Vale S A : ESG Investor Presentation - October 2020
October 08, 2020 at 05:05 pm IST
Share
Vale's ESG agenda
October, 2020
"This presentation may include statements that present Vale's expectations about future events or results. All statements, when based upon expectations about the future and not on historical facts, involve various risks and uncertainties. Vale cannot guarantee that such statements will prove correct. These risks and uncertainties include factors related to the following: (a) the countries where we operate, especially Brazil and Canada; (b) the global economy; (c) the capital markets; (d) the mining and metals prices and their dependence on global industrial production, which is cyclical by nature; and (e) global competition in the markets in which Vale operates. To obtain further information on factors that may lead to results different from those forecast by Vale, please consult the reports Vale files with the U.S. Securities and Exchange Commission (SEC), the Brazilian Comissão de Valores Mobiliários (CVM) and in particular the factors discussed under "Forward-Looking Statements" and "Risk Factors" in Vale's annual report on Form 20-F."
"Cautionary Note to U.S. Investors - The SEC permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We present certain information in this presentation,
including 'measured resources,' 'indicated resources,' 'inferred resources,' 'geologic
resources', which would not be permitted in an SEC filing. These materials are not proven or probable reserves, as defined by the SEC, and we cannot assure you that these materials will be converted into proven or probable reserves, as defined by the SEC. U.S. Investors should consider closely the disclosure in our Annual Report on Form 20-K, which may be obtained from us, from our website or at http://http://us.sec.gov/edgar.shtml."
Disclaimer
Brumadinho reparation
We are progressing with the Integral Reparation Program
Water Security
• Works to guarantee
Completion of
water supply to the
emergency works
Metropolitan region of
Belo Horizonte
and indemnities
Compensation actions
Projects to support the construction of permanent legacy for society
2021- 2024
Social legacy
Economy recovery
Projects to allow income and employment to communities without mining
2025
• Completion of immediate
2021
legal commitments
• Dam safety
2020
4
R$ 11.5 billion1
in reparation measures and dam de-characterization
¹ As of June 2020.
4
Since May/19, the Paraobepa River no longer receives sediments
Hydraulic barrier to contain tailings
5
Tailings containment works were concluded in Jan/2020
Fines retention dike
6
The water drained are pumped into a treatment plant
and returns clean to Paraopeba river
Water treatment plant
7
Construction of a water collection system on the Pará River to
guarantee the municipality's water supply
Pará de Minas pipeline
This is an excerpt of the original content. To continue reading it, access the original document here.
Vale SA published this content on 08 October 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 October 2020 11:34:02 UTC
Vale S.A. is one of the world's leading metallurgy and mining groups. Revenues break down by family of products as follows:
- ferrous minerals and metals (80,2%): ferrous minerals (85.1% of revenues; 254 Mt sold in 2020), ferrous mineral granules (13.2%; 31.2 Mt), iron alloys and manganese (0.7%; 1.4 Mt), and other (1%);
- non-ferrous minerals and metals (17.9%): nickel, precious metals, and cobalt (69.7% of revenues; 211 Kt of nickel sold) and copper (30.3%; 247 Kt);
- coal (1.2%): metallurgical coal (2.9 Mt sold) and thermal coal (3 Mt);
- other (0.7%).
Revenues are distributed geographically as follows: Brazil (7.3%), the United States (2.6%), Americas (1.5%), China (57.8%), Japan (5.5%), Asia (8.2%), Europe (13.3%) and Middle East/Africa/Oceania (3.8%).