Madhav Infra Projects Limited received of letter of acceptance for construction of Railway Over Bridge in lieu of Level Crossing No. 25 in Km 1050/1-2 of Bina- Katni section between Sagar Bus Stand to Sadar Bazar Road Near Dimple Petrol Pump in Sagar City Distt. Sagar (M.P.) from Office of the Executive Engineer, Public Work Department, Bridge Construction Division SAGAR (M.P).

Significant Terms and Conditions of contract of Contract: All Concrete Construction work is required to be done using: Fully computerized RMC plant of adequate capacity; Mechanical arrangement for carrying out construction. The firm shall have to make adequate arrangement for proper regulation of traffic so that no traffic due to construction activity at least for 15 days and shall make adequate arrangements for uninterrupted movement of traffic during the progress of work for which no extra shall be payable. The list of key equipment and key personnel provided in the document is indicative.

However, the firm shall provide additional manpower and machineries to complete the work the stipulated time frame in accordance with relevant specifications. Nature of Contract: Item Rate Contract. The period by which the contract is to be executed: 28 months.

Broad Consideration of the contract: INR 207,473,044.