Kesselrun Resources Ltd. provided the following drilling results on its Huronian Gold Project. Drilling of the McKellar zone continues to expand the footprint of the zone along strike and at depth as well as continuing to follow up with infill drilling. The zone is now well defined for nearly 600 metres of strike length and to a down dip depth of 150 metres.

Drilling to the west has shown the potential for at least another 200 metres of extension. 2022 drilling will aim at proving up that potential at a minimum as well as further extending the zone down dip. The 2021 Huronian drill program was completed with approximately 19,750 metres drilled of which the results from approximately 15,750 metres of drilling have been released.

2022 Huronian Exploration Program The 2022 Huronian exploration program will consist of drilling as well as geophysics over selected target areas. Drilling will be targeting the Fisher, Fisher North, McKellar and Huronian zones, all in close proximity along an approximate 1500 m strike length in the area of the historic Huronian Mine. As well, the geology on strike to the southwest of Goldshore Resources' Moss Lake deposit will be targeted.

A 2nd drill rig is currently in the process of being procured for the increased drilling activity anticipated in 2022.