Bounty Oil & Gas NL reported a successful start to the 2020 oil appraisal program at the Naccowlah Block, SW Queensland. Jarrar 6 was designed to test for a northerly extension of the producing zones in the Jarrar Field within the Naccowlah Block. The well was spudded on 16 January 2020 and completed on 23 January 2020. The well encountered good oil shows in the Birkhead Formation with logging indicating net oil pay. After logging the well was cased and suspended as a potential Birkhead producer. Jarrar 6 was a vertical (J shaped) development well drilled to a total depth of 1890 metres MDRT designed to test for and further appraise the Birkhead oil zone. The well was drilled with the Ensign 967 rig. Jarrar 6 is located in Jarrar Field; PL 77 approximately 18 km southwest of the Jackson Oil Facility.