Quarterly Report for December 2021

Highlights

During the quarter Rand and Tribune toll processed 49,399

tonnes of ore at 3.92 g/t from the EKJV operations at two

process plants in the district, with Tribune's share equating to

37,049 tonnes.

From that processing 5,204 ounces of gold was produced by

Rand and Tribune, with Tribune's 75% share equating to 3,903

oz of Gold.

Significant high grade intercepts from drilling at the EKJV

project including results from the Pode lode of 0.5 m @ 19.8 g/t,

0.7 m @ 23.6 g/t, and drilling in the Falcon lode including 0.6 m

@ 39.7 g/t and 0.10 m @ 146.1 g/t

Continued exploration success at EKJV identifying the Nugget

structure including 3.6m @ 164.9 g/t and 1.77 m @ 45.3 g/t

T:Suite+61G1,8 947449 Melville2113 |ParadeF: +61South8 9367Perth9386WA 6151

E: tribune@tribune.com.au | W: www.tribune.com.au

For personal use only

Ore Stockpiles

At the end of the quarter Tribune was entitled to a share of the following stockpiles -

ROM Pad

Ore Source

STOCKPILES

Ore

Grade

Tribune Entitlement

Rubicon ROM

EKJV RHP Ore

Tonnes

g/t

%

3,513

4.85

36.75

Rubicon ROM

EKJV RHP Low Grade

EKJV Stockpiles

1.26

36.75

62

Mungari ROM

EKJV RPH Ore

64,276

4.23

36.75

Mungari ROM

EKJV RPH Low Grade

10,104

1.26

36.75

Tribune Share of EKJV Stockpiles

28,468

3.87

100.00

Geology and Mining

EAST KUNDANA JOINT VENTURE

Raleigh Underground Mine Production

Raleigh remained on care and maintenance throughout the quarter.

Raleigh Underground Mine Development

At the end of the quarter, the bottom of the Raleigh Decline is at 5602 m RL, 743 m from the surface, the top of the Sadler Incline remains at 5989 m RL, 356 m from the surface and the bottom of the Sadler Decline remains at 5944 m RL, 401 m from the surface.

Rubicon-Hornet-Pegasus Underground Mine Production

Contained gold in stope and development ore mined during the quarter is tabulated below:

ORE BODY

Rubicon, Hornet & Pegasus

Month

Tonnes

Grade

Ounces

October

36,222

3.75

4,363

November

021 Q

35,819

4.14

4,764

Dec

01 292

3 94

841

December

29,251

3.95

3,713

September 21 Q

124,711

4.04

16,216

Quarterly reconciled gold production was 1,642 oz above the EKJV Managers production forecast. The outlook for the next quarter is similar production to the December quarter.

TRIBUNE RESOURCES LTD (ASX:TBR) | ASX ANNOUNCEMENT

Page 2 of 41

Quarterly Report for December 2021

For personal use only

Tribune's Mine Production Entitlement (36.75%)

Rubicon, Hornet & Pegasus

Quarter

Ore

Grade

Ounces

Tonnes

g/t

troy oz

Dec

1 Q

37 225

3 94

3 115

September 2021 Q

45,831

4.04

5,959

Rubicon-Hornet-Pegasus Underground Mine Development

Development performance for the quarter is summarised in the following table.

ORE BODY

Rubicon, Hornet & Pegasus

Month

Capital

Operating Lateral development

Decline

Other

Ore

Waste

Paste

(m)

(m)

(m)

(m)

(m)

October

28.6

86.0

142.5

0

5.03

November

21.8

41.0

81.4

31.4

4.7

December 2021

63.4

214.9

298.2

74.6

87.1

December

13.0

87.9

74.3

43.2

32.0

Toll Processing

During the quarter a total of 49,399 tonnes of Rand and Tribune ore at 3.92 g/t was processed under toll Milling contracts to recover 5,204 oz of gold at 93.70% gold recovery. Of this total, 29,495 tonnes were processed at Evolution Mining Limited's Mungari Mill and 19,904 tonnes were processed at Lakewood Mill. Rand and Tribune gold production for the December 2021 quarter, along with Tribune's share is tabulated below.

