Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

Potosí, Bolivia

In accordance with the requirements of National Instrument 43-101 "Standards of Disclosure for Mineral Projects" of the Canadian Securities Administrators

Qualified Persons:

M. Shannon, P.Geo.

D. Nussipakynova, P.Geo.

A. Holloway, P.Eng.

W. Rogers, P.Eng.

M. Molavi, P.Eng.

L. Botham, P.Eng.

AMC Project 722010

Effective date 30 November 2022

Unearth a smarter way

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

1Summary

1.1Introduction

This 2022 Technical Report reports an updated Mineral Resource estimate and provides the results of a Preliminary Economic Assessment (PEA) for the Silver Sand Property (the Property or Silver Sand), Potosí Department, Bolivia. The report has been prepared by AMC Mining Consultants (Canada) Ltd. (AMC Consultants) of Vancouver, Canada on behalf of New Pacific Metals Corp. (New Pacific or the Company) and has an effective date of 30 November 2022. The previous Technical Report on the Property titled "Silver Sand Deposit Mineral Resource Report (Amended) for New Pacific Metals Corp. Property Potosí, Bolivia" (2020 Technical Report), has an effective date of 16 January 2020.

New Pacific, through its wholly owned subsidiaries, acquired exploration and mining rights over an aggregate area of approximately 60 square kilometres (km2) covering the Silver Sand deposit and its surrounding areas. The Silver Sand area has been intermittently mined for silver from narrow high-grade mineralized veins in the Cretaceous sandstone since early to mid-1500's.

The 2022 Technical Report has been prepared in accordance with the requirements of National Instrument 43-101 (NI 43-101), "Standards of Disclosure for Mineral Projects" of the Canadian Securities Administrators (CSA) for lodgement on CSA's "System for Electronic Document Analysis and Retrieval" (SEDAR).

1.2Property description and ownership

The Property is situated in the Colavi District of Potosí Department in southwestern Bolivia, 33 kilometres (km) north-east of Potosí city, the department capital. The approximate geographic centre of the Property is 19°22' 4.97" S latitude and 65°31' 22.93" W longitude at an elevation of 4,072 metres above sea level (masl).

The Property consists of multiple types of tenure and initially consisted of 17 Temporary Special Authorizations (ATEs) within which the Silver Sand deposit has been discovered. These are now converted to a consolidated Administrative Mining Contract (AMC) covering an area of 3.1656 km2 and are held through New Pacific's 100% owned subsidiary Minera Alcira Sociedad Anónima Alcira S.A. (Alcira). The AMC is valid for 30 years and can be extended for an additional 30 years. In addition, New Pacific have acquired a 100% interest in three continuous mineral concessions called Jisas, Jardan and El Bronce originally owned by third party private entities. These three concessions, when converted to AMCs, will total 2.25 km2. The total area under full control of the Company will be 5.42 km2 after the consolidation and conversion procedures are complete. The Silver Sand South Block which hosts the Mineral Resource area is covered by AMCs.

In addition, through Alcira, New Pacific entered into a Mining Production Contract (MPC) with Corporación Minera de Bolivia (COMIBOL) on 11 January 2019. An updated MPC was entered with COMIBOL on 19 January 2022. The updated MPC covers 12 ATEs and 196 Cuadriculas for a total area of about 55 km2 surrounding the Silver Sand core area. The MPC is valid for 15 years and can be extended for up to an additional two 15-year terms or 30 years.

1.3History

Mining activity has been carried out on the Silver Sand Property and adjacent areas by various operators intermittently since the early 16th century. Historical mining activities on the Property mainly targeted high-grade vein structures and records of historical mine production are not available.

amcconsultants.comii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Despite the long history of mining on the Silver Sand Property and its adjacent areas, there has been little modern systematic exploration work recorded prior to 2009. In 2009 modern exploration on the Property commenced when Ningde Jungie Mining Industry Co. Ltd. (NJ Mining) purchased Alcira, owner of the Silver Sand project from Empresa Minera Tirex Ltda, a private Bolivia mining company. New Pacific acquired Alcira from NJ Mining, in mid-2017.

NJ Mining carried out a comprehensive exploration program across the Property. Exploration work comprised geological mapping, surface and underground sampling, trenching, and the drilling of eight diamond drillholes for 2,334 metres (m).

There are no known historical estimates of Mineral Resources or Mineral Reserves at the Property, and there has been no documented production from the Property.

1.4Geology and mineralization

The Silver Sand Property is located in the south section of the polymetallic tin belt in the Eastern Cordillera of the Central Andes, Bolivia. The oldest rocks observed within the Property comprise Ordovician to Silurian marine, clastic sediments which have been intensely folded and faulted.

Bedrock in the Property area mainly consists of weakly deformed Cretaceous continental sandstone, siltstone, and mudstone and the strongly deformed Paleozoic marine sedimentary rocks. The Cretaceous sedimentary sequence forms an open syncline which plunges gently NNW and is bounded to the SW and NE by NW trending faults.

The Cretaceous sedimentary sequence within the Property is divided into the lower La Puerta Formation and the upper Tarapaya Formation. The La Puerta Formation consists of sandstones and unconformably overlies the highly folded Paleozoic marine sedimentary rocks. The Tarapaya Formation conformably overlies the La Puerta sandstones in the central part of the Property and comprises siltstones and mudstones intercalated with minor sandstone.

Both the Cretaceous and Paleozoic sedimentary sequences are intruded by numerous small Miocene subvolcanic dacitic porphyry intrusions.

The Property exhibits a variety of geometries and morphology of the mineralized bodies which are controlled and hosted by local structures of tectonic transfer nature. Some are evident in outcrops, but the best examples are observed in drill cores and in underground workings. Mineralized structures usually appear as steps-overs developed between two neighbouring fault / vein segments that exhibit an echelon arrangement and may or may not be connected by lower-ranking faults / vein. These types of structures are of fractal type, which implies that they repeat their geometry, regardless of the observation scale, in arrangements of sigmoid (jogs), echelon, subparallel stepped, relay, horsetails, and extensional nets (swarms).

A total of eleven mineralized prospects have been identified across the Property to date. These include the Silver Sand deposit and the El Fuerte, San Antonio, Aullagas, Snake Hole, Mascota, Esperanza, North Plain, Jisas, Jardan, El Bronce, occurrences. Silver Sand, Snake Hole, Jisas, and El Bronce have been tested by drilling. Another nine prospects were defined by rock chip and grab sampling of ancient and recent artisanal mine workings and dumps. Exploration results from surface outcrops and underground workings defined a silver mineralized belt 7.5 km long and 2 km wide. At the Silver Sand deposit mineralization has been traced for more than 2,000 m along strike, to a maximum width of about 680 m and a dip extension of more than 250 m.

amcconsultants.comiii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Four mineralization styles have been recognized in the Property, and these in order of importance are: (1) sandstone-hosted silver mineralization, (2) porphyritic dacitic-hosted silver mineralization, (3) diatream breccia-hosted silver mineralization, and (4) manto-type tin and base metal mineralization.

The mineralization in Silver Sand project comprises silver-containing sulphosalts and sulphides occurring within sheeted veins, stockworks, veinlets, breccia infill and disseminated within host rocks. The most common silver-bearing minerals include freibergite [(Ag,Cu,Fe)12(Sb,As)4S13], miargyrite [AgSbS2], polybasite [(Ag,Cu)6(Sb,As)2S7] [Ag9CuS4], bournonite [PbCuSbS3] (some lattices of copper may be replaced by silver), andorite [PbAgSb3S6], and boulangerite [Pb5Sb4S11] (some lattices of lead may be replaced by silver). Most silver mineralization is hosted in La Puerta sandstone units with minor amounts in porphyritic dacite diatreme breccia.

Silver mineralization is hosted by faults, fractures, fissures, and crackle breccia zones in the Cretaceous La Puerta (brittle) sandstone and porphyritic dacitic dikes, laccolith, and stocks. In the mineralized sandstone, open spaces are filled with silver-containing sulphosalts and sulphides in forms of sheeted veins, stockworks, and veinlets, as well as breccia fillings and minor disseminations. Most silver mineralization in the Property is structurally controlled with secondary rheological controls. The intensity of mineralization is dependent on the frequency of various mineralized vein structures developed in the brittle host rocks.

Silver and base metal mineralization in the Silver Sand Property was formed during the regional uplifting and erosion process associated with the Tertiary orogenic events in the Eastern Cordillera. The genetic model of silver and tin mineralization in the Property is a magmatic-hydrothermal system related to a deep-seated magmatic centre.

1.5Exploration

Since October 2017, New Pacific has carried out an extensive property-scale reconnaissance investigation program by surface and underground sampling of the mineralization outcrops and the accessible ancient underground mine workings across the Property.

A total of 1,046 rock chip samples were collected from 35 separate outcrops by New Pacific. Continuous chip samples were collected at 1.5 m intervals along lines roughly perpendicular to the strike direction of the mineralization zones. Sample lines covered a total length of 2,863 m. Most of the sampled outcrops are located above or near old mine workings.

New Pacific has also mapped and sampled 65 historical mine workings comprising 5,780 m of underground tunnels. A total of 1,171 continuous chip samples have been collected at 1 - 2 m intervals along walls of available tunnels that cut across the mineralized zones.

Mine dumps from historical mining activities are scattered across a significant portion of the Property. New Pacific has collected a total of 1,408 grab samples from historical mine dumps. The majority of samples collected were remnants of high-grade narrow veins extracted from underground mining activity. Of the 1,408 samples collected from historical mine dumps to date, 439 samples (31%) returned assay results between 30 and 3,290 grams per tonne (g/t) Ag with an average grade of 194 g/t Ag.

Assay results of underground chip samples and surface mine dump grab samples show that silver mineralization widely occurs in the wall rocks of the previously mined-out high-grade veins in the abandoned ancient underground mining works.

amcconsultants.comiv

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

1.6Drilling

From October 2017 to July 2022, New Pacific conducted intensive diamond drilling programs on the Property totalling 139,920 m in 564 drillholes. A total of 523 HQ diamond holes for a total metreage of 128,074 m was drilled over the Silver Sand core area to define the mineralization. After drilling specific exploration targets, holes were drilled on a 50 m x 50 m grid to delineate the spatial extensions of the major mineralized zones. This was followed up by drilling on a nominal 25 x 25 m grid, infilling defined areas of mineralization. Drilling was halted during 2020 and part 2021 due to COVID-19 protocols and recommenced later in 2021.

All holes were drilled from the surface. Drillholes were drilled up to 545 m deep at inclinations between -45° and -80° towards azimuths of 060° (~NE) and 220° (~SW) to intercept the principal trend of mineralized vein structures perpendicularly.

The drilling programs have covered an area of approximately 1,600 m long in the north-south direction and 800 m wide in the east-west direction and have defined silver mineralization at the Silver Sand deposit over an oblique strike length of 2 km, a collective width of 650 m and to a depth of 250 m below surface.

Drill coring was completed using conventional HQ (64 millimetre (mm) diameter) equipment and 3 m drill rods. Drill collars are surveyed using a Real-Time Kinematic differential global positioning system (GPS), and downhole deviation surveys are completed by the drilling contractor using a REFLEX EZ-SHOT and SPT GyroMaster downhole survey tools. Drillholes are surveyed at a depth of approximately 20 m, and on approximately 30 m intervals as drilling progresses. Upon completion of each drillhole a concrete monument is constructed with the hole details inscribed.

Core is collected by New Pacific personnel and drill core containing visible mineralization is wrapped in paper to minimize disturbance during transport. Logging is both carried out at the rig where a quick log is completed, and after transportation to the company's Betanzos core processing facility, which is located approximately 1.5 hours drive from the Property. Currently data is directly collected or loaded into MX Deposit a database software from Sequent.

In addition to drilling in the Silver Sand core area, drilling was carried out at Snake Hole (32 drillholes for 7,457 m) and at the northern prospects, (9 drillholes for 4,298 m). These holes were more exploratory in nature but the same procedures as the grid drilling in the core area were employed.

Core recovery from the drill programs varies between 0% (voids and overburden) and 100%, averaging 97%. More than 92% of core intervals have a core recovery of greater than 95%.

1.7Sample preparation, assay, and QA/QC

New Pacific has developed and implemented good standard procedures for sample preparation, analytical, and security protocols.

New Pacific manages all aspects of sampling from the collection of samples, to sample delivery to the laboratory. All samples are stored and processed at the Betanzos facility. This facility is surrounded by a brick wall, has a locked gate, and is monitored by video surveillance and security guard 24 hours a day, seven days a week. Within the facility, there are separate and locked areas for core logging, sampling, and storage.

Samples are transported on a weekly basis by New Pacific personnel from the Betanzos facility to the ALS laboratories (ALS) in Oruro, Bolivia for sample preparation, and then shipped to ALS in Lima, Peru for geochemical analysis. ALS Oruro and ALS Lima are part of ALS Global - an

amcconsultants.comv

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

independent commercial laboratory specializing in analytical geochemistry services, all of which are accredited. in accordance with ISO/IES 17025:2017, and are independent of New Pacific.

All core, chip, and grab samples are prepared using the following procedures: (1) crush to 70% less than 2 mm; (2) riffle split off 250 g; and (3) pulverize split to better than 85% passing a 75-micron sieve.

Sample analysis in 2017 and 2018 comprised an aqua regia digest followed by Inductively Coupled Plasma (ICP) Atomic Emission Spectroscopy (AES) analysis of Ag, Pb, and Zn (ALS code OG46). Assay results greater than 1,500 g/t Ag were sent for fire assay and gravimetric finish analysis. In 2019 New Pacific changed its analysis protocol to include systematic multielement analysis for an initial 51 element ICP mass spectroscopy (MS) analysis. Over-limit samples were handled differently for different elements and protocols were further amended for the 2021-2022 drilling.

Drill programs have included Quality Assurance / Quality Control (QA/QC) monitoring programs which have incorporated the insertion of certified reference materials (CRMs), blanks, and duplicates into the sample streams, and umpire (check) assays at a separate laboratory at different times.

Four different CRMs have been used throughout the project history. A total of 4,495 CRMs was submitted between October 2017 and July 2022 representing an average overall insertion rate of 5%. Insertion rates for CRMs have been consistently above 5% on a yearly basis with the exception of 2019.

Blank material from two different quarry sites been used over time and coarse blanks have been inserted consistently at an acceptable insertion rate. While there have been some changes in failure criteria, there has been no evidence of systemic contamination and failures are dealt with by a re-assay protocol. Pulp blank samples have been inserted since 2021, but at a low insertion rate of less than 2.5%. Duplicates are also inserted, comprising field duplicates, coarse duplicates and pulp duplicates. In 2021 and 2022 they have been consistently included but at a rate of between 3.65% and 4.07%. Coarse rejects were also submitted to Actlabs Skyline as umpire samples in the 2017 to 2019 period. Actlabs Skyline is an independent geochemical laboratory certified according to ISO 9001:2015.

The Qualified Person (QP) has reviewed the QA/QC procedures used by New Pacific including certified reference materials, blank, duplicate and umpire data and has made some recommendations. The QP does not consider these to have a material impact on the Mineral Resource estimate and considers the assay database to be adequate for Mineral Resource estimation. The QP considers sample preparation, security, and analytical procedures employed by New Pacific to be adequate.

1.8Metallurgical testing

Two significant metallurgical testwork programs have been completed since 2018.

The initial (2018/19) program was completed at SGS Mineral Services in Lima, Peru, and examined several metallurgical composites of Oxide, Transition, and Sulphide mineralization from two areas of the Silver Sand deposit. A geometallurgical sampling approach was used and was designed to highlight the effect of differences in silver grade, degree of oxidation, and lithology. Four independent geometallurgical testwork programs (mineral characterization, comminution, froth flotation, and cyanide leaching) were carried out on the different metallurgical composites. Six metallurgical domains were identified for the flotation and leaching testwork and six geological domains were branded for the comminution work.

amcconsultants.comvi

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The second (2020/21) program, also completed at SGS Mineral Services in Lima Peru, maintained the initial geometallurgical definitions and examined a larger and more representative set of metallurgical samples via master composites and high / low grade variants of Oxide, Transition, and Sulphide mineralization. A more comprehensive scope of work was completed in this program, including physical and chemical characterization, heavy liquids separation, mineralogical analysis, particle sorting, flotation, cyanidation, and environmental characterization.

Both metallurgical testing programs demonstrated that good silver recoveries are possible using conventional extraction methods and that further improvements and refinements should be possible in future programs after fine-tuning the various test parameters. Highlights of the two testwork programs are as follows:

·An initial assessment of ore sorting showed encouraging results.

·A more comprehensive assessment of physical characteristics of the different oxidation types, indicated that samples are amenable to SAG milling.

·Composite samples were found to be mostly in the soft to medium grindability range with low to medium values of Abrasion Index (Ai).

·A larger flotation program culminated in locked cycle testing of new composite samples of Oxide, Transition and Sulphide mineralization, with silver recoveries of 67.4%, 83.2%, and 87.1% respectively at concentrate mass pulls of 0.5%, 2.2%, and 5.0%. Silver recovery is expected to increase with higher concentrate mass pull.

·A more comprehensive cyanidation program included coarse-particle and fine-particle bottle roll leaching, column leaching and leaching of flotation concentrates. Cyanidation of composite samples ground to 80% -75 µm achieved silver extractions of up to 93.9%, 92.5%, and 78.3% for Transitional, Oxide, and Sulphide master composite samples respectively under conditions of sodium cyanide concentration of 2 grams per litre (g/L), dissolved oxygen concentration of 11-15 parts per million (ppm) and retention time of 48 hours.

·Initial testing of cyanide detox amenability raised no concerns and suggests that SO2/Air is able to achieve residual cyanide concentration of 20 ppm WAD cyanide (CN) or less.

·Initial environmental testing of flotation tailing and cyanidation residue was completed, including ABA and TCLP characterization.

·Samples of oxide mineralization were submitted for coarse column (100% passing 12.7 mm) leach cyanidation testing and this achieved up to 88.3% silver extraction after 75 days.

·High recoveries achieved during cyanidation tests indicate that silver-bearing minerals within the sulphide and transition composite samples tested can be considered non-refractory in nature.

The results of the two testwork programs are consistent and suggest that the mineralized materials from the Silver Sand project would be amenable to processing using conventional flotation or large-scale whole ore cyanidation at atmospheric pressure.

A process options trade off study completed in 2022 determined that a flowsheet including crushing, grinding, cyanidation in agitated tanks and Merrill Crowe zinc precipitation can provide a superior balance of costs and revenue, resulting in the highest relative IRR. This flowsheet was carried through to the PEA and is summarized in Section 1.11 and described in Section 17 of this report.

1.9Mineral Resources

The Mineral Resource estimate was completed using 556 drillholes on the Property comprising 136,220 m of diamond core and 92,164 assays. Grade interpolation was completed for silver, lead, zinc, copper, arsenic, and sulphur. Only silver is reported as it is the only economic metal. All

amcconsultants.comvii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

estimation utilized ordinary kriging (OK) except for the 127 small domains which were estimated using the inverse distance squared (ID2) method.

The mineralization domains were built by New Pacific using Leapfrog Geo 4.0 software. The mineralization domains were reviewed and accepted by the QP with some changes, including separating the main domain into two areas based on vein orientation. The QP estimated into these domains and also estimated a background block model that was combined with the domain mineralization to form the final block model.

New Pacific performed 6,297 bulk density measurements on the core drilled on the Property. As the mineralization is hosted in one rock type, after reviewing the density data, the QP assigned a single bulk density measurement to the block model of 2.54 t/m3.

The pit-constrained Mineral Resources are reported for blocks above a conceptual pit shell based on a US$22.50/ounce silver price. There is not a reporting restriction to within the AMC claim boundary as in the 2020 Technical Report as an agreement has been reached with COMIBOL in regard to the surrounding MPC.

The cut-off applied for reporting the pit-constrained Mineral Resources is 30 g/t silver. Assumptions made to derive a cut-off grade (COG) included mining costs, processing costs and recoveries and were obtained from comparable industry situations. The model is depleted for historical mining activities. The assumptions are shown in Table 1.1.

Table 1.1Assumptions for pit optimization

Input

Units

Value

Silver price

$/oz Ag

22.5

Silver process recovery

%

91

Payable silver

%

99

Mining recovery factor

%

100

Mining cost

$/t mined

2.6

Process cost

$/t minable material > COG

16

G&A cost

$/t minable material > COG

2

Slope angle

degrees

44 - 47

Notes:

·Sustaining capital cost has not been included.

·Measured, Indicated and Inferred Mineral Resources included.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

The Mineral Resource for the Silver Sand deposit has been estimated by Ms Dinara Nussipakynova, P.Geo. Principal Geologist of AMC Consultants, who takes responsibility for the estimate.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

amcconsultants.comviii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 1.2Mineral Resource as of 31 October 2022

Resource category

Tonnes (Mt)

Ag (g/t)

Ag (Moz)

Measured

14.88

131

62.60

Indicated

39.38

110

139.17

Measured & Indicated

54.26

116

201.77

Inferred

4.56

88

12.95

Notes:

·CIM Definition Standards (2014) were used for reporting the Mineral Resources.

·The QP is Dinara Nussipakynova, P.Geo. of AMC Consultants.

·Mineral Resources are constrained by optimized pit shells at a metal price of US$22.50/oz Ag, recovery of 91% Ag and COG of 30 g/t Ag.

·Drilling results up to 25 July 2022.

·The numbers may not compute exactly due to rounding.

·Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

The QP is not aware of any known significant factors or risks that might affect access or title, or the right or ability to perform work on the Property, including permitting and environmental liabilities to which the project is subject.

In last three years Bolivia experienced a transition from social turmoil to stability. The government of the current President, elected at the end of 2020, supports and encourages private and foreign investments in the economic sectors of the country. New laws were approved by congress to encourage private investments in the mining sector, for example, Law 1391 (Decree 4579) waives value added tax for import of equipment and vehicles.

Although the country is now generally friendly to private and foreign investments in the mining sector, risks associated with instability of government caused by political polarization and visible divisions in the governing party remains. In addition, local protests and blockages by various social groups may pose unforeseen instability from time to time. Overall, political and social risks are currently manageable in Bolivia.

There are no Mineral Reserves on the Property.

1.10Mining

The Silver Sand project comprises four open pit areas - the Main pit, two small northern satellite pits (NP1 and NP2), and one eastern satellite pit (EP1). The open pits are proposed to be mined using a conventional truck and excavator mining method using 140 t payload trucks and 200 - 260 t excavators. A mining contractor operation is proposed, with ore and waste to be mined on 10 m benches. A mining recovery of 92% and a mining dilution of 8% at zero grade has been assumed.

The Lerchs-Grossmann pit optimization algorithm, as implemented in the Whittle software, was used to define the ultimate pit shell for Silver Sand. The selected pit shells were then used to produce pit designs and the mining schedule. Pit optimization was allowed to extend outside the AMC claim boundary into the MPC area to the NE and SW.

In total four phases have been designed in the Main area (Main 1 to 4) and one for each of the three small satellite pits. Haulage ramps have been designed at 32 m wide for double lane traffic at a 10% gradient. Single lane ramps of 17 m width were designed for the bottom bench access and the small satellite pits.

amcconsultants.comix

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

A single out-of-pit waste dump has been designed immediately south-west of the open pits in a natural depression in the topography. The waste dump has been designed to accommodate the totality of the waste mined from the pits, as well as the disposal of filtered tailings from the plant. Two in-pit dumps have been designed in the main pit to provide flexibility and costs savings for waste placement. Re-sloping the waste dumps, in-pit dumps, and ROM pad and placement of topsoil will be carried out post mine closure.

The open pit contains approximately 55.4 Mt of mineralized material with a grade of 106.6 g/t Ag, and 199.7 Mt of waste material, with an overall waste to mineralized material strip ratio of 3.60 to 1. The open pit operation includes one year of pre-strip (Year -1) and fourteen-years of production.

To optimize the overall value of the project and the sequence of mining, the value for each pit phase was estimated. The value, defined as the indicative undiscounted cashflow per tonne of mineralized material, accounts for preliminary mining costs, General and Administration (G&A), and processing costs. The projected value from each source and consideration of practical scheduling constraints provided a basis for the order in which the pits are scheduled.

The conceptual process feed schedule is summarized in Table 1.3. In a typical year 4.0 Mt of ore will be delivered to the process plant. The total annual ex pit material mined peaks at 18.5 Mtpa, before dropping to approximately 13 Mtpa at the end of the open pit mine life.

amcconsultants.comx

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 1.3LOM process plant feed schedule

Total

Yr -1

Yr 1

Yr 2

Yr 3

Yr 4

Yr 5

Yr 6

Yr 7

Yr 8

Yr 9

Yr 10

Yr 11

Yr 12

Yr 13

Yr 14

Total process feed (Mt)

55.4

-

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

3.4

Ag (g/t)

106.6

-

135.3

135.6

131.5

139.1

103.4

96.6

74.8

72.7

102.3

93.3

113.6

113.3

102.3

74.2

Mine to Process (Mt)

46.6

-

3.0

4.0

4.0

4.0

3.2

4.0

1.3

2.0

4.0

3.5

4.0

4.0

4.0

1.6

Ag (g/t)

116.3

-

136.1

135.6

131.5

139.1

117.9

96.6

133.5

99.4

102.3

100.0

113.6

113.3

102.8

106.6

Stockpile to Process (Mt)

8.8

-

1.0

-

-

-

0.8

-

2.7

2.0

-

0.5

-

-

-

1.8

Ag (g/t)

55.6

-

132.7

-

-

-

48.3

-

45.5

45.4

-

45.3

-

-

45.3

45.3

Mine to Stockpile (Mt)

8.8

1.6

0.8

0.8

1.1

1.5

1.0

1.2

0.1

-

0.6

-

0.1

-

-

-

Ag (g/t)

55.6

99.9

45.4

46.0

46.1

47.3

45.5

44.5

42.5

-

45.0

-

45.1

-

-

-

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.comxi

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

1.11Processing

Results from two recent metallurgical testwork programs have been used to select a processing flowsheet for the Silver Sand project. Interpretation of the testwork has enabled the completion of a process trade off study, the preparation of preliminary process design criteria and initial equipment selections.

Several processing options were considered for this PEA, including heap leaching, froth flotation, and agitated tank cyanidation (using carbon or zinc precipitation for silver recovery from solution). After preliminary trade-off studies to compare the estimated capital cost, operating cost and metallurgical efficiency of different options, an agitated tank cyanidation process was selected as the PEA base case.

The selected flowsheet represents a very conventional, low-risk approach to silver extraction, and consists of the following unit operations:

·Run-of-mine (ROM) receiving, crushing, and crushed rock storage.

·Stockpile discharge, grinding via SAG milling, and ball milling.

·SAG mill pebble crushing via SAG mill pebble ports, scalping screen, recycle conveyors, and cone crusher.

·Pre-leach thickening and cyanide leaching using stirred, oxygen sparged tanks.

·Liquid / solid separation using counter-current decantation (thickeners).

·Recovery of silver from pregnant leach solution using a zinc precipitation process followed by drying and smelting with fluxes to produce silver doré bars.

·Thickening and filtration of leach residues.

·Conveying of filter cake and long-term storage at the tailing storage area.

The base case flowsheet is expected to recover an average of 91% silver into a doré product for export to international markets.

1.12Infrastructure

Currently there is no significant infrastructure in place. As a comprehensive greenfield project, the Silver Sand project will require the development of supporting infrastructure. The Property is accessible from Potosi via a 54 km long road made up of a 27 km stretch of the paved Bolivia National Highway 5 and an all-season gravel road built for mining in the Colavi District.

The Silver Sand project is estimated to require approximately 25 to 35 megawatts (MW) of power annually. New Pacific has engaged with Bolivia's national power supply companies CNDC and ENDE. A preliminary power supply plan for the future operations has been discussed and agreed upon. The Company has submitted a power supply application to the Bolivia Ministry of Energy, following the formal procedure in the country. The Ministry of Energy issued an official letter to the Company acknowledging the application.

Water for domestic use can be obtained from a small lake, approximately 3.5 km north-west of the Property. Water for drilling can be sourced from nearby drainages. It is proposed that a water dam will be built up stream from the mine in the narrowest part of the creek to hold the water in a reservoir with a capacity of about 2.6 million cubic metres. This will provide water for the mineral processing plant and mining camp and could supply downstream residents for farming and daily life water requirement if required.

amcconsultants.comxii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The Filtered Tailings Storage Facility (Filtered TSF of TSF) will be integrated within the waste rock storage area. The TSF will be fully lined to provide protection against release of potentially contaminated water to the local surface and groundwater systems.

Accommodation and other infrastructure such as offices, workshop, warehouse, and laboratory are envisaged to be built close to the processing plant.

1.13Capital and operating costs

The capital and operating costs estimate have been developed by the following contributors:

·Halyard Inc: process plant, and plant infrastructure.

·NewFields: Tailings storage facility.

·AMC Consultants: site infrastructure, and open pit operating mining costs.

·New Pacific: owner's costs, and general and administration costs.

Costs are presented in US dollars ($) and are based on prices obtained during the fourth quarter of 2022 (4Q22).

Open pit mining costs are estimated based on contract mining.

G&A costs include camp accommodation, site administration compensation for land use, and mine closure costs.

Operating costs for the project have been estimated and are summarized in Table 1.4.

Table 1.4Operating costs summary

Description

LOM average cost ($/t feed)

Total LOM cost ($M)

Mining cost

9.55

529.7

Processing cost

14.20

787.3

Tailings storage cost

0.65

36.0

G&A cost

1.86

103.1

Total operating cost

26.26

1,456.1

Note: Totals may not add up exactly due to rounding. G&A includes mine closure and land use compensation cost.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

Capital costs for the project have been estimated and are summarized in Table 1.5.

Owner's capital costs include relocation / resettlement, additional studies, permit applications, local community projects, flights, and accommodation.

amcconsultants.comxiii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 1.5Capital expenditure summary

Description

Cost ($M)

Open pit pre-stripping

47

Contractor mobilization

1

Processing plant

186

Tailings facility

25

Site infrastructure

47

Owner's cost

21

Total capital cost

327

Initial capital

308

Sustaining capital

20

Note: Includes direct, indirect, and contingency costs. Totals may not add up exactly due to rounding.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

1.14Economics

All currency is in US$ unless otherwise stated. The cost estimate was prepared with a base date of the second half of Year -2 (1 July) and does not include any escalation beyond this date. For net present value (NPV) estimation, all costs and revenues are discounted at 5% from the base date. The economic model shows the Project under construction for 1.5 years (Year -2 and Year -1), which is considered development and then in production for the balance of the projected cash flows, which is considered operating (Years 1 to 14). Metal prices were selected after discussion with New Pacific and referencing current markets and forecasts in the public domain.

A regular Bolivian corporate income tax rate of 25% is applied. As a mining property, the Project is subject to an additional tax of 12.5%, with a 5% reduction for companies that produce pure metal products (as is the case with the Silver Sand project producing silver doré onsite). Within the AMC a 6.0% royalty is paid based on gross sales. Most of the Mineral Resources lie within the AMC. Outside the AMC, an additional 6.0% royalty is to be paid. No other royalties or levies are applicable to the Project.

A high-level economic assessment of the proposed open pit operation was conducted. The project is projected to generate approximately $1,106 million (M) pre-tax NPV and $726M post-tax NPV at 5% discount rate, pre-tax IRR of 52% and post-tax IRR of 39%. A summary of the potential economic outcome of the project is presented in Table 1.6.

amcconsultants.comxiv

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 1.6Summary of potential economic results

Unit

Value

Total plant feed

kt

55,441

Total waste production

kt

199,653

Silver grade

g/t

106.6

Silver recovery

%

91

Silver price

$/oz

22.50

Discount rate

%

5

Silver payable

%

99

Payable silver metal

Moz

171.2

Total net revenue

$M

3,510

Total capital costs

$M

327

Total operating costs

$M

1,456

Mine operating costs

$M

530

Process and tails storage operating costs

$M

823

General and administrative costs

$M

103

Operating cash cost

$/oz Ag

8.45

All in sustaining cost

$/oz Ag

10.42

Pre-tax payback period

Yrs

1.4

Post-tax payback period

Yrs

1.9

Pre-tax NPV

$M

1,106

Pre-tax IRR

%

52

Post-tax NPV

$M

726

Post-tax IRR

%

39

Notes:

·G&A costs include mine closure and land use compensation cost.

·Cash costs include all operating costs and transportation charges.

·All-in Sustaining Costs (AISC) include total cash costs, initial capital expenditures and sustaining capital expenditures.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

This PEA is preliminary in nature, it includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA will be realized.

1.15Conclusions and recommendations

The main recommendation is to advance the Silver Sand project to a pre-feasibility study level. This will require advancing the definition and engineering level of all of the mining, processing and infrastructural aspects. While the current block model will form the basis for that study work there are some geology and exploration recommendations for later.

1.15.1Geology

There are a number of recommendations on all facets of QA/QC summarized below.

·Purchase an additional CRM at the average grade (116 g/t Ag) of the deposit which has been certified using similar digestion methodology.

·Investigate performance issues with CRMs CDN-ME-1603 and CDN-ME-1605 if these are to be used in future programs.

·If continue to use ME-MS41 analytical method going forward it is recommended that the OG46 over-limit threshold be dropped from 100 g/t Ag to a level below the anticipated COG.

amcconsultants.comxv

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

·Continue to include blanks in every batch of samples submitted at a rate of at least 1 in every 20 samples (5%) and consistently monitor them in real time on a batch-by-batch basis and that remedial action is taken as issues arise.

·Ensure that all blank sample follow up is recorded.

·Implement investigative work to understand geological variance.

·Ensure that all future programs include 4 - 5% duplicate samples including field duplicates, coarse (crush) duplicates, and pulp duplicates to enable the various stages of sub-sampling to be monitored.

·In future programs, submit umpire duplicates, as was done for the October 2017 - 2019 programs.

·Submit pulp samples (rather than coarse reject) so that umpire samples only monitor analytical accuracy and variance.

·Include CRMs at the average grade and higher grades in umpire sample submissions.

For future Mineral Resource modelling the following should be considered:

·At the next update of the model include all remaining drill data which missed the closing date.

·Incorporate geometallurgical attributes into the block model.

·Verify mined-out volumes by surveying historical waste dumps.

·Conduct structural analysis of available data and complete initial structural / geotechnical drilling as required.

·Update the 3D geological model to include detailed geology - deposit oxidation domaining and structures.

The Silver Sand deposit as currently defined remains open for expansion and there has been no modern district scale exploration. While it is understood that engineering work for the pre-feasibility study will be based on the current block model, it is recommended that future drilling on the deposit should consider the following:

·Infill drilling to upgrade areas of high-grade mineralization within the current inferred resource area.

·Additional drilling around the current Mineral Resources, where the deposit remains open at depth.

The QP also notes that there has been no modern district scale exploration outside of Silver Sand deposit. It is recommended that additional drilling be completed at the other prospects to assess for the potential for Mineral Resources.

1.15.2Metallurgical testwork development

The following metallurgical activities are recommended:

·Further development of the current geometallurgical modelling.

·Further mineralization characterization studies, including quantitative mineralogy, and comminution studies.

·Development of a particle sorting trade-off.

·Development of cyanidation parameters, on a more widespread sample set.

·Settling testwork, with more comprehensive study of slurry rheology, reagent selection, and dosage.

·Further environmental testing, including a comprehensive set of static and kinetic (humidity cell) tests.

amcconsultants.comxvi

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

1.15.3Open pit mining

It is recommended that the following aspects are examined in the next study stage:

·It is recommended that a dilution study is conducted in the next stage of study to ascertain the anticipated mining dilution and ore recovery in combination with the most appropriate mining fleet and associated costs.

·The ongoing geotechnical program should be continued to collect additional data for pit wall angle stability analysis.

·It is recommended that quotes from Bolivian mining contractors are collected to firm up the mining costs estimates for the open pit operations.

·Further hydrological and hydrogeological studies should be conducted to better define dewatering requirements for the open pit. Recommendations from ITASCA Chile SpA (ITASCA) include:

¾to implement piezometers for groundwater table monitoring, at least in the future pit location.

¾Itasca recommends that the area where mining activities are developed is characterized in detail, to be used as a water quality baseline before the Silver Sand project starts to operate.

·Further work should be conducted to identify alternative dump locations with short hauls i.e., backfill in-pit dumps, and dump in the creek gully. Further work should be undertaken to develop a detailed waste and tailings disposal plan.

1.15.4Infrastructure

·It is recommended that all technical and commercial aspects of site infrastructure are pursued to a higher level of accuracy.

·Location and placement of accommodation camp, waste dump, crusher, and process plant be confirmed following drilling.

·Negotiation with Bolivian power authorities to continue to confirm there is capacity in the existing grid and that Silver Sand can get access to that.

