The plaintiffs have said the plants' anti-disaster measures do not take into consideration the possibility of major earthquakes despite the presence of active faults, while the operator, Hokkaido Electric Power, has denied the existence of active faults, according to NHK.

(Reporting by Makiko Yamazaki; Editing by Kim Coghill)