Statement 1087 Compliance Assessment Report

BHP NICKEL WEST

Mt Keith Satellite

Statement 1087

Compliance

Assessment

Report

BHP Nickel West

29 March 2022

1

Statement 1087 Compliance Assessment Report

BHP NICKEL WEST

Contents

Document Amendment Record

3

Endorsement

3

Executive Summary

4

1.

Introduction

5

2.

Purpose and Scope

5

3.

Project and Status

6

4.

Statement of Compliance

6

5.

Proposed Changes to the Compliance Assessment

Plan

13

6.

References

14

Appendix 1 - Statement of Compliance

16

Appendix 2 - MKS Water Meter Readings - Abstraction17

Appendix 3

- Stantec (2022) Mt Keith Satellite 2021 Flora

and Vegetation Monitoring Report

19

Appendix 4

- Astron (2022) Mt Keith Vegetation Remote

Sensing Analysis 2021

20

Appendix 5

- Hydrological Processes EMP

21

Appendix 6

- Mt Keith Satellite Mine Closure Plan 201924

2

Statement 1087 Compliance Assessment Report

BHP NICKEL WEST

Document Amendment Record

Version

Page No.

Version

Key Changes

Date

Description

1

-

Draft for Internal

-

22 March 2022

Review (BHP Nickel

West HSEC)

2

-

Draft for BHP

-

29 March 2022

Approval (BHP

Nickel West HSEC)

0

-

Final for BHP issue

-

29 March 2022

to EPA (BHP Nickel

West HSEC)

Endorsement

I have reviewed this Compliance Assessment Report prepared to meet the requirements of Condition 4-6 of the Statement 1087 approval for the Mt Keith Satellite Project, and accept that the information provided is an accurate account of the activities undertaken during the reporting period.

Michael Moscarda

A / General Manager Northern Operations

BHP Nickel West Pty Ltd

3

Statement 1087 Compliance Assessment Report

BHP NICKEL WEST

Executive Summary

BHP Billiton Nickel West Pty Ltd (BHP Nickel West) was granted environmental approval of the Mt Keith Satellite Project (the 'Project') in December 2018 by the Western Australian Minister for Environment in accordance with Section 45(5) of the Environmental Protection Act 1986 (WA).

Works on the Project commenced in February 2019, which to date have included the clearing and establishment of the initial operating areas (Haul Road, Mine Pits, Waste Rock Landform and Mine Ore Pad) and the commencement of productive mining of ore from both the Six Mile Well Mine Pit and the Goliath Mine Pit. Implementation of the Project is currently expected to continue until approximately 2030+.

Condition 4-6 of the Statement 1087 approval requires BHP Nickel West to submit an annual Compliance Assessment Report which outlines the status of implementation of the Project and compliance with the approval conditions. This Report outlines the implementation status and compliance for the Project covering the period of 28 December 2020 to 31 December 2021. BHP Nickel West was in compliance with all conditions of the Statement 1087 approval during the reporting period.

4

Statement 1087 Compliance Assessment Report

BHP NICKEL WEST

1. Introduction

The Mt Keith Satellite Project (the 'Project') is for a satellite mining operation as an extension to the existing Mt Keith Nickel Mine1. The Project comprises two Mine Pits, a Waste Rock Landform, Support Infrastructure and a Haul Road, requiring the clearing of up to 1,069 hectares (ha) of native vegetation within a Development Envelope of 1,265 ha, as identified by Figure 1 Project Area.

BHP Billiton Nickel West Pty Ltd (BHP Nickel West) referred the Project to the Environmental Protection Authority (EPA) in May 2017 in accordance with Section 38 of the Environmental Protection Act 1986 (WA)

(BHP Nickel West 2017). The EPA (2017) determined the Project required an environmental assessment, with the key assessment factors including 'Flora and Vegetation', 'Inland Waters', 'Social Surroundings' (Aboriginal Heritage) and 'Air Quality'. An 'Environmental Review' document (Environmental Impact Assessment) assessing the potential environmental effects of the Project was additionally prepared to assist the EPA assessment (BHP Nickel West 2018a).

The EPA (2018) assessment concluded the Project could be implemented subject to recommended conditions to ensure the potential environmental effects of the Project were appropriately managed. Following the advice of the EPA (2018), the Project was subsequently approved by the WA Minister for Environment (2018) through the Statement 1087 approval granted in accordance with Section 45(5) of the Environmental Protection Act 1986 (WA).