1.15.5Costs

The estimated cost of the program to complete a study to prefeasibility level is $2.288M.

amcconsultants.comxvii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Contents

1Summaryii

1.1Introductionii

1.2Property description and ownershipii

1.3Historyii

1.4Geology and mineralizationiii

1.5Explorationiv

1.6Drillingv

1.7Sample preparation, assay, and QA/QCv

1.8Metallurgical testingvi

1.9Mineral Resourcesvii

1.10Miningix

1.11Processingxii

1.12Infrastructurexii

1.13Capital and operating costsxiii

1.14Economicsxiv

1.15Conclusions and recommendationsxv

1.15.1Geologyxv

1.15.2Metallurgical testwork developmentxvi

1.15.3Open pit miningxvii

1.15.4Infrastructurexvii

1.15.5Costsxvii

2Introduction35

2.1General and terms of reference35

2.2The Issuer35

2.3Report authors35

2.4Sources of information36

2.5Other37

3Reliance on other experts38

4Property description and location39

4.1Property location39

4.2Bolivian Regulatory framework39

4.2.1Overview39

4.2.2Exploration and mining rights40

4.2.3Environment protection40

4.3Mineral tenure40

4.3.1Introduction40

4.3.2100% owned New Pacific tenure42

4.3.3Mining production contract42

4.4Environmental permits43

4.5Land holding costs43

4.6Surface rights44

4.7Royalties and encumbrances44

5Accessibility, climate, local resources, infrastructure, and physiography45

5.1Accessibility45

5.2Physiography46

5.3Climate and vegetation47

5.4Local resources and infrastructure50

amcconsultants.comxviii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

6History51

6.1Property ownership51

6.2Mining51

6.3Exploration51

6.3.1Surface and underground channel sampling54

6.3.2Test drilling55

6.4Historical Resource and Reserve estimate56

6.5Production56

7Geological setting and mineralization57

7.1Regional geology and metallogeny57

7.1.1Geotectonic framework of Bolivia57

7.1.2Geology of Central Andes58

7.1.2.1Subandean Belt58

7.1.2.2Eastern Cordillera Belt58

7.1.2.3Altiplano Belt58

7.1.2.4Western Cordillera Belt58

7.1.3Regional metallogeny of Central Andes58

7.2Geological setting and mineralization60

7.2.1Property geology60

7.2.2Structural control66

7.2.2.1North Block66

7.2.2.2South Block66

7.2.3Mineralization67

7.2.3.1Sandstone-hosted silver mineralization67

7.2.3.2Porphyritic dacite-hosted silver mineralization70

7.2.3.3Diatreme breccia-hosted silver mineralization71

7.2.3.4Manto-type tin mineralization72

7.2.4Relative timing of hydrothermal alteration and mineralization72

7.2.5Oxidation73

8Deposit types74

9Exploration76

9.1Introduction76

9.2Surface chip sampling78

9.3Dump sampling79

9.4Underground chip sampling79

9.5Discussion of exploration results80

10Drilling85

10.1Drilling overview85

10.2Drilling procedures87

10.2.1Drillhole deviation surveys87

10.2.2Core processing and logging88

10.3Sample recovery89

10.4Drilling programs89

10.4.1Exploration drilling - 2017 - 201889

10.4.2Definition and exploration drilling - 201989

10.4.3Definition, exploration, and metallurgical drilling - 202090

10.4.3.1Definition and geotechnical drilling - 202190

10.4.4Definition, exploration North prospects, and geotechnical drilling - 202290

amcconsultants.comxix

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

10.5Discussion of drilling results90

10.5.1Silver Sand90

10.5.2Snake Hole93

10.5.3Drilling of North prospect95

10.6Review of drilling results97

10.7Drilling conclusions99

11Sample preparation, analyses, and security100

11.1Sampling methods100

11.1.1Rock chip sampling100

11.1.2Grab sampling100

11.1.3Drillhole sampling100

11.2Sample shipment and security101

11.3Sample preparation and analysis102

11.4Bulk density103

11.5Quality Assurance / Quality Control104

11.5.1Certified Reference Materials105

11.5.1.1Description105

11.5.1.2Discussion106

11.5.1.3Recommendations109

11.5.2Blank samples109

11.5.2.1Description109

11.5.2.2Discussion110

11.5.2.3Recommendations112

11.5.3Duplicate samples112

11.5.3.1Description112

11.5.3.2Discussion113

11.5.3.3Recommendations116

11.5.4Umpire samples117

11.6Conclusions117

12Data verification119

13Mineral processing and metallurgical121

13.1Introduction121

13.2Initial metallurgical program - SGS Lima, 2018122

13.3Second metallurgical program - SGS Lima, 2020122

13.3.1Geometallurgical characterization122

13.3.2Composite sample preparation122

13.3.3Chemical analysis123

13.3.4Physical characterization124

13.3.5Size fraction assaying124

13.3.6Heavy Liquids Separation (HLS) testing125

13.3.7Mineralogical analysis127

13.3.8Particle sorting129

13.3.9Flotation130

13.3.9.1Primary grind size determination130

13.3.9.2Collector optimization132

13.3.9.3Batch cleaner tests135

13.3.9.4Locked cycle tests137

13.3.9.5Flotation concentrate analysis139

13.3.9.6Variability tests139

amcconsultants.comxx

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

13.3.10Cyanidation140

13.3.10.1Bottle roll testing - master composites140

13.3.10.2Coarse bottle roll tests143

13.3.10.3Column leaching - Transitional master composite144

13.3.10.4Bottle roll testing - Variability composites145

13.3.10.5Bottle roll testing - Flotation concentrates146

13.3.11Environmental characterization146

13.3.11.1Cyanide detoxification146

13.3.11.2ABA tests147

13.3.11.3TCLP tests148

13.4Recommendations149

13.4.1Sample selection and characterization149

13.4.2Preconcentration149

13.4.3Flotation149

13.4.4Cyanidation150

13.4.5Environmental testing150

14Mineral Resource estimates151

14.1Introduction151

14.2Data used152

14.2.1Drillhole database152

14.2.2Bulk density153

14.2.3Lithological domains153

14.2.4Mineralization domains153

14.2.5Mined-out domains154

14.3Modeling approach154

14.4Statistics and compositing154

14.5Block model parameters156

14.6Variography and grade estimation157

14.7Resource classification158

14.8Block model validation159

14.8.1Visual checks159

14.8.2Swath plots161

14.8.3Statistical comparison162

14.8.4Comparison with other interpolation methods163

14.9Mineral Resource estimate163

14.10Comparison with previous Mineral Resource estimate165

14.11Recommendations165

15Mineral Reserve estimates167

16Mining methods168

16.1General description168

16.2Hydrogeological parameters168

16.3Geotechnical parameters169

16.4Open pit mining169

16.4.1Resource model for open pit mining169

16.4.2Open pit geotechnical considerations169

16.4.3Open pit mining method171

16.4.4Open pit optimization171

16.4.4.1Cut-off calculation171

16.4.4.2Dilution and mining recovery factors172

amcconsultants.comxxi

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16.4.5Pit optimization and shell selection172

16.4.6Pit design174

16.4.7Layout of other mining related facilities180

16.4.8Open pit mining equipment182

16.4.9Open pit mining personnel182

16.5Projected open pit (LOM) production schedule183

16.5.1Inventory by mining area184

16.5.2Mine sequence considerations185

16.5.2.1Value of mining areas185

16.5.2.2In-pit backfill of waste185

16.5.2.3Tailings disposal area embankment construction186

16.5.2.4Open pit constraints and precedences186

16.5.3Conceptual open pit production schedule186

16.5.4Projected process plant feed schedule188

17Recovery methods190

17.1Summary190

17.2Process Design Criteria193

17.3Process description194

17.3.1Crushing194

17.3.2Grinding195

17.3.3Cyanide leaching195

17.3.4Zinc precipitation and silver doré production196

17.3.5Tailing treatment197

17.3.6Reagents198

17.3.7Services and water198

17.4Major equipment list199

17.5Process control philosophy200

18Project infrastructure202

18.1Overview202

18.2Site location202

18.3Road access205

18.4Power205

18.5Supply water206

18.6Fuel storage206

18.7Offices and warehouse207

18.8Equipment maintenance workshop207

18.9Explosives magazine207

18.10Communications207

18.11Gate house / security207

18.12Office building207

18.13Accommodations207

18.14Filtered Tailings Storage Facility207

18.15Process plant209

19Market studies and contracts211

19.1Markets211

19.2Commodity price211

19.3Contracts212

amcconsultants.comxxii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

20Environmental studies, permitting and social or community impact213

20.1Introduction213

20.2Environmental legislation and applicable procedures213

20.3Baseline conditions214

20.3.1Introduction214

20.3.2Baseline of surface water, groundwater, water for human consumption214

20.3.3Air quality / environmental risk baseline216

20.3.4Soil and sediment baseline216

20.3.5Biological baseline216

20.3.6Social baseline218

20.3.7Archaeological baseline219

20.4Public consultation process220

20.5Regarding waste management221

20.6Mine Closure Plan221

20.7Environmental guarantees221

21Capital and operating costs222

21.1Operating cost estimate222

21.1.1Open pit222

21.1.2Processing225

21.1.3Tailings storage facility (TSF)227

21.1.4General and administration (G&A)227

21.2Total operating cost estimate227

21.3Capital cost estimate228

21.3.1Open pit228

21.3.2Process plant228

21.3.3Tailings storage facility (TSF)230

21.3.4Surface infrastructure230

21.3.5Sustaining capital231

21.3.6Indirect capital231

21.3.7Contingency232

21.3.8Total capital cost estimate232

22Economic analysis233

22.1Assumptions233

22.2Economic analysis233

22.3Sensitivity analysis234

23Adjacent properties237

23.1Colavi Tin Polymetallic mine237

23.2Canutillos Tin Polymetallic mine237

24Other relevant data and information238

25Interpretation and conclusions239

25.1General and geology239

25.2Metallurgy and processing239

25.3Mining and infrastructure240

25.4Risks241

25.5Opportunities241

amcconsultants.comxxiii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

26Recommendations242

26.1Introduction242

26.2Quality Assurance / Quality Control242

26.3Mineral Resource242

26.4Metallurgical testwork development243

26.5Open pit mining243

26.6Infrastructure244

26.7Environmental baseline studies244

26.8Community and social studies244

26.9Pre-feasibility study244

26.10Costs244

27References245

28QP Certificates247

amcconsultants.comxxiv

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Tables

Table 1.1Assumptions for pit optimizationviii

Table 1.2Mineral Resource as of 31 October 2022ix

Table 1.3LOM process plant feed schedulexi

Table 1.4Operating costs summaryxiii

Table 1.5Capital expenditure summaryxiv

Table 1.6Summary of potential economic resultsxv

Table 2.1Persons who prepared or contributed to this Technical Report36

Table 4.1Mineral tenure controlled by New Pacific42

Table 4.2Fees paid to government from 2019 to 202243

Table 4.3Royalty applicable to silver in the AMC44

Table 5.1Annual weather averages in Potosí area49

Table 6.1Exploration work completed by NJ Mining from 2009 to 201552

Table 6.2Selected result of historical surface channel sampling program55

Table 6.3Summary of previous drilling programs55

Table 6.4Results of historical drill intersections56

Table 7.1Mineral occurrences and styles of mineralization67

Table 9.1Summary of underground and surface sampling programs76

Table 9.2Selected underground sampling results80

Table 9.3Summary of underground and surface sampling results81

Table 10.1New Pacific drilling by year85

Table 10.2Summary of North Prospects drillholes95

Table 10.3Drill intercepts for the Silver Sand deposit97

Table 11.1New Pacific sample analysis103

Table 11.2Silver Sand QA/QC samples by year [1] (October 2017 - July 2022)104

Table 11.3Silver Sand QA/QC submission rates [1] (October 2017 - July 2022)105

Table 11.4Silver Sand CRMs (October 2017 - July 2022)105

Table 11.5Silver Sand CRM warnings and fails (October 2017 - July 2022)106

Table 11.6Comparison between CRM values and analytical results (2020 - July 2022)108

Table 11.7Silver Sand coarse blank performance (2020 - July 2022)110

Table 11.8Silver Sand pulp blank performance (2021 - July 2022)112

Table 11.9Silver sand field duplicate statistical summary (2021 - July 2022)114

Table 11.10Silver sand coarse reject duplicate statistical summary (2021 - July 2022)115

Table 11.11Silver Sand pulp duplicate statistical summary (2021 - July 2022)116

Table 12.1Assay verification results119

Table 13.1Sample categories123

Table 13.2Composite head assays124

Table 13.3Grindability test data124

Table 13.4Master composite size / assay summary125

Table 13.5XRD analysis127

Table 13.6Modal mineralogy128

amcconsultants.comxxv

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.7Mineral grain size data (D50)128

Table 13.8Silver deportment128

Table 13.9Rougher vs one-stage Cleaner silver flotation performance136

Table 13.10Cleaner #1 vs Cleaner #2 silver flotation performance137

Table 13.11Locked cycle results, transitional MC138

Table 13.12Locked cycle results, oxide MC (single cleaner)138

Table 13.13Locked cycle results - sulphide MC138

Table 13.14Locked cycle concentrates, base metals139

Table 13.15Locked cycle concentrates, minor elements (by ICP)139

Table 13.16Bottle roll testing - effect of grind size140

Table 13.17Bottle roll testing - Effect of NaCN concentration (75 µm grind)144

Table 13.18DO2levels, transitional composite141

Table 13.19DO2levels vs % Ag extraction142

Table 13.20Sulphide master, initial lead nitrate evaluation143

Table 13.212 mm Crush: Bottle roll results143

Table 13.22Variability bottle roll results146

Table 13.23Cyanidation of flotation concentrate146

Table 13.24Cyanide detox test results (90 minutes)147

Table 13.25ABA tests on flotation LCT tailing (master comps)147

Table 13.26ABA tests on cyanide detox residues (master comps)148

Table 13.27TCLP test results: Flotation and cyanidation tail streams148

Table 14.1Silver Sand Mineral Resource as of 31 October 2022114

Table 14.2Drillhole data used in the estimate152

Table 14.3Grade capping for silver and arsenic155

Table 14.4Ag statistics of raw, composited, and capped assay data156

Table 14.5Block model parameters156

Table 14.6Ag grade interpolation search parameters157

Table 14.7Class interpolation search parameters158

Table 14.8Statistical comparison of capped assay data and block model for Ag163

Table 14.9Cut-off grade and conceptual pit parameters163

Table 14.10Silver Sand Mineral Resource as of 31 October 2022164

Table 14.11Mineral Resources within and outside the AMC164

Table 14.12Model sensitivity to cut-offs164

Table 14.13Mineral Resource comparison with previous 2019 estimate165

Table 16.1Slope design recommendations170

Table 16.2Open pit drilling parameters171

Table 16.3Open pit cut-off calculation172

Table 16.4Pit optimization results173

Table 16.5Open pit primary equipment182

Table 16.6Open pit manning183

Table 16.7Total inventory184

amcconsultants.comxxvi

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 16.8Capacity for in-pit backfill185

Table 16.9Rock volume required for tails south embankment construction186

Table 16.10Open pit material mined187

Table 16.11LOM process plant feed schedule189

Table 17.1Process Design Criteria193

Table 17.2Equipment list summary199

Table 20.1Surface water evaluation sites215

Table 21.1Summary of estimated open pit operating cost223

Table 21.2Summary of open pit operating costs by year224

Table 21.3Summary of estimated mill operating cost225

Table 21.4Labour details - Processing226

Table 21.5Power consumption details - Processing226

Table 21.6Consumable details - Processing227

Table 21.7Total operating cost estimate228

Table 21.8Mill area capital estimate228

Table 21.9Process plant direct capital breakdown by area229

Table 21.10Process Plant direct capital breakdown by discipline229

Table 21.11Tailings storage facility estimate230

Table 21.12Surface infrastructure project capital cost estimate231

Table 21.13Process plant indirect capital budget231

Table 21.14Total capital cost estimate232

Table 22.1Silver Sand deposit - key economic input assumptions and cost summary234

Table 22.2Silver Sand production and cash flow forecast235

Table 22.3Silver Sand project NPV ($M) / IRR (%) economic sensitivity analysis - post tax236

Table 26.1Budget for the recommended programs244

amcconsultants.comxxvii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figures

Figure 4.1Location of Silver Sand Property39

Figure 4.2Mineral concessions and MPC area41

Figure 5.1Administrative location and transportation access of Silver Sand Property45

Figure 5.2Physiographic zones of Bolivia46

Figure 5.3Climate map of Bolivia48

Figure 5.4Vegetation map of Bolivia49

Figure 6.1Mineralization zones defined in previous exploration programs53

Figure 6.2Historical channel sampling from Zone I, Silver Sand Property54

Figure 7.1Bolivian geotectonic framework57

Figure 7.2Bolivian metallogenic belts59

Figure 7.3Major deposits in the Bolivian Tin Belt60

Figure 7.4Unconformity and thrust fault contact61

Figure 7.5Thrust Fault north of Snake Hole62

Figure 7.6General geology of Silver Sand Property63

Figure 7.7Stratigraphic column for the Property64

Figure 7.8Transfer zones linked to mineralization at Silver Sand65

Figure 7.9Location of North and South Block66

Figure 7.10Silver mineralization in drill cores68

Figure 7.11Cross Section 5250, Silver Sand Zone70

Figure 7.12Crackle breccia intervals in altered porphyritic dacite71

Figure 7.13Diatreme breccia outcrop in Aullagas zone71

Figure 7.14Example of tin mineralization associated contact Tarapaya with
Cretaceous sandstone72

Figure 7.15Oxidation material in core73

Figure 7.16Transition material in core73

Figure 8.1Conceptual model of mineralization controls at Silver Sand Property75

Figure 9.1Location of historic adits and mine dumps77

Figure 9.2Results from the Jesus adit trench78

Figure 9.3Channel sampling at the Jardan Prospect79

Figure 9.4Underground mapping and sampling at Mascota prospect80

Figure 9.5Mineralized structures and fractures in historically mined Snake zone glory hole81

Figure 9.6El Fuerte prospect main structure82

Figure 9.7Aullagas prospect outcrop83

Figure 9.8El Bronce prospect83

Figure 9.9Jisas prospect outcrop photo84

Figure 10.1Location map of drillholes in Silver Sand area86

Figure 10.2Silver Sand drilling87

Figure 10.3Jisas North prospect drilling, showing "quicklog" process88

Figure 10.4Silver Sand mineralization - plan view91

amcconsultants.comxxviii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 10.5Silver Sand mineralization - 3D perspective92

Figure 10.6Cross Section 5250, Silver Sand center area92

Figure 10.7Cross Section 6400, Silver Sand south area93

Figure 10.8Location of drillholes, Snake Hole prospect94

Figure 10.9Drillholes of North Block96

Figure 11.1New Pacific Betanoz core logging and sampling facility101

Figure 11.2New Pacific Betanoz core processing facility102

Figure 11.3Control chart for CDN-ME-1501 (Ag) (2019 - July 2022)107

Figure 11.4Control chart for CDN-ME-1603 (Ag) (2020 - July 2022)107

Figure 11.5Control chart for CDN-ME-1810 (Ag) (2020 - July 2022)108

Figure 11.6Coarse blank control chart (2020 - July 2022)111

Figure 11.7Pulp blank control chart (2021 - July 2022)112

Figure 11.8Silver Sand field duplicate RPD and scatter plot (2021 - July 2022)114

Figure 11.9Silver Sand coarse reject duplicate RPD and scatter plot (2021 - July 2022)115

Figure 11.10Silver Sand pulp duplicate RPD and scatter plot (2021 - July 2022)116

Figure 13.1HLS recovery curves, Sulphide MC125

Figure 13.2HLS recovery curves, Transitional MC126

Figure 13.3HLS recovery curves, Oxide MC126

Figure 13.4Particle sorting samples (oxide core)129

Figure 13.5Rougher flotation kinetics, Sulphide master130

Figure 13.6Rougher flotation kinetics, Transitional master131

Figure 13.7Rougher flotation kinetics, Oxide master132

Figure 13.8Rougher flotation kinetics, Sulphide master133

Figure 13.9Rougher flotation mass pull vs Ag recovery curves134

Figure 13.10Rougher flotation kinetics, Transitional master134

Figure 13.11Rougher flotation kinetics, Oxide master135

Figure 13.12Cleaner #1 flotation response, master composites x 3136

Figure 13.13Locked cycle test flowsheet137

Figure 13.14Effect of DO2on Ag extraction, 75 µm grind, 2 g/L NaCN142

Figure 13.15Effect of lead nitrate on Ag extraction, Sulphide comp143

Figure 13.16Leaching of -2 mm master composites144

Figure 13.17Column leach kinetics (Transitional MC)145

Figure 14.1Silver Sand drillhole location plan152

Figure 14.23D view of mineralization domains looking north-east153

Figure 14.3Pie-chart of the percentage volume by domains154

Figure 14.4Probability plot for Ag155

Figure 14.53D view of the resource classification159

Figure 14.6Plan view of the block model and drillholes160

Figure 14.7Block model versus drillhole grade on Section 5200115

Figure 14.8All domains swath plot for silver162

Figure 16.1Structural domains170

Figure 16.2Recommended Inter-Ramp Angle from kinematic analysis170

Figure 16.3Pit optimization results174

Figure 16.4Final pit design175

Figure 16.5Section view A1-A2 with Ag grade values (g/t)176

Figure 16.6Section view B1-B2 with Ag grade values (g/t)176

Figure 16.7Section view C1-C2 with Ag grade values (g/t)177

Figure 16.8Section view D1-D2 with Ag grade values (g/t)177

Figure 16.9Section view E1-E2 with Ag grade values (g/t)178

Figure 16.10Main pit stages179

Figure 16.11General site layout181

Figure 16.12Open pit mining areas184

Figure 16.13Indicative value by mining area185

Figure 16.14Life-of-mine production schedule187

Figure 16.15Process feed schedule188

Figure 17.1Process flowsheet summary, Sheet 1191

Figure 17.2Process flowsheet summary, Sheet 2192

Figure 18.1Silver Sand site location203

Figure 18.2Preliminary site infrastructure layout204

Figure 18.3Power lines in the vicinity of property206

Figure 18.4TSF sectional view208

Figure 18.5Topography and infrastructure plant layout210

Figure 19.1Historical silver price and projections212

Figure 21.1Open pit benchmarking costs222

Figure 22.1Silver Sand project NPV economic sensitivity analysis - post tax236

amcconsultants.comxxix

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Abbreviations & acronyms

Abbreviations & acronyms

Description

$

United States dollar

%

Percentage

'

Feet

"

Inches

°

Degree

°C

Degrees Celsius

µm

Micron

µS/cm

Microsiemens per centimeter (a measure of electrical conductivity)

3D

Three-dimensional

AACN

National Competent Environmental Authority (Autoridad Ambiental Competente Nacional)

AAS

Atomic absorption spectroscopy

ABA

Acid Base Accounting

AES

Atomic Emission Spectroscopy

Ag

Silver

Ai

Abrasion index

AISC

All-in Sustaining Costs

AJAM

Jurisdictional Mining Administrative Authority (Autoridad Jurisdiccional Administrativa Minera)

Alcira

Minera Alcira Sociedad Anónima Alcira S.A.

ALS

ALS laboratories

AMC

Administrative Mining Contract

AMC Consultants

AMC Mining Consultants (Canada) Ltd.

AMD

Acid Mine Drainage

ARD

Acid Rock Drainage

As

Arsenic

ATE

Temporary Special Authorization

Au

Gold

BFA

Bench face angle

BOB

Bolivian Boliviano

BWi

Ball Mill Work Index

CaCO3

Calcium carbonate

CaO

Calcium oxide

Capex

Capital expenditure

CCD

Counter current decantation

CCR

Crusher Control Room

CIM

Canadian Institute of Mining, Metallurgy and Petroleum

CIMM

Research Center for Mining and Metallurgy

cm

Centimetre

CN

Cyanide

COG

Cut-off grade

COMIBOL

Corporación Minera de Bolivia

Congress

Congress of Bolivia

CPE

Political Constitution of the State (Constitución Política del Estado)

CR

Critically Endangered

amcconsultants.comxxx

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

CRM

Certified reference material

CSA

Canadian Securities Administrators

Cu

Copper

CV

Coefficient of Variation

d

Day

DDH

Diamond drillhole

DIA

Environmental License

DMS

Dense Media Separation

dmtpa

Dry metric tonnes per annum

dmtph

Dry metric tonnes per hour

DO2

Dissolved oxygen

DTM

Digital Terrain Model

DWi

Drop Weight Index

E

East

EEIA-AI

Analytical Environmental Impact Assessment Study

EIA

Environmental Impact Assessment

EN

Endangered

ENE

East-northeast

EP

Eastern pit

EPCM

Engineering, Procurement and Construction Management

Excel

Microsoft Excel

FAO

Food and Agriculture Organisation

FNCA

Environmental Categorization Form (Formulario de Categorización Ambiental)

FoS

Factor of Safety

g

Gram

G&A

General and Administration

g/L

Grams per litre

g/t

Grams per tonne

GEOBOL

Servicio Geologico de Bolivia

GPS

Global positioning system

GU

Geotechnical Unit

h

Hour

Haulage

Hexagon Mining's Mineplan Haulage

HG

High grade

HLS

Heavy Liquids Separation

HMI

Human-Machine Interface

hr

Hours

ICP

Inductively Coupled Plasma

ID2

Inverse distance squared

ID3

Inverse distance cubed

IES

International Electrotechnical Commission

IRA

Inter-Ramp Angle

IRAK

Kinematic Inter-Ramp Angle

IRR

Internal rate of return

ISO

International Organization for Standardization

ITASCA

ITASCA Chile SpA

amcconsultants.comxxxi

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

kg

Kilogram

kg/L

Kilogram per litre

kg/t

Kilogram per tonne

km

Kilometre

km2

Square kilometre

kPa

Kilopascal

kt

Thousand tonnes

kV

Kilovolt

kW

Kilowatt

kWh/t

Kilowatt-hour per tonne

kWh/m3

Kilowatt-hour per cubic metre

L

Litre

L/h

Litre per hour

lab

Laboratory

LCT

Locked cycle test

Leapfrog

Leapfrog Geo 4.0

LG

Low grade

LOM

Life-of-mine

M

Million

m

Metre

m2

Square metre

m3

Cubic metre

m3/h

Cubic metre per hour

M m3

Million metres cubed

masl

Metres above sea level

Mbcm

Million bulk cubic metres

MC

Master composites

MCC

Motor Control Center

MCR

Main Control Room

mg

Milligram

mg/L

Milligram per litre

MIBC

Methyl isobutyl carbinol

Minemax

Minemax Scheduler 7

mm

Millimetre

MMAYA

Ministry of Environment and Water protection (Ministerio de Medio Ambiente y Agua)

MMM

Ministry of Mining and Metallurgy

Moz

Million ounces

MP

Main pit

MPC

Mining Production Contract

MS

Mass spectroscopy

Mt

Million tonnes

Mtpa

Million tonnes per annum

mV

millivolt

MW

Megawatt

MWh

Megawatt per hour

N

North

amcconsultants.comxxxii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

NaCN

Sodium cyanide

NaOH

Sodium hydroxide

NE

North-east

New Pacific

New Pacific Metals Corp.

NI 43-101

National Instrument 43-101

NJ Mining

Ningde Jungie Mining Industry Co. Ltd.

NN

Nearest neighbour

NNE

North-northeast

NNW

North-northwest

NP

Northern pit

NPV

Net Present Value

NW

North-west

OK

Ordinary kriging

Opex

Operating expenditure

OSC

Competent sectoral agency (organismo sectorial competente)

oz

Troy ounce

p.a.

Per annum

P80

80% Passing

Pb

Lead

PCS

Process Control System

PDC

Process Design Criteria

PEA

Preliminary Economic Assessment

PFS

Pre-feasibility Study

pH

pH is a measure of hydrogen ion concentration; a measure of the acidity or alkalinity of a solution

PID

Proportional-integral-derivative

PLC

Programmable Logic Controller

PLS

Pregnant leach solution

ppm

Parts per million

Property

Silver Sand Property

QA/QC

Quality assurance and quality control

QP

Qualified Person as defined by NI 43-101

RAAM

Environmental Regulations for Mining Activities, (Reglamento Ambiental para Actividades Mineras)

RC

Reverse circulation drilling

2022 Technical Report

Technical Report

RF

Revenue Factor

RGGA

General Environmental Management Regulation (Reglamento General de Gestión Ambiental)

RGRS

Regulation for Solid Waste Management (Reglamento de Gestión de Residuos Sólidos)

RMCA

Regulation on Atmospheric Contamination (Reglamento en materia de Contaminación Atmosférica)

RMCH

Water Pollution Regulation (Reglamento en materia de Contaminación Hídrica)

RMSP

Regulation for Handling of Hazardous Substances (Reglamento para Manejo de Sustancias Peligrosas)

ROM

Run-of-Mine

RPCA

Environmental Prevention and Control Regulation (Reglamento de Prevención y Control Ambiental)

amcconsultants.comxxxiii

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

RPD

Relative paired difference

RQD

Rock quality designation

RSD

Relative standard deviation

S

South; Sulphur

SAG

Semi-autogenous grinding

SCADA

Supervisory Control and Data Acquisition

SCSE

Sag circuit specific energy

SD

Standard deviation

SEDAR

System for Electronic Document Analysis and Retrieval

SERNAP

National Protected Areas Service (Servicio Nacional de Areas Protegidas)

SI units

SI (Système International d'Unités) is a globally agreed system of units

Silver Sand

Silver Sand Property

SIPX

Sodium Isopropyl Xanthate

SMC

SAG Mill Comminution

Sn

Tin

SO2

Sulfur dioxide

SSE

South-southeast

STU

Special tax unit

SW

South-west

t

Tonne

t/m3

Tonne per cubic metre

t/op hr

Tonnes per operating hour

TCLP

Toxicity Characteristic Leaching Procedure

tpd

Tonnes per day

tph

Tonnes per hour

Trans.

Transitional

TSF

Tailings storage facility

UG

Underground

UNDP

United Nations Development Program

UPS

Uninterruptible Power Supply

US

United States

US$

United States dollar

US$/oz

United States dollar per ounce

US$/t

United States dollar per tonne

UTO

Oruro Technical University

VAT

Value-added tax

VGF

Vibrating grizzly feeder

VRA

Vertical rate of advance

VU

Vulnerable

W

West

w/w

Ratio of weight expressed as a percentage

Yr

Year

Zn

Zinc

amcconsultants.comxxxiv

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

2Introduction

2.1General and terms of reference

AMC Mining Consultants (Canada) Ltd. (AMC Consultants) was commissioned by New Pacific Metals Corp. (New Pacific or the Company) to prepare an independent Technical Report (2022 Technical Report) on the Silver Sand project (Property or Silver Sand) in the Potosí Department, in the Plurinational State of Bolivia (Bolivia). The 2022 Technical Report reports an updated Mineral Resource estimate and provides the results of a Preliminary Economic Assessment (PEA) for the Property. The previous Technical Report on the Property titled "Silver Sand Deposit Mineral Resource Report (Amended) for New Pacific Metals Corp. Property Potosí, Bolivia" (2020 Technical Report), has an effective date of 16 January 2020.

The 2022 Technical Report has been prepared to a standard which is in accordance with the requirements of National Instrument 43-101, Standards of Disclosure for Mineral Projects (NI 43-101), of the Canadian Securities Administrators (CSA) for lodgment on CSA's System for Electronic Document Analysis and Retrieval (SEDAR).

2.2The Issuer

New Pacific is a corporation incorporated under the laws of the province of British Columbia, Canada and is in the business of exploring and developing precious metal mining properties in South America and Canada. Through its three wholly owned subsidiaries Minera Alcira Sociedad Anónima Alcira S.A. (Alcira), Empresa Jisas - Jardan SRL, and Empresa El Cateador SRL, New Pacific collectively holds exploration and mining agreements over an approximate 60 square kilometres (km2) contiguous area. The Silver Sand project is located in Potosí Department, Bolivia.

New Pacific is listed on the TSX Exchange (symbol NUAG) and the NYSE American (symbol NEWP).

2.3Report authors

The names and details of persons who prepared, or who have assisted the Qualified Persons (QPs) in the preparation of this report, are listed in Table 2.1.

amcconsultants.com35

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 2.1Persons who prepared or contributed to this Technical Report

Qualified Persons responsible for the preparation of this Technical Report

Qualified Person

Position

Employer

Independent of New Pacific

Date of last site visit

Professional designation

Sections of Report

Mr J.M. Shannon

General Manager / Principal Geologist

AMC Mining Consultants (Canada) Ltd.

Yes

No visit

P.Geo. (BC)

2-6, 20, 23, 24, Part of 1, 25, 26

Ms D. Nussipakynova

Principal Geologist

AMC Mining Consultants (Canada) Ltd.

Yes

28-29 May 2022

P.Geo. (BC)

7-12, 14, Part of 1, 25, 26, 27

Mr A. Holloway

Process Director

Halyard Inc.

Yes

14-16 Jan 2020

P.Eng. (ON)

13, 17, 19, Part of 1, 21, 25, 26, 27

Mr W. Rogers

Principal Mining Engineer

AMC Mining Consultants (Canada) Ltd.

Yes

No visit

P.Eng. (BC)

15, 16, 22, Part of 1, 21, 25, 26, 27

Mr M. Molavi

Principal Mining Engineer

AMC Mining Consultants (Canada) Ltd.

Yes

No visit

P.Eng. (BC)

Part of 1, 18, 25, 26

Mr L. Botham

Principal Engineer

NewFields Canada Mining & Environment ULC

Yes

No visit

P.Eng. (SK)

Part of 1, 18, 21, 25, 26

Other Experts who assisted the Qualified Persons in the preparation of this Technical Report

Expert

Position

Employer

Independent of New Pacific

Visited site

Sections of Report

Mr Y. (Alex) Zhang

Vice President, Exploration

New Pacific Metals Corp.

No

Yes, multiple times

1-11 and 23

Mr J. Zhang

Manager, Projects

New Pacific Metals Corp.

No

Yes

All

Mr S. Chan

Senior Mining Engineer

AMC Mining Consultants (Canada) Ltd.

Yes

No

22

Ms K. Zunica

Senior Geologist

AMC Consultants Pty Ltd

Yes

No

11

Source: AMC Mining Consultants (Canada) Ltd., 2022.

AMC Consultants acknowledges the numerous contributions from New Pacific in the preparation of this report and is particularly appreciative of prompt and willing assistance of Mr Alex Zhang and Mr Jason Zhang.

Ms Dinara Nussipakynova visited the Property on 28-29 May 2022. All aspects of the project were examined, specifically drill core, drilling and core processing procedures, initial Quality Assurance / Quality Control (QA/QC) procedures, and database management. Mr Andrew Holloway of Halyard visited the Property in January 2020. All aspects relating to surface infrastructure, plant location, drill core, and geometallurgical considerations were inspected at that time.

2.4Sources of information

In preparing this report, the QPs have relied on various geological maps, reports, and other technical information provided by New Pacific. AMC Consultants has reviewed and analyzed the data provided and drawn its own conclusions augmented by its direct field observations. The key information used in this report is listed in Section 27 References, at the end of this report.

amcconsultants.com36

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

New Pacific's internal technical information reviewed by the QPs was adequately documented, comprehensive and of good technical quality. It was gathered, prepared, and compiled by competent technical persons. The QPs used their professional judgement and made recommendations in this report where it deems further work is warranted.

2.5Other

This report includes the tabulation of numerical data which involves a degree of rounding for the purpose of resource estimation. The QPs do not consider any rounding of the numerical data to be material to the project.

All currency amounts and commodity prices are stated in US dollars and any costs provided by New Pacific were in US dollars ($). Quantities are stated in metric (SI) units. Commodity weights of measure are in grams (g) or percent (%) unless otherwise stated.

A draft of the report was provided to New Pacific for checking for factual accuracy. The effective date of the report is 30 November 2022.

amcconsultants.com37

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

3Reliance on other experts

The QP has relied, in respect to certain information concerning legal matters relevant to the Technical Report, upon the work of the Experts listed below. To the extent permitted under NI 43-101, the QPs disclaim responsibility for the relevant section of the Report listed below.

·Experts: Mattias Garrón (Partner), PPO Law Offices, La Paz, Bolivia, as advised in letters to New Pacific Metals Corp. both with an effective date of 10 October 2022.

·Report, opinion, or statement relied upon: Legal Opinion regarding the Silver Sand project and Re: Mining Productive Contract with Corporacion Minera de Bolivia (COMIBOL).

·Extent of reliance: full reliance following a review by the QP.

·Portion of Technical Report to which disclaimer applies: Section 4.3.

The QP has relied, in respect to certain information concerning environmental and social aspects relevant to the Technical Report, upon the work of the Experts listed below. This work has been summarized and provided by New Pacific. To the extent permitted under NI 43-101, the QPs disclaim responsibility for the relevant sections of the Report listed below.

·Experts: Independent firm, Tierralta S.R.L. La Paz, Bolivia.

·Report, opinion, or statement relied upon: Environmental baseline information for the project from the Analytical Environmental Impact Assessment Study (EEIA-AI), 30 November 2022.

·Extent of reliance: full reliance following a review by the QP.

·Portion of Technical Report to which disclaimer applies: Section 20.1 - 20.3.5.

And

·Experts: Independent firm, Cumbre del Sajama S.A.

·Report, opinion, or statement relied upon: Final Report titled Socioeconomic Baseline, Risk Analysis and Community Relationship Recommendations for New Pacific Metals Corp - Silver Sands Project in the Department of Potosi-Bolivia, May 2018.

·Extent of reliance: full reliance following a review by the QP.

·Portion of Technical Report to which disclaimer applies: Section 20.3.6.

And

·Experts: Independent firm, CPM Investigación & Desarrollo, based in La Paz, Bolivia.

·Report, opinion, or statement relied upon: Archaeological studies, report date 29 November 2022.

·Extent of reliance: full reliance following a review by the QP.

·Portion of Technical Report to which disclaimer applies: Section 20.3.7.

amcconsultants.com38

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

4Property description and location

4.1Property location

The Property is situated in the Colavi District of Potosí Department in south-western Bolivia, 33 kilometres (km) north-east of Potosí city, the department capital. The approximate geographic centre of the Property is 19°22' 4.97" S latitude and 65°31' 22.93" W longitude at an elevation of 4,072 metres above sea level (masl). The location of the Property is shown in Figure 4.1.

Figure 4.1Location of Silver Sand Property

Source: New Pacific Metals Corp., 2022.

4.2Bolivian Regulatory framework

The following section on the Bolivian Regulatory framework borrows from Aguirre (2019) and Bufete Aguirre Soc. Civ. (2017).

4.2.1Overview

Bolivia began opening the mining industry to private investment in the 1980s. In 1997 a completely new Mining Code (the 1997 Code), governing most matters relating to mining activities was enacted. The 1997 Code followed the concession system considering mining concessions as real estate property which as such could be transferred, contributed to the capital of companies, mortgaged, bartered, sold, and subject to inheritance laws under the Civil Code.

A new and complete Mining and Metallurgy Law No 535 was introduced on 28 May 2014 (the 2014 Mining Law), to replace the 1997 Code. The 2014 Mining Law was modified by Law No. 845 of 24 October 2016 (the 2016 Mining Law) by Bolivian Congress.

The 2014 and 2016 Mining Laws set out rules in relation to:

·The procedures for the granting of new mining rights.

·The procedures for a change from the old mining concession system to the new system of Administrative Mining Contract (AMC) mandated by the new legislation based on the Constitution.

amcconsultants.com39

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

4.2.2Exploration and mining rights

Exploration and mining rights in Bolivia are granted by the Ministry of Mines and Metallurgy through the Jurisdictional Mining Administrative Authority (Autoridad Jurisdiccional Administrativa Minera; AJAM). Under the new Mining Laws, tenure is granted as either an AMC or an exploration license. Tenure held under previous legislation was converted to Temporary Special Authorizations (ATEs), formerly known as "mining concessions", under the new Mining Laws. These ATEs are required to be consolidated to new 25-hectare sized cuadriculas (concessions) and converted to AMCs. AMCs created by conversion recognize existing rights of exploration and / or exploitation and development, including treatment, foundry refining, and / or trading.

AMCs have a fixed term of 30 years and can be extended for a further 30 years if certain conditions are met. Each contract requires ongoing work and the submission of plans to AJAM.

Exploration licenses are valid for a maximum of five years and provide the holder with the first right of refusal for an AMC.

In specific areas, mineral tenure is owned by the Bolivian state mining corporation, COMIBOL. In these areas development and production agreements can be obtained by entering into a Mining Production Contract (MPC) with COMIBOL.

4.2.3Environment protection

Depending on the nature and scope of the activities to be conducted, the operator may need specific licenses or dispensations from the environmental authorities under the Ministry of Environment and Water or the Departmental Governorships. This applies to projects that may require consultation with a population that could be affected by the project.

The main law governing environmental protection, in general, is Law 1333 of 27 April 1992, which is regulated by various Supreme Decrees of the Executive Branch. The special Decree containing the mining rules is of primary importance. Strict parameters must be followed for the protection of the environment. Breach of environmental obligations may even trigger criminal liabilities under the Constitution.

Licenses must be updated depending on the changes as triggered by the ongoing activities and operations. An Environmental Impact Assessment (EEIA) is normally required to obtain the appropriate license. Specialized environmental authorities follow up and control compliance. As required under the licenses, any impact on the environment must be notified to the authorities. Remediation measures and rehabilitation projects are compulsory. For mine closure, the operator must create a financial reserve that is maintained on an annual basis. A final closure study on the effect on the environment would be required in due time. Under a special law known as the "Mother Earth Law", a certain requirement of restitution must be met.

4.3Mineral tenure

4.3.1Introduction

New Pacific's Silver Sand Property encompasses a combination of 100% owned concessions (ATEs and AMCs) and an MPC with COMIBOL which gives the Company access to approximately 60 km2, in this emerging silver district.

amcconsultants.com40

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 4.2Mineral concessions and MPC area

Notes: MPC Area = Mining Production Contract with the Bolivian Mining
Corporation, NUAG Property= 100% New Pacific owned mineral tenure.

Source: New Pacific Metals Corp., 2022.

amcconsultants.com41

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

4.3.2100% owned New Pacific tenure

The Property originally comprised 17 ATEs, now converted to a consolidated AMC covering an area of 3.1656 km2. These ATEs were acquired by New Pacific in its original purchase of the interests of Alcira, now New Pacific's wholly owned subsidiary. They are valid for 30 years and can be extended for an additional 30 years.

In accordance with the 2014 and 2016 Mining Laws, New Pacific (through Alcira) submitted all required documents for the consolidation and conversion of the original 17 ATEs, which comprise the core of the Silver Sand project, to Cuadriculas and AMC, to AJAM. Conversion was initially approved by AJAM in February 2018. On 6 January 2020, Alcira signed an AMC with AJAM pursuant to which the 17 ATEs were consolidated into one concession named as Arena De Plata (Silver Sand) with an area of 3.1656 km2. This AMC is registered with the mining register with mining registration number 1-05-1500055-0001-21, notary process completed and registration published in the mining gazette on 15 July 2021.

In addition, New Pacific acquired 100% interest in three continuous concessions currently consisting of ATEs called Jisas, Jardan and El Bronce originally owned by third party private entities. These three concessions, when converted to AMCs, will total 2.25 km2. The Jisas and Jardan concessions were acquired in July 2018 and are held through 100% owned subsidiary Empresa Jisas - Jardan SRL. The El Bronce concession was acquired in late 2019 and is held through 100% owned subsidiary Empresa El Cateador SRL.

