Ircon International Limited has been awarded the LOA for construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package-2) on Sairang - Phaibawk section of NH-6 in the State of Mizoram on EPC Mode at a quoted bid price of INR 6,306.6 million. Name of the entity awarding order(s)/contract(s) is National Highways & Infrastructure Development Corporation Limited (NHIDCL). Time period for the order(s)/contract(s) is to be executed is 36 months.