Antofagasta plc provided Group production guidance for 2023. For the period, the company is expected to be 670-710,000 tonnes of copper (as previously announced), 220-240,000 ounces of gold and 10-11,500 tonnes of molybdenum. Copper guidance reflects that the Los Pelambres desalination and concentrator plants will be in production during the second quarter of the year partly offset by lower grades at Centinela Cathodes.

Gold and molybdenum guidance reflects the higher grades and recoveries expected at Centinela Concentrates.