Implementation of the Project commenced in February 2019, which to date has included the clearing and establishment of the initial operating areas (Haul Road, Mine Pits, Waste Rock Landform and Mine Ore Pad) and the continuation of productive ore mining from both the Six Mile Well Mine Pit and the Goliath Mine Pit.

Implementation of the Project is expected to occur over a period of 10+ years, with the cessation of mining (and the commencement of mine closure) estimated to occur from approximately 2030+.

2. Purpose and Scope

Condition 4-6 of the Statement 1087 approvals requires the submission of an annual Compliance Assessment Report (CAR) document, which outlines the status of implementation of the Project and compliance with the approval conditions.

This CAR outlines the implementation and compliance status of the Project for the period of 28 December 2020 to 31 December 2021, and aligns with the requirements of the approved Compliance Assessment Plan

(BHP Nickel West 2020a) under Condition 4-1 of the Statement 1087 approval.

This CAR document is the third CAR document to be submitted for the Project under the Statement 1087 approval, following from the CAR documents submitted in 2020 and 2021 (BHP Nickel West 2020b and BHP Nickel West 2021c).

1 Note: The Mt Keith Nickel Mine commenced operations in 1993. The existing components of the Mt Keith Nickel Mine do not form part of the approved Project, and accordingly, are not addressed within this CAR document.

5

Statement 1087 Compliance Assessment Report

BHP NICKEL WEST

3. Project and Status

BHP Nickel West commenced implementation of the Project in February 2019. To date, implementation of the Project has included:

  • Clearing and establishment of the initial operating areas (Haul Road, Mine Pits, Waste Rock Landform and Run of Mine Pad); and
  • Continuation of productive mining of ore from both the Six Mile Well Mine Pit and commencement of mining from the Goliath Mine Pit.
  • Ore supplied from the Project is now the primary product processed at the Mt Keith Nickel Mine.

Implementation of the Project is expected to occur over a period of 10+ years, with the cessation of mining (and the commencement of mine closure) estimated to occur from approximately 2030+.

4. Statement of Compliance

A completed Audit Table (consistent with the approved Compliance Assessment Plan (BHP Nickel West 2020a)) is provided below to outline compliance with the conditions of the Statement 1087 approval. The Audit Table verifies that BHP Nickel West was in compliance with all conditions of the Statement 1087 approval during the reporting period. Refer to Table 1 Mt Keith Satellite Operations Audit Table.

A completed and signed Statement of Compliance form (prepared using the DWER (2018) form 'PAF2 - Statement of Compliance - 2018') is provided at Appendix 1.

6

BHP NICKEL WEST

Statement 1087 Compliance Assessment Report

AUDIT TABLE

Mt Keith Satellite Project, Statement No.1087

  • Phases that apply in this table = Pre-Construction, Construction, Operation, Decommissioning, Overall (several phases).
  • This audit table is a summary and timetable of conditions and commitments applying to this project. Refer to the Minister's Statement for full detail/precise wording of individual elements.
  • Code prefixes: M = Implementation condition; P = Proponent's commitment; N = Procedure.
  • Compliance status: C = Compliant, CLD = Completed, NC = Non-compliant, NR = Not required at this stage. Please note terms NA = Not Audited and VR = Verification Required are only for EPA use. IP = In Process may only be used by the proponent in circumstances outlined in Section 2.8 of the Post Assessment Guideline for Preparing an Audit Table.

Table 1: Mt Keith Satellite Operation Audit Table (28 December 2020 to 31 December 2021).

AUDIT

SUBJECT

REQUIREMENT

HOW

EVIDENCE

PHASE

TIMEFRAME

STATUS

FURTHER INFORMATION

CODE

1087:M1.1

Proposal

When implementing the proposal, the

Implement the Project

Compliance

Overall

For the life of the

COMPLIANT

Table 2 of Schedule 1 of the Statement 1087 approval, as amended by

Implementation

proponent shall not exceed the authorised

in accordance with

Assessment Reports.

Proposal.

Attachment 1 to the Statement 1087 approval under s45C in

extent of the proposal as defined in Table

criteria outlined in

September 2020, authorises the clearing of up to 1,069 hectares (ha) of

2 of Schedule 1, unless amendments to

Schedule 1.

native vegetation within a 1,265 ha Development Envelope. As of 31st

the proposal and the authorised extent of

December 2021, a total of 805.3 ha of native vegetation has been

the proposal have been approved under

cleared within the Development Envelope; being within the total 1,069 ha

the EP Act.

authorised limit. No clearing of native vegetation beyond the

Development Envelope has been undertaken for the Project. The area

of native vegetation clearing undertaken to date, and the extent of the

approved Development Envelope, is identified at Figure 2.