The total area of AMCs under full control of the Company will be 5.42 km2 after the consolidation and conversion procedures are complete for the recently acquired ATEs. This conversion process has already been completed for the Silver Sand South Block which hosts the Mineral Resource area.

Table 4.1 summarizes New Pacific's Silver Sand Mineral Tenure held on a 100% basis. All concessions are valid for 30 years of signing of an Administrative Resolution.

Table 4.1Mineral tenure controlled by New Pacific

Concession number

National registry

Name

Concession type

Size in hectares

Title holder

Expiry date

AMC #s 4694 - 4710

1-05-1500055-0001-21

Arena De Plata

AMC

316.56

Minera Alcira Sociedad Anonima

6 January 2050

13235

503-02753

Jisas

ATE

125

Empresa Jisas - Jardan SRL

25 October 2049

13257

503-02734

Jardan

ATE

50

25 October 2049

11313

503-03740

El Bronce

ATE

6

Empresa El Cateador SRL

31 August 2050

Totals

498

Notes:

·ATEs have been fully converted to AMCs and consolidated into one concession for Arean De Plata.

·The Quota Purchase agreement with the former shareholders of Cateador will need to be registered with Registry of Commerce.

Source: New Pacific Metals Corp., 2022.

4.3.3Mining production contract

New Pacific, through Alcira, entered into an MPC with COMIBOL on 11 January 2019. An updated MPC was entered with COMIBOL on 19 January 2022. The updated MPC covers 12 ATEs and 196 Cuadriculas for a total area of about 55 km2 surrounding the Silver Sand core area. For COMIBOL to obtain mining rights over such areas, AJAM will have to grant them by way of AMCs or Exploration Licenses in accordance with Bolivian mining laws. In addition, the MPC must be ratified by the Congress of Bolivia (Congress) to be valid and enforceable.

amcconsultants.com42

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Once the MPC has been ratified by Congress, the MPC with COMIBOL will be valid for 15 years which may be automatically renewed for an additional 15-year term and potentially, subject to submission of an acceptable work plan, for an additional 15-year term for a total of 45 years. According to the terms of the MPC, the Company has a minimum investment commitment of $6 million (M) during the first four years of exploration. The Company will pay COMIBOL a 6% gross sales value if the mineral concessions covered by the MPC are commercially exploited at a future date.

4.4Environmental permits

New Pacific has successfully obtained environment permits from local authorities to conduct mineral exploration and drilling activities in the mineral concessions fully owned by the Company and the MPC areas owned by COMIBOL. There are no known significant factors or risks that might affect access or title, or the right or ability to perform work on the Property, including permitting and environmental liabilities to which the project is subject.

4.5Land holding costs

AJAM employs a special tax unit (STU), that is indexed to the "Unidad de Fomento a la Vivienda", to calculate the annual fee ("patente") which mineral concession holders must pay to the government. Depending on the type and size of mineral concessions, the number of STUs varies between 375 and 692 STUs per Cuadricula. In 2019, each STU was equivalent to 2 Bolivianos. Note that the STU may change slightly year by year.

Table 4.2 below provides details of fees paid to the government from 2019 to 2022. In years 2019 to 2021, fees were paid based on the 17 ATEs. Starting from year 2022, fees are paid based on the consolidated concession of AMCs. For the concessions covered by the MPC with COMIBOL, fees are paid only for 7 ATEs in year 2019. The Company does not have to pay any fees to the government for the remaining ATEs owned by COMIBOL and covered by the MPC as they are nationalized concessions. The fees were paid for year 2019 only as COMIBOL did not provide account information to make payments for years 2020, 2021, and 2022. For the 196 Curadriculas, according to the terms of MPC, the Company will have to pay the annual fees to the government when COMIBOL is granted mineral concessions by AJAM. In addition, the Company will pay COMIBOL a management fee of $10,000 per month for all the concessions covered by the MPC upon ratification.

Table 4.2Fees paid to government from 2019 to 2022

Concessions

Title holder

2019

2020

2021

2022

17 ATEs

Minera Alcira Sociedad Anonima "Alcira" S.A.

11,644

11,869

12,093

Arena de plata

Minera Alcira Sociedad Anonima "Alcira" S.A.

6,140

Bronce

Empresa El Cateador SRL

222

226

230

233

Jisas

Empresa Jisas - Jardan SRL

4,620

4,710

4,800

4,850

Jardan

Empresa Jisas - Jardan SRL

1,848

1,884

1,920

1,940

7 ATEs of MPC

COMIBOL

3,215

Total BOB

21,549

18,689

19,043

13,163

Equivalent to $

3,096

2,685

2,736

1,891

Notes:

·The 17 ATEs were converted to AMCs in 2021 and now treated as one concession called Arena De Plata.

·The fees are in local currency, Bolivian Boliviano (BOB).

Source: New Pacific Metals Corp., 2022.

amcconsultants.com43

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

4.6Surface rights

As per the 2014 Mining Law, holders of mining rights may obtain surface rights (i) through administrative agreements entered into with AJAM. In addition, surface rights may be obtained on third-party contract areas and by neighbouring properties by the following means: i) agreement between parties; ii) payment of compensation; and iii) compliance with the regulations and procedures for authorization. Once surface rights are obtained, holders of mining rights may build treatment plants, dams and tailings, infrastructure, and other infrastructure necessary to carry out mining activities. New Pacific has not yet obtained surface land rights.

4.7Royalties and encumbrances

For the MPC, if commercial production commences, "COMIBOL will receive six percent (6%) over the gross sales value of the minerals obtained from the mining activities".

AMCs are subject to the following royalties and duties:

·Mining royalty: The royalty is applicable to all mining actors and applies to the exploitation, concentration and / or commercialization of mineral and metals non-renewable resources at the time of their internal sale or export pursuant to the 2014 Mining Law. The royalty is established according to the status of the mineral (raw, refined, etc.), on whether the mineral will be exported, and international mineral prices. The royalty applicable to silver pre-concentrates, concentrates, complexes, precipitates, bullion or molten bar and refined ingot is as shown in Table 4.3.

Table 4.3Royalty applicable to silver in the AMC

Official silver price per troy ounce ($)

%

Greater than $8.00

6

From $4.00 to $8.00

0.75 * official silver price

Less than $4.00

3

Source: New Pacific Metals Corp., 2022.

·Mining Patent: Is a requirement for the mining operator to continue holding mining rights over the mining area. Patents are calculated according to the size of the area under the exploration license or contract, as set out in the 2014 Mining Law. Failure to pay for the patents will trigger the loss of the underlying exploration or mining rights.

With the exception of political risk discussed in Section 14.1 and the need for final execution of some land agreements, AMC Consultants is not aware of other significant factors and risks which may affect access, title, or right to perform work on the Property.

amcconsultants.com44

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

5Accessibility, climate, local resources, infrastructure, and physiography

5.1Accessibility

The Property is located approximately 36 km north-east of the Cerro Rico de Potosí silver and base metal mine, 46 km south-west of the city of Sucre, and 33 km north-west of city of Potosí. The Property is accessed from Sucre and Potosí by travelling along a paved highway to the community of Don Diego, and then north from Don Diego along a 27 km, maintained, all-weather gravel road. Don Diego is accessed by driving 129 km to south-west from Sucre, or 29 km to the north-east from Potosí along paved Highway 5. Key roads and locations are shown in Figure 4.1.

Sucre has a population of 290,281 (worldpopulationreview.com) and is the constitutional capital of Bolivia and the capital city of Chuquisaca department (a department is the largest administrative division in Bolivia). Potosí has a population of 264,402 (worldpopulationreview.com) and is the capital city of Potosí department. Sucre is connected to major Bolivian cities and beyond by highways and commercial air flights. From Potosí, the Pan American highway provides access to La Paz, the capital city of Bolivia. Chilean port cities of Arica and Iquique can be accessed from Potosí via all-weather roads.

Figure 5.1 shows the administrative location of and transportation access to the Property.

Figure 5.1Administrative location and transportation access of Silver Sand Property

Source: Provided by New Pacific 2019 adapted from Geology.com.

amcconsultants.com45

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

5.2Physiography

Bolivia is divided into five north-west-trending physiographic zones as shown in Figure 5.2. These include, from west to east; the Western Cordillera (or Cordillera Occidental), the Altiplano, the Eastern Cordillera (or Cordillera Oriental), the Sub-Andean, and the Amazon Basin to the east.

Figure 5.2Physiographic zones of Bolivia

Notes: Amazon Basin=green, Sub-Andean=red, Eastern Cordillera=white, Altiplano=gray, Western Cordillera=white. Red outlines represent country borders.

Source: New Pacific, 2019 - Adapted from Wikipedia: Geography of Bolivia.

The Property is situated approximately within the central section of the Eastern Cordillera zone and consists of rolling hills with elevation ranging from 3,900 to 4,100 masl.

amcconsultants.com46

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

5.3Climate and vegetation

Due to the high elevation, the Property area has a cold, semi-arid desert climate despite the region's location approximately 19 degrees south of the equator. Vegetation on the Property is poorly developed and mainly consists of sparsely scattered low grasses and shrubs. In valleys below 4,000 m elevation, some eucalyptus trees are grown. Animals such as alpacas, llamas, vicunas, and guanacos are common in the Cordillera Oriental and the local peoples herd llamas and alpacas for food and wool.

Figure 5.3 shows a climate map of Bolivia and Figure 5.4 shows a vegetation map of Bolivia.

amcconsultants.com47

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 5.3Climate map of Bolivia

Source: World Köppen Classification. Enhanced, modified, and vectorized by Ali Zifan, 20 February 2016.

amcconsultants.com48

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 5.4Vegetation map of Bolivia

Source: U.S. Central Intelligence Agency, 1971.

Temperatures on the Property are relatively constant year-round with daily maximums between 14.8°Celsius (C) and 20.5°C. Minimum temperatures range between -5.6°C and 5.1°C. Minimum temperatures are typically below freezing between May and September.

The region experiences a rainy season in the warmer summer months from December to ~mid-April which contributes approximately 80% of the average annual precipitation of 393 millimetres (mm). The driest period is from May to August with very little precipitation.

None of these climate factors preclude operations from being conducted on a year-round basis.

Table 5.1 shows the annual weather averages in the Potosí area.

Table 5.1Annual weather averages in Potosí area

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Avg. temperature (°C)

10.6

10.9

10.6

8.4

8

4.6

5.4

6.6

8.5

11

12.4

11.9

Min. temperature (°C)

4.1

4.6

4.1

0.3

-1.2

-5.6

-4.6

-3.1

-0.6

2

4.3

5.1

Max. temperature (°C)

17.2

17.2

17.2

16.5

17.2

14.8

15.5

16.4

17.6

20.1

20.5

18.7

Precipitation (mm)

102

79

50

13

3

2

0

3

9

21

34

77

Source: Data adapted from www.climate-data.org.

amcconsultants.com49

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

5.4Local resources and infrastructure

Intensive mining for silver, tin, lead, and zinc has occurred in various locations around the city of Potosí ever since the discovery of the large silver deposit Cerro Rico de Potosí (the Rich Hill) in 1545. As a result, many residents of Potosí are employed in mines or mining-related businesses, providing a potential source of workers and services that may be needed at the Property.

A high voltage power line services the adjacent Canutillos mine to the west, and the Colavi mine north-west of the Property respectively. Both Canutillos and Colavi mines are adjacent to the Silver Sand Property boundary and are discussed in Section 22.3.

Water has not been a concern at the Property, though the greater Potosí area has experienced a drought in recent years. Water for domestic use can be obtained from a small lake, approximately 3.5 km north-west of the Property. Water for drilling can be sourced from nearby drainages. The previous owner, Ningde Jungie Mining Industry Co. Ltd. (NJ Mining) recorded groundwater at the Property. New Pacific have carried out some hydrological and hydrogeological work conceptual nature in 2022, and three piezometers were installed in October 2022. Additional work is required to determine whether there is sufficient water present to supply future production scenarios.

There is currently no infrastructure on site. The core processing facility is located at Betanzos, a town situated at a lower elevation where the project office is also located. Betanzos is approximately a 1.5-hour drive to the south of the Property.

Potential tailings storage and waste disposal areas, and potential processing plant sites are discussed in Section 18.

amcconsultants.com50

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

6History

Modern exploration on the Property commenced in 2009. The project history has been compiled from Birak (2017), Redwood (2018), Sugaki et al. (1983), and New Pacific (2017).

6.1Property ownership

In 2009, NJ Mining purchased Alcira, owner of the Silver Sand project, from Empresa Minera Tirex Ltda, a private Bolivia mining company. New Pacific entered into an agreement to acquire Alcira from NJ Mining, pursuant to the terms announced on 10 April 2017. The acquisition was finalized on the 20 July 2017.

New Pacific subsequently acquired 100% of the interests of a local private company who owns the mineral rights of two additional concessions (Jisas and Jardan) in July 2018. No exploration work was completed on the two concessions.

In December 2019, New Pacific acquired 100% of the interests of Empresa El Cateador SRL, a local private company which owns the mineral rights to a single ATE (El Bronce) located to the north of the Property. No exploration work was ever completed on this concession.

In January 2022, an updated MPC was signed between New Pacific's subsidiary Alcira and COMIBOL securing access to an additional 55 km2 of prospective property surrounding the original Silver Sand concessions.

6.2Mining

Mining activity has been carried out on the Silver Sand Property and adjacent areas by various operators intermittently since the early 16th century. There are widespread small mine workings and numerous abandoned miners' villages on the Property. Machacamarca, a historic silver mine on the Property, was mined from colonial times until the price declined in about 1890. Since then, local mining activities have focused on tin mineralization at the adjacent Colavi and Canutillos mines.

Historical mining activities on the Property mainly targeted high-grade vein structures.

Records of historical mine production are not available.

6.3Exploration

Despite the long history of mining on the Silver Sand Property and its adjacent areas, there has been little modern systematic exploration work recorded prior to 2009. The only documented exploration campaign was completed by NJ Mining between 2009 and 2015.

NJ Mining carried out a comprehensive exploration program across the Property. Exploration work comprised geological mapping, surface and underground sampling, trenching, and drilling as shown in Table 6.1. All exploration samples were analyzed at NJ Mining's laboratory facilities near Potosí, Bolivia for silver and, in some cases, tin.

amcconsultants.com51

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 6.1Exploration work completed by NJ Mining from 2009 to 2015

Type of exploration

Work completed

1:5,000 geological mapping

3.15 km2

1:1,000 geological traverse surveying

7,272 m in 15 NE-SW exploration lines

Topographic survey

8 survey points

Mapping historic workings

208 m

Diamond core drilling and logging

2,334 m in 8 holes

Trenching

40 m

Reconnaissance mapping

292 points

Reconnaissance sampling

1,202 samples

Mineralogy and lithology identification

19 thin sections

Petrography study

9 thin sections

Channel sampling

1,628 m with 546 samples

Core sampling

504 samples

Specific gravity measurement

31 samples

QA/QC

215 samples

Source: New Pacific Metals Corp., 2022.

Six silicified mineralization zones (Zones I, II, III, IV, IX, and X) were defined from results of the exploration program. This mineralization was defined over an area 1,500 m in length and up to 125 m in width as shown in Figure 6.1.

amcconsultants.com52

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 6.1Mineralization zones defined in previous exploration programs

Source: New Pacific, 2019 adapted from Birak, 2017.

amcconsultants.com53

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

6.3.1Surface and underground channel sampling

NJ Mining collected channel samples from both surface outcrop and abandoned underground workings. Surface channel samples were completed along 100 m spaced, south-west trending exploration lines (sections). They were designed to target north-west trending mineralization zones. Surface and underground samples were collected between Lines 76 and 50 over a strike length of 1,300 m Section lines are shown in Figure 6.1 above.

Both surface and underground channel samples were taken from a 10 centimetre (cm) wide, 2 - 3 cm deep channel cut horizontally into rock with a diamond saw. Individual samples represented 1 to 2.5 m along the channel. An example of sampling channels from Zone 1 is shown in Figure 6.2.

Figure 6.2Historical channel sampling from Zone I, Silver Sand Property

Source: New Pacific Metals Corp., 2019.

Significant results from channel sampling are presented in Table 6.2.

amcconsultants.com54

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 6.2Selected result of historical surface channel sampling program

Section number*

Sample location

Zone intersected

Interval (m)

Average silver grade (g/t)

Number of samples

50

Surface

Zone I

62.7

174

31

54

Surface

Zone I

112

127

59

58

Surface

Zone I

83

93

44

Underground

Zone II

21.4

263

10

62

Surface

Zone I

90.7

233

48

Underground

Zone I

72.1

207

36

66

Surface

Zone I

71.9

145

38

70

Surface

Zone I

33.8

131

18

Surface

Zone II

6.7

141

4

72

Surface

Zone III

16.9

198

9

Note: *Locations of exploration lines (sections) are shown in Figure 10.1.

Source: New Pacific Metals Corp., 2022.

6.3.2Test drilling

NJ Mining conducted two test drill programs consisting of a total of eight diamond holes to evaluate the spatial extensions of the mineralization zones defined at the surface. Table 6.3 shows a summary of the 2012 and 2015 drilling programs completed by NJ Mining.

Table 6.3Summary of previous drilling programs

Year

Drillhole ID

Collar location (UTM)

Collar elevation (m)

Length (m)

Azimuth (degree)

Dip angle (degree)

Easting

Northing

2012

ZK5601

234,681.33

7,856,244.63

3,962.40

242

61

‐76

ZK6401

234,808.24

7,855,854.01

4,005.90

314.5

64

‐73

ZK4002

234,504.00

7,857,063.00

4,092.00

155.3

0

‐90

ZK4801

234,708.00

7,856,719.00

4,052.00

64.8

0

‐90

Subtotal = 776.6 m

2015

ZK4601

234,617.28

7,856,785.18

4,094.90

313.1

241

‐76

ZK5401

234,824.67

7,856,443.33

4,063.80

413.7

243

‐75

ZK5402

234,510.12

7,856,267.07

3,991.10

546.6

0

‐90

ZK6601

235,057.10

7,855,869.01

3,926.00

284.3

258

‐76

Subtotal = 1,557.7 m

Total = 2,334.3 m

Source: New Pacific Metals Corp., 2022.

In 2012, two short, vertical diamond drillholes ZK4002 and ZK4801, targeting the shallow dipping tin mineralization, were drilled from the hanging wall of Zone I but did not intersect silver mineralization. Two angled holes ZK5601 and ZK6401 drilled in the same period but in the footwall of Zone I also did not intercept silver mineralization.

Four holes were drilled in 2015. Three angled holes ZK4601, ZK5401, and ZK6601 drilled from the hanging wall of Zone I mineralization intersected significant silver mineralization. One vertical hole ZK5402 collared in the footwall missed the silver mineralization zones. The mineralization intersections from the three historical drillholes are listed in Table 6.4.

amcconsultants.com55

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 6.4Results of historical drill intersections

Hole number

Section number

Average sample length (m)

Mineralized interval

From (m)

To (m)

Length (m)

Ag (g/t)

ZK4601

46

1.28

83.3

85.6

2.3

60

122

277.2

155.2

179

Incl.

122

145.4

23.4

261

Incl.

170.9

231.3

60.4

266

Incl.

258.6

277.2

18.6

290

ZK5401

54

1.27

151.1

346.4

195.3

168

Incl.

151.1

177.9

26.8

302

Incl.

195.2

249.5

54.3

303

Incl.

304

321.7

17.7

284

Incl.

336.4

346.4

10

321

ZK6601

66

1.33

51.9

243.2

191.3

246

Incl.

51.9

108.1

56.2

329

Incl.

132.1

182.6

50.5

316

Incl.

200.3

243.2

42.9

283

Source: New Pacific Metals Corp., 2022.

6.4Historical Resource and Reserve estimate

There are no known historical estimates of Mineral Resources or Mineral Reserves at the Property.

6.5Production

There has been no documented production from the Property.

amcconsultants.com56

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

7Geological setting and mineralization

7.1Regional geology and metallogeny

7.1.1Geotectonic framework of Bolivia

The regional geological and tectonic framework of Bolivia can be divided into six geotectonic belts. From east to west these comprise: the Precambrian Shield, the Chaco-Beni Plains, the Subandean Zone, the Eastern Cordillera, the Altiplano, and the Western Cordillera. These are shown in Figure 7.1.

Four of these geotectonic belts form part of the Central Andes and are discussed in more detail below.

Figure 7.1Bolivian geotectonic framework

Source: New Pacific Metals Corp., 2019. Adapted from Arce-Burgoa and Goldfarb, 2009.

amcconsultants.com57

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

7.1.2Geology of Central Andes

The Bolivian Central Andes comprise the four western geotectonic belts (Arce-Burgoa and Goldfarb, 2009). These belts were configured by the Mesozoic-Cenozoic orogeny as a result of persistent compressive deformation from the subduction of the oceanic Nazca plate beneath the South American plate since the Cretaceous period. The geology of these major belts is described herein from east to west.

7.1.2.1Subandean Belt

The Subandean Belt is a series of north- and north-west-trending mountain ranges with elevations ranging from 500 to 2,000 masl. The bedrock of the Subandean belt consists of Paleozoic marine siliciclastic sedimentary rocks and Mesozoic and Tertiary continental sedimentary rocks.

7.1.2.2Eastern Cordillera Belt

The Eastern Cordillera (Cordillera Oriental) comprises a series of mountain chains that attain elevations over 4,000 masl. The bedrock of the Eastern Cordillera is comprised of up to 10 km thick, intensively deformed sequences of Paleozoic marine clastic sedimentary rocks and thinner (<3 km), less-deformed Cretaceous and Cenozoic continental sedimentary rock sequences. Granodiorite and adamellite (quartz monzonite) plutonic rocks occur as batholiths and laccoliths in the northern part of the Eastern Cordillera. Permian to Triassic igneous rocks found in the middle and southern parts of the cordillera are mainly hypabyssal and volcanic rocks occurring as stocks and volcanic necks that intruded the Paleozoic sedimentary sequences. Tertiary andesitic volcanic rocks and related hypabyssal rocks associated with the Andean orogenic movement are seen along the western portion of the Eastern Cordillera.

7.1.2.3Altiplano Belt

The Altiplano Belt is a 130 km wide series of intermontane, continental basins forming a high plateau at elevations between 3,600 and 4,100 masl (Arce-Burgoa and Goldfarb, 2009). The Altiplano Belt comprises a Proterozoic to Paleozoic basement which is covered by vast volcanic rocks and continental sediments. Miocene-aged andesitic volcanic rocks occur in the southern portion of the belt. Miocene to Pliocene rhyolitic pyroclastic rocks occur in the northern part of the belt. Continental sediments have been deposited from Cretaceous to recent times.

7.1.2.4Western Cordillera Belt

The Western Cordillera (Cordillera Occidental) is an active volcanic mountain chain consisting of spaced Miocene and Quaternary andesitic volcanoes and small volcanic centers that have erupted through a sequence of Cenozoic and Cretaceous rocks. Volcanic cones rise over 2,000 m above the general land surface, reaching elevations above 6,000 masl (Lamb et al., 1997).

The Western Cordillera is extensively covered by Miocene to recent volcanic rocks erupted along the uplifting axis in the north-south direction. Continental sediments lie between the volcanic bodies.

7.1.3Regional metallogeny of Central Andes

The Bolivian Central Andes is characterized by a diverse series of deposits and metallogenic belts as shown in Figure 7.2. These include the Miocene to Pliocene red-bed copper deposits, epithermal Ag-Au-Pb-Zn-Cu deposits in the Altiplano and Western Cordillera, the Mesozoic and Cenozoic Tin Belt, the Paleozoic gold antimony belt, and the lead-zinc belt in the Eastern Cordillera (Arce-Burgoa and Goldfarb, 2009).

amcconsultants.com58

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 7.2Bolivian metallogenic belts

Source: New Pacific Metals Corp., 2022. Adapted from Arce-Burgoa and Goldfarb, 2009.

The Bolivian Silver-Tin Belt is a 900 km long, north-west to north-south trending belt containing significant deposits of tin, silver, and tungsten related to orogenic and magmatic processes which occurred between the late Paleozoic and late Tertiary. Pluton related Sb-W mineralization occurs within Triassic-Jurassic and Miocene aged rocks in the northern portion of the belt. Pluton related Sn-W and volcanic rock associated Sn-Ag-Pb-Zn mineralization occur within Miocene to Pliocene aged rocks in the central and southern portion of the belt (Rivas, 1979).

Deposits of the tin belt can be divided into four groups (Arce-Burgoa and Goldfarb, 2009):

1Porphyry-associated tin deposits.

2Volcanic rock-associated Sn-Ag-Pb-Zn deposits which include bonanza-type Ag and Sn.

3Sedimentary rock-hosted Sn-Ag-Pb-Zn deposits.

4Distinct pluton-related Sn-Au-W-Zn deposits.

Groups 2 and 3 are collectively defined as Bolivian polymetallic vein deposits which are mainly located in the southern half of the Bolivian Tin Belt (Arce-Burgoa and Goldfarb, 2009).

Bolivian polymetallic vein-type ore deposits are genetically related to Miocene and Pliocene subvolcanic intrusions. Mineralization occurs as veins, veinlet, stockwork, and disseminated ores hosted in Paleozoic and Mesozoic sedimentary rocks, Cenozoic volcanic rocks, and Paleozoic to Mesozoic plutons. The shallower erosion levels in the southern part of the belt results in the partial preservation of the upper silver-rich parts of deposits.

amcconsultants.com59

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Two world-class silver and tin deposits, the Cerro Rico de Potosí deposit, considered to be the largest silver deposit in the world, and the Llallagua deposit, considered to be the largest vein-type tin deposit discovered to date, both belong to the Bolivian polymetallic vein type. The Silver Sand Property is located about 35 km north-east of the Cerro Rico de Potosí deposit and 150 km south-east of the Llallagua deposit within the same tin metallogenic belt. Figure 7.3 shows the major deposits in the Bolivian Tin Belt.

Figure 7.3Major deposits in the Bolivian Tin Belt

Source: New Pacific Metals Corp., 2022. Adapted from Dietrich et al., 2000.

7.2Geological setting and mineralization

7.2.1Property geology

The Property is located in the polymetallic tin belt in the Eastern Cordillera. Evidence of historical mining activities such as abandoned mining adits and mining villages can be seen across the Property. The oldest rocks observed within the Property comprise Ordovician to Silurian marine, clastic sediments which have been intensely folded and faulted.

amcconsultants.com60

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The Paleozoic basement is unconformably overlain by weakly deformed, lower Cretaceous continental sandstone, siltstone, and mudstone. These Mesozoic rocks form an open syncline that plunges gently to NNW and is bound to the SW and NE by NW trending faults. The unconformity between Mesozoic rocks and deformed Paleozoic basement is observed in the south-east part of the Property as shown in Figure 7.4. This is a panoramic view looking to the SW showing the unconformity contact between Paleozoic and Cretaceous Sedimentary Sequences at El Fuerte.

Figure 7.4Unconformity and thrust fault contact

Source: New Pacific Metals Corp., 2019.

There is a thrust fault observed on the east side of the Property, north of the Snake Hole prospect (shown on Figure 7.5), which faults Palaeozoic rocks over the Cretaceous sandstone.

amcconsultants.com61

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 7.5Thrust Fault north of Snake Hole

Source: New Pacific Metals Corp., 2019.

The Cretaceous sedimentary sequence within the Property is divided into the lower La Puerta Formation and the upper Tarapaya Formation.

The La Puerta Formation consists of a sequence of mixed aeolian and fluvial sandstones exhibiting distinct massive, bedded, cross-bedded, and bioturbated "streaky" units which unconformably overlies the Paleozoic basement. The Tarapaya Formation conformably overlies the La Puerta sandstones in the central part of the Property and comprises red siltstones and mudstones intercalated with minor sandstone.

Several Miocene aged subvolcanic porphyritic dacite intrusions occur within Cretaceous and Paleozoic sequences. A porphyritic dacite laccolith is exposed overlying the Cretaceous Tarapaya siltstones at the landmark San Cristobal Hill at Mascota located in the approximate centre of the Property. This laccolith is similar to that hosting polymetallic systems in the southern tin belt. Porphyritic dacite dikes are also exposed in mine workings along the eastern Cretaceous Paleozoic thrust contact. Elongate stocks up to 5 km in length are recorded to the east of the Cretaceous sequence within Paleozoic basement.

A number of andesitic breccias with phreatic, crackle, and other breccia textures are recorded at the Property. A large, oval body of andesitic diatreme breccia cross cutting La Puerta Formation sandstone is seen in outcrop close to the west side of the major Silver Sand mineralization zone in the southern portion of the Property. Geological mapping has defined this zone over an area of approximately 300 m in length and 200 m in width along an NNE orientation. A separate ENE-striking sub-vertical diatreme breccia dike of about 13 m in width is seen in outcrop at Aullagas, central to the Property and about 500 m west of the diatreme outcrop. This unit has welded tuff and sandstone clasts and is cemented by abundant limonite.

The general geology of the Property is presented in Figure 7.6.

amcconsultants.com62

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 7.6General geology of Silver Sand Property

Source: New Pacific Metals Corp., 2022.

amcconsultants.com63

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The stratigraphic column for the Silver Sand Property is presented in Figure 7.7.

Figure 7.7Stratigraphic column for the Property

Source: New Pacific Metals Corp., 2022.

amcconsultants.com64

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

7.2.2Structural control

The Property exhibits a variety of geometries and morphology of the mineralized bodies which are controlled and hosted by local transfer faults. Some are evident in outcrops, but the best examples are observed in drill cores (Warren & Francis-Smith, 2018) and in underground workings. Mineralized structures usually appear as steps-overs developed between two neighboring fault / vein segments that exhibit an echelon arrangement and may or may not be connected by lower-ranking faults / vein. These types of structures are of fractal type, which implies that they repeat their geometry, regardless of the observation scale, in arrangements of sigmoid (jogs), echelon, subparallel stepped, relay, horsetails, and extensional nets (swarms). Line drawings of these features are shown in Figure 7.8.

Figure 7.8Transfer zones linked to mineralization at Silver Sand

Notes: a) release curvature, b) in relay, c) mineral filled jog, d) swarm, e) echelon,
f) jog with brecciated texture, g) faults parallel to bedding, h) combstyle.

Source: New Pacific Metals Corp., 2022.

Detailed geological and structural mapping of surface and accessible underground mining workings has been carried out in the Silver Sand deposit. by the project geology team of Silver Sand from 2018 to 2022. A total of 545 structural measurements including main foliations and tectonic lineations were collected. In addition, other structural data including strike and dip measurements were collected from oriented drillholes. Based on structural style (thrust assemblages) and geometric characteristics (listric faults and conjugate steeply dipping faults), the area has been divided into two blocks, North and South Block, as shown in the location map in Figure 7.9.

amcconsultants.com65

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 7.9Location of North and South Block

Notes: Machacamarca is a silver mine.

Source: New Pacific Metals Corp., 2022.

7.2.2.1North Block

This block covers an area of approximately 0.6 km2 (0.69 x 0.86 km), characterized by thrust-type pre-mineralization structures and listric faults. Penetrative conjugate fault systems in X (crossing) and Y (abutting) are superimposed on these structures and are the main hosts of mineralization, with preferential attitudes of mineralized structures N12°W/77°SW (major) and N12°W/80°NE (minor).

7.2.2.2South Block

This block covers an area of approximately 0.15 km2 (0.30 x 0.5 km), where the first order structure is constituted by the Machacamarca syncline, a cap of the Tarapaya formation (up to 30 m) and a system of penetrative conjugate fault system in X and Y being the main host of mineralization, with preferential attitudes of N20°W/74°SW (major) and N20°W/74°NE (minor).

amcconsultants.com66

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

7.2.3Mineralization

A total of eleven mineralized prospects have been identified across the Property to date. These include the Silver Sand deposit and the El Fuerte, San Antonio, Aullagas, Snake Hole, Mascota, Esperanza, North Plain, Jisas, Jardan, El Bronce, occurrences. Silver Sand, Snake Hole, Jisas, and El Bronce have been tested by drilling. The other nine prospects were defined by rock chip and grab sampling of ancient and recent artisanal mine workings and dumps. Exploration results from surface outcrops and underground workings defined a silver mineralized belt 7.5 km long and 2 km wide.

Table 7.1 summarizes the style of mineralization for each mineral occurrence. Each style is described in more detail in the sections below.

Table 7.1Mineral occurrences and styles of mineralization

Style of mineralization

Mineral occurrence

Sandstone-hosted silver

Silver Sand, El Fuerte, San Antonio, Snake Hole, Esperanza, North Plain, and Jisas

Porphyritic dacite-hosted silver

Mascota, El Bronce

Diatreme breccia- hosted silver

Aullagas

Manto-type tin mineralization

Tarapaya siltstone and mudstone covered areas, such as Canutillos and North Plain

Source: New Pacific Metals Corp., 2022.

7.2.3.1Sandstone-hosted silver mineralization

The mineralization in the Silver Sand project comprises silver-containing sulphosalts and sulphides occurring within sheeted veins, stockworks, veinlets, breccia infill, and disseminated within host rocks. The most common silver-bearing minerals include freibergite [(Ag,Cu,Fe)12(Sb,As)4S13], miargyrite [AgSbS2], polybasite [(Ag,Cu)6(Sb,As)2S7] [Ag9CuS4], bournonite [PbCuSbS3] (some lattices of copper may be replaced by silver), andorite [PbAgSb3S6], and boulangerite [Pb5Sb4S11] (some lattices of lead may be replaced by silver). Most silver mineralization is hosted in La Puerta sandstone units with minor amounts in porphyritic dacite diatreme breccia.

The silver mineralization is the majority of mineralization occurring almost exclusively within the Cretaceous-aged red quartz sandstones of La Puerta formation, which demonstrate extensive sericitic alteration (bleaching). This style of mineralization is usually structurally controlled. The intensity of mineralization is dependent on the density of various mineralized vein structures developed in the brittle host rocks.

Sandstone-hosted silver mineralization is recognized at the core area of Silver Sand deposit and in all regional prospects. Figure 7.10 shows examples of silver mineralization associated to Cretaceous sandstone from drill core.

amcconsultants.com67

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 7.10Silver mineralization in drill cores

Note: DSS565001 Sulphides and sulfosalts crackle breccia @ 141 m (265 g/t Ag, 0.28% Pb, 1.51% Zn).

Source: New Pacific Metals Corp., 2019.

Note: DSS665001 Sulphides and sulfosalts crackle breccia @ 125.81 m (1,290 g/t Ag, 0.92% Pb, 4.05% Zn).

Source: New Pacific Metals Corp., 2019.

amcconsultants.com68

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Note: DSS5803 Sulphides and sulfosalts veinlets @ 188.20 m (205 g/t Ag).

Source: New Pacific Metals Corp., 2019.

Note: DSS525001 Oxidized crackle breccia @ 65.30 m (892 g/t Ag).

Source: New Pacific Metals Corp., 2019.

The exploration drill program confirmed the characteristics of the Silver Sand deposit. The mineralization has been traced for more than 2,000 m along strike, to a maximum width of about 680 m and a dip extension of more than 250 m. Figure 7.11 is a cross section through the central portion of the deposit illustrating the extension of mineralization across strike and downdip.

Other regional mineralization occurrences hosted in sandstone units have been defined by chip sampling of mineralized outcrops and grab sampling of mining dumps. The Snake Hole, El Fuerte, and Jisas mineralization have been traced along a strike length of more than 1,000 m. This strike length is defined by the distribution of old mine working and sampling results of surface outcrops and underground workings.

amcconsultants.com69

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 7.11Cross Section 5250, Silver Sand Zone

Source: New Pacific Metals Corp., 2022.

7.2.3.2Porphyritic dacite-hosted silver mineralization

Silver mineralization within porphyritic dacite is observed at the Mascota and El Bronce prospects. These occurrences experienced extensive artisanal mining activities.

Moderate to strong alteration and well-developed stockwork are seen at the outcrops and in cores. Systematic grab sampling on mining dumps has returned silver grade from 50 to 500 grams per tonne (g/t) Ag. The El Bronce zone has been traced with grab sampling results for more than 1,000 m along strike. The zone is defined by silver assays > 50 parts per million (ppm). In the Jardan area north of Jisas, tin mining is also conducted along north-east-trending veins in porphyritic intrusions at Chiaraque.

Drilling at El Bronce prospect intersected porphyritic dacite intervals with moderate oxidation (limonite-jarosite), weak to moderate sericitic alteration, and argillization patches. Moderate to strong pyrite dissemination with stringers of pyrite, unknown fine sulphides, and minor amount of chalcopyrite, sphalerite, boulangerite, and brecciated intervals of limonite and jarosite in oxidized zones also occur.

amcconsultants.com70

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 7.12Crackle breccia intervals in altered porphyritic dacite

Note: DSSJS1701 Porphyritic Dacite with oxidized crackle breccia @ 11.10 m (XRF 889 g/t Ag, Assay pending).

Source: New Pacific Metals Corp., 2022.

7.2.3.3Diatreme breccia-hosted silver mineralization

Diatreme breccia hosted silver mineralization is observed in the Aullagas zone. Based on surface mapping, the Aullagas zone occurs within a north-east-trending dike-like breccia body of about 40 m in length and 13 m width, hosted by bleached sandstone. Breccia fragments consist of ignimbrite and sandstone clasts cemented with highly ferruginous material. Surface grab samples have returned silver grades from 50 to 298 g/t Ag. Further investigation is needed to define the size and potential of the diatreme breccia.

Figure 7.13Diatreme breccia outcrop in Aullagas zone

Note: Aullagas prospect diatreme breccia strongly oxidated. Grab Sample 293 g/t Ag.

Source: New Pacific Metals Corp., 2022.

amcconsultants.com71

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

7.2.3.4Manto-type tin mineralization

Manto-type tin mineralization on the Property occurs as metasomatic replacement of the calcareous horizons in the siltstone and mudstone at the base of the Tarapaya Formation. Very fine-grained cassiterite is accompanied by abundant pyrite and lesser ankerite, siderite, and barite in the stratiform manto.

Historically, and as early as 1890, artisanal mining of the manto-type tin mineralization occurred at the contact between the La Puerta sandstone and the Tarapaya siltstone and mudstone on the Property. Some drillholes in the current exploration drilling program intersected the tin manto-type mineralization horizon in the contact of Tarapaya siltstone with La Puerta Formation nodular sandstone unit.

Figure 7.14Example of tin mineralization associated contact Tarapaya with Cretaceous sandstone

Note: Hole DSS5803 Showing mantle type tin mineralization in contact Tarapaya formation with La Puerta Formation Sandstone.

Source: New Pacific Metals Corp., 2022.

7.2.4Relative timing of hydrothermal alteration and mineralization

At the Silver Sand deposit magmatic and hydrothermal processes are proposed to have occurred as two separate events within a single metallogenic epoch associated with the most recent orogenic event within the Eastern Cordillera. The initial event comprised an early stage of alteration and mineralization associated with a deep heat and fluid source (intrusion) within a mesothermal environment. This was followed by uplift and erosion of the Eastern Cordillera during Cenozoic orogenic events, and epithermal style mineralization.

The initial phase of metasomatic activity resulted in manto-type tin mineralization of selected calcareous horizons within the Tarapaya siltstone and mudstone package. The manto-type mineralization comprised high-temperature minerals indicative of a mesothermal environment including cassiterite, pyrite, magnetite, ankerite, siderite, and barite.

The underlying La Puerta sandstone was also intensely altered during this event. Metasomatic fluids resulted in the leaching of ferruginous cement from the sandstone, pervasive sericitization and silicification and introduction of pyrite veinlets and disseminated pyrite and sphalerite. Collectively, this alteration changed the rheological properties of the La Puerta sandstone units providing structural preparation for subsequent metasomatic events.

