BHP Group Limited ABN 49 004 028 077, BHP Group Plc. registration number 3196209 and their respective subsidiaries are members of the BHP Group. The BHP Group is headquartered in Melbourne, Australia.

Mt Arthur Coal

Annual Review FY23

29 September 2023

ANNUAL REVIEW FY23

Table of Contents

1

Statement of Compliance

7

2

Introduction

10

3

Approvals

13

4

Operations Summary

14

4.1

Mining Operations

14

4.2

Other Operations

14

4.3

Employment Details

15

4.4

Next Reporting Period

15

5

Actions Required from Previous Annual Review

16

6

Environmental Performance

17

6.1

Noise

17

6.2

Blasting

21

6.3

Meteorological Data

22

6.4

Air Quality

23

6.5

Biodiversity

27

6.6

Visual Amenity and Lighting

40

6.7

Aboriginal Cultural Heritage

41

6.8

European Cultural Heritage

42

6.9

Contaminated Land and Hydrocarbon Contamination

43

6.10

Spontaneous Combustion

44

6.11

Bushfire

45

6.12

Greenhouse Gas and Energy

45

6.13

Waste Management

46

6.14

Public Safety

47

7

Water Management

47

7.1

Water Balance

48

7.2

Erosion and Sediment

49

7.3

Surface Water

52

7.4

Ground Water

56

8

Rehabilitation

62

Page 2 of 128

ANNUAL REVIEW FY23

8.1

Buildings and Infrastructure

62

8.2

Topsoil

62

8.3

Landform Design

63

8.4

Other Activities

67

8.3

Rehabilitation Activities for Next Reporting Period

74

9

Community

75

9.1

Community Engagement

75

9.2

Community Investment

77

10

Independent Audit

78

11

Incidents and Non-compliances

102

12 Activities during Next Reporting Period

105

Appendix 1 - Surface Water Quality Monitoring Results

107

Appendix 2 Ground Water Monitoring Results and Groundwater Level Drawdown Analysis

110

Appendix 3 Community Complaints

111

Appendix 4 Annual Coal Transport Report FY23

118

Appendix 5 Rehabilitation Plan & and Monitoring Results

126

Appendix 6 Baiting & Weed Management Reports

127

List of Figures

Figure 1: Mt Arthur Coal mining leases, approved disturbance boundary and offset areas

11

Figure 2: Mt Arthur Coal locality plan

12

Figure 3: Air quality, blasting, noise and meteorological monitoring locations

20

Figure 4: Waste disposal from Mt Arthur Coal FY23

46

Figure 5 Riparian Vegetation and Channel Stability Monitoring Locations

51

Figure 6: Groundwater and surface water monitoring locations

54

Figure 7: Topsoil spreading at OPD emplacement

64

Figure 8 Bulk shaping and topsoil spreading at the Saddlers North emplacement

65

Figure 9 Rehabilitation Area Nomenclature

70

Figure 10 Relocated Tiger Orchid (Cymbidium canaliculatum)

71

Figure 11: Comparison of complaints received during current and previous financial years

76

Page 3 of 128

ANNUAL REVIEW FY23

List of Tables

Table 1: Annual Review title block

6

Table 2: Statement of compliance

7

Table 3: Non-compliance summary

7

Table 4: Mt Arthur Coal management contact details

10

Table 5: Mt Arthur Coal's existing statutory approvals as at 30 June 2023

13

Table 6: Production summary

14

Table 7: Actions required from FY22 Annual Review and additional requirements for FY23 Annual Review

16

Table 8: Monthly attended night-time noise monitoring results in decibels

17

Table 9: Attended noise monitoring results in decibels in comparison to previous years

18

Table 10: Summary of blast monitoring results

22

Table 11: Comparison of annual average deposited dust results

23

Table 12: Summary of TEOM PM10 monitoring results using validated data

25

Table 13: 24-hour PM10 exceedances and calculated Mt Arthur Coal incremental impact for statutory TEOMs

26

Table 14: Summary of total suspended particulate results

26

Table 15 FY23 rehabilitation monitoring sites

28

Table 16: Summary of native and introduced flora species within 20 x 20 m plots and condition scores across FY23

rehabilitation sites

29

Table 17 MS1: Comparison between reference site and benchmark values

30

Table 18 MS1 assessment against phase and domain specific criteria

30

Table 19 MS1 data comparison to draft completion criteria

31

Table 20 VB6: Comparison between historic data, reference site and benchmark values

