Group Ten Metals Inc. announced 2019 drill results from the Camp target area of the Company's Stillwater West PGE-Ni-Cu project in Montana, USA. This is the second in a series of planned news releases to report results of 2019 exploration programs which focused on the advancement of drill-defined mineralization at five priority target areas. Work at the Camp target area in 2019 included three holes drilled by the Company plus re-assaying of past core to obtain and support platinum group element "PGE" and base metal values on an additional five drill holes. Subsequent news releases will report results from re-assaying of past core at additional priority target areas, ongoing modelling work, and mapping and sampling programs completed in 2019 . 399 meters of 0.25% Total Nickel Equivalent ("TotNiEq"), in drill hole CZ-2019-01, starting at surface and mineralized across the entire drill hole featuring multiple zones of strong PGE-Ni-Cu-Co mineralization including: 62 meters of 0.61% TotNiEq starting from 117 meters depth comprising 0.57 g/t 3E (0.18 g/t Pt, 0.34 g/t Pd, 0.05 g/t Au), 0.30% Ni, 0.13% Cu, 0.025% Co; 3.5 meters of 3.07% TotNiEq starting from 163 meters depth comprising 3.45 g/t 3E (1.76 g/t Pt, 1.44g/t Pd, 0.25 g/t Au), 1.53% Ni, 0.49% Cu, and 0.099% Co; and 6.7 meters of 1.22% TotNiEq starting from 219 meters depth comprising 2.32 g/t 3E (0.70 g/t Pt, 1.38g/t Pd, 0.24 g/t Au), 0.31% Ni, 0.34% Cu, and 0.013% Co. Drill hole IM-2008-01, first assayed for base metals by Group Ten in 2019, returned 119 meters of 0.32% TotNiEq starting from 3.05 meters depth and including: 55 meters of 0.56% TotNiEq starting at 7 meters depth comprising 0.59 g/t 3E (0.16 g/t Pt, 0.28 g/t Pd, 0.16 g/t Au), 0.26% Ni, 0.09% Cu, 0.021% Co; 17.1 meters of 0.67% TotNiEq starting at 7.6 meters depth comprising 0.53 g/t 3E (0.16 g/t Pt, 0.23 g/t Pd, 0.14 g/t Au), 0.35% Ni, 0.14% Cu, 0.027% Co; and 11.6 meters of 0.76% TotNiEq starting at 31.4 meters depth comprising 0.80 g/t 3E (0.21 g/t Pt, 0.30 g/t Pd, 0.29 g/t Au), 0.38% Ni, 0.10% Cu, 0.024% Co. Drill hole CZ04-01, drilled in 2004 and re-logged and partially re-assayed by Group Ten in 2019, returned 106 meters of 0.40% TotNiEq, starting at 44.1 meters depth and including: 76 meters of 0.47% TotNiEq starting from 74 meters depth comprising 0.39 g/t 3E (0.11 g/t Pt, 0.23 g/t Pd, 0.05 g/t Au), 0.22% Ni, 0.14% Cu, 0.021% Co; and 22.6 meters of 0.81% TotNiEq starting from 93.9 meters depth comprising 0.64 g/t 3E (0.16 g/t Pt, 0.39 g/t Pd, 0.08 g/t Au), 0.40% Ni, 0.22% Cu, and 0.032% Co. The results support that the geophysical (conductive high) in the Camp target area is targeting large bodies of disseminated nickel and copper sulphides that are enriched in palladium, platinum, gold, and cobalt. Rhodium assays are in progress with results pending. The core of this geophysical anomaly has not been systematically drill tested to date, and is one of eight multi-kilometer-scale target areas defined by Group Ten at Stillwater West.