Progressive uplifting and erosion of the Eastern Cordillera during the Cenozoic orogenic events resulted in a transition to an epithermal environment. Hydrothermal activities during this time led to extensive fracturing, hydrothermal brecciation, and reactivation of earlier structures in the brittle

amcconsultants.com72

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

sandstone and porphyritic intrusions and deposition of silver sulphides and sulphosalts. North-west trending fractures and faults with moderate to high-angle dips are thought to have acted as conduits for mineralizing fluids. This mineralization was superimposed on rocks altered during the initial hydrothermal event.

This hypothesis is supported by Rivas (1979) who noted the porphyritic dacite dikes displace manto-style mineralization at the Colavi mine. At the Silver Sand deposit, veins of silver sulphides and sulphosalts crosscut earlier pyrite veinlets, and pyrite in druses are coated with later silver minerals. Silver mineralization zones are spatially associated with porphyritic dacite intrusions but are formed at a later stage than the intrusion. The abundance of low-temperature silver sulphosalts in silver veins and the widespread mineralized hydrothermal and structural breccia suggest an epithermal environment.

7.2.5Oxidation

Mineralized zones on the Property have been oxidized to a vertical depth of more than 250 m in places. The base of oxidation is commonly irregular resulting in significant mixed oxide and sulphide zones (transition zones) due to the strong local influence of fractures.

Oxide minerals are dominated by limonite, jarosite, goethite, and minor hematite resulting pervasive staining within sandstones, and pseudomorphic of sulphide minerals within fractures, breccias, veinlets and veins.

Figure 7.15 shows an example of oxidized mineralization grading into transition Material.

Figure 7.15Oxidation material in core

Note: Hole DSS525001 Oxidation interval (Limonite, jarosite), showing silver grades.

Source: New Pacific Metals Corp., 2022.

Figure 7.16 shows an example of transition mineralization intervals where oxidation is developed along fractures.

Figure 7.16Transition material in core

Note: DSS529001 Transition interval (oxide and sulphides), showing silver grades.

Source: New Pacific Metals Corp., 2022.

amcconsultants.com73

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

8Deposit types

Silver and base metal mineralization in the Silver Sand Property was formed during the regional uplifting and erosion process associated with the Tertiary orogenic events in the Eastern Cordillera. The genetic model of silver and tin mineralization in the Property is a magmatic-hydrothermal system related to a deep-seated magmatic center. The ore-forming processes in the Property are outlined as follows:

1Tin-bearing hydrothermal solutions derived from the magmatic center moved upwards through major faults cutting through the Paleozoic and Mesozoic sedimentary sequences in a mesothermal environment at the early stage of orogeny.

2The ductile and impermeable red siltstone and mudstone of the Tarapaya Formation overlying the porous and permeable La Puerta sandstone acted as a barrier to the upward movement of the high-temperature tin-bearing hydrothermal solutions. This early hydrothermal activity resulted in the extensive sericitic alteration (bleaching) the La Puerta sandstone and the formation of the stratiform metasomatic replacement (manto-type) tin and base metal mineralization at the base of the Tarapaya siltstone and mudstone.

3With persistent uplifting and erosion, the hydrothermal system evolved into an epithermal environment and subvolcanic activities developed in the Property area. Porphyritic dacite rocks intruded Paleozoic and Mesozoic sedimentary sequences and displaced the manto-type mineralization in the Tarapaya siltstone and mudstone. The subvolcanic activities likely caused intensive fracturing, faulting, and brecciation of the previously bleached brittle La Puerta sandstone.

4Following the dacitic porphyry intrusions, silver-rich, and tin-bearing hydrothermal fluid migrated though faults, fractures, and breccia structures in the La Puerta sandstone and porphyritic dacite intrusions both beneath and above the Tarapaya Formation. This later-stage hydrothermal activity is characterized by typical epithermal features such as hydrothermal brecciation and a low-temperature mineral assemblage.

5The continuous uplifting and erosion of the region has exposed the mineralization and resulted in oxidation of the mineralized zones along deep-seated fractures.

The stratiform metasomatic replacement tin mineralization formed in the earlier hydrothermal event is manto-type tin and base metal mineralization which is unique in the Bolivia Tin Belt. The silver and tin mineralization formed in the later hydrothermal event is typical of the Bolivian polymetallic vein-type deposits represented by the giant Cerro Rico de Potosí silver mine. The Bolivian polymetallic vein-type mineralization in the Property includes three subtypes, the sandstone-hosted, the subvolcanic-hosted, and the diatreme breccia-hosted mineralization.

A conceptual model of mineralization controls in the Property is established from the above discussion and is shown in a schematic format in Figure 8.1.

amcconsultants.com74

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 8.1Conceptual model of mineralization controls at Silver Sand Property

Source: New Pacific Metals Corp., 2020.

amcconsultants.com75

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

9Exploration

9.1Introduction

Since the acquisition of the Property by New Pacific in October 2017, exploration work has focused on geological mapping and sampling of surface outcrops, historical mine dumps, and accessible historical underground workings. After an overview of the programs, the results are discussed in Sections 9.2 to 9.4.These samples are not truly representative and are not used in any estimates.

Samples collected from outcrop and underground workings were between 1 to 1.5 m long and were taken along sample lines. Representative grab samples were taken from historical mine dumps. A total of 3,625 rock samples were collected at Silver Sand between October 2017 to July 2022 as shown in Table 9.1.

Table 9.1Summary of underground and surface sampling programs

Sample type

Total samples

Comments

Surface samples

1,046

Rock chips from channels, including the Silver Sand project and regional prospects.

Mine dump samples

1,408

Grab samples from historic mine dumps.

Underground samples

1,171

Rock chip samples from channels in 5,780 m of underground development in 65 locations.

Total

3,625

Source: New Pacific Metals Corp., 2022.

Figure 9.1 shows the distribution of the abandoned artisanal adits and mine dumps across the Property. New Pacific has sampled all mine dumps and accessible adits with silver mineralization showings. Areas mined for tin mineralization over the Tarapaya formation rocks have not been systematically sampled.

amcconsultants.com76

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 9.1Location of historic adits and mine dumps

Source: New Pacific Metals Corp., 2022.

amcconsultants.com77

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

9.2Surface chip sampling

A total of 1,046 rock chip samples were collected from 35 separate outcrops by New Pacific since 2017. Most of the outcrops sampled were located above or proximal to historical workings. Samples were collected at 1.5 m intervals along sample lines oriented approximately perpendicular to the strike direction of mineralization, for a total length of 2,863 m. An example of surface chip sample locations is shown in Figure 9.2. A panoramic photo of chip sampling being carried out in the Jardan prospect is shown in Figure 9.3.

For each sample, the sample type, location, and a description of the lithology, alteration, and mineralization were recorded by New Pacific personnel using Microsoft Excel (Excel) worksheet. Geological and structural mapping was also completed at the same time. Assay data is compiled and stored in the MX Deposit central database as point data. Geological and assay data are then compiled onto a geological plan map.

Of the 1,046 samples collected to date, 101 samples (9.6%) returned a grade between 30 and 840 g/t Ag with an average grade of 150 g/t Ag.

Figure 9.2Results from the Jesus adit trench

Source: New Pacific Metals Corp., 2022.

amcconsultants.com78

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 9.3Channel sampling at the Jardan Prospect

Note: Photo looking west showing channel sampling process March 2020 at the Jardan prospect.

Source: New Pacific Metals Corp., 2022.

9.3Dump sampling

Mine dumps from historical mining activities are scattered across a significant portion of the Property. These provide valuable insight into subsurface mineralization and geology.

New Pacific collected a total of 1,408 grab samples from historical mine dumps. Most samples collected were remnants of high-grade narrow veins extracted from underground mining activity.

Of the 1,408 samples collected to date, 439 samples (31%) returned assay results between 30 and 3,290 g/t Ag with an average grade of 194 g/t Ag.

9.4Underground chip sampling

The Property encompasses significant historical underground mine workings which date back to the 16th century. A number of adits and tunnels provide access to underground workings from the surface. New Pacific has surveyed all safe and readily accessible tunnels within a 2 km wide and 6 km long area encompassing the mineralized La Puerta sandstone, and porphyritic dacite dykes and intrusions. Mine workings have typically focused on high-grade veins.

New Pacific has mapped and sampled 65 historical mine workings comprising 5,780 m of underground tunnels. A total of 1,171 continuous chip samples have been collected at 1 - 2 m intervals along walls of available tunnels that cut across the mineralized zones.

Of the 1,171 samples collected to date, 404 samples (34.5%) returned assay results between 30 and 2,710 g/t Ag with an average grade of 205 g/t Ag.

amcconsultants.com79

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

New Pacific geological personnel record geological features on both a map and in an Excel worksheet. Assay results are compiled in the MX Deposit central database. A compilation map comprising the surveyed mine workings, geology, and assay data is subsequently collated. An example of underground mapping and sampling is presented in Figure 9.4.

Figure 9.4Underground mapping and sampling at Mascota prospect

Source: New Pacific Metals Corp., 2022.

Table 9.2 provides a summary of the results of underground sampling.

Table 9.2Selected underground sampling results

Name of adit

Length (m)

Sample type

Number of samples

Mineralized samples

Host rock

Number

Grade range Ag (g/t)

Average grade Ag (g/t)

Jesus Adit Lower

145

Chips

31

14

31-2,710

371

Sandstone

Jisas Jardan Adit 1

275

Chips

44

19

31-281

109

Sandstone, Porphyry

North Porphyry Adit Lower

385

Chips

45

36

30-1,365

220

Porphyry

North Porphyry Adit Upper

290

Chips

18

15

31-812

244

Porphyry

Silver Sand PD_25

250

Chips

98

26

33-666

114

Sandstone

Silver Sand PD_62

177

Chips

77

24

34-750

179

Sandstone

Snake Hole Principal Adit 1

188

Chips

8

6

85-433

251

Sandstone

Snake Hole Zone Adit 3

82

Chips

4

4

34-495

164

Sandstone

Snake Hole Zone Middle Adit 2

76

Chips

38

22

31-1,460

157

Sandstone

South Adit 1

300

Chips

47

10

34-767

240

Sandstone

South Adit 4 Level 1-4

113

Chips

23

23

38-1,500

583

Sandstone

Esperanza Adit 1

55

Chips

13

8

75-830

337

Sandstone

Esperanza Adit 2

153

Chips

41

19

39-568

150

Sandstone

Esperanza Adit 3

195

Chips

24

10

32-536

234

Sandstone

Esperanza Adit 4

26

Chips

13

6

35-176

103

Sandstone

Esperanza Adit 5

6

Chips

3

3

189-1,300

624

Sandstone

Esperanza Adit 6

34

Chips

17

5

40-148

95

Sandstone

Esperanza Adit 7

14

Chips

7

1

118

118

Sandstone

Esperanza Adit 8

36

Chips

18

5

33-110

61

Sandstone and Porphyry

Esperanza Adit 9

52

Chips

26

0

-

-

Sandstone

El Bronce Main Adit 1 Upper and Lower

120

Chips

11

7

37-785

331

Porphyry

El Bronce Adit 2

30

Chips

9

7

49-318

108

Porphyry

El Fuerte Adit 2

73

Chips

7

5

86-589

261

Sandstone

El Fuerte Adit 1

100

Chips

12

8

34-214

100

Sandstone

Source: New Pacific Metals Corp., 2022.

9.5Discussion of exploration results

Assay results of underground chip samples and surface mine dump grab samples suggest historical mining focused on high-grade veins within the core of the mineralized system and that in-situ mineralized material exists outside of the principal or main veins. This material forms continuous mineralized zones from several metres to several tens of metres in width in bleached sandstone and porphyritic dacite.

Results of samples collected to date show comparable average grades between the underground chip samples and the grab samples from historical waste dumps. Surface rock chip sample grades are consistently lower. The significant difference in silver grades between underground and surface chip samples may be the result of oxidation and leaching of silver sulphides and sulphosalts from the host rocks on surface.

amcconsultants.com80

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

A summary of results from surface rock chip samples, waste dump samples, and underground chip samples is presented in Table 9.3. Mineralized samples listed in the table below are samples with > 30 g/t silver.

Table 9.3Summary of underground and surface sampling results

Sample type

Total samples

Average Ag grade of all samples (g/t)

Number of mineralized samples

Grade Ag range (g/t)

Average Ag grade of mineralized samples (g/t)

Surface samples

1,046

18

101

30 - 840

150

Mine dump samples

1,408

94

439

30 - 3,290

194

Underground samples

1,171

76

404

30 - 2,710

205

Note: Mineralized samples are samples with > 30 g/t silver.

Source: New Pacific Metals Corp., 2022.

The main regional prospects where mapping has been carried out are described below:

Snake Hole: This prospect is located approximately 600 m east of the Silver Sand deposit and consists of artisanal underground workings on structures that trend NNW-SSE. The workings and associated surface mine dumps were started in the Spanish colonial era and have continued sporadically to recent times, creating a "glory hole". Developed in altered (bleaching) quartz sandstones, the workings are traceable over more than 1,000 m strike length with widths varying from a few metres up to 100 m. Geochemical sampling of the workings and mine dumps returned encouraging results, typically ranging from 100 g/t Ag to 300 g/t Ag.

Surface mapping suggests that the mineralized fracture zone remains open to the north, where it potentially trends undercover towards the Jisas prospect located approximately two kilometres to the north.

Figure 9.5Mineralized structures and fractures in historically mined Snake zone glory hole

Notes: Historical mined structures and fractures. Left: Intersection of principal NS. Right: conjugate EW.

Source: New Pacific Metals Corp., 2022.

amcconsultants.com81

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

El Fuerte: This prospect is located south-east of the Silver Sand deposit and covers an area of 0.46 km2. The host rock is the Cretaceous La Puerta Formation with clear signs of alteration seen as bleaching. Multiple old mining works were observed in the area, showing a fracture zone with brecciated intervals and vein stocks with moderate to strong oxidation.

The mineralized structures and breccias consist of hematite, limonite, goethite, quartz, jarosite, and pyrolusite. A total of 170 rock samples were taken in the area. Chip sampling includes 114 samples with grades up to 589 g/t Ag. Grab / selected sampling includes 56 samples with grades up to 983 g/t.

Figure 9.6El Fuerte prospect main structure

Notes: Picture looking to NE. Showing brecciated structure of 1.35 m wide (320°/85°SW).

Source: New Pacific Metals Corp., 2022.

Aullagas: This prospect is located west of the Silver Sand deposit, covering an area of 0.54 km2. The host rock is also the Cretaceous La Puerta Formation with clear signs of alteration seen as bleaching.

The prospect contains two diatreme breccias with a northeast-southwest orientation. Both breccia bodies are subvertical or dipping south at high angles. The northern one has a reddish fine-grained matrix with polymictic subrounded clast from 0.5 to 10 cm. The southern breccia is in the center of the prospect. It has polymictic subrounded to angular clast from 0.2 to 15 cm and some up to size blocks of Anzaldo formation. The limonite and hematite content of the breccia is high.

The diatreme breccia bodies present a mineralogical association established by the presence of pyrite-limonite-hematite. Grab and channel sampling results have silver grades from 20 to 293 Ag g/t.

amcconsultants.com82

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 9.7Aullagas prospect outcrop

Notes: Looking to West. Showing contact between Cretaceous La Puerta Formation and diatreme breccia.

Source: New Pacific Metals Corp., 2022.

El Bronce: This prospect is located NW of the Silver Sand deposit, covering an area of 0.5 km2. The area has outcrops with porphyritic rhyolitic-dacitic intrusive rocks, and hosts several mineralized zones scattered with widespread historical mine workings and dumps. The mining probably dates back to colonial times. Silver minerals (acanthite-freibergite), zinc (sphalerite), copper (malachite) and some tin minerals were observed.

Detailed geological mapping indicates the intrusive host rock is pervasively flooded by moderate to intense alteration. This reflects the passage of silver-rich hydrothermal fluids (phylic alteration (sericite) with local argillic (kaolinite) and propylitic (chlorite-epidote) zones). Surface mapping has also identified good to moderate micro-veining and stockwork development between the principal historically exploited structures thereby forming an attractive bulk tonnage target.

Figure 9.8El Bronce prospect

Notes: Mine dump sampling at El Bronce, looking south.

Source: New Pacific Metals Corp., 2022.

amcconsultants.com83

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Jisas: The prospect is located north of the Silver Sand deposit, covering an area of 1.25 km2. The host rock is whitish bleached Cretaceous La Puerta Formation sandstone bounded to the east by a regional low angle thrust overlain by strongly folded and faulted Paleozoic clastic sediments of the Anzaldo Formation. The thrust is striking NW, dipping east at a dip of around 30 degrees. Locally, dacitic intrusions are emplaced along the thrust and intrude both Cretaceous sandstone and Paleozoic sediments.

Three sets of mineralized fractures were identified from surface outcrops and underground workings. The major set is striking roughly NW direction and dips west at high angles. The other two minor sets strike NW and NE respectively. The mineralized structures are oxidized to various extent near surface, with mineralization characterized by quartz, cassiterite, pyrrhotite, pyrite, siderite, and barite freibergite, andorite, bournonite, blende, chalcopyrite, argentite, and malachite.

Figure 9.9Jisas prospect outcrop photo

Notes: Contact between the Anzaldo formation and porphyry dacitic dike. The contact yellow line with direction N65°W/75°NE.

Source: New Pacific Metals Corp., 2022.

amcconsultants.com84

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

10Drilling

10.1Drilling overview

This section describes diamond drill programs completed by New Pacific at the Property between October 2017 to July 2022. Drilling completed by previous operators is discussed in Section 6.

In total, New Pacific has completed 564 diamond core drillholes for a total of 139,920 m. Drilling programs were completed in four drill campaigns (Phases). The initial Phase consisted of drilling of the main Silver Sand target area between October 2017 and December 2018. This program was designed to test areas with anomalous surface and underground rock chip results and resulted in the discovery of the main Silver Sand deposit. Ongoing drilling resulted in a nominal 50 x 50 m spaced drill grid over an area of 1,600 m x 800 m at Silver Sand.

The second Phase of drilling was completed between April 2019 and December 2019 comprised infill drilling of key portions of the Silver Sand deposit to a nominal 25 x 25 m grid, as well as exploration drilling at the Snake Hole prospect, discussed in Section 10.5.2. In 2020 and 2021 the scheduled drilling programs were interrupted by country wide pandemic lockdown and this Phase spans both years. In 2022 the drilling continued at the Silver Sand deposit and commenced in the North Block prospects (El Bronce and Jisas).

Drill statistics by year are presented in Table 10.1.

Table 10.1New Pacific drilling by year

Year

Phase

Silver Sand

Snake Hole

North prospects

Total

Holes

Metres

Holes

Metres

Holes

Metres

Holes

Metres

2017

Phase 1 drilling

18

5,020

-

-

-

-

18

5,020

2018

177

49,991

-

-

-

-

177

49,991

2019

Phase 2 drilling

182

39,917

24

5,957

-

-

206

45,874

2020

Phase 3 drilling

5

899

8

1,590

13

2,489

2021

Phase 3 drilling

54

12,814

-

-

-

-

54

12,814

2022

Phase 4 drilling

87

19,433

-

-

9

4,298

96

23,731

Total

523

128,074

32

7,547

9

4,298

564

139,920

Notes:

·Table predominantly refers to drilling inside the 100% owned New Pacific mineral tenure as shown in Figure 10.1.

·Numbers may not compute exactly due to rounding.

Source: AMC Mining Consultants (Canada) Ltd., 2020, based on data provided by New Pacific Metals Corp.

A local drill grid has been developed across the Property, comprising 100 m spaced drill sections orientated 060°-240° and numbered from 32 in the north-west, to 80 in the south-east shown in Figure 10.1. Drillhole IDs comprise a prefix which reflects the drillhole section, followed by a drillhole number. Drillholes have been drilled up to 545 m deep at inclinations between -45° and -80° towards azimuths of 060° (~NE) and 240° (~SW) to intercept the principal trend of mineralized vein structures perpendicularly.

Figure 10.1 shows the location of New Pacific drillholes completed at the Silver Sand Property.

amcconsultants.com85

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 10.1Location map of drillholes in Silver Sand area

Source: New Pacific Metals Corp., 2022.

amcconsultants.com86

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

10.2Drilling procedures

Diamond drill programs completed at the Property were designed and managed by New Pacific personnel. Drilling was completed by contract drilling companies Maldonado Exploraciones and Leduc Drilling SRL both out of La Paz, Bolivia.

Drillhole collars are located by New Pacific geologists using a Real-Time Kinematic differential global positioning system (GPS) and marked with a wooden stake. The site is then cleared, and sumps constructed to manage drill water and cuttings. The drill is then positioned by the drilling contractor and the drill alignment (inclination and azimuth) is confirmed by New Pacific geologists. The coordinate system used is WGS 84 UTM Zone 20S.2. Drilling operations are carried out as two separate shifts, 24 hours per day, seven days per week.

Core drilling is completed using conventional HQ (64 mm diameter) equipment and 3 m drill rods. The core is placed in plastic core boxes by the drilling contractor. Core blocks are placed at the end of each drill run with the driller marking the core recovery and drillhole depth by the drilling contractor. Each core box is marked with the drillhole ID and the corresponding from and to depths.

At the completion of each drillhole, PVC casing is placed by the drilling contractor in the drillhole. New Pacific personnel subsequently construct a concrete monument and mark the collar with the drillhole ID, depth, dip, azimuth. Such a monument and Leduc Rig #2-hole drilling DSS565013a, are shown in Figure 10.2.

Figure 10.2Silver Sand drilling

Source: New Pacific Metals Corp., 2022.

10.2.1Drillhole deviation surveys

Drillhole deviation surveys are completed by the drilling contractor using a REFLEX EZ-SHOT and SPT GyroMaster downhole survey tools. Drillholes are surveyed at a depth of approximately 20 m, and on approximately 30 m intervals as drilling progresses. A second confirmation survey is carried out once the hole is complete. This is done on 30 m intervals as the drill rods are pulled out of the hole (multi-shot).

amcconsultants.com87

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

10.2.2Core processing and logging

New Pacific's drill site supervising geologists visit each drill at least once daily to monitor drillhole progress. Core boxes are sorted and placed in order to enable core blocks and depths to be checked. Preliminary logging is then completed. This consists of completing a "quick log" of major geological features, marking of natural breaks, and analyzing veins with a portable XRF to determine silver concentrations, markings readings of XRF gun on drill cores and taking core photos on drill site. The drill-site core photos are uploaded to the Company's Dropbox account for the Company's management to review on daily basis so that drill plan can be adjusted instantly based on actual drill progress and mineralization.

Figure 10.3Jisas North prospect drilling, showing "quicklog" process

Source: New Pacific Metals Corp., 2020.

Prior to transportation, individual segments of core are sequentially numbered, and the core box is photographed as part of the chain of custody. Core containing visible mineralization is also wrapped in paper to minimize core damage during transport. Lids are placed on core boxes prior to transport.

Core boxes are transported by New Pacific personnel to the Company's secure Betanzos core processing facility (Betanzos), daily following preliminary processing at site.

On arrival at Betanzos, the core boxes are checked and recorded in a core handover form that is signed by the receiver. Core boxes are then moved to the logging shack where detailed logging, processing, and sampling are completed. From 2017 to 2020 logging data was collected on paper

amcconsultants.com88

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

templates which were later transferred to an Excel file before being exported to an Access database. Since September 2020, as part of data management improvements the data entry and database compilation has been migrated to MX Deposit software, a Sequent product.

In general, New Pacific's core logging process carried out at Betanzos comprises the following:

·Core is cleaned and drill core segments are pieced together.

·The length of core for each drill run is measured and recovery is calculated.

·Drillhole depths are marked on the core.

·Rock quality designation (RQD) is measured and basic geotechnical features are noted (fracture frequency).

·Geological logging is completed entering the data into MX Deposit software in computer tablets. The geological data collected includes oxidation style and intensity, lithology, alteration, structure, and mineralization information using codes established by New Pacific.

·Once the logging is complete, a geologist determines the core to be sampled based on alteration and mineralization, marks sample intervals and determines what QA/QC samples to be included.

·Samples for bulk density determinations are collected approximately every 20 m or every main alteration-mineralization interval. The samples are measured at a dedicated measuring station using water immersion and the Archimedes principle.

·Prior to core cutting, photographs of wet core are taken using a high-definition camera for the entire hole.

·After photography a cutting line is marked on the core based on the observed mineralization and structures.

·Core is cut in half using a diamond core saw and sampling is completed.

·Core boxes are then stored at Betanzos.

·Samples are dispatched to the laboratory on a weekly basis.

Sampling, shipment, and security protocols are described in Section 11 of this report.

10.3Sample recovery

Core recovery from New Pacific drill programs varies between 0% (voids and overburden) and 100%, averaging 96.85%. More than 94.55% of core intervals have a core recovery equal or greater than 95%.

10.4Drilling programs

10.4.1Exploration drilling - 2017 - 2018

The 2017 - 2018 phase one drill program was designed to test the depth and continuity of mineralization delineated by surface mapping and sampling in the Silver Sand area. Positive drill results led to ongoing drilling and the definition of numerous north-northwest striking and moderate to steeply west dipping zones of silver mineralization. The completed program was at a nominal drill spacing of 50 x 50 m and over a 1,600 x 800 m area. Ninety seven percent of drillholes (190 out of 195) encountered silver mineralization.

10.4.2Definition and exploration drilling - 2019

A phase two drill program commenced in April 2019. This program was designed to infill existing drilling within the Silver Sand deposit, and to assess the potential strike extensions of major mineralized zones beneath the Tarapaya Formation north of Section 44. The phase two 2019 drill program comprised the drilling of 182 drillholes for a total of 39,917 m. Drillholes ranged from 86 to 365 m in depth, averaging 225 m.

amcconsultants.com89

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The assay results confirmed the continuity of mineralization delineated in previous drilling campaigns and were used in the initial Mineral Resource estimation in early 2020 and as reported in the 2020 Technical Report.

10.4.3Definition, exploration, and metallurgical drilling - 2020

A phase three drill program was carried out from February to March 2020, prior to interruption. The program included collecting samples for metallurgy testwork, infill the existing drilling grid within the Silver Sand deposit, assess the potential strike extensions of major mineralized zones beneath the Tarapaya Formation and to test the mineralized zone at Snake Hole. Due to the pandemic lockdown, the drilling programs were paused from April 2020 to July 2021. A total of 13 drillholes for 2,489 m were completed in the attenuated program with hole lengths ranging from 100 m to 292.8 m and averaging 191 m.

10.4.3.1Definition and geotechnical drilling - 2021

The phase three drill program was continued in July 2021 and completed in September 2021. 54 drillholes for a total of 12,814 were completed during this stage. Drillholes ranged from 2.1 (abandoned) to 715.95 m in depth, averaging 237 m.

10.4.4Definition, exploration North prospects, and geotechnical drilling - 2022

The phase four drill program was completed from January 2022 to July 2022. The programs were designed to infill the high-grade core area of mineralization at the Silver Sand deposit, step-out test the known mineralization zones, and drill for the geotechnical study of the initially proposed pit wall. A further facet of the program was to explore and test the North Block prospects of EL Bronce and Jisas. A total of 96 drillholes for a total of 23,731 m were completed in this period. Drillholes ranged from 54.85 to 721.5 m in depth, averaging 247 m.

10.5Discussion of drilling results

10.5.1Silver Sand

Drill programs completed between October 2017 and July 2022 have defined silver mineralization at the Silver Sand deposit over a strike length of 2.5 km, and a width of 650 m and to a depth of more than 250 m below surface.

Silver mineralization occurs predominantly associated with dissemination, brecciated intervals, fractures, veinlets, and veins within the bleached and altered La Puerta sandstone. Within the core of the system, where vein density is greatest, mineralized zones are relatively continuous along strike and to depth, reaching thicknesses of up to 300 m. The core portion of the system shows good continuity. Mineralization outside of the core occurs as discontinuous pods and lenses often only multiple meters thick.

North of Section 60 mineralized zones generally dip west to the west at high angles. Drilling in this area typically intersects up to 50 m of red Cretaceous Tarapaya Formation before intersecting massive, white, altered and mineralized La Puerta sandstone. The contact between the Tarapaya and La Puerta Formation commonly contains massive pyrite which is up to 2 m thick. Historical mining activity does not appear to be widespread in this area.

South of Section 60, massive, altered, and fractured La Puerta sandstone is exposed at surface. Zones of silver mineralization typically dip to the west at high angles, and historical mining activity appears to be extensive.

Figure 10.4 and Figure 10.5 show a plan view and three-dimensional (3D) perspective of the mineralization on the Property, respectively.

amcconsultants.com90

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 10.4Silver Sand mineralization - plan view

Source: New Pacific Metals Corp., 2022.

amcconsultants.com91

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 10.5Silver Sand mineralization - 3D perspective

Source: New Pacific Metals Corp., 2022.

Figure 10.6 and Figure 10.7 present cross section views through the center and south portions of deposit, showing the intersection angles of the zones by the drilling. The grade shells shown are built at a > 20 g/t Ag threshold and the mineralized intersections shown are calculated at a 30 g/t Ag cut-off.

Figure 10.6Cross Section 5250, Silver Sand center area

Source: New Pacific Metals Corp., 2022.

amcconsultants.com92

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 10.7Cross Section 6400, Silver Sand south area

Source: New Pacific Metals Corp., 2022.

10.5.2Snake Hole

New Pacific's Snake Hole prospect is located approximately 600 m east of the Silver Sand deposit. This prospect comprises a 1 km long NNW-SSE trend comprising extensive historical artisanal mining activities and mine dumps. Historical workings are developed in bleached sandstone and suggest mineralization is between a few metres and up to 100 m wide. Previous sampling of workings and dumps in this Snake Hole area by New Pacific returned numerous assay results between 100 g/t Ag and 300 g/t Ag. Geological mapping also suggested that mineralized structures extend north-west towards the Company's Jisas-El Fuerte prospects.

A total of 32 HQ diamond drillholes totalling 7,547 m were completed to assess sub-surface mineralization within the Snake Hole prospect area between August 2019 to March 2020 Drillholes were completed on a drilling grid at a 50 m spacing along the steeply dipping structure striking NNW-SSE. Each section was drilled with at least one drillhole at an inclination between 40° and 80°. The majority of drillholes were drilled towards an azimuth of 060°, four holes were drilled towards 240° and two drillholes were drilled towards 285° and 195° respectively as part of a drill fan. Drillhole locations are presented in Figure 10.8.

amcconsultants.com93

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 10.8Location of drillholes, Snake Hole prospect

Source: New Pacific Metals Corp., 2022.

amcconsultants.com94

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

10.5.3Drilling of North prospect

The North prospect consists of El Bronce and Jisas, which are located approximately 3.5 km to NNW from the center of Silver Sand deposit. This prospect comprises a 2 km long NNW-SSE trend comprising extensive historical artisanal mining activities and mine dumps. Historical workings are developed in bleached sandstone and strongly altered dacitic intrusive rocks, and suggest mineralization is between a few metres and up to 100 m wide.

A total of nine HQ diamond drillholes totaling 4,297.9 m were completed between May to July 2022. Drillholes were completed on a drilling grid at a 50 m spacing along the East-West section lines at Jisas and along a N20E grid at El Bronce. All holes were drilled at an angle of -45°. The majority of drillholes were drilled on the grids. Only one hole (DSSJS1703) was drilled off grid. Hole DSSJS1702 was abandoned due to downhole issues. Drillhole locations are presented in Figure 10.9. Drillhole collar information is presented in Table 10.2.

Table 10.2Summary of North Prospects drillholes

Hole ID

East (m)

North (m)

Elevation (m)

Depth (m)

Azimuth (°)

Dip (°)

DSSJS1901

234,197.57

7,859,527.14

3,869.13

541.5

90

-45

DSSJS1701

234,237.50

7,859,423.20

3,856.11

433.5

270

-45

DSSJS1702

234,238.25

7,859,423.60

3,856.16

223.5

90

-45

DSSJS1702B

234,237.97

7,859,424.53

3,856.19

565.5

90

-45

DSSJS1703

234,236.98

7,859,423.94

3,856.20

505.5

218

-45

DSSBR195001

234,002.18

7,860,300.51

4,102.29

301.9

60

-45

DSSJS1801

234,246.02

7,859,476.75

3,862.35

496.5

90

-45

DSSBR2101

233,986.24

7,860,359.37

4,079.55

721.5

60

-47

DSSJS1802

234,245.60

7,859,476.84

3,862.27

508.5

270

-45

Note: Coordinate system: WGS 84, UTM20 S.

Source: AMC Mining Consultants (Canada) Ltd., based on information provided by New Pacific Minerals Corp.

Drill results of North Block are pending as of the effective date of this report.

amcconsultants.com95

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 10.9Drillholes of North Block

Source: New Pacific Metals Corp., 2022.

amcconsultants.com96

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

10.6Review of drilling results

To the end of July of 2022, a total of 139,920 m in 564 drillholes have been completed on the Property. Most holes intersected silver mineralization hosted in altered sandstones and dacitic intrusions. Drill results confirmed the extent and continuity of mineralization at the Silver Sand deposit which remains open on strike and at depth.

Up to July 2022, assay results for 544 of 564 drillholes have been received. Highlights of drillhole intersections are presented in Table 10.3. The grades are length-weighted average, based on intersected widths and composited at a nominal 20 g/t Ag cut-off. As to a large degree the intersections are not far off normal to the trend of the mineralization the intersected and true widths are similar. This is demonstrated in Figure 10.6 and Figure 10.7.

Table 10.3Drill intercepts for the Silver Sand deposit

Hole_ID

From (m)

To (m)

Interval (m)

Ag (g/t)

Pb (%)

Zn (%)

DSS4402

69.85

214.7

144.85

86

0.03

0.05

Incl.

129.50

178.0

48.50

211

0.03

0.03

DSS4609

63.38

147.3

83.92

116

0.07

0.10

Incl.

84.30

94.70

10.40

398

0.28

0.04

Incl.

138.40

147.30

8.90

414

0.15

0.02

DSS505003

59.85

285.67

225.82

116

0.05

0.01

Incl.

185.76

285.67

99.91

244

0.09

0.01

DSS505004

73.50

168.70

95.20

162

0.06

0.13

Incl.

117.70

134.40

16.70

703

0.10

0.00

Incl.

161.40

168.70

7.30

291

0.09

0.00

DSS5604

39.92

119.40

79.48

135

0.06

0.01

Incl.

39.92

62.65

22.73

330

0.05

0.01

220.66

226.60

5.94

96

0.03

0.00

DSS525009

59.90

238.89

178.99

96

0.03

0.02

Incl.

126.49

144.52

18.03

362

0.03

0.00

DSS525010

12.00

118.40

106.40

154

0.04

0.03

Incl.

12.00

50.75

38.75

165

0.04

0.04

Incl.

92.43

96.46

4.03

2,366

0.42

0.00

DSS5407

64.07

140.10

76.03

205

0.09

0.01

Incl.

64.07

124.96

60.89

251

0.10

0.01

DSS645001

27.46

113.00

85.54

119

0.06

0.01

Incl.

27.46

53.50

26.04

189

0.05

0.00

Incl.

81.84

113.00

31.16

156

0.09

0.02

DSS6603A

7.90

73.15

65.25

181

0.08

0.10

Incl.

7.90

39.90

32.00

304

0.08

0.15

DSS665001

44.23

134.00

89.77

115

0.12

0.31

Incl.

44.23

48.68

4.45

394

0.06

0.01

Incl.

58.00

95.15

37.15

149

0.17

0.34

amcconsultants.com97

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

DSS642501

23.15

137.38

114.23

117

0.06

0.02

Incl.

23.15

31.43

8.28

265

0.01

0.00

Incl.

46.20

53.09

6.89

313

0.13

0.01

Incl.

103.83

107

3.17

1,105

0.21

0.06

DSS422501

41.70

146.20

104.50

183

0.05

0.11

Incl.

80.25

146.20

65.95

282

0.05

0.00

DSS507502

82.10

165.52

83.42

116

0.03

0.04

Incl.

82.10

108.65

26.55

242

0.06

0.05

Incl.

145.38

165.52

20.14

155

0.02

0.00

DSS507503

98.50

155.86

57.36

354

0.11

0.02

Incl.

98.50

116.94

18.44

403

0.16

0.01

Incl.

142.70

146.30

3.60

3,378

0.72

0.05

DSS522503

62.95

244.22

181.27

100

0.04

0.01

Incl.

128.05

222.23

94.18

177

0.06

0.01

Incl.

205.55

222.23

16.68

754

0.20

0.01

DSS5213

61.90

241.80

179.90

88

0.09

0.02

Incl.

114.90

132.00

17.10

265

0.59

0.01

Incl.

173.98

187.15

13.17

339

0.04

0.00

DSS5214

51.60

161.35

109.75

96

0.07

0.03

Incl.

54.35

68.50

14.15

250

0.06

0.01

Incl.

87.30

103.80

16.50

228

0.11

0.02

DSS522506

73.80

239.30

165.50

204

0.06

0.01

Incl.

73.80

167.30

93.50

336

0.10

0.00

Incl.

116.30

161.30

45.00

641

0.19

0.01

DSS422503

65.86

209.30

143.44

110

0.04

0.03

Incl.

173.30

183.47

10.17

860

0.18

0.00

DSS522510

5.30

53.39

48.09

176

0.02

0.00

213.5

216.07

2.57

748

0.35

0.00

DSS565006

19.91

84.37

64.46

250

0.09

0.01

Incl.

40.00

60.70

20.70

613

0.16

0.01

DSS645005

27.10

235.17

208.07

73

0.11

0.28

Incl.

86.57

90.28

3.71

513

0.33

0.46

Incl.

180.74

205.00

24.26

270

0.13

0.07

DSS407502

90.12

158.00

67.88

218

0.04

0.00

Incl.

137.00

149.34

12.34

496

0.11

0.00

DSS522513

40.32

149.3

108.98

228

0.13

0.01

Incl.

43.84

98.30

54.46

414

0.20

0.01

DSS525021

4.90

284.15

279.25

91

0.09

0.00

Incl.

217.55

232.95

15.40

657

0.24

0.00

DSS527505

40.10

118.30

78.20

245

0.17

0.16

Incl.

43.30

71.74

28.44

335

0.20

0.07

Incl.

83.10

96.30

13.20

541

0.19

0.47

DSS644001

23.00

156.63

133.63

91

0.05

0.04

Incl.

56.92

65.75

8.83

296

0.11

0.00

Incl.

90.00

112.56

22.56

246

0.06

0.02

amcconsultants.com98

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

DSS325001

147.66

155.30

7.64

448

0.09

0.00

163.00

182.76

19.76

150

0.06

0.10

DSS702501

84.90

139.09

54.19

132

0.38

0.54

178.80

184.00

5.20

46

0.04

0.00

DSS685002

11.66

42.96

31.30

171

0.02

0.00

Incl.

26.75

41.46

14.71

298

0.03

0.00

120.2

148.53

28.33

48

0.09

0.02

DSS7002

25.28

40.54

15.26

285

0.02

0.00

131.59

144.7

13.11

62

0.11

0.14

180.47

183.15

2.68

215

0.19

0.14

DSS487505

32.45

51.93

19.48

337

0.00

0.00

Incl.

38.53

47.16

8.63

715

0.00

0.00

91.83

103.88

12.05

160

0.03

0.00

162.96

180.87

17.91

78

0.48

0.01

DSS582501

30.57

75.34

44.77

214

0.10

0.00

151.46

176.50

25.04

143

0.07

0.11

Incl.

151.46

154.00

2.54

823

0.07

0.00

Incl.

169.00

171.12

2.12

536

0.31

0.17

DSS5218

60.50

132.94

72.44

279

0.06

0.04

Incl.

84.95

117.91

32.96

517

0.10

0.06

Source: AMC Mining Consultants (Canada) Ltd., based on information provided by New Pacific Minerals Corp.

10.7Drilling conclusions

At this time there are no known drilling, sampling, or recovery factors that could impact the accuracy and reliability of the results. Due to fine-grained mineralization occurring on fractures, there is the possibility of loss of mineralization during the drilling, transportation, and core handling processes, which may lead to underestimation of the grade.

amcconsultants.com99

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

11Sample preparation, analyses, and security

This section describes the sampling methods, analytical techniques and assay QA/QC protocols employed at the Silver Sand Property between October 2017 and July 2022, with a focus on the 2020 - July 2022 period. All exploration programs were managed by New Pacific, and all work was carried out in accordance with New Pacific's internal procedures.