Quarter

Rand and Tribune

Tribune's share

Gold (oz)

Au (oz)

Dec

021

5,204

3,903

September 21

16,981

12,736

Tribune Share of Ore Processed

Campaign Location

Tonnes

Head Grade

Recovery

Fine Au

Milled

Au (g/t)

(%)

Produced (Oz)

GMM Lakewood

14,928

3.82

94.18

1,175

EVN Mungari

22,121

4.11

93.26

2,728

Total

37,049

3.92

93.70

3,903

TRIBUNE RESOURCES LTD (ASX:TBR) | ASX ANNOUNCEMENT

Page 3 of 41

Quarterly Report for December 2021

For personal use only

ExplorationKJV Undergroundactivity inExplorationFY22 Q2 across the East Kundana Joint Venture primarily focused on the Pode and Nugget prospects. Exploration being defined by Drill Targeting or Resource Targeting designations. A total of 15 diamond drill holes for 2,763 metres were completed between 1st October 2021 and 31st December 2021.

Project

Prospect

Tenement

DD Metres

DD Samples

EKJV

Nugget

M16/309

1,923

673

EKJV

Pode

M16/309

841

152

Total

2,763

825

EKJV exploration activity for FY22 Q2. Drilled metres includes incomplete drillholes.

Results received for holes targeting Nugget down-dip and potential repeat structures at depth, with

ubicon

RUBDT21041 intercepting mineralisation proximal to K2A lithological contact.

Hole ID

East

North

RL

Dip

Azi

Hole

From

To

DH Width

Grade g/t Au

True

(MGA)

(MGA)

(AHD)

(MGA)

Depth

Width

RUBDT21041

333305

6597564

-227

18

261

213.04

35.94

36.45

0.5

3.2

0.4

64.00

64.70

0.7

5.0

0.6

74.44

75.40

1.0

14.0

0.8

81.86

82.40

0.5

4.9

0.5

173.18

177.00

3.8

3.6

3.3

179.51

182.47

3.0

6.9

2.6

RUBDT21047

333281

6597583

-189

27

219

157.95

125.60

126.00

0.4

4.3

0.2

Summary of significant assays results returned for Rubicon drilling during Q2 FY22.

TRIBUNE RESOURCES LTD (ASX:TBR) | ASX ANNOUNCEMENT

Page 4 of 41

Quarterly Report for December 2021

For personal use only

East-west section of significant results received for Rubicon drilling during Q2 FY22.

ElevenPode diamond drillholes targeting the Pode and associated satellite structures returned significant intercept results during the quarter. A new satellite lode was intercepted in three holes with results from PODRT21174 returning 0.5 m @ 19.8 g/t. Drilling in the quarter also showed potential for the Typhon lode to be extended to the north, with PODRT20379 intercepting 0.7 m @ 23.6 g/t.

Falcon Lodes were also intercepted in PODRT21007 and PODRT21009 with significant results including 0.6 m @ 39.7 g/t and 0.10 m @ 146.1 g/t respectively.

Sections highlighting significant Pode drilling intercepts are shown below.

East

North

RL

Azi

Hole

Grade

True

Hole ID

Dip

From

To

DH Width

g/t

(MGA)

(MGA)

(AHD)

(MGA)

Depth

Width

Au

PODRT20363

332712

6598482

-112

-17

294

636.44

597.77

598.07

0.3

6.8

0.3

636.44

97.75

98.20

0.5

3.6

0.1

636.44

99.06

100.20

1.1

5.7

0.3

PODRT20379

332712

6598484

-112

6

302

600.37

174.50

175.90

1.4

23.6

0.7

600.37

291.26

291.56

0.3

6.3

0.3

PODRT21006

332627

6598094

-201

-33

173

444.04

Assays

Pending

PODRT21007

332627

6598095

-201

-40

131

348.07

168.49

169.95

1.5

39.7

0.6

TRIBUNE RESOURCES LTD (ASX:TBR) | ASX ANNOUNCEMENT

Page 5 of 41

Quarterly Report for December 2021

This is an excerpt of the original content. To continue reading it, access the original document here.