Vestas has secured a 18 MW order in Taiwan with Star Energy Corporation for two of their latest wind energy projects. The order includes the supply and supervision of installation of 5 V105-3.45 MW turbines delivered in 3.6 MW Power Optimised Mode. The wind park will be located in Changhua along the west coast of Taiwan, which holds the larger wind energy capacity of any county, municipality or city in Taiwan. The company's High Wind Operation (HWO) will help increase energy production, reduced hysteresis losses and increased grid stability during High Wind condition which is ideal for Taiwan's good wind condition and requirement. The order also includes a 5-year service agreement AOM 4000 including a company Online Business SCADA solution. The company is currently servicing 159 MW of wind turbines in Taiwan including multiband turbines. Turbine installation is expected to commence around the second half of 2019.