11.1Sampling methods

11.1.1Rock chip sampling

Rock chip samples were collected by New Pacific personnel from surface outcrop and existing underground workings. In both cases, continuous samples were collected from sample lines across mineralization using a hammer and chisel. Surface outcrop sample lines were orientated approximately perpendicular to the strike of mineralization and samples were collected at 1.5 m intervals. Underground samples were collected at 1.0 m intervals from the walls of accessible tunnels that cross-cut mineralization.

In both instances, samples were collected in plastic bags. Sample information was recorded in a sample tag book pre-numbered with a unique sample identifier and multiple tear-off tags. One sample tag is included in the plastic bag with the sample, before the bag is sealed. The sample number is also written on each bag with a permanent indelible marker.

11.1.2Grab sampling

Grab samples were collected by New Pacific personnel from waste rock dumps generated by historical mining operations. Samples were collected randomly from the waste dumps. The number of samples collected was dependent on the size of the dump.

11.1.3Drillhole sampling

All drilling completed at the Property between September 2021 and July 2022 was completed by contract diamond drillers using HQ (64 mm) sized equipment. Drilling, logging, and core processing procedures are described in detail in Section 10 of this report. This process is in line with the procedures which were implemented for the earlier programs which were described in the 2020 Technical Report.

Core sampling was completed by New Pacific personnel at Betanzos as part of the core processing workflow. After samples are logged, sample intervals are identified by the geologists based on visual parameters. Individual sample intervals are physically marked out on the core using an indelible marker or crayon at intervals between 1.0 and 1.5 m lengths and respecting geological, structural and alteration contacts and poor sample recovery (voids, sample loss) as appropriate. Sampling intervals typically extend above and below the visually mineralized zone by 2 m. Core intervals with no recovery due to core loss or intersection of historical mine workings are identified and recorded.

During this sampling process the geologist records the hole ID and relevant from and to interval of the sample in a sample tag book pre-numbered with a unique sample identifier and two tear-off tags. A cut line is also marked along the core axis with a marker of crayon by geologists at this time.

After the core has been photographed, core to be sampled is cut in half along the cut line using a diamond saw. Half of the core is then collected consistently from one side of the cutting line and placed into sample bags pre-labelled with a corresponding unique sample number. Samples intervals are cross checked with the sample tag book and the prelabelled sample bag. The outer

amcconsultants.com100

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

portion of the tear off sample tag is affixed to the core box at the start of the sample interval and the inner tear-off tag is placed into the sample bag.

Once sampling is complete the geologist checks the samples and seals the plastic sample bags with staples and tape. QA/QC samples are inserted into the sample sequence and sample bags are then placed into large poly-weave sample bags for transportation to the laboratory. Individual sample batches comprise up to 100 samples.

Figure 11.1New Pacific Betanoz core logging and sampling facility

Notes: Left: core logging area, Right: diamond core saws.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

11.2Sample shipment and security

New Pacific manages all aspects of sampling from the collection of samples to sample delivery to the laboratory. All samples are stored and processed at Betanzos. This facility is surrounded by a brick wall, has a locked gate, and is monitored by video surveillance and security guard 24 hours a day, seven days a week. Within the facility, there are separate and locked areas for core logging, sampling, and storage.

Drilling samples are collected from the drill site at the Property at least every 24 hours as part of routine site inspections and drill management completed by site geologists. Geological "quick logs", portable XRF analyses and photographs of each core box are completed during the site inspection and before core boxes are transported.

Samples are transported from the Betanzos facility to the laboratory in Oruro, Bolivia for sample preparation. This is done on a weekly basis by New Pacific personnel. Sample shipments typically comprise up to 800 samples.

amcconsultants.com101

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 11.2New Pacific Betanoz core processing facility

Notes: Left: core processing facility security, Right: core storage.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

11.3Sample preparation and analysis

All drill core, chip and grab samples collected by New Pacific between September 2021 and July 2022 were dispatched to ALS laboratories (ALS) in Oruro, Bolivia for sample preparation, and then to ALS in Lima, Peru for geochemical analysis. ALS Oruro and ALS Lima are part of ALS Global - an independent commercial laboratory specializing in analytical geochemistry services. Both labs are certified in accordance with the International Organization for Standardization (ISO) and International Electrotechnical Commission (IES) "General requirements for the competence of testing and calibration laboratories" (ISO/IES 17025:2017).

All samples are prepared in accordance with ALS preparation code PREP-31 which involves crushing samples to 70% less than 2 mm, riffle splitting off 250 g and then pulverizing the split sample to better than 85% passing a 75 µm (micron) sieve.

All pulp samples were then transferred to ALS Lima for sample analysis. A summary of analytical methods used is presented in Table 11.2.

Sample analysis completed in 2017 and 2018 comprised an aqua regia digest followed by Inductively Coupled Plasma (ICP) Atomic Emission Spectroscopy (AES) analysis of Ag, Pb, and Zn (ALS code OG46). Samples returning assay results greater than 1,500 g/t Ag (over-limit samples) were analyzed by fire assay and gravimetric finish (ALS code Ag-GRA21). New Pacific subsequently requested all pulp samples with Ag values greater than 5 ppm be analyzed using an ICP-AES 35 element analysis (ALS code ME-ICP41). This approach was taken primarily to understand the impact of potential credit elements gallium and indium.

New Pacific changed its analysis protocol in 2019 to include systematic multielement analysis. All samples were sent for an initial 51 element ICP mass spectroscopy (MS) analysis (ALS code ME-MS41). Over-limit samples (>100 ppm Ag, or >10,000 ppm Pb or >10,000 ppm Zn) were then analyzed by ALS code OG46. For the third pass, for over-limit Samples with Ag results which exceeded the upper limit of detection of the OG46 analysis (>1,500 ppm) were then subsequently analyzed by fire assay and gravimetric analysis (Ag-GRA21).

amcconsultants.com102

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 11.1New Pacific sample analysis

Drill campaign

ALS analysis code*

Elements

Detection range

Description

Protocol notes

2017 - 2018

Ag-OG46

Pb-OG46

Zn-OG46

Ag

Pb

Zn

1-1,500 ppm

0.001-20%

0.01-10%

0.4 g sample

Aqua-regia digest

ICP-AES analysis

Initial analysis

Ag samples > 1,500 ppm analyzed by AG-GRA21

Ag-GRA21

Ag

5-10,000 ppm

30 g sample

Fire assay

gravimetric analysis

Over limit analysis

VH-ME-ICP4 (Actlabs)

Ag

Pb, Zn

35 other elements

0.2-100 ppm

2-10,000 ppm

variable

0.5 g sample

Aqua-regia digest

ICP-OES analysis

Subsequent analysis completed on pulps with Ag >=5 ppm

2019

2020 - 2022

ME-MS41

Ag

Pb

Zn

48 other elements

0.01-100 ppm

0.2-10,000 ppm

2-10,000 ppm

variable

0.5 g sample

Aqua-regia digest

ICP-MS analysis

Initial analysis

Over limit samples analyzed by OG-46

Ag-OG46

Pb-OG46

Zn-OG46

Ag

Pb

Zn

1-1,500 ppm

0.001-20 %

0.01-10 %

0.4 g sample

Aqua-regia digest

ICP-AES analysis

(Over limit analysis #1)

Ag samples > 1,500 ppm analyzed by Ag-GRA21

Ag-GRA21

Ag

5-10,000 ppm

30 g sample

Fire assay, gravimetric analysis

(Over limit analysis #2)

Notes: *Unless otherwise stated.

Overlimit protocols shown for 2019 but were refined for later programs as described in the text below.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

For the 2020 - 2022 analysis protocol, there was a slight variation in how over-limit samples were defined after the ICP mass spectrometry analysis. First pass over-limit samples (Ag > 30 ppm, or > 10,000 ppm Pb or Zn) were analyzed using aqua regia digestion with ICP-AES or AAS finish (ALS Code OG46).

Samples with gold mineralization went to a second pass of analysis by fire assay and AAS finish (ALS Code Au-AA25). If these samples > 100 ppm, they were analysed by fire assay with gravimetric finish (ALS Code Au-GRA21) which has an upper detection limit of 1,000 ppm. Au samples > 1,000 ppm underwent analysis by fire assay with gravimetric finish (ALS Code Au-CON01).

Samples with > 1,500 ppm Ag were analysed by fire assay with gravimetric finish (ALS Code Ag-GAR21) with an upper detection limit of 10,000 ppm. Ag samples > 10,000 ppm underwent analysis by fire assay with gravimetric finish (ALS Code Ag-CON01).

Samples with > 20% Pb, 30% Zn, and 40% Cu underwent analysis by classic titration methods (ALS Code Pb-VOL70, Zn-VOL50, and Cu-VOL61).

11.4Bulk density

Density measurements are completed by New Pacific personnel as part of routine core processing procedures. Samples are selected in both mineralized and non-mineralized areas at a rate of 1 in every 15 samples. Measurements are completed at a dedicated density weigh station using the Archimedes principle, whereby water displacement is used to approximate volume. Density is calculated by dividing the dry weight by the calculated volume. This method is considered to be appropriate for competent, non-porous core samples. Weigh scale calibration is completed regularly as part of the density sampling program.

amcconsultants.com103

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The QP recommends New Pacific improve density QA/QC procedures by:

·Incorporating the regular use of a density standard.

·Weigh samples following immersion to ensure that the sample is not absorbing water.

·Sending a portion of samples to a third-party laboratory for a density measurement check.

11.5Quality Assurance / Quality Control

New Pacific has established QA/QC procedures which cover sample collection and processing at the Silver Sand Property. All drilling programs completed on the property incorporate the insertion of certified reference materials (CRMs), blanks, and duplicates into the sample stream on a batch-by-batch basis. The QP completed a detailed review of QA/QC protocols during a site visit in 2019 and again in May 2022. The following discussion is based on the QP's findings from the site visit and an independent review of drilling and QA/QC databases associated with the 556 drillholes for which assays have been received at the date of closure of the database for the Mineral Resource.

New Pacific monitors Ag, Au, Pb, Zn, and Cu assay values in CRMs, blanks, and duplicates however only the results of silver are discussed in this report as silver constitutes the majority of the value in the Mineral Resource.

A summary of QA/QC samples from the October 2017 - July 2022 program is presented in Table 11.2.

Table 11.2Silver Sand QA/QC samples by year1(October 2017 - July 2022)

Year2

Drill Samples

CRMs3

Coarse Blanks

Pulp Blanks

Field duplicates (¼ core)

Pulp duplicates

Coarse reject duplicates

Coarse reject umpire duplicates

2017

3,213

172

31

0

16

0

0

173

2018

34,638

1,747

1,684

0

208

0

0

1,615

2019

30,629

1,106

1,159

0

243

0

0

1,063

2020

1,735

359

422

0

0

0

0

0

2021

7,688

433

327

141

309

288

312

0

2022

12,292

678

435

305

496

449

484

0

Total

90,175

4,495

4,058

446

1,272

737

796

2,851

Notes:

1 Based on 556 drillholes with assay results.

2 Drillhole year based on the date of the Ag assay.

3 CRM statistics excludes CRMs submitted with umpire duplicate samples.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

Table 11.3 summarizes the insertion rate of these QA/QC samples. New Pacific's QA/QC submission rate protocols are:

·CRMs: 5%

·Coarse blanks - 3%

·Field duplicates - 2 - 3%

·Coarse reject duplicates - 2 - 3%

·Pulp duplicates - 2 - 3%

·Umpires - 5%

The QP recommends that insertion rates should be approximately 5% for CRMs and blanks and 6% for duplicates (2% each for field, coarse reject, and pulps duplicates) and 5% for umpires.

amcconsultants.com104

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 11.3Silver Sand QA/QC submission rates1(October 2017 - July 2022)

Year2

CRMs3

Coarse Blanks

Pulp Blanks

Field duplicates (¼ core)

Pulp duplicates

Coarse reject duplicates

Coarse reject umpire duplicates

Total QA/QC

2017

5.4%

1.0%

0.0%

0.5%

0.0%

0.0%

5.4%

12.2%

2018

5.0%

4.9%

0.0%

0.6%

0.0%

0.0%

4.7%

15.2%

2019

3.6%

3.8%

0.0%

0.8%

0.0%

0.0%

3.5%

11.7%

2020

20.7%

24.3%

0.0%

0.0%

0.0%

0.0%

0.0%

45.0%

2021

5.7%

4.3%

1.8%

4.0%

3.8%

4.1%

0.0%

23.6%

2022

5.5%

3.5%

2.5%

4.0%

3.7%

4.0%

0.0%

23.2%

Overall

5.0%

4.5%

0.5%

1.4%

0.8%

0.9%

3.2%

16.3%

Notes:

1 Based on 550 drillholes with assay results.

2 Drillhole year based on the date of the Ag assay.

3 CRM statistics excludes CRMs submitted with umpire duplicate samples.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

11.5.1Certified Reference Materials

11.5.1.1Description

Four different CRMs were used by New Pacific in the 2017 - July 2022 drill programs, one of which, CDN-ME-1605 was discontinued in 2018. All CRMs were supplied by CDN Resource Laboratories of Langley, British Columbia, Canada and are certified for Ag, Au, Pb, Cu, and Zn analysis by four acid digest and ICP. All CRMs have a relative standard deviation (RSD) of less than 5%.

Details of CRMs used at Silver Sand are presented in Table 11.4.

Table 11.4Silver Sand CRMs (October 2017 - July 2022)

CRM

Ag (g/t)

Number of CRMs inserted by year

Expected value

Certified SD

2017

2018

2019

2020

2021

2022

CDN-ME-1501

34.6

1.15

0

0

370

133

189

231

CDN-ME-1603

86

1.5

0

999

496

144

155

285

CDN-ME-1810

154

4.5

0

0

240

82

89

162

CDN-ME-1605

274

4.5

172

748

0

0

0

0

Notes: All CRM values shown are certified for four-acid digest and ICP analysis, SD=standard deviation.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

CRMs are supplied as both 100 g individual sealed packages and in bulk 1 kg containers. New Pacific personnel package bulk material into 100 g 'zip-lock' bags for insertion into the sample stream. Disposable gloves and spoons are used to ensure contamination does not occur during this process.

New Pacific's internal procedures require that one CRM is inserted for every 20 samples. CRM performance is monitored on a batch-by-batch basis. New Pacific considers CRMs with laboratory assay results outside of three standard deviations as stipulated on the CRM certificate to have failed. Failed samples are investigated by New Pacific and sample batches are re-analyzed as required. For ME-MS41 analysis, New Pacific accepts assay results within 10% plus 2 times the detection limit of the expected value of the CRM, based on internal discussions with ALS. New Pacific has re-assayed two sample batches. Batches that failed but did not contain mineralized material were not re-assayed.

amcconsultants.com105

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

11.5.1.2Discussion

CRMs contain standard, predetermined concentrations of material (Ag) which are inserted to into the sample stream to check the analytical accuracy of the laboratory. The QP recommends an insertion rate of at least 5% of the total samples assayed. CRMs should be monitored on a batch-by-batch basis and remedial action taken immediately if required. For each economic mineral, the QP recommends the use of at least three CRMs with values:

·At the approximate cut-off grade (COG) of the deposit.

·At the approximate expected grade of the deposit.

·At a higher grade.

A total of 4,495 CRMs was submitted between October 2017 and July 2022 representing an average overall insertion rate of 5.0%. Insertion rates for CRMs have been consistently above 5% on a yearly basis except for 2019.

The average grade of the Silver Sand open pit Mineral Resource is approximately 116 g/t Ag at a 30 g/t Ag COG. The QP considers CDN-ME-1501 (34.6 g/t Ag) to be appropriate to monitor the analytical accuracy at the COG of the deposit. CDN-ME-1603 (86 g/t Ag) and CDN-ME-1810 (154 g/t Ag) monitor analytical accuracy below and above the average grade. CDN-ME-1605 (274 g/t Ag) monitors analytical accuracy at higher grades, however this CRM was not used beyond the 2018 program. The QP notes that there was no CRM used in 2017 or 2018 to monitor laboratory accuracy at the cut-off and average grades. While there is presently no individual CRM monitoring the average grade of the deposit, the QP considers CDN-ME-1603 and CDN-ME-1810 to adequately cover the anticipated grade ranges and provide confidence in analytical results.

The QP typically recommends re-assaying batches where two consecutive CRMs in a batch occur outside two standard deviations (warning), or one CRM occurs outside of three standard deviations (fail) of the expected value described on the assay certificate.

Control charts are commonly used to monitor the analytical performance of an individual CRM over time. CRM assay results are plotted in order of analysis. Control lines are also plotted on the chart for the expected value of the CRM, two standard deviations above and below the expected value, and three standard deviations above and below the expected value. These charts show analytical drift, bias, trends, and irregularities occurring at the laboratory over time. Table 11.5 presents detail on CRM performance for the entire period October 2017 - July 2022.

Table 11.5Silver Sand CRM warnings and fails (October 2017 - July 2022)

CRM ID

Expected value (Ag)

Certified SD

Number of assays

# Low warnings (-2SD)

# High warnings (+2SD)

# Low fail (-3SD)

High fail (+3SD)

Fail % (>3SD)

CDN-ME-1501

34.6 g/t

1.15

923

25

21

4

4

0.87

CDN-ME-1603

86 g/t

1.5

2,079

182

38

86

54

6.73

CDN-ME-1810

154 g/t

4.5

573

7

6

0

0

0.00

CDN-ME-1605

274 g/t

4.5

920

73

13

24

3

2.9

Notes: SD=standard deviation.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

Figure 11.3 to Figure 11.5 presents CRM control charts for silver. Control charts include control lines for two and three standard deviations and show the warnings and fails. The control charts cover the period from 2020 to July 2022, (2019 to July 2022 in the case of CDN-ME- 1501). Example control charts from the period of 2017 to 2019 were presented in the 2020 Technical Report.

amcconsultants.com106

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 11.3Control chart for CDN-ME-1501 (Ag) (2019 - July 2022)

Note: CDN-ME-1501 contains all samples from 2019, not all 2019 samples were reported in the previous Technical Report.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

Figure 11.4Control chart for CDN-ME-1603 (Ag) (2020 - July 2022)

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com107

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 11.5Control chart for CDN-ME-1810 (Ag) (2020 - July 2022)

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

Table 11.6 shows the comparison between the CRM and analytical results for the period 2020 - July 2022. There has been a slight improvement for CDN-ME-1603 since the end of 2019 onwards, the means are very similar and there is a slight reduction in the difference between the standard deviations. The other two CRMs performed similarly, with acceptable comparisons.

Table 11.6Comparison between CRM values and analytical results (2020 - July 2022)

CRM

CRM

Analytical results

Comparison

Expected Ag value (ppm)

SD

Number of assays

Mean

SD

Mean vs expected

SD of results vs expected

CDN-ME-1501

34.6

1.2

923

34.5

1.2

99.71%

100%

CDN-ME-1603

86

1.5

584

85.8

2.7

99.77%

144.44%

CDN-ME-1810

154

4.5

333

153.8

3.9

99.87%

85%

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

The QP noted the following in the previous Technical Report for the property regarding CRM performance, which covered the period October 2017 - 2019:

·CRMs used at Silver Sand generally show overall acceptable analytical accuracy.

·The mean and standard deviation of analytical results approximate the certified performance criteria and provide confidence in analytical results at the deposit COG and at higher grades (150 g/t Ag).

·From 2017 - 2019 CDN-ME-1603 showed poor analytical precision with a significant number of analytical results occurring outside of two standard deviations, and 5.4% of samples occurring outside of three standard deviations (failure limits).

·CRM CDN-ME-1605 also showed sub-optimal analytical precision with a significant number of analytical results occurring outside of two standard deviations and 2.9% of samples occurring outside three standard deviations (failure limits). While the average analytical results of CDN-ME-1605 are only ~1% lower than the certified mean, the majority of samples outside control limits are biased low. The standard deviation of analytical results is ~1.5 times greater than the certified value.

amcconsultants.com108

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

·The excessive number of warnings and failures occurring in CDN-ME-1603 and CDN-ME-1605 is concerning and should be further investigated prior to continued use. Standard deviations of analytical results from these CRMs are 1.5 times greater than the between laboratory standard deviation provided by the CRM supplier. The QP notes that CRMs were certified using a four-acid digest but that methods OG46 and ME-MS41 comprise an aqua-regia digest. This difference in sample digestion may explain poor CRM performance.

The QP notes that similar results are observed in CRM performance post 2019 and reiterates the following with respect to CRM performance for the 2020 - July 2022 period:

·CRMs used at Silver Sand generally show overall acceptable analytical accuracy.

·CRMs CDN-ME-1501 and CDN-ME-1810 still show acceptable analytical precision, exhibiting low failure rates and with the majority of results falling within the control limits (3 standard deviations).

·The number of warnings and failures occurring in CDN-ME-1603 should be further investigated prior to continued use. The QP notes that CRMs were certified using a four-acid digest but that methods OG46 and ME-MS41 comprise an aqua-regia digest. This difference in sample digestion may explain poor CRM performance.

11.5.1.3Recommendations

The QP makes the following recommendations regarding CRMs at the Silver Sand project:

·Purchase an additional CRM around the average grade (116 g/t Ag) of the deposit which has been certified using a similar digestion method.

·Investigate performance issues with CRM CDN-ME-1603 if this CRM is to be used in future programs. This could be done by preparing several separate sample batches comprising 20-30 CRMs each and comprising at least two different CRMs in random order. Each batch should then be sent to both the primary laboratory and at least one other check laboratory. If results occur outside of certified performance criteria, expected values and standard deviation can be calculated from laboratory results and used as performance criteria.

·Re-evaluate the use of ME-MS41 analytical method. If this method is to be used going forward it is recommended that the OG46 over-limit threshold be dropped from 100 g/t Ag to a level below the anticipated COG. This is because of the poor precision of this method for Ag.

11.5.2Blank samples

11.5.2.1Description

New Pacific uses material collected from quarry sites, local to the deposit as the source of coarse blank material. Cobble to boulder sized material is collected from a quarry site and broken with hammers into cm sized pieces by New Pacific personnel for insertion into the sample stream.

Two different sources have been used as blank material over time. Limestone from a quarry site near Betanzos was used as the initial source of blank material, however this was changed in July 2018 after receiving numerous results with elevated base metals. A new blank quarry site was subsequently sourced approximately 30 km west of Silver Sand. Blank material collected from this quarry comprises red quartz sandstone of similar age and composition to that hosting mineralization at the Silver Sand deposit. Five grab samples from this quarry site were sent for analysis at ALS using ME-MS41. Results ranged between 0.01 and 0.04 g/t Ag, averaging 0.02 g/t Ag.

New Pacific's internal procedures require that one coarse blank is inserted for every 20 samples. For the period October 2017 - 2019, New Pacific considered blank samples with assay results above 1.3 g/t Ag as a warning and samples above 2.4 g/t Ag a fail. These control limits were developed by New Pacific after reviewing analytical data, removing outliers, and calculating the average

amcconsultants.com109

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

background grade and standard deviation of the blank material. The warning and fail limits are set at three times the standard deviation, and six times the standard deviation of background samples respectively. Commencing in August 2019 New Pacific implemented a procedure for laboratory follow up. Assays from blank samples that exceed the warning limit are investigated by New Pacific personnel and followed up as necessary. Assays from blank samples that exceed the fail limit are discussed with the laboratory and re-analyzed as required.

For the programs post 2019, the New Pacific protocols for the assessment of the performance of blanks has been adjusted slightly, a warning is considered above 1 Ag ppm and a failure is considered above 2 Ag ppm. The change in protocol means that the threshold for failure is lower than for the 2017 - 2019 coarse blank samples. The QP considers this adjustment reasonable.

Pulp blanks were submitted in 2021 and 2022. The blank material is CRM CDN-GEO-1901. The source of the CRM is from a copper-gold porphyry deposit in British Columbia. The CRM has a provisional mean for Ag of 1 ppm with a standard deviation of 0.15. The analytical method was four acid digestion with instrumental finish.

11.5.2.2Discussion

Coarse blanks

Coarse blanks test for contamination during both sample preparation and assaying. Blanks should be inserted in each batch sent to the laboratory. In the QP's opinion, when using typical feed grade analytical methods, 80% of coarse blanks should be less than three times the detection limit.

A total of 4,058 coarse blank samples have been inserted since 2017, 1,184 of which were submitted between 2020 - July 2022, representing an overall insertion rate of 4.5%. The QP considers this an acceptable insertion rate.

For the October 2017 - 2019 period blank performance, New Pacific used a failure criteria for samples analyzed by ALS method OG46 as 2.4 times the Ag detection limit. The QP acknowledged that applying a failure limit of three times this detection limit (0.01 g/t Ag) may not be practical for ore grade level analysis but recommended the failure criteria level be reduced from 2.4 g/t Ag if ME-MS41 was to be used on an ongoing basis. This has been implemented. In the QP's opinion the blank monitoring procedures implemented by New Pacific over the 2017 - 2019 period were adequate to identify significant sample contamination during sample preparation and analysis. Blank samples showed no significant systematic levels of contamination.

Table 11.7 summarizes the coarse blank performance based on the New Pacific failure criteria for the period 2020 - July 2022. There has been an improvement in performance since 2019. Coarse blank samples show no significant systematic levels of contamination.

Table 11.7Silver Sand coarse blank performance (2020 - July 2022)

Year

Total

<1 Ag ppm
(Pass)

1 - 2 Ag ppm
(Warning)

> 2 ppm
(Fail)

2020

422

419

1

2

2021

327

326

0

1

2022

435

430

2

1

Total

1,184

1,175

3

4

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com110

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 11.6Coarse blank control chart (2020 - July 2022)

Note: The extreme value recorded in 2022 is 20.5 Ag ppm.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

The QP notes that consistent monitoring and follow up of coarse blank samples has only been completed and clearly documented since mid-2019, in that same year two sample investigations were completed. In both cases, samples before and after the failed blank were re-analyzed. Contamination was found to have occurred during sample preparation, from a preceding high-grade Ag interval. For 2020 onwards, only three failures have been recorded in 2022. Investigation determined that this was due to elevated values in the blank sample which can happen due to the source of the material. These samples also returned slightly elevated values for base metals.

In the QP's opinion, the coarse blank monitoring procedures implemented by New Pacific are adequate to identify significant sample contamination during sample preparation and analysis. Blank samples show no significant systematic levels of contamination.

Pulp blanks

Pulp blanks test for contamination occurring during the analytical process. Blanks should be inserted in each batch sent to the laboratory. In the QP's opinion, when using typical ore grade analytical methods is that 90% of pulp blanks should be within two times of the detection limit.

A total of 446 pulp blank samples have been inserted since 2021, representing an overall insertion rate of 0.5%. The QP has applied the following protocols for assessing the pulp blank samples. The value of 1.3 Ag ppm is equivalent to the provisional mean of the CRM plus two times the standard deviation. This would equate to a warning value for a CRM, and a failure value of 1.45 Ag ppm (provisional mean plus three standard deviations). Table 11.8 and Figure 11.7 show the pulp blank performance. There are two samples which show contamination.

amcconsultants.com111

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 11.8Silver Sand pulp blank performance (2021 - July 2022)

Year

Total

<1.3 ppm Ag
(Pass)

1.3 to 1.45 ppm Ag
(Warning)

> 1.45 ppm Ag
(Fail)

2021

141

139

1

1

2022

305

301

3

1

Total

446

440

4

2

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

Figure 11.7Pulp blank control chart (2021 - July 2022)

Note: The two extreme values are 35.5 and 18.6 Ag ppm, respectively.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

In the QP's opinion, the pulp blank monitoring procedures implemented by New Pacific are adequate to identify significant sample contamination during sample analysis. Blank samples show no significant systematic levels of contamination.

11.5.2.3Recommendations

The QP makes the following recommendations regarding blank samples:

·Continue to include coarse and pulp blanks in every batch of samples submitted at a rate of at least 1 in every 20 samples (5%).

·Continue to ensure that blanks are consistently monitored in real time on a batch-by-batch basis and that remedial action is taken as issues arise.

·Ensure that all blank sample follow up is recorded.

11.5.3Duplicate samples

11.5.3.1Description

New Pacific has submitted a total of 1,272 quarter core field duplicate samples during the period October 2017 - July 2022, of which 805 were submitted from 2021 - July 2022. Field duplicate samples are selected once assay results have been received to ensure that duplicate samples encompass the entire grade range. Duplicate samples are collected by cutting the remaining half core in half. One portion of the quarter core is submitted for duplicate analysis, and the remaining portion of quarter core is returned to the core tray.

amcconsultants.com112

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

New Pacific did not submit pulp duplicates prior to 2019, however, submitted 737 pulp duplicate samples between 2021 and July 2022.

New Pacific did not submit coarse reject duplicates prior to 2019, however, submitted 796 coarse reject duplicate samples between 2021 and July 2022.

11.5.3.2Discussion

Field duplicates monitor sampling variance, sample preparation and analytical variance, and geological variance. Coarse reject samples monitor sub-sampling variance, analytical variance, and geological variance. Pulp duplicates monitor analytical and geological variance.

The QP recommends that field, coarse and pulp duplicate samples be selected over the entire range of grades seen at the Project to ensure that the geological heterogeneity is understood. However, the majority of duplicate samples should be selected from zones of mineralization. Unmineralized or very low-grade samples should not form a significant portion of duplicate sample programs as analytical results approaching the stated limit of lower detection are commonly inaccurate, and do not provide a meaningful assessment of variance.

Duplicate data can be assessed using a variety of approaches. The QP typically assesses duplicate data using scatterplots and relative paired difference (RPD) plots. These plots measure the absolute difference between a sample and its duplicate. For field duplicates it is desirable to achieve 80% to 85% of the pairs having less than 20% RPD between the original assay and check assay. For coarse reject duplicates it is desirable to achieve 80% to 85% of the pairs having less than 15% RPD between the original assay and check assay. For pulp duplicates it is desirable to achieve 80% to 85% of the pairs having less than 10% RPD between the original assay and check assay. In these analyses, pairs with a mean of less than 15 times the lower limit of analytical detection are excluded. Removing these low values ensures that there is no undue influence on the RPD plots due to the higher variance of grades expected near the lower detection limit, where precision becomes poorer (Long et al., 1997). For the assessment of the 2021 - July 2022 field duplicates, a lower detection limit of 0.01 Ag ppm was used and is based on the ME-MS41 analytical method. Prior to this, a lower detection limit of 1 Ag ppm was used based on the Ag-OG46 analytical method.

Field duplicates

Submission rates for the field duplicates has varied from year to year, with < 1% submission rates prior to 2021. For 2021 and 2022, the submission rates are 4%. The overall submission rate of field duplicates for the period October 2017 - July 2022 is 1.4%.

Field duplicate performance for the period October 2017 - 2019 showed a relatively poor correlation between duplicate sample pairs with only 34% of samples occurring within 20% RPD. Based on these results the QP formed the opinion that that mineralization is heterogenous, that sample errors are occurring during the sampling process, or a combination of both factors. The QP recommended further work to confirm whether the friable nature of silver sulphosalts might have resulted in loss of portions of the mineralized veins during the core cutting and sampling process, resulting in progressive decrease in sample grade with each stage of processing, and an overall net underestimation of metal.

The results of the field duplicate performance for the period 2021 - July 2022 is presented using RPD and scatter plots shown in Figure 11.8 and a statistical comparison is presented in Table 11.9. The duplicate data ranges from 0.01 ppm - 1,540 Ag ppm, with a mean of 14.27 Ag ppm. There are 643 samples greater than 15 times the detection limit, which provides a reasonable sample size from which to make an assessment. The duplicates cover the appropriate grade range.

amcconsultants.com113

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 11.8Silver Sand field duplicate RPD and scatter plot (2021 - July 2022)

Note: the scatterplot is limited to 500 Ag ppm, only 2 samples in the dataset are above 500 Ag ppm.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

Table 11.9Silver sand field duplicate statistical summary (2021 - July 2022)

Ag (ppm)

Original

Duplicate

Number of samples

805

805

Number of samples > 15 times detection limit

643

643

Mean

14.27

13.69

Maximum

1,525.00

1,540.00

Minimum

0.01

0.01

Pop Std Dev.

70.58

72.46

CV

4.95

5.29

Cor Coeff

0.94

-

Bias (all data)

4.05%

-

Percent Samples <20% RPD

54.90

-

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

The QP notes that the performance of the field duplicates has improved significantly since 2019, although still showing poor precision. There is a slight bias towards the original sample.

Coarse reject duplicates

Submission rates for the coarse reject duplicates is approximately 4%, noting that these were only submitted between 2021 and July 2022. The QP considers the insertion rate to be reasonable.

The results of the coarse reject duplicate performance for the period 2021 - July 2022 is presented using RPD and scatter plots shown in Figure 11.9 and a statistical comparison is presented in Table 11.10. The duplicate data ranges from 0.01 ppm - 2,090 Ag ppm, with a mean of 19.42 Ag ppm. There are 634 samples greater than 15 times the detection limit, which provides a reasonable sample size from which to make an assessment. The duplicates cover the appropriate grade range.

amcconsultants.com114

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 11.9Silver Sand coarse reject duplicate RPD and scatter plot (2021 - July 2022)

Note: the scatterplot is limited to 500 Ag ppm, only 3 samples in the dataset are above 500 Ag ppm.

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

Table 11.10Silver sand coarse reject duplicate statistical summary (2021 - July 2022)

Ag (ppm)

Original

Duplicate

Number of samples

794

796

Number of samples > 15 times detection limit

634

634

Mean

19.42

19.81

Maximum

1,970.00

2,090.00

Minimum

0.01

0.01

Pop Std Dev.

99.36

102.78

CV

5.12

5.19

Cor Coeff

1.00

Bias (all data)

-1.98%

Percent Samples <15% RPD

93.38

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

The QP notes that the coarse reject performance is acceptable, with > 90% within 15% RPD. There is a slight negative bias towards the original sample.

Pulp duplicates

Submission rates for the pulp duplicates is just below 4%, noting that these were only submitted between 2021 and July 2022.

The results of the pulp duplicate performance for the period 2021 - July 2022 is presented using RPD and scatter plots shown in Figure 11.10 and a statistical comparison is presented in Table 11.11. The duplicate data ranges from 0.01 ppm - 2,060 Ag ppm, with a mean of 25.23 Ag ppm. There are 595 samples greater than 15 times the detection limit, which provides a reasonable sample size from which to make an assessment. The duplicates cover the appropriate grade range.

amcconsultants.com115

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 11.10Silver Sand pulp duplicate RPD and scatter plot (2021 - July 2022)

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

Table 11.11Silver Sand pulp duplicate statistical summary (2021 - July 2022)

Ag (ppm)

Original

Duplicate

Number of samples

735

737

Number of samples > 15 times detection limit

595

595

Mean

25.23

22.86

Maximum

2,060.00

2,060.00

Minimum

0.01

0.01

Pop Std Dev.

145.60

127.79

CV

5.77

5.59

Cor Coeff

0.89

Bias (all data)

9.39%

Percent Samples < 10% RPD

86.22

Source: Compiled by AMC Mining Consultants (Canada) Ltd., 2022.

The QP notes that 86% of samples fall within 10% RPD. This shows good precision. There is a bias towards the original samples of approximately 9%. There is an outlying sample, where the original value is 1,875 Ag ppm and the duplicate value is 64.7 Ag ppm. Removing this sample reduces the bias to -0.47% and the mean of the original samples to 22.71 Ag ppm. As such, the QP does not consider there to be any bias between the original and duplicate samples.

11.5.3.3Recommendations

The QP notes that the field duplicates, which monitor the variance of original field sampling (core cutting), coarse reject sub-sampling, and pulp sub-sampling, show sub-optimal precision. The coarse and pulp duplicates show good analytical precision. This suggests that the majority of sampling variance is occurring during the initial sampling process. This may indicate that the quarter core sample is insufficient because of geological heterogeneity at this scale.

amcconsultants.com116

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

·Implement investigative work to understand the geological variance. This should include:

¾In future programs consider submitting field duplicates as half core rather than quarter core to assess sub-sampling error.

¾Consider drilling twin holes using triple tube diamond core or RC drilling to evaluate the deposit variance on a local scale and whether loss of vein material is occurring during drilling and sampling processes.

·Ensure that all future programs include between 4 - 5% duplicate samples including field duplicates, coarse reject duplicates and pulp duplicates to enable the various stages of sub-sampling to be monitored.

11.5.4Umpire samples

New Pacific submitted a total of 2,851 coarse reject samples to Actlabs Skyline in Lima, Peru for check assay analysis during October 2017 - 2019. Actlabs Skyline is an independent geochemical laboratory certified according to ISO 9001:2015.

The QP compared the original and umpire duplicate assays for 2,064 sample pairs where the original and duplicate assay were 15 times the detection limit of 1 g/t Ag. These showed no sample bias and sub-optimal precision with only 62% of umpire duplicates being within 10% RPD. The sub-optimal performance may be due to additional sub-sampling variance incurred during sampling of the reject or issues with the laboratory.

No umpire samples were submitted from 2020 - July 2022.

The QP makes the following recommendations regarding umpire samples:

·In future programs, submit umpire duplicates, as was done for the October 2017 - 2019 programs.

·Submit pulp samples (rather than coarse reject) so that umpire samples only monitor analytical accuracy and variance.

·Include CRMs at the average grade and higher grades in umpire sample submissions.

11.6Conclusions

New Pacific has developed and implemented sound procedures which manage sample preparation, analytical and security procedures.

Drilling programs completed on the Property between 2017 and July 2022 have included QA/QC monitoring programs which have incorporated the insertion of CRMs, blanks, and duplicates into the sample streams, and umpire (check) assays at a separate laboratory. The QP has compiled and reviewed the available QA/QC data for 556 drillholes where assays have been received.

New Pacific has included CRMs, blank, coarse reject, and pulp duplicate assays as part of routine analysis at slightly less than the preferred rates of 5% for the CRMs and blanks. Duplicate insertion rates are acceptable at 3%.

New Pacific has used four different CRMs throughout the project history. CRMs generally show reasonable analytical accuracy; however, one of the three CRMs did not perform within certified control limits, with an excessive number of failures. The QP postulates that poor CRM performance might be due to the CRMs being certified using a four-acid digest but analyzed using aqua-regia. The QP recommends that follow up work be completed prior to further use of these CRMs.

amcconsultants.com117

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Blank sample results are considered acceptable and show that no significant contamination has occurred during sample preparation and analysis.

Quarter core field duplicate samples show improved, yet sub-optimal performance which suggest that mineralization is heterogenous, that sample errors are occurring during the sampling process, or a combination of both factors. The good performance of the coarse and pulp duplicates submitted in 2021 - July 2022 indicates that the majority of variance is occurring at the initial sampling stage. This should be investigated.

The QP recommends that umpire samples be submitted as pulps in future QA/QC programs.

The QP has reviewed the QA/QC procedures used by New Pacific including certified reference materials, blank, duplicate and umpire data and has made some recommendations. The QP does not consider these to have a material impact on the Mineral Resource estimate and considers the assay database to be adequate for Mineral Resource estimation. The QP considers sample preparation, security, and analytical procedures employed by New Pacific to be adequate.

amcconsultants.com118

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

12Data verification

Dinara Nussipakynova, P.Geo. of AMC Consultants, completed a site visit to the Project between 28 - 29 May 2022, and during the inspection the following activities were carried out:

·Review of field site of Silver Sand project.

·Review of drilling and core processing procedures.

·Review of New Pacific QA/QC procedures.

·Review of randomly selected core from seven drillholes:

¾DSS5423

¾DSS487502

¾DSS504510

¾DSS527506

¾DSS527510

¾DSS529001

¾DSS646001

·Inspected the core processing facility and core storage in Betanzos.

·Held discussions with several staff on site, in regard to data collection and quality.

·Held discussions on database management procedures.

·Observed the marked and identified collars of the recent drillholes in the field.

·Reviewed the drill management process adopted by New Pacific.