Table 2 of Schedule 1 of the Statement 1087 approval authorises

groundwater abstraction (mine pit dewatering) of up to 0.4 gigalitres (GL)

per year (y) using bores and pit sumps. A total of 0.206 GL (206,173

kilolitres (kL)) of groundwater was abstracted between 1st January 2021

and 31st December 2021; being within the 0.4 GL/y authorised limit.

Groundwater abstractions records to verify the mine pit dewatering

volumes from each bore/sump is provided in Appendix 2.

1087:M2.1

Contact Details

The proponent shall notify the CEO of any

Notify the CEO of any

Written notification to

Overall

Within 28 days of such

NOT REQUIRED

No change to the Proponent name, physical address or postal address

change of its name, physical address or

change in proponent

the CEO of any

change.

has occurred during the reporting period, and accordingly, no notification

postal address for the serving of notices

details.

change in proponent

to the DWER CEO has been required.

or other correspondence within twenty-

details.

eight (28) days of such change. Where

the proponent is a corporation or an

association of persons, whether

incorporated or not, the postal address is

that of the principal place of business or of

the principal office in the State.

1087:M3.1

Time Limit for

The proponent shall not commence

Notify the CEO

Written notification to

Overall

After 28 December

COMPLETED

Implementation of the Project commenced in February 2019 with the

Proposal

implementation of the proposal after five

advising proposal has

the CEO.

2023.

construction and operation of the Project. Implementation of the Project

Implementation

(5) years from the date on this Statement,

not commenced

is considered to be 'substantial'. Compliance with Condition 3-1 is now

and any commencement, prior to this

implementation.

completed.

date, must be substantial.

1087:M3.2

Time Limit for

Any commencement of implementation of

N/A.

Compliance

Overall

Within 5 years from

COMPLETED

Implementation of the Project commenced in February 2019 with the

Proposal

the proposal, on or before five (5) years

Assessment Reports.

the date of Statement

construction and operation of the Project. Implementation of the Project

Implementation

from the date of this Statement, must be

1087, being on or

is considered to be 'substantial'. Written evidence demonstrating

demonstrated as substantial by providing

before 28 December

compliance was confirmed in the DWER Compliance Audit Report in

the CEO with written evidence, on or

2023.

May 2020. Compliance with Condition 3-2 is now completed.

before the expiration of five (5) years from

the date of this Statement.

1087:M4.1

Compliance

The proponent shall prepare, and

Submit Compliance

Compliance

Pre-construction

At least six (6) months

COMPLIANT

A Compliance Assessment Plan (CAP) document

Reporting

maintain a Compliance Assessment Plan

Assessment Plan to

Assessment Plan (this

prior to the first

(BHP Nickel West 2019a) was initially submitted to the DWER CEO in

which is submitted to the CEO at least six

the CEO.

document).

Compliance

September 2019, with the DWER CEO granting initial approval of

(6) months prior to the first Compliance

Assessment Report

the CAP document in October 2019.

Assessment Report required by condition

required by condition

4-6, or prior to implementation of the

4-6, or prior to

The current version of the CAP document (Revision 2,

proposal, whichever is sooner.

implementation of the

BHP Nickel West 2020a) was approved by the DWER CEO in

October 2020 (DWER 2020b).

March 2022

7

BHP NICKEL WEST

Statement 1087 Compliance Assessment Report

AUDIT

SUBJECT

REQUIREMENT

HOW

EVIDENCE

PHASE

TIMEFRAME

STATUS

FURTHER INFORMATION

CODE

proposal, whichever is

sooner.

BHP Nickel West will continue to review and maintain the CAP

document, as required from time to time, to ensure ongoing compliance

with Condition 4-1.

1087:M4.2

Compliance

The Compliance Assessment Plan shall

Submit Compliance

Compliance

Pre-construction

At least six (6) months

COMPLIANT

A Compliance Assessment Plan (CAP) document

Reporting

indicate:

Assessment Plan to

Assessment Plan (this

prior to the first

(BHP Nickel West 2019a) was initially submitted to the DWER CEO in

(1) the frequency of compliance reporting;

the CEO.

document).

