Miramar Resources Limited provided an update on exploration activities at its 80% owned Gidji JV Project ("Gidji" or the "Project") located 15km north of Kalgoorlie in the Eastern Goldfields region of Western Australia. Re-examination of historical data, in particular historical auger data, has identified a 1km long auger Au anomaly parallel to the Marylebone and newly outlined Blackfriars targets (Figure 1). The main part of the newly identified "Highway" target has not been tested by historical or recent drilling however two historic aircore holes at the western and northern edges of the target (PKAC527 and PKAC034 respectively) both intersected 4m @ >0.5g/t Au.

In addition, a number of aircore holes completed by Miramar at the southern end of the target, testing the Piccadilly target, increase in grade in a north westerly direction towards the main part of the auger anomaly. The Company advises that it is currently awaiting results from the Phase 5 aircore drilling program completed in late 2021 and is planning a substantial exploration programme at Gidji during 2022 includ. RC bedrock testing of the Marylebone target in the first quarter of 2022.

Extending the detailed ground magnetic survey over the northern Boorara Shear Zone. Aircore (+/- RC) drilling of various targets (Figure 2) including: Blackfriars (infill), Highway, Boorara North, Boorara South. Refining "The Jog" target for RC and/or diamond drill testing.