Sixty North Gold Mining Ltd. announced that the resupply of the mine site has been fully completed without any lost-time accidents or incidents. A total of 95,000 litres of diesel, 5 tonnes of explosives, plus propane, lumber, steel, and miscellaneous consumable materials as well as the recently acquired diamond drill were moved to site over a 14 day period on a winter road that attained minimum ice thickness of 92 cm with a maximum thickness reported of 182 cm.