Colibri Resource Corporation announced that its partner Silver Spruce Resources has released an update with respect to the Phase 1 exploration drilling at the El Mezquite Au-Ag property ("El Mezquite" or the "Property"). The first seven (7) drill holes are complete and have been submitted to the laboratory, and Layne de Mexico has added a second drill to the Property to aim to complete the 2,475 metres of drilling by the end of next week. The technical team has been expanded with additional geologists and samplers to expedite progress. The program was delayed for a period of four weeks by local security concerns which required the demobilization of the team and equipment as a precaution. The inaugural drilling program at El Mezquite is now scheduled to be completed in July with samples submitted to ALS Global in Hermosillo on a weekly basis. The data will be released once the final precious metal and multi-element results are in receipt and interpreted for the first seven (7) drill holes, and for the remaining thirteen (13) drill holes, and all of which will contribute to the program design for Phase 2 drilling after the summer rainy season.