As reported in the 2020 Technical Report, the QP undertook random cross-checks of assay results in the database with original assay results on the assay certificates returned from ALS (Bolivia) and Actlabs (Peru) up to 31 December 2019. This verification consisted of comparing 3,616 of the 58,420 assay results in the database to those in the certificates. This is approximately 6.2% of the total samples at that time. One typing error was detected. The QP also undertook a random cross check of the original collar and survey measurements for 18 drillholes and compared them to the database. This represented 5.5% of the total drillholes. No errors were detected.

After the 2022 site visit, the QP undertook random cross-checks of assay results of the 2020 - 2022 drillholes with original assay results on the assay certificates returned from ALS (Bolivia) and Actlabs (Peru). This verification consisted of comparing 270 of the 5,198 assay results in the database to those in the certificates. This is approximately 5.2% of the total samples. One typing error was detected. No errors were detected.

As shown in Table 12.1 a total of 6.1% of the assays have been checked.

Table 12.1Assay verification results

Report

Total samples

# Samples selected for verification

Errors noted

% Samples verified

2020 Technical Report

58,420

3,616

1

6.2

2022 Technical Report

5,198

270

1

5.2

Total

63,618

3,616

2

6.1

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com119

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The drillhole file has undergone the following checks:

·Inconsistent FROM and TO values.

·Incorrect treatment of absent assay values.

·Duplicate records and duplicate holes.

·Downhole surveys.

·Drillhole collar elevation not matching topography wireframe.

·556 drillholes were reviewed in 3D space and these had a total of 91,164 records.

No inconsistencies were identified during checking the drillholes in 3D. Checking the collar locations against the Digital Terrain Model (DTM) of the topography surface showed no differences in elevation.

The QP considers the database fit-for-purpose and in the QP's opinion, the geological data provided by New Pacific for the purposes of Mineral Resource estimation were collected in line with industry best practice as defined in the CIM Exploration Best Practice Guidelines and the CIM Mineral Resource, Mineral Reserve Best Practice Guidelines. As such, the data are adequate for use in the estimation of Mineral Resources.

amcconsultants.com120

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

13Mineral processing and metallurgical

13.1Introduction

The various tests completed as part of two recent metallurgical programs on samples of mineralization from the Silver Sand deposit indicate that the silver-bearing minerals are amenable to efficient extraction using a variety of simple, well-established mineral processing techniques. Both testwork programs were completed by SGS Minerals in Lima, Peru and these are summarized herein.

Highlights of the first metallurgical program, conducted in 2019, are as follows:

·A lab-scale rougher-scavenger flotation program resulted in silver recoveries of up to 92.0%, 86.8%, and 96.0% at concentrate mass pull of 18.4%, 10.2%, and 10.0% for samples of Oxide, Transition, and Sulphide mineralization respectively.

·Samples of Oxide, Transition, and Sulphide mineralization were submitted for bottle roll cyanidation testing and this work achieved up to 96.3%, 97.0%, and 96.7% silver extraction respectively at grind size of 80% passing 50 µm, cyanide concentration of 3.0 grams per litre (g/L) NaCN, retention time of 72 hours and dissolved oxygen of 25 - 30 ppm.

·Samples of Oxide mineralization were submitted for column leach cyanidation testing, and this achieved up to 88.3% silver extraction with crush size of 100% passing 12.7 mm, cyanide concentration of 4.0 g/L NaCN and test duration of 75 days.

·Samples submitted for initial comminution testing were found to be mostly in the soft to medium grindability range with Bond ball mill work index of 4.1 to 15.9 kilowatt-hours per tonne (kWh/t) and low to medium values of Abrasion Index (Ai).

A follow-up metallurgical program commenced in 2020, that built upon the initial work and provided a more robust base for processing trade-off studies and flowsheet development. Highlights of this program include:

·Confirmation of the geometallurgical model developed in 2018.

·An initial assessment of ore sorting showed encouraging results.

·A more comprehensive assessment of physical characteristics of the different oxidation types, with an overall indication that samples are amenable to SAG milling.

·A larger flotation program culminated in locked cycle testing of new composite samples of Oxide, Transition, and Sulphide mineralization, with silver recoveries of 67.4%, 83.2%, and 87.1% respectively at concentrate mass pulls of 0.5%, 2.2%, and 5.0%. Silver recovery is expected to increase significantly with higher concentrate mass pull.

·A more comprehensive cyanidation program included coarse-particle and fine-particle bottle roll leaching, column leaching and leaching of flotation concentrates. Cyanidation of composite samples ground to 80% -75 µm achieved silver extractions of up to 93.9%, 92.5%, and 78.3% for Transitional, Oxide, and Sulphide master composite samples respectively under conditions of cyanide concentration of 2.0 g/L NaCN, dissolved oxygen concentration of 11 - 15 ppm and retention time of 48 hours.

·Initial testing of cyanide detox amenability raised no concerns and suggests that SO2/Air will be a suitable process to achieve residual cyanide concentration of less than 20 ppm WAD cyanide (CN).

·Initial environmental characterization testing was completed, including Acid Base Accounting (ABA) and Toxicity Characteristic Leaching Procedure (TCLP) characterization.

The metallurgical efficiency with which a mineral processing plant might recover metals into a saleable product can have a significant impact on the potential for economic extraction. The economic analysis described in Section 22 included a 91% metallurgical recovery assumption for

amcconsultants.com121

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

silver and this is considered reasonable by the QP given the predicted mine plan together with test work results presented in this section. It should be noted however that the metallurgical program discussed below is preliminary in nature and is therefore limited in its ability to represent the deposit by the preliminary nature of the tested samples.

13.2Initial metallurgical program - SGS Lima, 2018

The initial program of metallurgical testwork commenced in 2018 at the SGS Lima metallurgical facilities in Peru, with support work by Centro de Investigacion Minero Metalurgico (CIMM) (managed by the Corporacion Minera de Bolivia) and Universidad Técnica de Oruro (UTO). Comminution, flotation, and cyanide leaching programs were completed by SGS, while the mineral characterization work was completed by the CIMM and UTO in Bolivia.

The results of this work were reported in detail within the previous Silver Sand Technical Report (2020 Technical Report) and therefore not repeated here.

13.3Second metallurgical program - SGS Lima, 2020

The second program of metallurgical testwork was initiated in 2020 and was designed specifically to build upon the initial 2018/19 studies. This program was also completed at the SGS metallurgical facilities in Lima, Peru, with support work by SGS in Lakefield, Ontario, Canada.

13.3.1Geometallurgical characterization

A comprehensive lithogeochemical and geometallurgical study of the Silver Sand deposit was undertaken by CSA Global in early 2020. This work examined the project's geochemical database and advanced compositional domain classifications. The analysis ultimately supported the geometallurgical classifications made in the initial metallurgical study (i.e., Oxide, Transition, and Sulphide) and therefore these relatively simple classifications remained in force for the 2020 metallurgical program.

The following grade classifications were applied for the domaining exercise:

·Silver grade less than 12 g/t was anticipated to be sub-economic and was tagged as waste.

·Silver grade greater than 70 g/t was tagged as high-grade mineralization.

·Silver grade between 12 g/t and 70 g/t was tagged as low-grade mineralization.

A proxy for the degree of oxidation was determined using iron and sulphur assays (in molar percentage), in lieu of geologists logging data. The calculation and interpretation of FeOx% is given below:

FeOx Index (%) = 100*(2Fe-S)/(2Fe+S), where:

·FeOx Index greater than 90% was determined to be "Oxide".

·FeOx Index between 33% and 90% was determined to be "Transitional".

·FeOx Index less than 33% was determined to be "Sulphide".

13.3.2Composite sample preparation

Over 300 interval samples from the four metallurgical drillholes were shipped to SGS Lima for composite sample creation. Sample selections were designed to ensure that the following broad sampling principles were respected:

·Samples should be spatially diverse.

·The distribution of silver grade within sample sets should reflect that of the overall drillhole population.

amcconsultants.com122

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

·Each geometallurgical domain should be adequately represented.

·Material should be coarse enough to allow accurate comminution work and column leach work.

Sample material consisted of ½ HQ drill cores taken from four metallurgical drillholes (422501T, 522501T, 525021T, and 642501T) selected by the QP during a 2020 site visit and drilled as twins to existing holes. QA/QC work confirmed that the distribution of grade in these twins was a close match with the original holes.

The grade and oxidation analysis discussed above resulted in the categorization of material shown in Table 13.1 (assays are based on interval assays from the diamond drillhole database).

Table 13.1Sample categories

HG Oxide

LG Oxide

Waste

HG Trans

LG Trans

HG Sulph

LG Sulph

Total

Samples, no

19

30

224

109

106

23

19

306

Mass, kg

89

147

1,117

133

133

110

92

704

Ag Grade, g/t

196

27

4

412

32

386

23

178

Fe Grade, %

2.1

2.1

2.1

2.9

1.6

2.8

2.5

2.3

FeOx Index, %

96%

96%

67%

56%

57%

29%

29%

62%

S Grade, %

0.10

0.10

0.72

1.71

0.92

3.17

2.70

1.38

As Grade, g/t

397

205

154

546

163

491

319

346

Source: Compiled by Halyard Inc., 2022.

From these samples, three master composites (MC) were created together with six grade variability composites:

·Oxide MC, made from 50% HG oxide and 50% LG oxide

·Transitional MC, made from 30% HG transition and 70% LG transition

·Sulphide MC, made from 30% HG sulphide and 70% LG sulphide

·Oxide High Grade

·Oxide Low Grade

·Transitional High Grade

·Transitional Low Grade

·Sulphide High Grade

·Sulphide Low Grade

Note that 224 samples (approximately 1,100 kg of material) carried a silver grade of below 12 g/t and were defined as non-economic. These samples were excluded from composite recipes.

The QP designed the sampling protocols described above and worked with geologists during a 2020 site visit to select metallurgical drill hole locations. The QP finds this, together with the subsequent selection of sub-samples and composites to be acceptable for a preliminary metallurgical program. The sampling allows for a preliminary assessment of metallurgy by geometallurgical domain, but further work on more spatially diverse composite sets is recommended in order to complement the domain results and to verify that the metallurgical assumptions hold true.

13.3.3Chemical analysis

A staged crushing / blending exercise was completed to prepare the nine metallurgical composite samples. A representative subsample of each was subsequently removed for head assay analysis. Results are summarized in Table 13.2.

amcconsultants.com123

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.2Composite head assays

Sample

Ag (g/t)

Au (g/t)

Pb (ppm)

Zn (ppm)

Cu (ppm)

Fe (%)

S (%)

LG Oxide Composite

28

0.021

850

67

86

2.69

0.09

HG Oxide Composite

157

0.025

1,222

65

104

2.83

0.12

Oxide Master Composite

91

0.017

977

53

89

2.81

0.10

LG Transitional Composite

33

0.008

507

141

265

2.08

0.92

HG Transitional Composite

306

0.027

1,085

57

202

3.40

1.73

Transitional Master Composite

113

0.014

639

113

236

2.38

1.16

LG Sulphide Composite

19

0.014

640

3,806

345

3.00

2.58

HG Sulphide Composite

385

0.045

944

333

1,418

3.16

2.62

Sulphide Master Composite

119

0.023

690

2,568

595

3.10

2.60

Source: Compiled by Halyard Inc., 2022.

13.3.4Physical characterization

Representative sub-samples were removed at appropriate stages of composite preparation and submitted for SMC testing, Bond ball mill work index testing, and abrasion index determination. Results are summarized in Table 13.3.

The initial SAG mill design parameters should be supplemented by additional data in order for them to become statistically meaningful, but as initial estimates of SAG mill performance, these test results indicate that a SAG-based comminution circuit is a suitable option for grinding the Silver Sand mineralization.

Table 13.3Grindability test data

Sulphide MC

Transitional MC

Oxide MC

DWi, kWh/m3

6.3

3.9

4.7

SG, t/m3

2.56

2.53

2.52

A*b

40.6

64.4

53.6

SCSE, kWh/t

9.62

7.95

8.54

Bond BWi, kWh/t

12.3

14.1

16.6

Abrasion Index (g)

0.365

0.325

0.309

Source: Compiled by Halyard Inc., 2022.

With A x b values of 40.6, 64.4, and 53.6, are judged to be softer than average.

Ball Mill Work Index (BWi) with a closing screen of 106 µm confirm the data obtained in earlier metallurgical testing and suggest that a reasonable range of work index (12.3 - 16.6 kWh/t) will be seen in the mill circuit, with hardness increasing relative to the degree of oxidation (i.e. Higher FeOx figures = higher BWi).

Abrasion index tests indicate that all composite samples are only slightly abrasive, and no major wear-related concerns should arise from the processing of these materials.

13.3.5Size fraction assaying

Earlier work had noted some upgrading of silver to the finer fractions and thus a size fraction analysis was carried out on a coarse crushed sample of the master composites to determine if a size-based preconcentration step could be included in the Silver Sand flowsheet. A 4 kg subsample was removed from the preparation of each master composite at the -3/4" stage of crushing, sized into several fractions, and assayed. Results were generally unremarkable, with upgrades only seen in the finest fraction (-300 µm).

amcconsultants.com124

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.4Master composite size / assay summary

Retained size

Mass

Assay of Retained Fraction

Distribution %

g

%

Ag (g/t)

Fe (%)

S (%)

Ag

Fe

S

Sulphide -300 µm

282

7

332

3.1

3.1

12.1

8.1

8.2

Sulphide Head

3,999

100

193

2.7

2.6

100.0

100.0

100.0

Transitional -300 µm

266

7

119

2.6

1.4

8.8

8.2

8.5

Transitional Head

4,029

100

89

2.1

1.1

100.0

100.0

100.0

Oxide -300 µm

336

8

194

2.8

0.1

16.9

9.0

10.7

Oxide Head

4,321

100

94

2.6

0.1

100.0

100.0

100.0

Source: Compiled by Halyard Inc., 2022.

As an effective industrial scale size separation at 300 µm would be more challenging, this work was not pursued further.

13.3.6Heavy Liquids Separation (HLS) testing

In addition to size fraction assaying, a series of simple density-based separation tests were attempted using heavy liquids on coarse (100% -1/2") unsized subsamples of the three master composite samples. This testing was completed at SGS in Lakefield, Ontario. Each heavy liquids test composite had the fines (-1.5 mm) removed beforehand and HLS testing was completed on the coarse fraction only (+1.5 mm). The HLS tests were conducted at several different densities, with incremental sink fractions collected at each stage. This method allows the preparation of a simple washability curve for scoping level determination of separability.

HLS test results for the Sulphide, Transitional, and Oxide composites are plotted in Figure 13.1, Figure 13.2, and Figure 13.3 (note that these results include the recombination of fines bypass to the product stream).

Figure 13.1HLS recovery curves, Sulphide MC

Source: AGP Mining Consultants Inc., 2021.

amcconsultants.com125

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 13.2HLS recovery curves, Transitional MC

Source: AGP Mining Consultants Inc., 2021.

Figure 13.3HLS recovery curves, Oxide MC

Source: AGP Mining Consultants Inc., 2021.

amcconsultants.com126

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

For the Sulphide master composite, the curves illustrate that for example a separation at 2.6 kg/L cut yields a 92.5% silver recovery into 68.2% of the feed mass. The silver grade of the concentrate would be 143 g/t whilst that of the reject stream would be 25 g/t.

The Transitional sample results are worse: a separation at 2.6 kg/L cut would yield a 78.0% silver recovery into 50.8% of the feed mass. Reducing the separation density to 2.55 kg/L would result in 87.7% silver recovery into 75.4% of the feed mass. The silver grade of a 2.60 kg/L concentrate would be 147 g/t whilst that of the reject stream would be 43 g/t.

For the Oxide master composite, separability is also quite poor: a split at 2.6 kg/L cut would yield a 73.2% silver recovery into 58.8% of the feed mass. If the separation density was reduced to 2.55 kg/L, then 90.9% of silver would be recovered into 87.5% of the feed mass. The silver grade of a 2.60 SG concentrate would be 171 g/t whilst that of the reject stream would be 89 g/t.

The heavy liquids tests suggest that a Dense Media Separation (DMS) preconcentration process would not provide an economic separation, and therefore the work was not pursued further.

13.3.7Mineralogical analysis

Samples of Sulphide, Transitional, and Oxide Master composite samples were submitted to the Advanced Mineralogy Facility at the SGS Lakefield site. The objectives of this investigation were to determine the bulk mineralogy of the samples with emphasis on the silver mineral attributes. Samples were characterized using XRD and TIMA-X data.

XRD measurement showed that the three samples consist mainly of quartz, with minor mica, chlorite and for the sulphide composite, pyrite. Qualitative observations are given in Table 13.5.

Table 13.5XRD analysis

Sulphide MC

Transitional MC

Oxide MC

Major

Quartz

Quartz

Quartz

Moderate

-

-

-

Minor

Mica, Pyrite

Mica

Mica, Chlorite

Trace

Chlorite, K-feldspar, jarosite, chlorite, plagioclase

Pyrite, chlorite, goethite, k-feldspar, jarosite, plagioclase

Pyrite, goethite, k-feldspar, jarosite, plagioclase, maghemite

Source: Compiled by Halyard Inc., 2022.

The bulk modal mineralogy of the three samples as determined by TIMA-X is summarized in Table 13.6. The Sulphide, Transitional, and Oxide samples consist mainly of quartz (84.8%, 89.1%, to 88.7%), micas / chlorite / clays (4.9% to 3.5% to 3.1%), and Fe-oxides (0.7%, 2.7%, and 6.4%, respectively). Trace amounts of other minerals are also present. Note the presence of pyrite which ranges from 7.2% to 3.2% to 0.1%, and Pb-Bi-Sb-Cu sulfosalts from 0.29% to 0.13% to 0.1% in the Sulphide, Transitional, and Oxide samples, respectively.

amcconsultants.com127

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.6Modal mineralogy

Mass distribution, %

Sulphide MC

Transitional MC

Oxide MC

Quartz

84.8

89.1

88.7

Pyrite

7.22

3.17

0.10

Micas / Chlorite / Clays

4.88

3.49

3.13

Fe-Oxides

0.68

2.70

6.44

Sphalerite

0.65

0.03

0.01

Sulphosalts

0.29

0.13

0.10

Ti Oxides

0.26

0.23

0.20

Tetrahedrite

0.16

0.01

-

Other Sulphides

0.08

0.06

-

Argentite / Chloroargyrite

0.02

0.03

0.03

Galena

0.02

-

-

Other Oxides

0.10

0.14

0.24

Carbonates

-

0.01

-

Jarosite

-

0.02

0.02

Other (Misc)

0.78

0.79

1.00

Total

100

100

100

Source: Compiled by Halyard Inc., 2022.

The D50 (50% passing value) as determined by TIMA-X for major mineral components is given in Table 13.7.

Table 13.7Mineral grain size data (D50)

Mineral D50 measured (µm)

Sulphide MC

Transitional MC

Oxide MC

Pyrite

50

50

47

Quartz

42

50

48

Micas / Chlorite / Clay

17

17

15

Fe-Oxides

9

17

12

Source: Compiled by Halyard Inc., 2022.

The deportment of silver amongst the various minerals within each composite was also derived using TIMA-X data and is given in Table 13.8. Note that the SGS Mineralogist mentions that the wide variation in measured silver concentration in oxides and sulfosalts means that the data is semi-quantitative only.

Table 13.8Silver deportment

Sulphide MC

Transitional MC

Oxide MC

Argentite / Chloroargyrite

52.4

94.4

97.1

Tetrahedrite

34.8

1.9

-

Sulphosalts

12.7

3.0

2.3

Iron Oxide

-

0.5

0.4

Other

0.1

0.2

0.2

Source: Compiled by Halyard Inc., 2022.

The silver deportment data highlights the main difference between the Sulphide composite sample and the Oxide and Transitional composite samples, with roughly half the silver in tetrahedrite and sulphosalts for the sulphide sample and almost all silver in Argentite / Chloroargyrite for the oxide and transitional samples.

amcconsultants.com128

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

13.3.8Particle sorting

A total of 45 hand-picked samples of half core were sent to TOMRA in Germany who are the manufacturers of XRF / XRT sorting machines for what is described as a "First Inspection" process. The test involves measurement of each particle using various sensor heads and comparing these signatures with the actual grade measured for each particle by assay (measured after the testwork is complete). A typical set of the samples sent for measurement is shown in Figure 13.4.

Figure 13.4Particle sorting samples (oxide core)

Source: TOMRA, 2020.

amcconsultants.com129

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The results of this program are discussed in detail within the TOMRA report. After measurement, each sample was individually pulverized and assayed, to allow for a quantitative analysis (albeit with somewhat poor statistics due to the small overall sample size).

Results were generally encouraging, with only a small number of false negatives (i.e. Identified as "Waste" ID but with significant silver grade by assay) and false positives (i.e. Identified as "HG" ID but low silver grade by assay). The remaining samples were correctly identified by the sorter.

This sorting testwork should be advanced in future studies using more significant sample mass, and operational strategies should be developed in parallel with other flowsheet development work.

13.3.9Flotation

A flotation program consisting of rougher kinetic tests, open circuit cleaner tests and locked cycle tests was completed at SGS Lima. The majority of flowsheet development work was conducted on the master composite samples, with a short program included to verify the variability composites for each oxidation type. Flotation tests were completed using a standard Denver D12 flotation machine, and flowsheet details picked up from the previous (2019) testwork program.

13.3.9.1Primary grind size determination

The first round of rougher flotation tests was designed to establish the relationship between metallurgical performance and primary grind size. Three grind size targets (80% passing 100 µm, 75 µm, and 53 µm) were selected for each master composite sample. Other parameters such as reagent dosage, % solids and air rates were kept constant. Concentrates were collected after 1, 2, 4, 8, and 12 minutes. The remaining solids after completion of flotation were filtered and collected as a rougher tailing. PAX was used as the baseline collector, as it is very strong and non-selective. MIBC was used as a frother for these preliminary evaluations.

Silver flotation kinetics for the Sulphide master composite sample are plotted below in Figure 13.5.

Figure 13.5Rougher flotation kinetics, Sulphide master

Source: AGP Mining Consultants Inc., 2021.

amcconsultants.com130

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Silver recoveries of 90 - 95% at concentrate mass pull of 12 - 15% after 12 minutes flotation time is an encouraging result, although the data suggests that the initial concentrate appears to be negatively impacted by finer grinds. In fact, looking at photographs of the individual tests, froth stability was very poor (over-collected) in the 53 µm and 75 µm tests - a well-known effect of the PAX collector used in these tests. In all likelihood, a stronger frother or different collector would allow the finer grind tests to perform properly.

For the Transitional and Oxide composite samples, good silver recoveries were achieved, although gradually lower overall as the degree of oxidation increases.

Figure 13.6Rougher flotation kinetics, Transitional master

Source: AGP Mining Consultants Inc., 2021.

amcconsultants.com131

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 13.7Rougher flotation kinetics, Oxide master

Source: AGP Mining Consultants Inc., 2021.

At 12 minutes of flotation time, the net effect of grind size appears to be slight, although there is a slightly larger drop in recovery at the P80 = 100 µm level for the transitional and oxide composite samples. Logically, this effect would be expected for the Sulphide composite also - assuming that froth stability issues were addressed through adjustment of reagents.

On the basis of these results, a grind size of 80% passing 75 µm was selected for subsequent testwork.

13.3.9.2Collector optimization

With the primary grind size fixed, adjustments to the reagent recipe were subsequently attempted. Tests were completed with combinations of Sodium Isopropyl Xanthate (SIPX) and AR7498 (a locally-sourced dithiophosphate) instead of the less-selective PAX. In addition, lime was added to one test in order to provide an alkaline environment (pH =8) for improved sulphide recovery.

amcconsultants.com132

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 13.8Rougher flotation kinetics, Sulphide master

Source: AGP Mining Consultants Inc., 2021.

The improvement in early flotation (less than 4 minutes) for the new tests is clear - highlighting the effect of early over-collection in the initial grind test, where PAX was dosed heavily upfront. It appears that for the sulphide composite, lower initial xanthate dosages are appropriate, as are staged collector dosages. The test at a higher pH (pH=8 vs the natural pH of ~6) did not result in an improvement and the dithiophosphate did not appear to work as well as the straight xanthates.

If one looks at the impact of xanthate strength on concentrate mass pull (shown in Figure 13.9), the positive impact of a less selective collector is quite apparent. Using SIPX in a staged addition (30 g/t initial + 5 then 5 then 5 g/t in the later stages of flotation) results in a similar overall silver recovery (91% vs 92.2% in the initial PAX test), but with a concentrate mass of only 9% vs 15% for the PAX.

amcconsultants.com133

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 13.9Rougher flotation mass pull vs Ag recovery curves

Source: AGP Mining Consultants Inc., 2021.

For the transitional master composite, overall silver recovery results are similar (see Figure 13.10), although the effect of over collection in early flotation using 45 g/t PAX is absent here and the PAX test gives superior kinetics early on. In contrast to the sulphide master result, PAX and SIPX overall mass pull is similar, so none of the new reagent combinations can match the original 45 g/t PAX addition.

Figure 13.10Rougher flotation kinetics, Transitional master

Source: AGP Mining Consultants Inc., 2021.

amcconsultants.com134

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

For the oxide master composite, results are similar to those from the transitional master testing (see Figure 13.11).

Figure 13.11Rougher flotation kinetics, Oxide master

Source: AGP Mining Consultants Inc., 2021.

As with the Transitional master composite, the results using SIPX and / or higher pH did not match the results of the original PAX test (45 g/t PAX). It is worth noting that the oxide composite resulted in little collection of mass to the concentrate, with less than 3% mass recovery observed in most tests. The concentrate grades achieved in the first minute of flotation were impressive, with up to 12,000 g/t achieved in one test.

The rougher flotation tests completed in this program confirm that standard non-selective sulphide collectors at natural pH are quite suitable for good grade / recovery performance at a primary grind size of 80% passing 75 µm.

13.3.9.3Batch cleaner tests

Cleaner flotation is generally aimed at increasing concentrate grade to a saleable level, via additional liberation (regrinding) and multiple stages of selective silver recovery to reject the entrained gangue minerals. For the Silver Sand project, commercially attractive concentrate grades likely require payable base metal (Cu, Pb, or Zn) content in addition to silver grades.

Initial cleaner tests consisted of a single stage upgrade of a bulk rougher flotation concentrate and later testing used two cleaner stages. Concentrate regrinding was not tested as selective flotation was achievable without regrind.

PAX and SIPX were compared as collectors for rougher and cleaner flotation of the three master composites. Bulk rougher concentrates were prepared for each using the conditions determined in previous programs (i.e., 45 g/t SIPX or PAX, 75 µm grind, MIBC frother, etc.) and cleaner concentrates were recovered from the rougher concentrate incrementally over 10 minutes. A plot of cleaner concentrate mass pull vs recovery for the three composites is shown below (Figure 13.12), illustrating how performance is generally better when SIPX is used as the primary collector.

amcconsultants.com135

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 13.12Cleaner #1 flotation response, master composites x 3

Source: AGP Mining Consultants Inc., 2021.

In general, between 3% and 5% of silver recovery reported to the cleaner tailing stream. For locked cycle testing and industrial scale flotation, this stream would be recirculated to the rougher / scavenger feed where a percentage of that loss could be recovered. Cleaner concentrate vs rougher concentrate grades and recoveries are compared in the following Table 13.9.

Table 13.9Rougher vs one-stage Cleaner silver flotation performance

SIPX cleaner flotation

Ag grade (ppm)

Ag recovery (%)

Sulphide Rougher Concentrate

1,128

91.0

Sulphide Cleaner Concentrate

2,486

86.5

Transitional Rougher Concentrate

1,676

88.2

Transitional Cleaner Concentrate

3,488

83.2

Oxide Rougher Concentrate

3,007

79.6

Oxide Cleaner Concentrate

11,564

75.4

Source: Compiled by Halyard Inc., 2022.

Each master composite was subsequently tested using two stages of cleaner flotation, using SIPX as the primary collector and with other conditions similar to previous tests.

The second stage of cleaning had a similar effect on the concentrate - lowering the recovery slightly and improving the concentrate grade (see Table 13.10). Note that very high silver grade is achievable from the oxide composite - albeit at relatively low recoveries.

amcconsultants.com136

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.10Cleaner #1 vs Cleaner #2 silver flotation performance

SIPX cleaner flotation

Ag grade (ppm)

Ag recovery (%)

Transitional Cleaner 1 Concentrate

2,931

83.0

Transitional Cleaner 2 Concentrate

4,017

76.1

Oxide Cleaner 1 Concentrate

9,130

69.9

Oxide Cleaner 2 Concentrate

27,657

61.0

Sulphide Cleaner 1 Concentrate

2,037

84.2

Sulphide Cleaner 2 Concentrate

2,169

79.9

Source: Compiled by Halyard Inc., 2022.

13.3.9.4Locked cycle tests

Locked cycle testing takes the open circuit cleaner flowsheet discussed above and includes the recirculation of intermediate streams in a series of consecutive tests. The intermediate products from cycle #1 are fed into cycle #2 at the appropriate point together with a new batch of fresh feed. This is generally repeated five or six times, until the circuit masses are stable.

In this way, the effect of circulating loads within the flowsheet are included in the result. The products from these tests tend to be much more representative of continuous operation in terms of both grade and recovery.

A single locked cycle test was completed on each master composite, using the flowsheet illustrated below. SIPX was used as a collector, and flotation conditions were those established in open circuit testing as illustrated in Figure 13.13.

Figure 13.13Locked cycle test flowsheet

Source: Halyard Inc., 2022.

amcconsultants.com137

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

For the transitional master composite, locked cycle test results are as follows in Table 13.11.

Table 13.11Locked cycle results, transitional MC

Product

Mass (%)

Grade

Distribution (%)

Ag (g/t)

Fe (%)

S (%)

Ag

Fe

S

Cleaner 2 Concentrate

2.2

4,300

45.9

47.5

83.2

39.9

89.4

Combined Recycled Prod.

1.3

107.2

3.5

0.8

1.2

1.8

0.9

Combined Rougher Tails

96.6

18.0

1.5

0.1

15.5

58.3

9.7

Rougher Concentrate

3.4

2,741

30.1

30.1

84.5

41.7

90.3

Feed

100.0

111.9

2.5

1.2

100.0

100.0

100.0

Source: Compiled by Halyard Inc., 2022.

A total of 83.2% of the silver was recovered into a concentrate grading 4,300 g/t Ag and 47.5% sulphur. This is a good result, with high recovery in the cleaner circuit despite a reasonable upgrade.

For the Oxide composite, locked cycle test results are as follows in Table 13.12.

Table 13.12Locked cycle results, oxide MC (single cleaner)

Product

Mass (%)

Grade

Distribution (%)

Ag (g/t)

Fe (%)

S (%)

Ag

Fe

S

Cleaner 1 Conc

0.5

12,095

16.0

9.4

67.4

2.8

39.2

Combined Recycled Prod.

0.5

480

5.3

0.2

3.1

1.1

1.0

Combined Rougher Tails

99.0

25.2

2.6

0.1

29.5

96.2

59.8

Rougher Concentrate

1.0

5,8560

10.3

4.5

70.5

3.8

40.2

Feed

100.0

74.4

1.0

0.2

100.0

100.0

100.0

Source: Compiled by Halyard Inc., 2022.

A second stage cleaner is not necessary for the oxide composite, with a grade of >12,000 g/t achieved already in the first cleaner stage.12,095 g/t concentrate grade containing 67.4% of the silver is an acceptable result for the oxide composite.

For the Sulphide master composite, good silver recovery of 87% was achieved, in contrast to the open circuit cleaner tests which could only achieve 80% to the second cleaner conc. Note also the high sulphur grade of the cleaner concentrate, at >50% Sulphur. The presence of non-silver bearing sulphides in the concentrate mean that the concentrate silver grade is relatively low, at 2,222 g/t.

Table 13.13Locked cycle results - sulphide MC

Product

Mass (%)

Grade

Distribution (%)

Ag (g/t)

Fe (%)

S (%)

Ag

Fe

S

Cleaner Conc

5.0

2,222

45.5

51.4

87.1

71.5

92.9

Combined Recycled Prod.

1.1

154.3

3.1

1.7

1.3

1.0

0.7

Combined Rougher Tails

93.9

15.9

0.9

0.2

11.6

27.4

6.5

Rougher Concentrate

6.1

1,854

38.0

42.6

88.4

72.6

93.5

Feed

100.0

128.2

3.2

2.8

100.0

100.0

100.0

Source: Compiled by Halyard Inc., 2022.

No work was done to assess the effect of mixed oxide / sulphide / transitional material, and this would be recommended further work should project economics determine that flotation is a viable process route.

amcconsultants.com138

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

13.3.9.5Flotation concentrate analysis

Final flotation concentrates from the three locked cycle tests were submitted for base metals and minor element analysis.

Base metals concentrations were measured in the concentrates generated for each cycle of the LCT and averaged in Table 13.14. The assays suggest that base metal grades in these products may be insufficient to attract reasonable smelter terms at copper, lead, or zinc smelters.

Table 13.14Locked cycle concentrates, base metals

Product

Grade

Cu (%)

Pb (%)

Zn (%)

Sulphide average

0.97

0.67

5.28

Transitional average

0.58

0.13

0.38

Oxide average

0.48

0.41

1.05

Source: Compiled by Halyard Inc., 2022.

Concentrates from the last three cycles of the LCT tests were also submitted for minor element ICP scans. The data given in Table 13.15 is the average of three measurements.

Table 13.15Locked cycle concentrates, minor elements (by ICP)

Element

Unit

Sulphide

Transitional

Oxide

Element

Unit

Sulphide

Transitional

Oxide

Al

%

0.23

1.00

3.33

Mo

ppm

47

197

651

As

ppm

3,905

3,170

2,524

Na

%

0.10

0.05

0.10

Ba

ppm

11

60

237

Nb

ppm

12

5

4

Be

ppm

<0.5

0.55

0.55

Ni

ppm

221

951

2,943

Bi

ppm

354

40

111

P

%

<0.01

0.01

0.09

Ca

%

<0.01

0.02

0.10

S

%

>10

>10

>10

Cd

ppm

316

13

37

Sb

ppm

5,559

628

680

Co

ppm

48

67

118

Sc

ppm

0.5

0.6

1.5

Cr

ppm

304

1,618

5,068

Sn

ppm

1,143

190

223

Fe

%

>15

>15

>15

Sr

ppm

33

123

830

Ga

ppm

<10

<10

19

Ti

%

0.03

0.05

0.06

K

%

0.10

0.41

1.3

Tl

ppm

<2

<2

2

La

ppm

1.5

5.1

10.2

V

ppm

30

36

68

Li

ppm

<1

3

4

W

ppm

180

34

103

Mg

%

<0.01

0.01

0.04

Y

ppm

0.9

1.0

1.8

Mn

ppm

43

174

588

Zr

ppm

21

16

26

Source: Compiled by Halyard Inc., 2022.

Somewhat high arsenic levels are noted in the concentrates, and this element could attract penalties in certain smelters. Antimony in the sulphide concentrate is due to the presence of tetrahedrite.

13.3.9.6Variability tests

Several variability composites were created as described within Section 13.3.2, corresponding to high-grade and low-grade variants of the Sulphide, Transitional, and Oxide master composites. Rougher kinetics for each variant were evaluated for comparison to the baseline master composite work. Results were predictable, with grades and recoveries in near proximity to the master composite results. No variability concerns were raised.

amcconsultants.com139

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

13.3.10Cyanidation

The extraction of silver using sodium cyanide as a lixiviant was tested under various conditions. Master composites and variability composites were tested, using standard bottle roll procedures over 48 - 72 hours. In addition to bottle roll testing, the Transitional Master composite was evaluated for heap leach amenability testing via a 120-day column leach test. These tests are described below.

13.3.10.1Bottle roll testing - master composites

An initial program of bottle roll tests was carried out to determine preferred conditions (grind size, cyanide concentration, dissolved oxygen levels, etc.).

The effect of grind size was assessed using standard leaching conditions (room temperature, 45% solids, 2.0 g/L NaCN, 48-hour leach time and sparging with oxygen).

Table 13.16Bottle roll testing - effect of grind size

Sample

P80
µm

Ag Head grade (g/t)

Residue
Ag (g/t)

Extraction
Ag (%)

Reagents (kg/t)

Assayed

Calc

CaO

NaCN

Sulphide master composite sample

100

119

132

35

73.3

0.64

3.01

75

122

26

78.4

0.58

3.74

53

136

27

80.1

0.58

3.96

Transitional master composite sample

100

113

119

10

91.5

0.34

1.63

75

120

7.3

93.9

0.37

1.98

53

113

7.3

93.5

0.42

2.85

Oxide master composite sample

100

91

101

9.3

90.9

0.38

1.64

75

106

8.0

92.5

0.40

1.85

53

101

5.7

94.4

0.46

2.79

Source: Compiled by Halyard Inc., 2022.

In all cases, the coarse grind size P80 (100 µm) gives rise to a marked drop in silver recovery. Oxide and Sulphide composites both see an increase in silver recovery at 48 hours for the fine (53 µm P80) increment, whilst the transitional composite is less sensitive.

In common with the flotation testwork, a primary grind size of 80% passing 75 µm was chosen as the best balance of power consumption/reagent consumption and silver recovery under standard conditions.

With the primary grind size fixed, the effect of changing cyanide concentrations was subsequently assessed. For each master composite, a set of tests used cyanide concentrations that were maintained at 1.0 g/L and 3.0 g/L NaCN for comparison with the base 2.0 g/L case. High (12 - 15 ppm) dissolved oxygen (DO2) levels were targeted in all tests.

The effect of NaCN concentration on material 80% passing 75 µm grind, at pulp density of 45% solids, and 48 hours of retention time in bottle roll testing is shown in Table 13.17.

amcconsultants.com140

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.17Bottle roll testing - Effect of NaCN concentration (75 µm grind)

Sample

P80
µm

NaCN (g/L)

Ag Head grade (g/t)

Residue
Ag (g/t)

Extraction
Ag (%)

Reagents (kg/t)

Assayed

Calc

CaO

NaCN

Transitional master composite sample

75

1.0

113

122

31

74.8

0.41

1.47

2.0

122

7.3

93.9

0.37

1.98

3.0

117

7.4

93.7

0.37

2.33

Oxide master composite sample

1.0

91

106

15

85.7

0.32

1.40

2.0

106

8.0

92.5

0.40

1.85

3.0

103

10

89.8

0.31

1.88

Sulphide master composite sample

1.0

119

140

41

70.5

0.75

2.23

2.0

122

26

78.43

0.58

3.74

3.0

123

25

79.6

0.82

3.65

Source: Compiled by Halyard Inc., 2022.

These tests highlighted an unusual result for Transitional and Oxide composites: the silver extraction in the first round of tests appears to be positively offset from the tests in this second round. Upon further investigation, it was considered likely that the anomaly was an effect of the higher DO2 levels used in first-round testing.

Under all conditions, the leaching process appeared to be incomplete after 48 hours and therefore subsequent bottle roll tests were carried out over 72 hours.

Comparing the Transitional composite data in Table 13.18, one sees that a higher DO2 level was likely responsible for the higher silver extraction seen in the first round of tests.

Table 13.18DO2 levels, transitional composite

Time (hours)

Dissolved oxygen level (DO2), ppm

Round 1, 2g/L NaCN

Round 2, 1 g/L NaCN

Round 2, 3 g/L NaCN

0

6.4

9.2

10.1

2

12.2

10.3

9.4

4

16.7

10.0

11.1

8

20.1

14.2

13.5

12

20.2

11.4

13.4

24

18.9

11.1

12.3

48

13.9

10.3

7.6

Source: Compiled by Halyard Inc., 2022.

Subsequent tests under a range of different DO2 conditions show a fair amount of scatter (the DO2 values used here are average readings over a 48-hour duration) but results tend to confirm a broad relationship for Oxide and Transitional composite samples (less so for Sulphide). Results are summarized in Table 13.19 and plotted in Figure 13.14.