Compliance

September 2019, with the DWER CEO granting initial approval of

(2) the approach and timing of compliance

Assessment Report

the CAP document in October 2019.

assessments;

required by condition

(3) the retention of compliance

4-6, or prior to

The current version of the CAP document (Revision 2,

assessments;

implementation of the

BHP Nickel West 2020a) was approved by the DWER CEO in

(4) the method of reporting of potential

proposal, whichever is

October 2020 (DWER 2020b).

non-compliances and corrective actions

sooner.

taken;

In accordance with Condition 4-2, the approved CAP document

(5) the table of contents of Compliance

identifies:

Assessment Reports; and

frequency of compliance reporting;

(6) public availability of Compliance

approach and timing of compliance assessments;

Assessment Reports.

retention of compliance assessments;

method of reporting of potential non-compliances and corrective

actions taken;

table of contents of Compliance Assessment Reports; and

public availability of Compliance Assessment Reports.

BHP Nickel West remains in compliance with the requirements of

Condition 4-2.

1087:M4.3

Compliance

After receiving notice in writing from the

Implementation of

Notice in writing from

Overall

Ongoing as per

COMPLIANT

This Compliance Assessment Report (CAR) document submitted to

Reporting

CEO that the Compliance Assessment

Compliance

the CEO and

requirements of CAP.

DWER in 2021 provides an assessment of compliance with the

Plan satisfies the requirements of

Assessment Plan.

Compliance

conditions of the Statement 1087 approval consistent with the approved

condition 4-2 the proponent shall assess

Assessment Reports.

CAP document. Annual submission of this CAR document ensures that

compliance with conditions in accordance

BHP Nickel West remains in compliance with the requirements

with the Compliance Assessment Plan

of Condition 4-2.

required by condition 4-1.

1087:M4.4

Compliance

The proponent shall retain reports of all

Retain records in

Written response to

Overall

When requested by

COMPLIANT

Submitted CAR documents will be retained by BHP Nickel West for the

Reporting

compliance assessments described in the

accordance with

request by CEO.

CEO.

duration of the Project in accordance with standard document control

Compliance Assessment Plan required by

Compliance

practices, as outlined within the approved CAP document.

condition 4-1 and shall make those

Assessment Plan.

reports available when requested by the

No requests were received from the DWER CEO during the reporting

CEO.

period to make additional copies of the submitted CAR documents

available.

1087:M4.5

Compliance

The proponent shall advise the CEO of

Notification of the

Written

Overall

Within 7 days of the

COMPLIANT

Nil potential non-compliance items were identified, or required reporting

Reporting

any potential non-compliance within

CEO via an email to

correspondence to

potential non-

to DWER, during the reporting period.

seven (7) days of that non-compliance

compliance@dwer.wa.

CEO.

compliance being

being known.

gov.au

known.

BHP Nickel West has not been required to provide advice to the DWER

which will include any

CEO of any potential non-compliance during the reporting period.

corrective actions

taken to address the

potential non-

compliance.

1087:M4.6.1

Compliance

The proponent shall submit to the CEO

Submit Compliance

Compliance

Overall

The first report to be

COMPLIANT

The first CAR document (BHP Nickel West 2020b) was submitted to the

Reporting

the first Compliance Assessment Report

Assessment to the

Assessment Reports.

submitted by 28

DWER CEO in March 2020 addressing compliance with the conditions

fifteen (15) months from the date of issue

CEO.

March 2020 and from

for the first 12 month period following the granting of the Statement 1087

of this Statement addressing the twelve

then on annual by 28

approval. This CAR document presents the third report addressing

(12) month period from the date of issue

March each year.

compliance with the conditions of the Statement 1087 approval.

of this Statement and then annually from

the date of submission of the first

As outlined in Section 5 Proposed Changes to the Compliance

Compliance Assessment Report, or as

Assessment Plan, in 2020 BHP Nickel West proposed that future CAR

otherwise agreed in writing by the CEO.

