Golden Goliath Resources announced that the preparatory work for the preliminary drilling has been completed on its 100% owned Wish Ore project, located 12 km from the Trans-Canada Highway north of Sault Ste Marie, Ontario. The drill and crew arrive on site. The purpose of this program is to do a preliminary drill test of the known showings to get a better understanding of the mineralization, geology, structure, and alteration associated with the known gold values. The access and drill pads have been prepared. As company continue to refine the preliminary drill program the project will now consist of 4 drill holes totaling approximately 600m. The program will target the two main showings on the property and IP chargeability with coincident gold geochemical anomalies near the showings. Target 1 will focus on the New Zone trench that returned channel sample results of 4.28 gpt gold over 3 meters, including 1 meter of 9.05 gpt gold within a larger area of anomalous gold results. Target 2 ~130 meters to the north, will target an IP chargeability anomaly which is coincident with anomalous gold, arsenic, and copper in soil. Target 3 will focus on the Trench Zone, a broad area of quartz carbonate alteration with anomalous gold values of up to 0.5 gpt over 2 meters. Target 4 ~120 meters north of the trench zone, will focus on an IP chargeability anomaly with coincident gold in soil anomalies. Permitting is presently underway to allow for a potential winter geophysics program to better refine the possible source of the mineralized boulders along the trend north of
Crack Mouse Lake.