Of note, low DO2 levels (<8 ppm) are known to be deleterious for silver cyanidation chemistry, and therefore effort should be made to ensure higher levels for any industrial processes. This can be problematic at high altitude sites such as Silver Sand and therefore has the potential to affect potential economic extraction.

amcconsultants.com141

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.19DO2 levels vs % Ag extraction

Sample

Ag Extraction with 2 g/L NaCN and 75 µm grind

8 ppm DO2

9-10 ppm DO2

11 ppm

15 ppm

Sulphide MC

69.4

78.4

77.1

78.3

Transitional MC

84.5

91.0

93.9

Oxide MC

89.1

91.7

90.5

Source: Compiled by Halyard Inc., 2022.

Figure 13.14Effect of DO2 on Ag extraction, 75 µm grind, 2 g/L NaCN

Source: AGP Mining Consultants Inc., 2021.

The cyanidation results above highlight lower silver extraction rates for the Sulphide composites. Supposing that this might be due to the formation of a passivation layer which inhibits the diffusion of oxygen and cyanide to the silver surface, then the addition of lead nitrate to the cyanide solution can be of benefit. For the following block of tests, lead nitrate was added at various rates to assess the effect of this potential catalyst.

Lead nitrate was initially tested on the Sulphide master composite at 150 g/t and 300 g/t dosage. Results are summarized in Table 13.20 and Figure 13.15.

Table 13.20Sulphide master, initial lead nitrate evaluation

ID sample

Ag Head grade (g/t)

Residue

Extraction

Reagents (kg/t)

Assayed

Calculated

Ag (g/t)

Ag (%)

CaO

NaCN

Pb(NO3)2

0 g/t Pb(NO3)2

118.8

130.4

34.3

73.7

0.30

3.87

0

150 g/t Pb(NO3)2

132.2

29.8

77.5

0.52

2.84

150

300 g/t Pb(NO3)2

120.8

25.1

79.3

0.57

2.67

300

Source: Compiled by Halyard Inc., 2022.

amcconsultants.com142

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 13.15Effect of lead nitrate on Ag extraction, Sulphide comp

Source: AGP Mining Consultants Inc., 2021.

The application of 150 or 300 g/t lead nitrate to the leach solution has a positive impact on kinetics, with the 300 g/t dosage in particular showing a large improvement at the 24-hour mark. This warrants further investigation as the metallurgical programs continue.

13.3.10.2Coarse bottle roll tests

A coarse bottle roll test was conducted on each master composite to gauge the feasibility of a coarse vat leach processing option. A sample of 100% -2 mm crushed material was leached using standard conditions (45% solids, room temperature, 2.0 g/L NaCN, oxygen sparging, 72 hours retention time, 300 g/t Pb(NO3)2) but with no grinding stage. Results are given in Table 13.21.

Table 13.212 mm Crush: Bottle roll results

ID sample

Ag Head grade (g/t)

Residue

Extraction

Reagents (kg/t)

Assayed

Calculated

Ag (g/t)

Ag (%)

CaO

NaCN

Pb(NO3)2

Sulphide Master

118.8

129.9

60.9

53.1

0.83

1.48

0.30

Transitional Master

113.2

117.6

21.3

81.9

0.55

0.96

0.30

Oxide Master

90.8

100.0

17.1

82.9

0.68

0.72

0.30

Source: Compiled by Halyard Inc., 2022.

amcconsultants.com143

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Leach kinetics for the 100% -2 mm composites are illustrated in Figure 13.16.

Figure 13.16Leaching of -2 mm master composites

Source: AGP Mining Consultants Inc., 2021.

The oxide and transitional composites leach well at the 2 mm crush size, reaching a >75% extraction within 24 hours. Looking at the transitional composite, the final extraction of 80% is achieved after around 36 hours, whereas this same is achieved in >100 days for the coarser column leach test (100% passing 12.7 mm).

The Sulphide composite does not leach well at this coarser size, and one would therefore expect similarly poor (or worse) performance under coarser heap leach conditions.

13.3.10.3Column leaching - Transitional master composite

A sample of the transitional master composite was split out during sample preparation, to give roughly 100-kg of 100% -1/2" material. This was prepared as feed for a single column leach test using a 6" diameter x 3 m height column. The test duration was 142 days. The test was configured as a closed-circuit test, with continuous adsorption of leached silver using a carbon column on the recycled leachate. Solution cyanide concentrations were maintained at 600 ppm NaCN and the irrigation rate was maintained at 10 L/h per m2 throughout the test.

Results of the column leach test are illustrated in Figure 13.17. An operational issue with overloaded carbon around day 36 is responsible for the slight bump in the curve at that point. This was quickly rectified and does not materially affect the overall result.

Silver recovery reaches a level of about 80% after ~120 days and copper recovery reaches 68% in the same time. This is a reasonable kinetic response and suggests that heap leaching might be a suitable processing option for low-grade mineralization. There are some scale-up concerns related

amcconsultants.com144

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

to heap leaching at altitude however - the maintenance of high DO2 within a leach pad at 4,100 m is a difficult proposition (forced air leach pads are in use but are more complicated and expensive to operate). For a tall leach pad where sulphide material is present or cyanide soluble copper content is high, it can be difficult to maintain a high-level cyanide concentration.

Cyanide consumption data shows a trend towards 1.20 kg/t at the end of the test.

Figure 13.17Column leach kinetics (Transitional MC)

Source: AGP Mining Consultants Inc., 2021.

13.3.10.4Bottle roll testing - Variability composites

The majority of flowsheet development work for cyanidation was completed on master composites and focused on the effect of grind size, NaCN concentration, DO2 levels, and the addition of Pb(NO3)2 as a catalyst. To conclude the cyanidation program, a simple variability program was also completed, using high-grade and low-grade variants of the Sulphide, Transitional, and Oxide mineralization types.

The preferred bottle roll conditions were used as a standard for the variability testing, these being 80% passing 75 µm grind, 45% solids, room temperature, 2.0 g/L NaCN, oxygen sparging, 300 g/t Pb(NO3)2, and 72-hour retention time. These standard conditions make no attempt to adjust for differences in head grade, and therefore tend to highlight the effect of this variable. Results of the variability testing are listed in Table 13.22.

amcconsultants.com145

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.22Variability bottle roll results

ID sample

Ag Head grade (g/t)

Residue

Extraction

Reagents (kg/t)

Assayed

Calculated

Ag (g/t)

Ag (%)

CaO

NaCN

Pb(NO3)2

Sulphide HG

384.9

409.8

107.7

73.7

0.70

3.95

0.3

Sulphide LG

20.4

23.6

2.9

87.8

0.64

1.63

0.3

Transitional HG

306.4

349.2

86.5

75.2

0.53

3.70

0.3

Transitional LG

32.8

36.2

2.0

94.6

0.53

1.37

0.3

Oxide HG

166.8

192.5

21.3

89.0

0.61

1.75

0.3

Oxide LG

27.8

31.6

2.1

93.3

0.75

0.90

0.3

Source: Compiled by Halyard Inc., 2022.

13.3.10.5Bottle roll testing - Flotation concentrates

A single bottle roll test was completed on each of the final concentrate samples from the locked cycle flotation tests described in Section 13.3.9.4, using typical conditions, namely 5.0 g/L NaCN, 300 g/t lead nitrate, 15 ppm DO2, and 48 hours of leaching. These tests provide an initial simulation of a cyanidation circuit after preconcentration by flotation. Results are summarized in Table 13.23.

Table 13.23Cyanidation of flotation concentrate

ID sample

Assayed head

Calculated head

Residue

% Ag Extraction

CaO
(kg/t)

NaCN (kg/t)

Pb(NO3)2 (kg/t)

Transitional Master

4,221

3,923

182

95.4

3.56

24.86

0.3

Sulphide Master

2,214

2,094

855

59.2

4.52

25.92

0.3

Oxide Master

4,108

4,003

82

97.9

2.39

22.98

0.3

Source: Compiled by Halyard Inc., 2022.

Results of these initial tests indicate a complication for the Sulphide composite, with <60% extraction of silver using standard conditions. Additional work is required to optimize the conditions for this high sulphur (>50% S) flotation concentrate.

Combining the flotation recovery and cyanidation extraction rate for each composite, one arrives at an overall silver extraction rate, as follows:

·Transitional Master: 83.2% x 95.4% = 79.4%

·Sulphide Master: 87.1% x 59.2% = 51.6%

·Oxide Master: 67.4% x 97.9% = 66.0%

These are unremarkable results and further testing is required before this option could be considered commercially attractive.

13.3.11Environmental characterization

A preliminary environmental program consisted of cyanide detoxification testing, together with ABA and TCLP tests on two sets of Sulphide, Transitional, and Oxide tailing / residue samples.

13.3.11.1Cyanide detoxification

A preliminary cyanide detoxification testing program was carried out on samples of the three master composites. For each composite, 2 litres of pulp at 50% solids were passed through a standard cyanide leach process, followed by a carbon adsorption stage. The resultant slurries were then used as feed for three detox tests.

amcconsultants.com146

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

For these initial tests, a standard SO2/Air process was assumed. Sodium Metabisulphite was added at a rate of 7.7 g SO2 per g of CNWAD, copper sulphate was dosed at 50 ppm Cu, pulp density of 40% solid, and air was sparged through the slurry at a rate of 2 litres per minute. Each test was run for 90 minutes.

Results are presented in Table 13.24.

Table 13.24Cyanide detox test results (90 minutes)

Composite ID

Time (min)

pH

ORP (mV)

Cu (mg/L)

Cyanide Concentration (mg/L)

Reagent Cons. (kg/m3)

CNFREE

CNWAD

CNTOTAL

Thiocyanate

MBS

Lime

Sulphide Master

0

8.3

85

986

1,603

1,761

1,089

-

-

90

8.2

260

1.57

1.87

3.46

3.51

471

12.30

6.22

Transitional Master

0

8.3

127

915

1,811

1,990

408

-

-

90

8.2

250

0.18

0.075

0.11

0.18

121

13.89

6.29

Oxide Master

0

8.3

148

735

1270

1337

68

-

-

90

8.2

240

0.11

0.938

1.18

10.10

27

9.75

4.78

Source: Compiled by Halyard Inc., 2022.

Further optimization of the detoxification parameters is required, but these initial tests are encouraging and suggest that the SO2/Air process will be quite acceptable for an operation treating a mixture of Oxide, Sulphide, and Transitional mineralization.

13.3.11.2ABA tests

Samples of Sulphide, Transitional, and Oxide Master Composite locked cycle tests tailing slurry were submitted for standard ABA tests. ABA results are presented in Table 13.25.

Table 13.25ABA tests on flotation LCT tailing (master comps)

Sample

Total sulphur (%)

Elemental sulphur (%)

Sulphate sulphur (%)

Sulphide sulphur (%)

Carbon total
(%)

Organic carbon (%)

Inorganic carbon (%)

CaCO3 equivalent (%)

Transitional MC

0.13

<0.01

0.03

0.10

0.02

0.01

0.01

<0.05

Oxide MC

0.09

<0.01

0.04

0.05

0.02

0.01

0.01

<0.05

Sulphide MC

0.21

<0.01

0.05

0.16

0.02

0.01

0.01

<0.05

Sample

Paste pH

Fizz rating

AP

NP

NNP

NPR

kg CaCO3/t

Transitional MC

5.3

None

3.2

0.9

-2.30

0.28

Oxide MC

5.7

None

1.6

0.7

-0.90

0.44

Sulphide MC

4.7

None

5.0

0.4

-4.60

0.08

Source: Compiled by Halyard Inc., 2022.

Samples of Sulphide, Transitional, and Oxide Master Composite residue from the cyanide detox tests described in the previous section were also submitted for standard ABA testing. ABA results are presented in Table 13.26.

amcconsultants.com147

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 13.26ABA tests on cyanide detox residues (master comps)

Sample

Total sulphur (%)

Elemental sulphur (%)

Sulphate sulphur (%)

Sulphide sulphur (%)

Carbon total
(%)

Organic carbon (%)

Inorganic carbon (%)

CaCO3 equivalent (%)

Transitional MC

1.34

<0.01

0.43

0.91

0.05

0.03

0.03

<0.10

Oxide MC

0.25

<0.01

0.19

0.06

0.05

0.03

0.03

<0.15

Sulphide MC

2.78

<0.01

0.37

2.41

0.06

0.02

0.05

<0.25

Sample

Paste pH

Fizz rating

AP

NP

NNP

NPR

kg CaCO3 / t

Transitional MC

8.0

None

28.5

5.1

-23.4

0.18

Oxide MC

8.2

None

1.8

5.1

3.3

2.83

Sulphide MC

7.9

None

75.4

5.6

-69.8

0.07

Source: Compiled by Halyard Inc., 2022.

13.3.11.3TCLP tests

Samples of Sulphide, Transitional, and Oxide Master Composite tailings from the locked cycle flotation tests described in the previous section, plus samples of residues from cyanide detox testing were submitted for standard TCLP testing. Results are presented in Table 13.27.

The copper, lead and zinc levels for the sulphide master composite cyanidation residue sample are somewhat high, and should be monitored closely.

Table 13.27TCLP test results: Flotation and cyanidation tail streams

Element

Unit

Flotation LCT Tailing

Cyanide Detox Residues

Sulphide MC

Trans. MC

Oxide MC

Sulphide MC

Trans. MC

Oxide MC

Conductivity in TCLP

µS/cm

4,620

4,610

4,620

5,240

5,145

5,055

Redox Potential in TCLP

mV

280

289

262

182

168

143

pH in TCLP

pH

5.02

4.98

5.01

5.05

5.05

5.06

Silver

mg/L

<0.005

<0.005

<0.005

<0.005

0.02

0.18

Aluminium

mg/L

0.24

0.22

0.13

1.68

2.00

1.21

Arsenic

mg/L

<0.006

<0.006

<0.006

0.01

<0.006

<0.006

Boron

mg/L

0.11

0.13

0.14

0.13

0.12

0.16

Barium

mg/L

0.38

0.88

1.30

0.06

0.05

0.07

Beryllium

mg/L

<0.002

<0.002

<0.002

<0.002

<0.002

<0.002

Bismuth

mg/L

<0.006

<0.006

<0.006

<0.006

<0.006

<0.006

Calcium

mg/L

3.98

4.61

4.42

152

186

124

Cadmium

mg/L

0.03

<0.004

<0.004

0.18

<0.004

<0.004

Cobalt

mg/L

0.01

0.01

0.00

0.00

0.00

0.00

Chrome

mg/L

<0.004

<0.004

<0.004

0.02

0.03

0.03

Copper

mg/L

1.19

0.34

0.03

7.39

3.61

0.27

Iron

mg/L

0.07

0.17

0.10

0.32

0.54

2.76

Mercury

mg/L

<0.003

<0.003

<0.003

<0.003

<0.003

<0.003

Potassium

mg/L

1.83

1.78

1.48

12.42

14.97

10.76

Magnesium

mg/L

0.56

0.61

0.67

1.02

0.99

0.95

Manganese

mg/L

0.43

0.40

0.28

0.55

0.49

0.44

Molybdenum

mg/L

<0.0012

0.01

<0.0012

<0.0012

<0.0012

<0.0012

amcconsultants.com148

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Nickel

mg/L

0.07

0.17

0.10

0.03

0.04

0.04

Phosphorous

mg/L

<0.11

<0.11

<0.11

<0.11

<0.11

<0.11

Lead

mg/L

0.26

0.02

0.04

4.32

2.42

1.68

Antimony

mg/L

0.02

0.00

<0.002

0.91

0.14

0.07

Selenium

mg/L

0.01

0.01

0.01

<0.004

<0.004

<0.004

Tin

mg/L

<0.002

<0.002

<0.002

<0.002

<0.002

<0.002

Strontium

mg/L

0.04

0.05

0.05

0.22

0.23

0.22

Titanium

mg/L

<0.014

<0.014

<0.014

<0.014

<0.014

<0.014

Thallium

mg/L

<0.003

<0.003

<0.003

<0.003

<0.003

<0.003

Vanadium

mg/L

<0.016

0.08

0.04

<0.016

<0.016

<0.016

Zinc

mg/L

0.87

0.07

0.03

4.75

0.29

0.12

Source: Compiled by Halyard Inc., 2022.

13.4Recommendations

The work described within the following sections would be carried out as a single phase, aimed at supporting the process design and process cost engineering components of a pre-feasibility or feasibility study.

13.4.1Sample selection and characterization

The geometallurgical models developed to date are preliminary in nature and relatively straightforward, and the continued development towards a detailed geometallurgical model for the deposit is encouraged. The completion of more extensive metallurgical sampling, characterization testwork, and modelling is recommended as exploration and infill drilling programs continue.

The physical characterization of metallurgical composites has highlighted a relatively low level of variability within the deposit, and a trend towards harder samples as oxidation levels increase. Accurate sizing and selection of comminution equipment will require additional data, and an extended variability program in this area is recommended. Large diameter core is preferred for at least a subset of the new program, allowing more accurate determination of impact resistance and determination of SAG mill requirements.

Additional quantitative mineralogy programs will assist in understanding the bulk mineralogy and silver deportment for the various geometallurgical zones and is recommended for inclusion in future metallurgical programs.

13.4.2Preconcentration

Initial preconcentration testing has given variable results, with unremarkable density separation results and a reasonably encouraging particle sorting program completed to date. The opportunity to develop a sensor-based particle separation prior to the grinding circuit should not yet be dismissed as this approach can provide for the rejection of low-grade material and waste at a fairly coarse size (2 - 3") and a subsequent downsizing of the downstream processes. The coarse particle nature of particle sorter testwork requires much larger samples of drillcore to improve the statistical relevance of the results however. The larger scale work also provides additional opportunity to optimize sensor response and to correlate sensor response with actual grade and / or mineralogical content. Additional work in this field is recommended.

13.4.3Flotation

Initial trade off studies have downgraded the importance of flotation as an economic processing route, with concentrate export challenges being a hindrance, together with lower silver recoveries. This is not to say that flotation work should not continue in the future, but rather that the cyanidation

amcconsultants.com149

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

work should be given priority. If scheduled, further flotation testwork should focus on the optimization of frothers and collectors to control mass pull and recovery. Achievement of a concentrate with saleable base metals grades may improve the prospects for this process route.

13.4.4Cyanidation

Current studies have helped to show that cyanide-based processes appear to offer preferred conditions from an economic standpoint, with the higher overall silver recovery and superior saleability of a doré product in Bolivia being big drivers. The cost of imported sodium cyanide together with the high consumption of this key reagent is a significant operating cost, and further work to optimize process conditions to give minimized cyanide consumption is recommended.

As the Silver Sand process plant will be located at high altitude (>4,000 m), it is important that further cyanidation testwork should focus on the effects of low DO2 that were noted in this round of work. The DO2 vs recovery relationship should be firmed up to assist the justification of oxygenation steps in the flowsheet. The impact of pre-aeration and lead nitrate on cyanide consumption and silver recovery is also important, and it is recommended that this be evaluated in more detail.

Although heap leaching was not seen to offer attractive economics within the recent trade-off study, further column leaching work is still recommended. Initial column leach test results are reasonably encouraging, but the practicalities of operating a heap leach pad at altitude is seen as a significant risk, with low DO2 conditions within the leach pad being the main concern. However, forced aeration of heap leach piles is a regular practice for secondary copper leaching operations, where oxygen availability is key to bioleaching efficiency. If the metallurgical risk associated with silver heap leaching can be mitigated through additional testwork, then the opportunity for a hybrid heap leach + grinding / tank leaching operation can be examined. In this scenario, low grade oxide and transitional material could be heap leached while higher grade Sulphide and Transitional material could be milled and leached in agitated tanks.

13.4.5Environmental testing

A larger set of variability samples should be submitted to understand the potential for acid-generation and metals leaching in tailing streams and waste rock piles. Testwork should include static tests and kinetic (humidity cell) tests.

amcconsultants.com150

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

14Mineral Resource estimates

14.1Introduction

The Mineral Resource for the Silver Sand deposit has been estimated by Ms Dinara Nussipakynova, P.Geo., of AMC Consultants, who takes responsibility for the estimate.

The estimate is dated 31 October 2022 and is an update to the initial Mineral Resource estimate on the deposit, which was discussed in the 2020 Technical Report. The data used in this estimate includes results of all drilling carried out on the Property up to 25 July 2022.

The estimation was carried out in Datamine™ software. Interpolation of Ag, As and S grades were carried out using ordinary kriging (OK) for the four main mineralized domains, and the background model. The remaining 127 small domains were estimated using the inverse distance squared (ID2) method. The grades for Pb, Zn, and Cu were estimated separately using the indicator method to define the higher grade zones and utilized OK for the estimation, ignoring the domains used for the estimation of the other metals. The indicator method was also used to define the location of the oxidation type.

The result of the current estimate is summarized in Table 14.1. The following metals were estimated: silver, lead, zinc, copper, arsenic, and sulphur. Only silver is reported as it is the only economic metal. The additional elements were estimated to enable geometallurgical modelling to be carried out. The model is depleted for historical mining activities. The Mineral Resources are reported within a conceptional pit shell and at a 30 g/t Ag COG.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Table 14.1Silver Sand Mineral Resource as of 31 October 2022

Resource category

Tonnes (Mt)

Ag (g/t)

Ag (Moz)

Measured

14.88

131

62.60

Indicated

39.38

110

139.17

Measured & Indicated

54.26

116

201.77

Inferred

4.56

88

12.95

Notes:

·CIM Definition Standards (2014) were used for reporting the Mineral Resources.

·The Qualified Person is Dinara Nussipakynova, P.Geo. of AMC Consultants.

·Mineral Resources are constrained by optimized pit shells at a metal price of US$22.50/oz Ag, recovery of 91% Ag and COG of 30 g/t Ag.

·Drilling results up to 25 July 2022.

·The numbers may not compute exactly due to rounding.

·Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

The QP is not aware of any known significant factors or risks that might affect access or title, or the right or ability to perform work on the Property, including permitting and environmental liabilities to which the project is subject.

In last three years Bolivia experienced a transition from social turmoil to stability. The government of the current President, elected at the end of 2020 supports and encourages private and foreign investments in the economic sectors of the country. New laws were approved by congress to encourage private investments in mining sector, for example, Law 1391 (Decree 4579) waives value added tax for import of equipment and vehicles.

amcconsultants.com151

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Although the country is now generally friendly to private and foreign investments in the mining sector, risks associated with instability of government caused by political polarization and visible divisions in the governing party remains. In addition, local protests and blockages by various social groups may pose unforeseen instability from time to time. Overall, political and social risks are currently manageable in Bolivia. The country becomes relatively more attractive for foreign investments, and this trend is evidenced by the fact that more western exploration and mining companies started business in the country in recent years.

14.2Data used

14.2.1Drillhole database

The data used in the estimate consists of surface diamond drillholes only. New Pacific maintains the resource database in a Microsoft Access database and provided data to AMC Consultants as Microsoft Excel files. The number of holes and number of assays used in the AMC Consultants estimate, by year of drilling, is shown in Table 14.2.

Table 14.2Drillhole data used in the estimate

Year drilled

No. of drillholes

No. of assays

Metres drilled (m)

2017

18

3,337

5,020

2018

177

34,728

49,991

2019

206

30,662

45,874

2020

13

1,762

2,489

2021

54

7,835

12,815

2022

88

13,840

20,031

Total

556

92,164

136,220

Notes:

·Drillholes are surface DDHs.

·Drill data to 25 July 2022.

·Numbers may not add due to rounding.

·Number of drillholes on the Property is 566 but only 556 are in the Mineral Resource area.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

Figure 14.1 is a plan showing the location of the drillholes used in the estimate.

Figure 14.1Silver Sand drillhole location plan

amcconsultants.com152

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

14.2.2Bulk density

New Pacific performed 6,297 density measurements on the core drilled on the Property. The collection of bulk density measurements is described in Section 11. As the mineralization is hosted in one rock type, after reviewing the density data, the QP assigned one density measurement to the block model of 2.54 t/m3.

14.2.3Lithological domains

The Silver Sand deposit is hosted in La Puerta Formation sandstones and is capped by the red siltstone of the Tarapaya Formation as discussed in Section 7. New Pacific provided the contact between these two formations. The contact was modelled in Leapfrog Geo 4.0 (Leapfrog). The contact was reviewed and accepted by the QP.

14.2.4Mineralization domains

Mineralization domains were constructed by New Pacific. The mineralization wireframes were built by the grade shell method in Leapfrog.

The mineralization domains were reviewed and accepted by the QP with minor changes including a change of the naming convention. Domains 1-4 are the main domains which contain 80% of the volume of mineralization are shown in Figure 14.2 as a red solid. In Figure 14.3 the relative percentage volumes of the domains or group of domains are shown.

Visual checks were carried out by the QP to ensure that the constraining wireframes respected the raw data.

Figure 14.23D view of mineralization domains looking north-east

amcconsultants.com153

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 14.3Pie-chart of the percentage volume by domains

Source: AMC Mining Consultants (Canada) Ltd., 2022.

14.2.5Mined-out domains

New Pacific provided AMC Consultants with void solids that are interpreted to represent historical mining. The void solids were built by extrapolating voids in Leapfrog tools. Surveying of the historical mining voids could not be undertaken due to safety issues.

The QP compared the provided solids with the drillhole database and found them to be acceptable.

14.3Modeling approach

Grade estimation was completed using two different approaches.

1Ag, As, and S estimation carried out within mineralization domains as described in Section 14.2.4, (the background model was unconstrained).

2Cu, Pb, and Zn estimation was constrained into high and low grade volumes using an Indicator method.

An oxidation model consisting of oxide, transition and sulfide was also constrained using an Indicator method.

14.4Statistics and compositing

Sample lengths range from 0.01 m to 9.2 m within the resource area. The mean sample length is 1.19 m. Given this mean and considering the width of the mineralization, the QP chose to composite to 1.2 m lengths within the domains. Outside the domains for the background model a composite length of 2.5 m was used. Samples were composited by domain using Datamine's dynamic

amcconsultants.com154

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

composting tool. This tool adjusts each composite length as necessary to achieve equal sample support and eliminate residuals (very short samples).

The composite data for Ag, As, and S for all mineralization domains were viewed on log probability plots, and also evaluated using the decile method, to assist with determining the capping level for higher values. The probability plot for Ag is shown in Figure 14.4.

Figure 14.4Probability plot for Ag

Source: AMC Mining Consultants (Canada) Ltd., 2022.

Capping was applied for Ag and As after compositing with the results as shown in Table 14.3. No capping was applied for S.

Table 14.3Grade capping for silver and arsenic

Element

Top cap

Original mean

New mean

Number of samples top cut

New mean grade as % of original

Ag (g/t)

2,000

125

120

65

96.3%

As (ppm)

2,000

236

234

76

97.9%

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com155

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The raw, composited, and capped assay data for silver for all the mineralized domains are shown in Table 14.4.

Table 14.4Ag statistics of raw, composited, and capped assay data

Domain

Data

Number of samples

Minimum

Maximum

Mean

Standard deviation

Coefficient of variation

1

Raw selected

5,469

0.0

16,194

113

349.59

3.08

Composited

5,366

0.0

10,532

113

293.03

2.59

Capped

5,366

0.0

2,000

108

217.45

2.00

2

Raw selected

8,888

0.0

12,791

138

371.97

2.69

Composited

8,726

0.0

10,740

138

322.44

2.33

Capped

8,726

0.0

2,000

133

255.55

1.92

3

Raw selected

214

0.2

3,410

116

330.36

2.83

Composited

210

0.2

3,137

116

302.59

2.59

Capped

210

0.2

2,000

111

254.01

2.29

4

Raw selected

213

0.5

1,130

74

120.28

1.64

Composited

204

0.5

1,120

74

110.61

1.50

Capped

204

0.5

1,120

74

110.61

1.50

5 -131

Raw selected

2,294

0.0

7,830

108

299.12

2.78

Composited

2,238

0.0

4,009

108

257.77

2.39

Capped

2,238

0.0

2,000

104

219.31

2.11

Source: AMC Mining Consultants (Canada) Ltd., 2022.

14.5Block model parameters

The block size selected for estimating Ag, As and S within the mineralization domains was 2.5 mE x 5 mN x 2.5 mRL with sub-blocking employed. Sub-blocking resulted in minimum cell dimensions of 1.25 mE x 0.5 mN x 1.25 mRL. The background mineralization, being that outside the mineralization domains, was estimated with a parent block dimension of 10 mE x 10 mN x 10 mRL.

Cu, Pb and Zn and the oxidation attributes were estimated into 2.5 mE x 5 mN x 2.5 mRL blocks for the high grade and 5 mE x 10 mN x 5 mRL for the low grade. These elements and As an S were estimated for geometallurgical purposes only.

All models were then merged to form one model. The block model dimensions and rotation for the merged model are shown in Table 14.5. The model was rotated counter-clockwise around the Z-axis.

Table 14.5Block model parameters

Parameter

X

Y

Z

Origin (m)

234,500

7,854,750

3,400

Maximum block size (m)*

5

10

5

Minimum block size (m)

0.625

0.250

0.250

Rotation angle (deg)

0

0

-30

No. of blocks

500

280

200

Note: *Parent block size of merged model.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com156

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

14.6Variography and grade estimation

Variography was carried out on domains 1-4 and for the low-grade background model, for Ag, As, and S. The search distances for the grade estimation were based on the variogram ranges. Search parameters for domains 5-131 were based on vein orientation and visual continuity. Dynamic anisotropy was used in the estimation process for domains 60-68, where the internal orientation was variable.

Three passes were employed, each using different search distances and passes. Table 14.6 shows the search parameters for Ag.

Table 14.6Ag grade interpolation search parameters

Domain

Pass

X (m)

Y (m)

Z (m)

Rotation angle axis Z

Rotation angle axis X

Rotation angle axis Y

Minimum no. of samples

Maximum no. of samples

Minimum no. of drillholes

1

1

80

80

12

240

70

0

6

12

2

2

160

160

24

240

70

0

4

12

2

3

240

240

36

240

70

0

2

12

2

2

1

86

102

12

240

70

0

6

12

2

2

172

204

24

240

70

0

4

12

2

3

258

306

36

240

70

0

2

12

2

3

1

76

91

10

240

70

0

6

12

2

2

152

182

20

240

70

0

4

12

2

3

228

273

30

240

70

0

2

12

2

4

1

72

72

17

240

70

0

6

12

2

2

144

144

34

240

70

0

4

12

2

3

216

216

51

240

70

0

2

12

2

5 - 59

1

80

90

15

240

77

0

6

12

2

2

160

180

30

240

70

0

4

12

2

3

240

270

45

240

70

0

2

12

2

60 - 68

1

80

90

15

DA

DA

0

6

12

2

2

160

180

30

DA

DA

0

4

12

2

3

240

270

45

DA

DA

0

2

12

2

69 - 131

1

40

45

8

240

77

0

2

12

-

2

80

90

16

240

70

0

2

12

-

3

120

135

24

240

70

0

2

12

-

Background

1

100

90

21

240

75

0

6

12

2

2

200

180

42

240

75

0

4

12

2

3

300

270

63

240

75

0

2

12

2

Note: DA - Dynamic anisotropy angles.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

The estimation was carried out in Datamine™ software and the interpolation methods used were as follows:

·Domains 1-4, Ag, As, and S grades interpolated by OK

·Background model, Ag, As, and S grades interpolated by OK

·Domains 5-132, Ag, As, and S grades interpolated ID2

·Total model, Pb, Zn, and Cu interpolated by OK

·Oxidation attributes interpolated by OK

amcconsultants.com157

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The blocks inside the block model are coded by estimated Ag, As, S, Cu, Pb, and Zn. In addition, the oxidation type and an assigned bulk density value are included. Only silver, which has a proven metallurgical recovery method, is reported in the Mineral Resource statement.

14.7Resource classification

Mineral Resource classification was completed using an assessment of geological and mineralization continuity, data quality, and data density. Search passes, which were different from those used to estimate grade, were used as an initial guide for classification. Wireframes were then generated manually to build coherent areas defining the different classes.

Interpolation for classification was carried out using the OK method. Three passes were employed, each using different search distances and multiples as follows:

·Pass 1 = 1 x search distance

·Pass 2 = 2 x search distance

·Pass 3 = 3 x search distance

These are shown in Table 14.7 along with the minimum and maximum number of samples used for each pass.

Table 14.7Class interpolation search parameters

Pass

X (m)

Y (m)

Z (m)

Minimum no. of samples

Maximum no. of samples

Minimum no. of drillholes

1

30

30

10

8

24

4

2

60

60

20

6

20

3

3

90

90

30

4

20

2

Source: AMC Mining Consultants (Canada) Ltd., 2022.

Figure 14.5 shows a 3D view of the resource classification constrained by the domains in the block model.

amcconsultants.com158

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 14.53D view of the resource classification

14.8Block model validation

The block model was validated in four ways. First, visual checks were carried out to ensure that the grades respected the raw assay data. Secondly, swath plots were reviewed. Thirdly, the estimate was statistically compared to the capped assay data, with satisfactory results. Lastly the OK estimates were compared to an ID2, and inverse distance cubed (ID3) and a nearest neighbour (NN) estimate, all with acceptable results.

14.8.1Visual checks

Figure 14.6 shows a plan view of the block model showing drillhole composite silver grades on drillhole traces compared to the block model estimated grades.

The comparison was viewed on a number of sections and as an example Section 5200 is located on Figure 14.6 and this section is shown in Figure 14.7 as a representative section.

amcconsultants.com159

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 14.6Plan view of the block model and drillholes

amcconsultants.com160

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 14.7Block model versus drillhole grade on Section 5200

14.8.2Swath plots

Swath plots for all domains for the combined Measured, Indicated, and Inferred Ag mineralization are shown below in Figure 14.8. Except for some areas where there is sparse data there is acceptable agreement between drillhole and block model silver grades.

amcconsultants.com161

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 14.8All domains swath plot for silver

Source: AMC Mining Consultants (Canada) Ltd., 2022.

The swath plots show a reasonable correlation between block model grades and composite grades.

14.8.3Statistical comparison

Table 14.8 shows the statistical comparison on the composites versus the block model grades for silver.

amcconsultants.com162

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 14.8Statistical comparison of capped assay data and block model for Ag

Domain

1

2

3

4

5 - 131

Data

Comps

Model

Comps

Model

Comps

Model

Comps

Model

Comps

Model

N records

5,366

1,234,369

8,726

788,030

210

50,533

204

35,802

2,238

721,335

Minimum

0.00

0.00

0.00

0.00

0.20

1.33

0.50

2.80

0.00

0.00

Maximum

2,000

1,606

2,000

1,477

2,000

1,244

1,120

645

2,000

1,939

Mean

109

93

133

120

111

101

74

80

104

105

SD

217.45

72.05

255.55

92.67

254.01

105.37

110.61

60.04

219.31

118.03

CV

2.00

0.78

1.92

0.77

2.29

1.04

1.50

0.75

2.11

1.13

Notes: SD - Standard Deviation, CV - Coefficient of Variation.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

14.8.4Comparison with other interpolation methods

The OK estimates were compared to an ID2, and ID3 and a NN estimate, also with acceptable results. Note, domains 5-131 were estimated by ID2 and the comparison was to ID3 and NN models.

14.9Mineral Resource estimate

The Mineral Resources are reported for blocks within a pit shell based on a $22.50/ounce Ag price. This shell includes Mineral Resources reported both within the AMC claim boundary and the MPC.

The cut-off applied for reporting the Mineral Resources is 30 g/t Ag. Assumptions made to derive the COG and build the pit shell included mining costs, processing costs and metallurgical recoveries. These inputs were obtained from benchmarked comparable studies and metallurgical testwork. These parameters are shown in Table 14.9. The model is depleted for historical mining activities. Measured, Indicated, and Inferred blocks were used to define the pit shell.

Table 14.9Cut-off grade and conceptual pit parameters

Input

Units

Value

Silver price

$/oz Ag

22.5

Silver process recovery

%

91

Payable silver

%

99

Mining recovery factor

%

100

Mining cost

$/t mined

2.6

Process cost

$/t minable material > COG

16

G&A cost

$/t minable material > COG

2

Slope angle

Degrees

44 - 47

Notes:

·Sustaining capital cost has not been included.

·Measured, Indicated, and Inferred Mineral Resources included.

·G&A cost refers to General and Administration costs.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com163

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The Mineral Resource estimate is shown in Table 14.10.

Table 14.10Silver Sand Mineral Resource as of 31 October 2022

Resource category

Tonnes (Mt)

Ag (g/t)

Ag (Moz)

Measured

14.88

131

62.60

Indicated

39.38

110

139.17

Measured & Indicated

54.26

116

201.77

Inferred

4.56

88

12.95

Notes:

·CIM Definition Standards (2014) were used for reporting the Mineral Resources.

·The Qualified Person is Dinara Nussipakynova, P.Geo. of AMC Consultants.

·Mineral Resources are constrained by optimized pit shells at a metal price of US$22.50/oz Ag, recovery of 91% Ag and COG of 30 g/t Ag.

·Drilling results up to 25 July 2022.

·The numbers may not compute exactly due to rounding.

·Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

The majority of the Mineral Resources lie within the AMC. Table 14.11 shows the split of the 2022 Mineral Resource within the AMC boundary and outside the boundary. Since the 2019 Mineral Resources were reported, a subsequent agreement with COMIBOL permits the reporting of Mineral Resources outside the AMC. Mineral Resources in the MPC will be subject to a royalty of 6% payable to COMIBOL during the production stage according to the agreement reached with COMIBOL.

Table 14.11Mineral Resources within and outside the AMC

Resource category

Inside AMC boundary

Outside AMC boundary

Tonnes (Mt)

Ag (g/t)

Ag (Moz)

Tonnes (Mt)

Ag (g/t)

Ag (Moz)

Measured

14.57

131

61.51

0.31

108

1.08

Indicated

34.38

110

121.38

5.00

111

17.79

Measured & Indicated

48.95

116

182.90

5.31

111

18.87

Inferred

3.17

77

7.88

1.40

113

5.07

Source: AMC Mining Consultants (Canada) Ltd., 2022.

The results of reporting the Measured and Indicated portion of the block model at a range of cut-offs are shown in Table 14.12, with the preferred cut-off shown in bold text. The QP notes the block model is relatively insensitive to COG.

Table 14.12Model sensitivity to cut-offs

Cut-off grade Ag (g/t)

Tonnes (Mt)

Ag (g/t)

Ag (Moz)

25

55.46

114

202.83

30

54.26

116

201.77

35

52.41

119

199.83

40

50.02

122

196.94

45

47.36

127

193.30

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com164

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

14.10Comparison with previous Mineral Resource estimate

A comparison of the 2019 and 2022 Mineral Resource estimates are shown in Table 14.13. Table 14.10 and Table 14.13 list the estimate footnotes for the 2022 and 2019 estimates respectively. The differences between the estimates are most notably in silver price, recovery, and COG. An increased mining cost assumption for the 2022 estimate has resulted in an optimum pit shell that does not go as deep as the 2019 estimate. In addition, the 2022 Mineral Resource includes material within the MPC, which can now be considered available to New Pacific for reporting purposes.

Table 14.13Mineral Resource comparison with previous 2019 estimate

Class

Tonnes (Mt)

Ag (g/t)

Ag (Moz)

2019
(cut-off 45 g/t Ag)

Measured

8.40

159

43.05

Indicated

26.99

130

112.00

Measured and Indicated

35.39

137

155.05

Inferred

9.84

112

35.55

2022
(cut-off 30 g/t Ag)

Measured

14.88

131

62.60

Indicated

39.38

110

139.17

Measured and Indicated

54.26

116

201.77

Inferred

4.56

88

12.95

Difference

Measured

6.48

-28

19.55

Indicated

12.39

-20

27.17

Measured and Indicated

18.87

-21

46.72

Inferred

-5.28

-24

-22.60

Notes applicable to both estimates:

·CIM Definition Standards (2014) were used for reporting the Mineral Resources.

·The Qualified Person is Dinara Nussipakynova, P.Geo. of AMC Consultants.

·The numbers may not compute exactly due to rounding.

·Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

2022 Mineral Resource notes:

·Mineral Resources are constrained by optimized pit shells at a metal price of US$22.50/oz Ag, recovery of 91% Ag and COG of 30 g/t Ag.

·Drilling results up to 25 July 2022.

2019 Mineral Resource notes:

·Mineral Resources are constrained by an optimized pit shell at a metal price of US$18.70/oz Ag and recovery of 90% Ag.