documents cover the financial year period 1 July to 30 June, with

March 2022

8

BHP NICKEL WEST

Statement 1087 Compliance Assessment Report

AUDIT

SUBJECT

REQUIREMENT

HOW

EVIDENCE

PHASE

TIMEFRAME

STATUS

FURTHER INFORMATION

CODE

submission by 30 October (to align to other standard Government

financial year reporting requirements). The request for agreement of the

DWER CEO for this change was provided as part of the 2020 CAR

submission (Section 5). No response from the DWER CEO has been

received to this request. In the absence of a response BHP Nickel West

continues to comply with a March submission date for the CAR

1087:M4.6.2

Compliance

The Compliance Assessment Report

Compliance

Compliance

Overall

The first report to be

COMPLIANT

This CAR complies with reporting requirements, specifically:

Reporting

shall:

Assessment Report

Assessment Reports.

submitted by 28

1. Endorsement by the General Manager of BHP Nickel West, as an

(1) be endorsed by the proponent's Chief

developed in

March 2020 and from

authorised delegate of the CEO of BHP Nickel West.

Executive Officer or a person delegated to

accordance with the

then on annual by 28

sign on the Chief Executive Officer's

approved Compliance

March each year.

2. BHP Nickel West has complied with all conditions of the

behalf;

Assessment Plan.

Statement 1087 approval during the reporting period. Statements to

(2) include a statement as to whether the

this effect are included within this CAR document.

proponent has complied with the

conditions;

3. Nil potential non-compliances with the conditions of the

(3) identify all potential non-compliances

Statement 1087 approval occurred during the reporting period.

and describe corrective and preventative

Accordingly, no corrective or preventative actions have been

actions taken;

required to address potential non-compliances.

(4) be made publicly available in

accordance with the approved

4. Following approval of this CAR document by the DWER CEO, this

Compliance

CAR document will be made publicly available through the

Assessment Plan; and

BHP Nickel West website as outlined by the approved CAP report

(5) indicate any proposed changes to the

(refer to https://www.bhp.com/sustainability/environment/regulatory-

Compliance Assessment Plan required by

information/).

condition 4-1.

5. Proposed changes to the CAP document are outlined in

Section 5 Proposed Changes to the Compliance Assessment Plan.

1087:M5.1

Public Availability

Subject to condition 5-2, within a

To be determined in

Written advice from

Overall

To be determined in

COMPLIANT

Environmental data, management plans and reports relevant to the EPA

of Data

reasonable time period approved by the

consultation with

CEO confirming

consultation with the

assessment of the Project are publicly available through the EPA

CEO of the issue of this Statement and for

CEO.

manner approved.

CEO.

website (refer tohttps://www.epa.wa.gov.au/proposals/mt-keith-satellite-

the remainder of the life of the proposal

project). This public availability of the Project assessment information is

the proponent shall make publicly

considered to be appropriate, with further actions for the public

available, in a manner approved by the

availability of the assessment information by BHP Nickel West not

CEO, all validated environmental data

considered to be considered necessary.

(including sampling design, sampling

methodologies, empirical data and

Environmental data, management plans and reports relevant to the

derived information products (e.g. maps))

implementation of the Statement 1087 approval are publicly available

management plans and reports relevant

through the BHP website (refer to

to the assessment of this proposal and

https://www.bhp.com/sustainability/environment/regulatory-information/).

implementation of this Statement.

To date, this publicly available information includes:

Flora and Vegetation Environmental Management Plan (EMP) Rec

0.2 (BHP Nickel West 2019);

Compliance Assessment Plan (BHP Nickel West 2020a);

Compliance Assessment Report 2019 (BHP Nickel West 2020b)

and

Compliance Assessment report 2020.

Following approval by the DWER CEO, this CAR document will

additionally be made publicly available through the BHP website.

To note, the DWER CEO has not provided written advice to

BHP Nickel West on the approved manner or the timing for the public

availability of information required under Condition 5-1 of the

Statement 1087 approval. BHP Nickel West consider the above actions

for public availability to meet the intent of Condition 5-1 and the

objectives of the DWER CEO for the public availability of environmental

data, management plans and reports.

1087:M5.2

Public Availability

If any data referred to in condition 5-1

Proponent request to

Notice in writing to

Overall

As required from time

NOT REQUIRED

No requests were made by BHP Nickel West to the CEO DWER to not

of Data

contains particulars of:

CEO to not make

CEO notifying of any

to time.

make environmental data publicly available during the reporting period.

