Ora Gold Limited announced excellent results from the latest reverse circulation drilling program at the Abbotts Gold Project (M51/390). The wholly-owned Abbotts Gold Project is located at the north end of the Ora Gold tenements north of Meekatharra, Western Australia. The latest drilling program consisted of twenty-eight short reverse circulation holes totaling 1,987m over the South New Murchison King, South Abbotts, South-West Abbotts and North Vranizan prospects with the better intersections as follows: 4m @ 7.32g/t Au from 42m in OGGRC289, including 1m @ 21.6g/t Au from 42m. 17m @ 2.81g/t Au from 18m in OGGRC295, including 1m @ 33.09g/t Au from 19m. 10m @ 4.9g/t Au from 68m in OGGRC303, including 2m @ 18.2g/t Au from 72m. 4m @ 3.85g/t Au from 41m in OGGRC310. 8m @ 5.42g/t Au from 36m in OGGRC314, including 3m @ 11.52g/t Au from 37m and 16m @ 1.93g/t Au from 46m including 2m @ 8.95g/t Au from 48m. The high-grade gold mineralisation at Abbotts, which together with the near-development Crown Prince Gold Project and the emerging Lydia Gold Project, adds to the high-grade gold endowment of Ora Gold's extensive Abbotts Greenstone Belt tenements - an emerging "gold province" yet to reveal its full potential. The program was designed to intersect mineralised cross-structures, which have only been recently mapped and are interpreted to carry a large proportion of the near-surface gold mineralisation in the Abbotts Gold Project system. The project is located about 37km north-north-west of the regional centre of Meekatharra and is alongside the well-maintained gravel Mt Clere Road. The program's drill hole siting was directed by recent mapping and interpretation of the Riedel shear cross-structures and the program has defined new and extensive mineralised structures linking the major northerly-striking mineralised Eastern and Western Shears. High-grade gold mineralisation was intersected within areas less tested by previous explorers with interpreted zones of mineralisation in the cross-structures being some hundreds of metres in strike length. No additional drilling was undertaken on the mineralised Eastern Shear. Further infill and deeper drilling is required to delineate resources in the new mineralised structures. The Abbotts Gold Project is on M51/390, which was granted in 1991 prior to the enactment of the Native Title Act 1993 (Act), and as such does not carry obligations under the Act.