Red Sky Energy announced that the fraccing by Santos Limited at Yarrow 3 Well which commenced on November 18, 2022 was executed as per plan and has now been completed. Post-frac flowback indicates stable rate of approximately 5.0 MMscf/d at WHP of 790psi on 36/64" choke. Santos has informed Red Sky that post-fraccing, the forward plan includes running a Memory Production Logging Tool (MPLT) to assess relative contribution from the two zones, followed by analysis of pressure data to better assess volumes.