32

Table 21 VB6 data comparison to draft completion criteria

32

Table 22 VB6 assessment against phase and domain specific criteria

32

Table 23 VB4: Comparison between historic data, reference site and benchmark values

34

Table 24 VB4 data comparison to draft completion criteria

34

Table 25 VB4 assessment against phase and domain specific criteria

35

Table 26 VB5: Comparison between historic data, reference site and benchmark values

37

Table 27 VB5 data comparison to draft completion criteria

37

Table 28 VB5 assessment against phase and domain specific criteria

37

Page 4 of 128

ANNUAL REVIEW FY23

Table 29 Pest animal control program results for FY23

40

Table 30: Summary of spontaneous combustion at Mt Arthur Coal in FY23

44

Table 31: Water take for FY23

48

Table 32: Riparian vegetation assessment - FY23 RARC and CSIRO Assessment Results

50

Table 33: Summary of statutory surface water quality monitoring results

55

Table 34: Groundwater Level Trigger Exceedances

57

Table 35: Groundwater Quality Trigger Exceedances

60

Table 36 Topsoil stockpiles maintained in the reporting period

62

Table 37 Mt Arthur Coal pasture seed mix

65

Table 38: Mt Arthur Coal rehabilitation claimed for FY22

66

Table 39: Mt Arthur Coal rehabilitation summary

66

Table 40 Diversity Tube stock mix used in McDonalds South

67

Table 41 Diversity ground cover seed mix used in MacDonalds South

68

Table 42 Box Gum Woodland Mix used in MacDonalds South diversification

68

Table 43 Alternative Growth Media Trials

73

Table 44: Summary of IEA Non-Compliances and Recommendations

78

Table 45: 2020 Independent Environmental Audit Non-compliance Recommendations and Actions

79

Table 46: 2020 Independent Environmental Audit Improvement Recommendations and Actions

91

Table 47: Mt Arthur Coal's performance against targets for FY22

105

Page 5 of 128

ANNUAL REVIEW FY23

Table 1: Annual Review title block

Document Details

Name of Operation

Mt Arthur Coal

Name of Operator

Hunter Valley Energy Coal Pty Ltd

Project Approvals

PA 09_0062 (MOD 1)

PA 06_0091

Name of holder of project approvals

Hunter Valley Energy Coal Pty Ltd

Mining Leases

CCL 744, CL 396, ML 1358, ML 1487, ML 1548,

ML1593, ML1655, ML 1739, ML 1757, MPL 263

Name of holder of mining leases

Hunter Valley Energy Coal Pty Ltd; Mt Arthur Coal

Pty Limited

WAL 917, WAL 918, WAL 1296, WAL 18141, WAL

Water Licences

18247, WAL 41495, WAL 41556, WAL 41557, WAL

18175

Name of holder of water licences

Hunter Valley Energy Coal Pty Ltd

Forward Program Commencement Date

1 August 2022

Forward Program Completion Date

30 June 2025

Annual Review Commencement Date

1 July 2022

Annual Review Completion Date

30 June 2023

I, Hannah Farr, certify that this audit report is a true and accurate record of the compliance status of Mt Arthur Coal for the period 1 July 2022 to 30 June 2023 and that I am authorised to make this statement on behalf of Hunter Valley Energy Coal Pty Ltd.

Note.

The Annual Review is an 'environmental audit' for the purposes of section 122B(2) of the Environmental Planning and

Assessment Act 1979. Section 122E provides that a person must not include false or misleading information (or

provide information for inclusion in) an audit report produced to the Minister in connection with an environmental audit

if the person knows that the information is false or misleading in a material respect. The maximum penalty is, in the

case of a corporation, $1 million and for an individual, $250,000.

The Crimes Act 1900 contains other offences relating to false and misleading information: section 192G (Intention to

defraud by false or misleading statement-maximum penalty 5 years imprisonment); sections 307A, 307B and 307C

(False or misleading applications/information/documents-maximum penalty 2 years imprisonment or $22,000, or

both).

Name of authorised reporting officer

Hannah Farr

Title of authorised reporting officer

Manager HSE - Mt Arthur Coal

Signature of authorised reporting officer

Date

11/09/2023

Page 6 of 128

ANNUAL REVIEW FY23

1 Statement of Compliance

A statement of Mt Arthur Coal's compliance with its project approvals and mining leases is presented in Table 2 with four identified non-compliances during the reporting period being discussed in Table 3.

