NORTEC MINERALS CORP. announced drilling at the Kietyönmäki Lithium Project in Finland for which United Lithium Corp. ("ULTH") is the project operator.

Highlights Reported by United Lithium Corp. Diamond drilling commenced in September 2022; A 10-hole program is planned with holes averaging 100 meters in length. The program is designed to confirm the current geological knowledge of the project.

The objective of the program is to provide sufficient information to model a mineralized body exceeding 500,000 tonnes with grades greater than 1% Li2O. A bedrock surface sampling program of 250 sample points is also to be conducted. Project expansion: an additional 535 hectares have been added to the Kietyönmäki Lithium project, bringing the total land area to 900 hectares.