March 2022

9

BHP NICKEL WEST

Statement 1087 Compliance Assessment Report

AUDIT

SUBJECT

REQUIREMENT

HOW

EVIDENCE

PHASE

TIMEFRAME

STATUS

FURTHER INFORMATION

CODE

(1) a secret formula or process; or

certain data publicly

information not to be

(2) confidential commercially sensitive

available, including

made publicly

Consistent with standard practices, BHP Nickel West will seek to ensure

information; the proponent may submit a

explanation and

available.

public availability of all environmental data which relates to the

request for approval from the CEO to not

reason why.

implementation of, and compliance with, the Statement 1087 approval.

make these data publicly available. In

making such a request the proponent

shall provide the CEO with an explanation

and reasons why the data should not be

made publicly available.

1087:M6.1

Flora and

The proponent shall implement the

Implement the

MKS FVEMP.

Overall

The first report to be

COMPLIANT

BHP Nickel West has implemented the Project to avoid and minimise,

Vegetation

proposal to meet the following

proposal in

submitted by 28

where possible, indirect effects to DBCA-classified 'priority' flora taxa,

Management Plan

environmental objective:

accordance with the

Compliance

March 2020 and from

the Violet Range 'priority' ecological community and the adjacent

(1) Avoid, where possible, and minimise

Flora and Vegetation

Assessment Reports.

then on annual by 28

'Class A' Wanjarri Nature Reserve. The avoidance / minimisation

indirect impacts as far as practicable to

Environmental

March each year.

measures have been implemented through the Flora and Vegetation

Priority flora, the Violet Range PEC and

Management Plan

EMP (BHP Nickel West 2019b) (as described below under

the Wanjarri Nature Reserve.

(FVEMP).

Condition 6-3).

1087:M6.2

Flora and

In order to meet the requirements of

Implement the

MKS FVEMP

Overall

Throughout the life of

NOT REQUIRED

The Flora and Vegetation EMP dated December 2019 (Revision 0.2)

Vegetation

condition 6-1, the proponent shall

proposal in

the Project.

was prepared in accordance with Condition 6-3 (below). Accordingly,

Management Plan

implement the Flora and Vegetation

accordance with the

Compliance

implementation of the previous revision of the Flora and Vegetation EMP

Environmental Management Plan

FVEMP.

Assessment Reports.

Annual compliance

under Condition 6-2 is no longer required, with implementation of the

(Version 0, September 2018).

assessment reporting

revised/approved Flora and Vegetation EMP to be regulated in

commencing 28

accordance with Condition 6-3 (as addressed below).

March 2020.

1087:M6.3

Flora and

The proponent shall implement the most

Implement the current

Written notice from

Overall

Throughout the life of

COMPLIANT

The current revision of the Flora and Vegetation EMP (BHP Nickel

Vegetation

recent version of the Flora and Vegetation

and most recent

CEO confirming the

the Project.

West 2019b, Revision 0.2) was approved by the DWER CEO in

Management Plan

Environmental Management Plan which

version of the FVEMP.

FVEMP addresses

February 2021 (DWER 2021).

the CEO has confirmed by notice in

condition 6-1, on

Annual compliance

writing, addresses the requirements of

advice from DBCA.

assessment reporting

Consistent with the approved Flora and Vegetation EMP, the

condition 6-1, on advice of the

commencing 28

environmental management actions implemented to minimise the direct

Department of Biodiversity, Conservation

Compliance

March 2020.

and potential indirect effects of the Project to flora and vegetation values

and Attractions.

Assessment Reports

has included:

Implementation of the Environmental Heritage Impact Assessment

process (internal process) prior to land disturbance (control of

direct effects).

Environmental monitoring within pre-defined quadrats for:

o DBCA-classified 'priority' native flora taxa (tagged individuals);

o vegetation communities; and

o introduced flora taxa (weeds)

at defined monitoring sites located in close proximity to Project and

distant from the Project (control sites).

Hygiene inspections of equipment and vehicles to minimise the risk

of introduction of introduced flora taxa (weeds), with targeted spray

control for any identified infestations.

The key environmental outcomes from the implementation of the

management actions in the Flora and Vegetation EMP has notably

included:

All clearing of native vegetation for the Project has occurred within

the authorised Development Envelope (spatial area), and within the

total authorised clearing limit (area in hectares);

Maintenance of plant health condition of tagged DBCA-classified

'priority' flora taxa adjacent to the Project (compared to control

sites);

No measurable effect to vegetation condition in proximity to the

Project (including for the Violet Range 'priority' ecological

community and the adjacent 'Class A' Wanjarri Nature Reserve),

with no measured exceedance of trigger criteria or threshold

criteria; and

March 2022

10