The Board of Sky Metals Limited provided an update on its exploration activities at the Tallebung tin project. TALLEBUNG TIN RC DRILLING (sky 100%) All results have been received from recent RC drilling activity. Drilling was designed to test for shallow tin mineralisation along strike from lodes defined in previous drilling. TBRC009 5m @ 1.33% Sn from 69m, incl. 2m @ 2.76% Sn from 71m, TBRC011 10m @ 0.28% Sn from 127m, incl. 1m @ 1.61% Sn from 131m. SKY commenced on-ground exploration activities on the Heron-Farm-In Projects during early December 2019 with the completion of a soil geochemistry survey (360 samples) and two diamond drillholes, totaling 755.3m at the Hume Target, Cullarin Project. Drilling was designed to validate historical results and test the geometry and depth extensions of previously identified mineralisation at the Hume Target, including: WL31 148.4m @ 0.97g/t Au from 16.2m, incl. 14.6m @ 5.1g/t Au from 16.2m, WL28 142.1m @ 0.89g/t Au from 25.9m, incl. 12m @ 4.4g/t Au from 25.9m.