Table 2: Statement of compliance

Were all conditions of the relevant approval(s) complied with?

PA 09_0062

EPL 11457

EPBC 2011/5866

EPBC 2014/7377

ML

YES

NO

YES

YES

YES

Table 3: Non-compliance summary

Relevant

Condition

Description

Compliance

Comment

Report

approval

Summary

Status

Reference

EPL

O2.6

Missing quarterly

Non-compliant

Written records of required STP quarterly

Section 11

11457

STP records

(Administrative)

inspections misplaced.

EPL

Noise exceedance

Non-compliant

Misalignment between EPL and PA led to

R4.2

noise exceedance in October 2021 not

Section 11

11457

not reported to EPA

(Administrative)

being reported to EPA.

EPL

M2.3

<100% data capture

Non-compliant

Communication error with device sending

Section 11

11457

at Discharge Point 6

(Low)

data to Water NSW and BHP systems.

EPL

M2.3

<100% data capture

Non-compliant

Communication error with device sending

Section 11

11457

at Discharge Point 6

(Low)

data to Water NSW and BHP systems.

<100% data capture

Non-compliant

Monitor servicing; technical issues /

EPL

equipment malfunction; invalid data; and

M2.2

at dust Monitoring

Section 11

11457

(Low)

power outages all contributing to minor

Points

data loss.

Airblast overpressure exceedance of

Blast incident

Non-compliant

120.6 dB was recorded at Sheppard Ave.

EPL11457

L6.3

overpressure

Exceedance was notified to the DPE and

Section 11

(Low)

exceedance

EPA. DPE determined no breach of

approval occurred.

Note: Compliance Status key for Table 3

Risk Level

Colour code

Description

High

Non-compliant

Non-compliance with potential for significant environmental consequences, regardless

of the likelihood of occurrence

Medium

Non-compliant

Non-compliance with:

potential for serious environmental consequences, but is unlikely

to occur; or

potential for moderate environmental consequences, but is likely

to occur

Low

Non-compliant

Non-compliance with:

potential for moderate environmental consequences, but is unlikely to occur; or

potential for low environmental consequences, but is unlikely to occur

Administrative

Non-compliant

Only

to be applied where the non-compliance does not result in any risk of

non-compliance

environmental harm (e.g. submitting a report to government later than required under

approval conditions)

Page 7 of 128

ANNUAL REVIEW FY23

Acronyms

Acronyms

AHMP

Aboriginal Heritage Management Plan

ARA

Annual rapid assessment

BioMP

Biodiversity Management Plan

BMP

Blast Management Plan

CASA

Civil Aviation Safety Authority

CCC

Community Consultative Committee

CCL

Consolidated coal lease

CHPP

Coal handling and preparation plant

CL

Coal lease

CRD

Cumulative rainfall departure

DAWE

Commonwealth Department of Agriculture, Water and the Environment

DoEE

Former Federal Department of the Environment and Energy is now part of DAWE

DPE

NSW Department of Planning and Environment

DRE

Former Division of Resources and Energy

DRG

Former Division of Resources and Geoscience

EA

Environmental assessment

EIS

Environmental impact statement

EL

Exploration licence

EMS

Environmental management system

EPA

NSW Environment Protection Authority

EPBC

Environment Protection and Biodiversity Conservation Act 1999

EPL

Environment Protection Licence

FY

Financial year

GPA

Ground pasture assessment

HRSTS

Hunter River Salinity Trading Scheme

HSE

Health, Safety and Environment

Page 8 of 128

ANNUAL REVIEW FY23

HVEC

Hunter Valley Energy Coal (Mt Arthur Coal)

IROC

Integrated Remote Operations Centre

MAC

Mt Arthur Coal

ML

Mining lease

MOP

Mining Operations Plan

MSC

Muswellbrook Shire Council

NGER

National Greenhouse and Energy Reporting Act 2007

NRAR

Natural Resources Access Regulator

NSW

New South Wales

OEH

NSW Office of Environment and Heritage

PA

Project Approval

RACI

Responsible, accountable, consult and inform

RAW

Rapid assessment walkover

ROM

Run of mine

RR

NSW Resources Regulator

UAV

Unmanned aerial vehicle

VPA

Voluntary Planning Agreement

VWP

Vibrating wire piezometers

Page 9 of 128