Strike Energy Limited provides an update on the West Erregulla Appraisa Campaign well on behalf of the EP469 Joint Venture. Since the last update, Strike has successfully suspended WE3 with a series of cement plugs. Subsurface, Engineering and Procurement works are ongoing with regards to the plan on taking WE3 to final depth. Post the suspension of WE3, Rig 970 packed down, moved and setup at the WE4 lease. The operations went smoothly without incident and the efficient move has allowed for several maintenance programs to be carried out. After the completion of the pre-spud checklist, WE4 was officially spud over the weekend and drilling operations have commenced.