCM to the north and the MCCM to the northwest. The extents of the EA boundaries and noise monitoring locations for each of the mines that comprise the BTM Complex are presented in Figure 2.1.
2.1 Boggabri Coal Mine
BCM is an existing open cut mine that consists of an open cut pit, overburden dump, infrastructure area including coal processing facilities, water management structures, and a rail spur. BCM obtained NSW State Government approval on the 18 July 2012, and Commonwealth Government approval on 11 February 2013. These approvals (as modified) allow operations at BCM to extend until 2036 at a rate of 8.6 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal. The project approval for BCM provides for operation of existing ancillary equipment; construction and operation of a new coal handling and preparation plant (CHPP); 17 km rail spur line; bridges over the Namoi River and Kamilaroi Highway; a rail load-out facility located at the mine; upgrade of the overburden and coal extraction haulage fleet (with an option for a drag-line); upgrade of electricity transmission lines; and establishment of a water supply bore field and other ancillary infrastructure.
BCM have modified PA09_0182 on multiple occasions since approval with the most recent being in January 2024, relating to an increase in the depth of mining.
2.2 Tarrawonga Coal Mine
The TCM is an existing coal mining operation that was granted approval by the (now) DPHI to extract 2 Mtpa of ROM coal in 2005 (DA88-4-2005). TCPL, a subsidiary of Whitehaven Coal, submitted a project application in July 2011 for an extension of open cut mining operations with an increased production rate to 3 Mtpa of ROM coal for a further 17 years from 2013 to 2030. This project application was determined by the PAC on 22 January 2013 and included, under Condition 12 (g), the requirement that the proponent shall prepare and implement a NMP that must include a NMS for the BTM Complex.
TCM have modified Project Approval 11_0047 on a number of occasions since then, increasing coal extraction to a maximum of 3.5 million tonnes in 2020. The most recent modification was determined in December 2023 to increase the road haulage hours of operation.
2.3 Maules Creek Coal Mine
The MCCM Project Approval (PA 10-0138) was granted by the PAC as delegate of the Minister of DP&E on 23 October 2012. The approval includes extraction of up to 13 Mtpa of ROM coal for 21 years, construction and operation of site infrastructure including a CHPP and associated facilities; train loading facility; rail spur and loop; a mine access road; communications and power reticulation; explosives storage; and a water pipeline from the Namoi River.
MCCM have modified Project Approval 10_0138 on a number of occasions since then, with the most recent being in March 2024. This latest modification authorised changes to the existing biodiversity strategy and construction and use of an electricity transmission line.
BTM COMPLEX | Noise Management Strategy 5
BTM COMPLEX | Noise Management Strategy 6
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Whitehaven Coal Limited published this content on 21 May 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 21 May 2024 02:38:07 UTC.