·COG is 45 g/t Ag.

·Mineral Resources are reported inside the AMC claim boundary.

·Pit optimization allows waste to extend outside the AMC to the NE and SW.

·Drilling results up to 31 December 2020.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

14.11Recommendations

For future Mineral Resource modelling the following should be considered:

·At the next update of the model include all remaining drill data which missed the closing date.

·Incorporate geometallurgical attributes into the block model.

·Verify mined-out volumes by surveying historical waste dumps.

·Conduct structural analysis of available data and complete initial structural / geotechnical drilling as required.

·Update the 3D geological model to include detailed geology - deposit oxidation domaining and structures.

amcconsultants.com165

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The Silver Sand deposit, as currently defined, remains open for expansion at depth. While it is understood that engineering work for the pre-feasibility study will be based on the current block model, it is recommended that future drilling on the deposit should consider the following:

·Infill drilling to upgrade areas of high-grade mineralization within the current Inferred resource area.

·Additional drilling around the current Mineral Resources, where the deposit remains open at depth.

The QP also notes that there has been no modern district scale exploration outside of Silver Sand deposit. It is recommended that additional drilling be completed at the other prospects to assess for the potential for Mineral Resources.

amcconsultants.com166

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

15Mineral Reserve estimates

As this is not an Advanced Property, this section is not addressed.

amcconsultants.com167

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16Mining methods

16.1General description

The Silver Sand project comprises four open pit areas - the Main pit, two small northern satellite pits (NP1 and NP2), and one eastern satellite pit (EP1). Open pit mining entails conventional drilling and blasting, with loading by excavator and haulage by trucks. Mineralized material is hauled to the crusher or to the run-of-mine (ROM) pad. Waste is hauled to external and in-pit waste rock dumps.

16.2Hydrogeological parameters

AMC Consultants has reviewed the hydrological and hydrogeological work completed for the open pit and adopted the findings of the QP for this Technical Report. The following information was provided by ITASCA Chile SpA (ITASCA) to support the QP's findings and conclusions:

·Itasca (October 2022) INF-682.002.01-Hydrological and Hydrogeological Conceptual Study-R1

The Itasca hydrological and hydrogeological conceptual study was primarily based on the following data, provided by New Pacific:

·Geological map of the study area (Minera Alcira S.A. New Pacific Metals Corp., 2022).

·Meteorological data from nearby weather stations, such as rainfall and evaporation.

·Hydrochemical fieldwork documentation:

¾Database, inventory, and monitoring of water sources (Minera Alcira S.A., 2019).

¾Surface water sampling stations details.

¾Integrated database with the hydrochemical analysis results of the surface water.

¾sampling campaigns made in June, July, August, and September of 2021.

¾Hydrochemistry laboratory reports of the surface water sampling campaigns.

¾Environmental monitoring report N°3 (NPM Minerales S.A., 2022).

¾Fieldwork proposal for surface water quality sampling (Knight Piésold, 2021).

·Well construction report SEV1 (Flores, 2020).

·Hydrogeological exploration report- Well construction Machacamarca with appendices (Flores, 2019).

·Preliminary exploration for precious metals within the Colavi- Machacamarca ore deposit (GEOBOL- PNUD, 1991).

The Silver Sand project area has approximately 8 months of dry season every year. The project straddles the Machacamarca river. Measures must be taken to prevent the up-stream water from flowing into the open pit. Therefore, a water dam will be built up stream in the narrowest part of the river to hold the water in a reservoir that will hold about 2.6 million cubic metres of water, that will be used in the processing plant.

A preliminary water balance was estimated for baseline conditions, incorporating all rainfall and evaporation data collected from nearby weather stations. Results indicate that 9% of rainfall in the catchment would become recharge to the aquifer. Runoff peaks during summer months, when the evaporation is at its lowest and rainfall at its highest. During winter months, most of the rainfall would be lost due to evaporation.

AMC Consultants does not foresee a major impact from water inflows into the proposed pits. None the less, there will be some water accumulations in the mining area, this water will be managed through pit sumps with de-watering pumps as required.

amcconsultants.com168

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16.3Geotechnical parameters

AMC Consultants has reviewed the geotechnical work completed for the open pit and adopted the findings of the QP for this Technical Report. The following information was provided by ITASCA to support the QP's findings and conclusions:

·Itasca (September 2022) MEM-682.002.03-Conceptual Open Pit IRA recommendations-Rev0 9.26

·Itasca (September 2022) 682-002-PPT-UGT-Structural Domains-Eng.R1.pdf

·Itasca (October 2021) INF-Site Visit Report-en-R0 (2021-10-18)

16.4Open pit mining

16.4.1Resource model for open pit mining

AMC Consultants developed the Mineral Resource block model for the Silver Sand (reference: FIN_MOD_PB_ZN_CU.dm) for evaluation of the open pit mining potential. The block model is a sub celled, rotated model, with parent block dimensions of 5 m in the X (east) direction by 10 m in the Y (north) direction by 5 m in the Z (vertical) direction. The model was developed using Datamine™ software.

16.4.2Open pit geotechnical considerations

ITASCA developed scoping-level slope design configurations to be used in the PEA, as summarized in a report entitled "ITASCA-MEM-682.002.03-Conceptual Open Pit IRA recommendations-Rev0 9.26.pdf", 2022.

The slope stability assessment was primarily based on conceptual information. Where information was not available, assumptions were made based on past experience in similar conditions. Two types of analyses were carried out to provide recommendations of inter-ramp angles to use in the open pit design:

·A bench scale kinematic analysis to estimate potential planar and wedge mechanisms that may form due to combination between joint fabric and slope orientations.

·A simplified continuous numerical analyses using the FLAC / Slope tool, which will generate an inter-ramp angle versus inter-ramp height curve for each geotechnical unit.

The result of the assessment includes the recommended Inter-Ramp Angle (IRA) of the slopes based on the kinematic (IRAk) and rock mass strength analyses (IRA vs height curve). The design to be used in each sector is the lowest IRA of these two recommendations.

The bench scale kinematic analysis was developed assuming double benching of 10 m high benches with catch berms placed every 20 m, friction angle of 30° and no cohesion on the joints, and the bench face is dry (no pore water pressure). Bench face angles (BFA) of 80° and an IRAk within 53° to 57° were recommended. Although the analyses indicates that BFAs of more than 80° are possible, a BFA of 80° was selected as representative for the whole open pit.

The inter-ramp angle versus inter-ramp height curve was determined to obtain a Factor of Safety (FoS) greater than or equal to the acceptability criteria of each Geotechnical Unit (GU). Assumptions used for this analysis include Hoek-Brown constitutive model, σci, mi, and GSI from the GU, Hoek-Brown D factor equal to 0.7, and both a dry case and a water case. The inter-ramp angle versus inter-ramp height curve analysis indicated that all GUs can be excavated at an IRA of 55° for an inter-ramp height of 150 m.

amcconsultants.com169

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

A total of three structural domains were defined for the Silver Sand deposit:

·Domain 1 (D1): 4 joint sets

·Domain 2 (D2): 5 joint sets

·Domain 3 (D3): 3 joint sets

The approximate location of the structural domains is shown in Figure 16.1.

Figure 16.1Structural domains

Source: ITASCA Chile SpA.

The resulting recommended kinematic Inter-Ramp Angle (IRAk) per domain and wall orientation is shown in Figure 16.2.

The slope design recommendations for the Silver Sand open pit are summarized in Table 16.1.

Table 16.1Slope design recommendations

Sector

Geotechnical Parameters

Domain 1

Domain 2

Domain 3

Double bench height (m)

20

20

20

BFA (deg)

80

80

80

Berm width (m)

10.5 - 11.5

10.5 - 11.0

10.5 - 12.0

IRA (deg)

53 - 55

54 - 55

52 - 55

Figure 16.2Recommended Inter-Ramp Angle from kinematic analysis

Source: ITASCA Chile SpA.

amcconsultants.com170

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16.4.3Open pit mining method

It is proposed to mine the open pits using a conventional truck and excavator mining method. A mining contractor operation is assumed. It is proposed that a 10 m bench height would be adopted. Mining of waste material will occur using 260 t hydraulic shovels (example: Komatsu PC3000). The average productivity of the PC3000 shovels in blasted material is expected to be approximately 1,740 t/op hr. Mining of mineralized material will occur using 200 t hydraulic excavators (example: Komatsu PC2000). The average productivity of the PC2000 excavators in blasted material is expected to be approximately 1,370 t/op hr.

Hauling of mineralized material and waste will be undertaken by 140 t trucks (example: CAT 785). Mineralized material will be hauled to the ROM pad or the process plant. Waste material will be hauled to external and in-pit waste rock dumps. Transportation of dry stack tailings from the process plant will be done by conveyor and stacker.

The majority of the material will require blasting. Proposed drilling parameters for 10 m bench heights are presented in Table 16.2. Down the hole hammer drill rigs would be equipped with blasthole sample equipment to collect samples for grade control. Drilling and explosive supply including loading and blasting, are assumed to be provided by contractors.

Table 16.2Open pit drilling parameters

Parameter

Unit

Value

Bench height

m

10

Burden

m

5.5

Spacing

m

6.5

Hole size

mm

165

Collar

m

3.7

Subdrill

m

1.0

Powder factor

kg/t

0.20

Source: AMC Mining Consultants (Canada) Ltd.

16.4.4Open pit optimization

16.4.4.1Cut-off calculation

Table 16.3 displays the calculation of the open pit COG. Assumptions made to derive a COG included metal price, processing costs and recoveries. These inputs were obtained from New Pacific based on comparable industry situations and benchmarked against the AMC Consultants database. The assumptions used for determining the COG are considered reasonable.

amcconsultants.com171

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 16.3Open pit cut-off calculation

Input

Units

Value

Silver price

$/oz Ag

22.50

Silver process recovery

%

91

Payable silver

%

99

Selling costs

$/oz Ag

0.50

Mining cost

$/t mined

2.60

Incremental mining cost

$/t mined / 10 m bench

0.04

Process cost

$/t Mineralized material mined

16.00

TSF operating cost

$/t Mineralized material mined

0.7

G&A cost

$/t Mineralized material mined

2.00

Royalty

%

6.00

Cut-off grade

Ag g/t

311

Note: 1Open pit marginal cut-off excludes mining cost.

Source: AMC Mining Consultants (Canada) Ltd.

16.4.4.2Dilution and mining recovery factors

The mineralization occurs in steeply dipping, narrow sheeted veins. A mining dilution of 8% and a mining recovery of 92% were assumed. Mining loss and dilution assumptions are based on experience on other projects. The mining dilution and recovery were applied as factors during the pit optimization process and to estimate open pit tonnages for the schedule. The dilution material is assumed to have zero grade.

Dilution method of the block models should be further investigated in the next study stage.

16.4.5Pit optimization and shell selection

The Lerchs-Grossmann pit optimization algorithm, as implemented in the Whittle software, was used to define the ultimate pit shell for Silver Sand. The selected pit shells were then used to produce pit designs and the mining schedule. Pit optimization was allowed to extend outside the AMC claim boundary into the MPC area to the NE and SW.

The pit optimization results are provided in Table 16.4 and Figure 16.3. The graph in Figure 16.3 shows discounted pit values for "best case" and "worst case", and undiscounted values. The best case gives the maximum discounted value and requires that each shell be mined sequentially. The worst case assumes that the deposit is mined on a bench-by-bench basis and gives the lowest discounted value. Discounted values are based on a discount rate of 8%.

amcconsultants.com172

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 16.4Pit optimization results

Pit shell

Revenue factor

Cashflow undiscounted ($M)

Processed tonne (kt)

Waste tonnage (kt)

Total tonnes (kt)

Strip ratio

Grade input Ag (g/t)

Mining cost ($)

Process cost ($)

Incremental mining cost ($/t of ore)

Incremental value
($/t of ore)

1

0.10

5.7

28

47

74

1.7

378.02

0

-1

2

0.15

28.0

211

323

534

1.5

258.99

1

-4

6.9

122.0

3

0.20

64.3

669

843

1,512

1.3

198.06

4

-13

6.2

79.2

4

0.25

140.2

1,822

2,879

4,701

1.6

168.02

13

-34

7.6

65.8

5

0.30

376.9

6,257

11,295

17,552

1.8

142.02

50

-118

8.3

53.4

6

0.35

645.9

12,340

22,653

34,992

1.8

129.35

100

-232

8.2

44.2

7

0.40

1,013.9

20,881

46,598

67,479

2.2

124.99

192

-393

10.8

43.1

8

0.45

1,149.3

24,815

56,643

81,459

2.3

121.66

234

-467

10.5

34.4

9

0.50

1,246.7

28,136

65,757

93,893

2.3

118.72

271

-529

11.2

29.3

10

0.55

1,547.4

38,747

106,526

145,273

2.7

113.80

425

-728

14.6

28.3

11

0.60

1,686.7

44,512

130,938

175,450

2.9

111.61

520

-837

16.4

24.1

12

0.65

1,729.9

46,595

140,572

187,167

3.0

110.78

556

-876

17.5

20.7

13

0.70

1,762.8

48,518

150,577

199,094

3.1

109.95

593

-912

19.0

17.1

14

0.75

1,793.0

50,523

162,475

212,999

3.2

109.22

638

-950

22.3

15.1

15

0.80

1,804.3

51,465

168,336

219,801

3.3

108.85

660

-968

23.6

12.0

16

0.85

1,821.2

53,125

181,591

234,717

3.4

108.38

707

-999

28.5

10.2

17

0.90

1,829.6

54,445

191,250

245,695

3.5

107.79

742

-1,024

26.4

6.4

18

0.95

1,832.4

55,104

197,213

252,317

3.6

107.60

764

-1,036

33.0

4.2

19

1.00

1,833.5

56,127

207,318

263,446

3.7

107.29

800

-1,055

35.5

1.1

20

1.05

1,832.9

56,652

212,546

269,198

3.8

107.08

818

-1,065

34.9

-1.2

21

1.10

1,830.6

57,220

218,183

275,402

3.8

106.86

839

-1,076

36.8

-4.1

22

1.15

1,826.8

57,794

224,230

282,024

3.9

106.60

861

-1,087

37.7

-6.7

23

1.20

1,823.2

58,188

229,029

287,217

3.9

106.46

878

-1,094

42.4

-9.0

24

1.25

1,819.2

58,534

233,595

292,129

4.0

106.32

893

-1,100

43.3

-11.5

25

1.30

1,809.3

59,282

242,932

302,214

4.1

105.93

923

-1,115

40.7

-13.2

26

1.35

1,798.9

60,005

251,806

311,810

4.2

105.54

953

-1,128

40.8

-14.5

27

1.40

1,794.5

60,246

255,009

315,255

4.2

105.43

964

-1,133

46.5

-18.0

28

1.45

1,777.9

61,001

267,053

328,054

4.4

105.13

1,004

-1,147

53.2

-22.0

amcconsultants.com173

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 16.3Pit optimization results

Source: AMC Mining Consultants (Canada) Ltd.

16.4.6Pit design

Pits were designed based on the selected optimization shell 19, revenue factor 1 (RF), based on New Pacific's goal of increased plant feed tonnes.

Seven pits have been designed, four phases in the main pit (MP1, MP2, MP3, and MP4), two small northern satellite pits (NP1 and NP2), and one eastern satellite pit (EP1).

Four phases were designed in the main pit to provide the best grade to the plant as soon as possible and to allow in-pit backfill of waste. MP1 and MP2 are based on the RF 0.4 shell allowing for the high grade from lower stripping areas to be delivered to the plant first, followed by pushbacks MP3 and MP4 to the final RF 1.0 shell. The creek channel provides a logical location to split the pit into north and south. This split allows for in-pit backfill of waste from MP4 into MP3.

Haulage ramps have been designed at 32 m wide for double lane traffic at a 10% gradient. Single lane ramps of 17 m width were designed for the bottom bench access and the small satellite pits. The final pit designs presented in Figure 16.4. Sections displaying Ag grade (g/t) for the mineralized material are presented in Figure 16.5 to Figure 16.9.

amcconsultants.com174

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 16.4Final pit design

amcconsultants.com175

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 16.5Section view A1-A2 with Ag grade values (g/t)

Source: AMC Mining Consultants (Canada) Ltd., 2022.

Figure 16.6Section view B1-B2 with Ag grade values (g/t)

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com176

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 16.7Section view C1-C2 with Ag grade values (g/t)

Source: AMC Mining Consultants (Canada) Ltd., 2022.

Figure 16.8Section view D1-D2 with Ag grade values (g/t)

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com177

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 16.9Section view E1-E2 with Ag grade values (g/t)

Source: AMC Mining Consultants (Canada) Ltd., 2022.

Figure 16.10 shows the four stages (MP1, MP2, MP3, and MP4) of the Main pit. The Main pit is the largest pit measuring approximately 2,200 m in length, 350 m to 700 m in width, and 280 m at its deepest point.

amcconsultants.com178

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 16.10Main pit stages

Note: Scale bar applies to all four drawings.

Source: AMC Mining Consultants (Canada) Ltd.

amcconsultants.com179

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16.4.7Layout of other mining related facilities

A single out-of-pit waste dump has been designed immediately south-west of the open pits in a natural depression in the topography. The waste dump has been designed to accommodate the totality of the waste mined from the pits. Waste will be placed to create an embankment to contain the filtered tailings from the process plant. The waste dumps have been designed based on a 2:1 overall slope angle. Connecting haul roads are maximum 10% grade.

Two in-pit dumps have been designed in the main pit (MP3 and MP4) pit to reduce hauling costs as the out-of-pit dump grows in size and the mined-out voids can be safely backfilled. The general site layout including waste dumps is presented in Figure 16.11.

The ROM stockpile has been designed to accommodate up to 6 million tonnes of mineralized material.

amcconsultants.com180

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 16.11General site layout

amcconsultants.com181

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16.4.8Open pit mining equipment

The projected mining schedule (see Section 16.5) was used to derive the equipment requirements. The following assumptions were used to estimate loading, hauling, and drilling equipment:

·Equipment availability of 80%

·Use of availability of 85%

·Operating efficiency of 92%

·Derived utilization of 63%

·5,255 operating hours per annum

Open pit primary equipment requirement at peak production is summarized in Table 16.5.

Table 16.5Open pit primary equipment

Equipment type1

Peak No. required

260 t shovel for waste (Komatsu PC3000)

2

200 t excavator for mineralized material (Komatsu PC2000)

1

Wheel loader (WA600)

1

140 t haul truck (CAT785)

12

Production drill (D65)

4

Dozer (450HP)

3

Grader (CAT 140M)

2

Water truck

2

Total

30

Note: 1Equipment models indicated are for sizing and costing purposes only and are not meant to be recommendations regarding equipment manufacturer for purchasing decisions.

16.4.9Open pit mining personnel

The total number of personnel required was estimated based on the production throughput of the operation and the equipment numbers. It is assumed that the management and technical staff will be part of the owner's team. Contractor personnel numbers were estimated for mine supervision, mine operations and maintenance.

Total operator numbers were calculated based on the number of machines on site at any given time. Equipment such as trucks, excavators, drills, and dozers are considered to be manned at all times.

Management and technical staff were assumed to work on an 8 on 6 off roster while mining and maintenance labour is assumed to work on a two-weeks on one-week off basis. Two 12-hour shifts per day are proposed.

The open pit mining personnel at peak production rate is shown in Table 16.6.

amcconsultants.com182

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 16.6Open pit manning

Open pit manning

Peak No. required

Owner - Mining Supervision and Technical Services

OP Mining Manager

1

Technical Services Manager

1

Mine Safety and Training

4

Maintenance Superintendent

3

Technical Services Superintendent

1

Mine Engineer

3

Geotechnical Engineer

1

Geologist

2

Surveyor

4

Sub total

20

Contractor - OP Supervision and Production

Project Manager & Mine Services

3

Operation Supervisor

3

Dispatcher & ROM Controller

3

Excavator / Shovel operator

9

Truck operator

45

Drill operator

12

Grader / Dozer operator

15

Ancillary equipment operator

28

Sub total

118

Contractor - maintenance

Boilermaker

3

Electrician

3

Planner

3

Clerks

3

Mechanic

33

Laborer / Forklift / Crane Operator

3

Sub total

48

Total OP personnel

186

16.5Projected open pit (LOM) production schedule

The open pit mine plan was completed using Minemax Scheduler 7 (Minemax) software. Minemax seeks to maximize the discounted operating cash flows while honoring constraints related to processing and mining inputs.

The target of the LOM schedule is to maximize the net present value of the plan while maintaining a 4.0 Mtpa, 12,000 tpd, steady state processing plant throughput. The schedule was developed on a yearly basis using a discount rate of 5% per annum.

A comprehensive haulage network model was developed, using Hexagon Mining's Mineplan Haulage (Haulage) module, for each pit phase using the pit phase design haul ramps and access to the destinations. The model cycle times were then integrated into the Minemax schedule to model equipment capacity for loading and truck hours.

amcconsultants.com183

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16.5.1Inventory by mining area

The total inventory includes 255.1 Mt of rock, of which 55.4 Mt are mineralized material with an average Ag grade of 106.6 g/t. This is an overall stripping ratio (waste:mineralized material) of 3.6:1.The mine plan includes seven open pit phases as shown in Figure 16.12.

Figure 16.12Open pit mining areas

The inventory by mining area and their associated mineralized material and waste quantities is presented in Table 16.7.

Table 16.7Total inventory

Mining area

Mineralized material tonnes (Mt)

Ag grade
(g/t)

Waste tonnes
(Mt)

Total rock tonnes (Mt)

Main 1 (MP1)

6.5

108.4

26.7

26.7

Main 2 (MP2)

17.1

117.8

69.9

69.9

Main 3 (MP3)

7.6

87.4

30.1

30.1

Main 4 (MP4)

21.9

103.2

110.1

110.1

North 1 (NP1)

0.2

77.1

1.1

1.1

North 2 (NP2)

1.4

111.0

9.6

9.6

East 1 (EP1)

0.7

136.8

7.5

7.5

Total

55.4

106.6

199.7

255.1

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com184

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The PEA is preliminary in nature, it includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA will be realized.

16.5.2Mine sequence considerations

16.5.2.1Value of mining areas

In order to optimize the overall value of the project and the sequence of mining, the value for each pit phase was estimated. The value, defined as the indicative undiscounted cashflow per tonne of mineralized material, accounts for preliminary mining costs, G&A, and processing costs.

The projected value from each source and consideration of practical scheduling constraints provided a basis for the order in which the pits are scheduled. The indicative value by mining area is shown in Figure 16.13.

Figure 16.13Indicative value by mining area

Source: AMC Mining Consultants (Canada) Ltd., 2022.

16.5.2.2In-pit backfill of waste

In addition to considering the value by mining area when developing the preferred mining sequence, a focus to mine pushbacks MP1 and MP3 allows for in-pit backfill of waste from MP4 into MP3. The storage capacities of the in-pit dumps are presented in Table 16.8. In future studies, it is recommended that further work is done to identify alternative dump locations (i.e., in-pit backfill, gully dump downstream of water reservoir) to make use of shorter hauls.

Table 16.8Capacity for in-pit backfill

Mining area

Volume available for waste
(M m3)

MP3

4.1

MP4

4.7

Total

8.8

amcconsultants.com185

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16.5.2.3Tailings disposal area embankment construction

Year -1 is considered to be a pre-strip period and activities include waste stripping, some ore stockpiling, haul road construction and tailings disposal area embankment construction. Waste rock from the pits will be used to construct the embankment at the south end of the valley to allow development of the filtered tailings storage facility (Filtered TSF or TSF). It is proposed that filtered tailings will be disposed of with the waste rock at the same location. The estimated rock volumes required to construct the embankment are presented in Table 16.9.

Table 16.9Rock volume required for tails south embankment construction

Year

Volume of rock
(M m3)

Volume of rock (cumulative)
(M m3)

Pre-strip (Yr -1)

8.9

8.9

End of Yr 2

14.7

23.6

End of Yr 5

16.1

39.7

End of Yr 8

12.4

52.1

End of Yr 10

5.1

57.2

Total

57.2

57.2

Source: NewFields, 2022.

16.5.2.4Open pit constraints and precedences

The following open pit precedences and constraints are used in the LOM schedule:

·1 year of pre-strip mining.

·MP1 to be mined at least 1 bench ahead of MP3.

·MP2 to be mined at least 1 bench ahead of MP4.

·Maximum of 2 phases to be mined per year.

·Vertical advance rate limit of 12 benches per year.

·No constraints on stockpiling of mineralized material.

16.5.3Conceptual open pit production schedule

Mining operations extend over 15 years, including the pre-strip period (Yr -1). The total annual ex-pit material mined peaks at 18.5 Mtpa, before dropping to approximately 13 Mtpa at the end of the open pit mine life.

Ex-pit production rates of 18.5 Mtpa are adequate to deliver 4.0 Mtpa ore to the process plant. This included consideration of vertical rate of advance (VRA).

MP2 and MP1 are mined first as the schedule targets high grade and low strip ratio ore. MP1, MP2, and MP3 are all mined by the end of Year 6. MP4 is mined from Years 7 to 13. NP1, NP2, and EP1 are mined at the end of LOM.

MP4 mining makes use of short hauls to backfill 4.1 M m3 of waste into MP3. NP1 and NP2 make use of short hauls to backfill waste into MP4.

The projected open pit schedule is summarized in Table 16.10 and Figure 16.14.

amcconsultants.com186

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 16.10Open pit material mined

Unit

Total

Yr -1

Yr 1

Yr 2

Yr 3

Yr 4

Yr 5

Yr 6

Yr 7

Yr 8

Yr 9

Yr 10

Yr 11

Yr 12

Yr 13

Yr 14

Mineralized material mined

Mt

55.4

1.6

3.8

4.8

5.1

5.5

4.1

5.2

1.4

2.0

4.6

3.5

4.1

4.0

4.0

1.6

Ag grade

g/t

106.6

99.9

117.1

120.2

113.4

113.6

100.9

84.8

126.8

99.4

94.6

100.0

111.7

113.3

102.8

106.6

Waste mined

Mt

199.7

16.9

14.1

13.7

13.4

10.8

14.4

11.7

17.1

16.5

13.9

15.0

14.4

8.8

9.9

9.1

Total mined

Mt

255.1

18.5

17.9

18.5

18.5

16.3

18.5

16.9

18.5

18.5

18.5

18.5

18.5

12.8

13.9

10.7

Figure 16.14Life-of-mine production schedule

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com187

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

16.5.4Projected process plant feed schedule

Projected production from the open pit is stockpiled in Year -1, during the construction of the process plant. It has been assumed that the process plant would be capable of producing 4.0 Mt from Year 1 onwards.

As presented in Figure 16.15, the targeted process feed is achieved on a yearly basis. High grade material stockpiled during Year -1 is reclaimed in Year 1. Waste stripping of MP4 in Years 7 and 8 requires most plant feed to come from stockpiles. Stockpiling and reclaiming plant feed allows the ex-pit mining profile to be smoothed, and revenue to be brought forward by maximizing head grade based on available feed stock.

Figure 16.15Process feed schedule

Source: AMC Mining Consultants (Canada) Ltd., 2022.

The PEA is preliminary in nature, it includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA will be realized.

The conceptual process feed is summarized in Table 16.11.

amcconsultants.com188

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 16.11LOM process plant feed schedule

Total

Yr -1

Yr 1

Yr 2

Yr 3

Yr 4

Yr 5

Yr 6

Yr 7

Yr 8

Yr 9

Yr 10

Yr 11

Yr 12

Yr 13

Yr 14

Total process feed (Mt)

55.4

-

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

3.4

Ag (g/t)

106.6

-

135.3

135.6

131.5

139.1

103.4

96.6

74.8

72.7

102.3

93.3

113.6

113.3

102.3

74.2

Mine to Process (Mt)

46.6

-

3.0

4.0

4.0

4.0

3.2

4.0

1.3

2.0

4.0

3.5

4.0

4.0

4.0

1.6

Ag (g/t)

116.3

-

136.1

135.6

131.5

139.1

117.9

96.6

133.5

99.4

102.3

100.0

113.6

113.3

102.8

106.6

Stockpile to Process (Mt)

8.8

-

1.0

-

-

-

0.8

-

2.7

2.0

-

0.5

-

-

-

1.8

Ag (g/t)

55.6

-

132.7

-

-

-

48.3

-

45.5

45.4

-

45.3

-

-

45.3

45.3

Mine to Stockpile (Mt)

8.8

1.6

0.8

0.8

1.1

1.5

1.0

1.2

0.1

-

0.6

-

0.1

-

-

-

Ag (g/t)

55.6

99.9

45.4

46.0

46.1

47.3

45.5

44.5

42.5

-

45.0

-

45.1

-

-

-

amcconsultants.com189

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

17Recovery methods

17.1Summary

The results of metallurgical testwork (described in Section 13) have been used to select a mineral processing flowsheet for the Silver Sand project. Interpretation of the testwork results has enabled the preparation of preliminary process design criteria, equipment selection and flowsheet.

Several processing options were considered, including heap leaching, froth flotation, and agitated tank cyanidation (using carbon or zinc precipitation for silver recovery from solution). After preliminary trade-off studies to compare the capital cost, operating cost and metallurgical efficiency of different options, an agitated tank cyanidation process was selected for the PEA base case. The selected flowsheet represents a very conventional, low-risk approach to silver extraction, and consists of the following unit operations:

·ROM receiving, crushing, and crushed rock storage.

·Stockpile discharge, grinding via SAG milling, and ball milling.

·SAG mill pebble crushing via SAG mill pebble ports, scalping screen, recycle conveyors, and cone crusher.

·Pre-leach thickening and cyanide leaching using stirred, oxygen sparged tanks.

·Liquid / solid separation using counter-current decantation (thickeners).

·Recovery of silver from pregnant leach solution using a zinc precipitation process followed by drying and smelting with fluxes to produce silver doré bars.

·Thickening and filtration of leach residues.

·Conveying of filter cake and long-term storage at the tailing storage area.

The processing rate was selected to match the mine production rate of 12,000 tpd. Simplified block flow diagrams for the full processing plant are given in Figure 17.1 and Figure 17.2.

amcconsultants.com190

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 17.1Process flowsheet summary, Sheet 1

amcconsultants.com191

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 17.2Process flowsheet summary, Sheet 2

amcconsultants.com192

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

17.2Process Design Criteria

The Process Design Criteria (PDC) prepared for this study is summarized in Table 17.1 below.

Table 17.1Process Design Criteria

Criteria

Unit

Design

Annual Throughput

dmtpa

4,000,000

Crushing Circuit

Availability

%

75

Hours per annum

h

6,570

Average hourly feed rate

dmtph

609

Grinding Circuit

Availability

%

91.3

Hours per annum

h

8,000

Average hourly feed rate

dmtph

500

ROM Characteristics

Solids density

t/m3

2.53

(average blend)Crushing Wi

kWh/t

10.3

Abrasion Index

g

0.37

Axb

-

40.6

Bond Ball Wi

kWh/t

16.0

Silver grade (average)

g/t

107

Copper grade

g/t

300

Crushing Circuit

Feed top size

mm

700

Feed size, F80

mm

450

Product size, P80

mm

130

Peak throughput

dmtph

609

Grinding Circuit

Feed top size

mm

220

Configuration

SABC

SAG mill feed size, F80

mm

130

Cyclone overflow size, P80

µm

75

Applied energy

kWh/t

25.9

Throughput

dmtph

500

Pre-Leach Thickener

Diameter

m

30

Unit area

t/m2/d

15.5

Underflow % solids

%

46

amcconsultants.com193

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Leaching Circuit

Retention time

h

48

No of tanks

10

Each tank volume

m3

4,000

pH

10.5 - 11.0

NaCN concentration

g/L

3.0

DO2 levels

ppm

10-12

Silver dissolution rate

%

92.0

CCD

No of Stages

#

4

Thickener Diameter

m

33

Unit Area

t/m2/d

12.8

Wash water / thickener underflow liquor

w/w

3.0

Underflow %solids

%

50-55

Wash Efficiency

%

99.2

Tailings Thickener Diameter

m

35

Thickener underflow density

t/m3

1.57

Underflow % Solids

% (w/w)

60

Tailings Filter Capacity

tph

500

Number of Filters

#

9

Total Filtration Area

m2

7,200

Merrill Crowe

Clarifying Filters

#

2

Filtration area of each filter

m2

450

Zinc addition rate

kg Zn/kg Ag

3.0

Lead nitrate

kg Pb(NO3)2/kg Ag

0.10

Precipitation Filters

#

3

Precipitation cycle time

d

3

Refinery

Precipitate cake handling

tpd

10 (wet)

Drying Ovens

#

3

Induction Furnace

kW

800

Overall Silver Recovery into doré

%

91.0

17.3Process description

The 4 Mtpa processing plant is described in the following subsections and illustrated in Figure 17.1 and Figure 17.2.

17.3.1Crushing

Crusher feed material will be delivered in 140 t trucks and dumped via an earth ramp into an inload bin. The maximum feed particle size accepted into the plant will be 700 mm. The inload bin will be discharged by a variable speed vibrating grizzly feeder (VGF) allowing both fines removal and throughput control for the jaw crusher. Approximately 50% of the feed mass will pass through the VGF and only the oversize fraction will report to the crusher. The jaw crusher, a 1,200 mm x 1,600 mm unit, will crush oversize material and will discharge onto a short sacrificial conveyor together with VGF fines.

The sacrificial conveyor will transfer the primary crushed rock onto the stockpile feed conveyor and will also present the material to an over-belt magnet that can remove any tramp steel that may be present. The stockpile feed conveyor will transport the crushed material to the top of an uncovered conical stockpile whose live capacity will provide a 16-hour buffer at nominal throughput rate (500 dry metric tonnes per hour (dmtph)) to the downstream grinding circuit.

amcconsultants.com194

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The crushing circuit design is based on an instantaneous 609 dmtph throughput rate, with an assumed average utilization of 75%.

17.3.2Grinding

The crushed rock stockpile will be drawn down using 3 variable speed apron feeders (2 running, 1 on standby). These feeders control the rate at which the stockpile will discharge onto the SAG Mill feed conveyor. A weightometer located on the SAG mill feed conveyor will measure and accumulate tonnage rates, allowing for accurate process control and metallurgical accounting.

Lime will be added to the SAG mill feed conveyor in powdered form, using a control loop that will bring the pre-leach thickener feed slurry pH up to 9.5 - 9.8. The balance of lime will be added as a slurry directly to the leach tanks.

A 26' diameter x 13' EGL, 4,500 kW SAG mill will be fed with crushed material via the mill feed conveyor, whereupon it will be mixed with process water and ground to a pulp using 5" steel balls and other large rocks already part of the mill charge. As the pulp / pebble mixture discharges from the SAG mill via a discharge grate and pan lifters, it will pass over a multi-slope vibrating scalping screen fitted with ½" aperture panels. This screen will protect the pumps beneath from oversize material, directing it instead into the pebble crushing circuit. The screen undersize stream, a coarsely ground slurry of roughly 60% solids, will gravitate into the common mill discharge pumpbox where it will combine with ball mill discharge slurry.

Scalping screen oversize material which consists mainly of pebbles, will discharge onto a series of recycle conveyors that will be equipped with self-cleaning magnets and a metal detector. The pebble stream will discharge into a storage bin sized to provide a 15 to 20-minute buffer. This storage bin will be discharged using a vibrating pan feeder into the pebble crusher before being conveyed back to the SAG mill as a recycle stream. The pebble crusher will reduce 50-60 mm pebbles to <10 mm.

The SAG mill discharge slurry will be mixed with ball mill discharge slurry and process water in the common mill discharge pumpbox. From here, the mixture will be pumped to a hydrocyclone cluster for size classification. The cyclone underflow slurry (containing the coarse size fractions) will gravitate to the ball mill for further grinding, while the cyclone overflow slurry (containing the finer size fractions) will gravitate to the trash screen and then to the pre-leaching thickener.

The ball mill will be a 20' x 34' overflow discharge unit with a 7,500 kW drive arrangement. A trommel screen on the mill discharge will protect pumps and help to remove tramp steel and other "scats" that may exit the mill.

Grinding balls will be added to the SAG and ball mills on a daily basis in 2-tonne lots using a system of magnets, loading kibbles and hoists.

Spillage within the grinding area will be directed into sumps, where vertical sump pumps will collect and pump the spillage back into the process.

The grinding circuit product (cyclone overflow) will have a size specification of 80% passing 75 µm.

17.3.3Cyanide leaching

Cyclone overflow slurry at 33% solids will gravitate across to the pre-leach thickener area after passing through a two-stage sampling station. The sampling station will collect shift composite samples of leach feed slurry for metallurgical accounting purposes. Slurry will be directed onto a pair of linear trash screens before entering the pre-leach thickener feed launder. Flocculant and

amcconsultants.com195

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

coagulant will be added to the thickener feed slurry to accelerate settling rates and to improve thickener overflow clarity.

As the finely ground solids settle within the pre-leach thickener, rotating rakes within the tank will direct material to the centre cone, and into the suction side of the thickener underflow pumps. The thickener underflow pumps will transport the thickened slurry from the thickener cone into the leaching tanks. An inline shear reactor will be fitted to the thickener underflow slurry line and this will allow initial oxygenation of the slurry.

The leaching circuit will consist of a single train of 10 agitated tanks. Each tank will contain roughly 4,000 m3 of slurry and will be equipped with a 150 kW twin blade agitator. Tanks will be cascaded to allow gravity flow through the train. Lime slurry will be added to the first 2 or 3 leach tanks to ensure that pH is maintained at 10.5 to 11.0 during the cyanidation process. Lead nitrate may be added to the initial leach tanks or to the grinding mills on an as-required basis (testwork showed a significant improvement in extraction kinetics for sulphide mineralization). A cyanide dosing system will be provided to allow dosing to any of the tanks, although cyanide will likely not be added to tank #1 depending on the oxygen demand profile and cyanide consumption (still to be established via testwork). 48 hours of leaching time will be provided by the leaching tank train, assuming a slurry density of 1.38 t/m3 (i.e. 46 weight % solids). Higher densities may be achievable in practice, and this would increase retention time (and possibly silver extraction rate) accordingly. Oxygen availability is a particularly important aspect of the silver leaching process, and testwork has already demonstrated how initial dissolved oxygen levels of >10 ppm are beneficial to both silver extraction kinetics and cyanide consumption. To aid the efficient transfer of oxygen into the circuit, an on-site oxygen plant and high velocity gas injection spargers will be included in the leach tank design.

Slurry from leach tank #10 will overflow into a two-stage sampling station and then to the feed mixing box of CCD thickener #1. A train of 4 CCD thickeners at wash ratio of 3:1 will provide adequate solids / liquid separation after the leaching process to achieve a wash efficiency around 99.2%. Each CCD thickener will be equipped with flocculant and coagulant dosing facilities, to assist with solids settling rates and overflow clarity.

The CCD circuit will use counter-current washing of solids with barren solution to reduce residue solution silver losses to minimum practical levels. The thickened underflow slurry from each CCD thickener will be pumped downstream (i.e. thickener #1 underflow is pumped to thickener #2 feed), whilst the overflow solution from each thickener will gravitate from thickener #4 to #3 to #2 to #1. Efficient mixing of the upstream slurry and downstream solution prior to entering the thickener is an important aspect of the design, and this will be encouraged through the use of static mixing boxes directly ahead of each CCD thickener.

The overflow solution from CCD thickener #1 will be the pregnant leach solution (PLS) and it is expected that this will contain about 99.2% of the silver dissolved during the leach. Mass and solution balance calculations for the flowsheet give a PLS flowrate of approximately 2,000 m3/h.

17.3.4Zinc precipitation and silver doré production

The PLS from CCD thickener #1 will be pumped into a surge / storage tank ahead of the zinc precipitation circuit. The 1,600 m3 tank will provide almost 1-hour of surge capacity in case the zinc precipitation (Merrill Crowe) plant is shut down temporarily.

From the PLS storage tank, pregnant solution will be pumped to the zinc precipitation plant. This plant will follow the standard Merrill Crowe flowsheet, with PLS solution clarification, vacuum deaeration, zinc dust and lead nitrate addition, zinc precipitate filtration, and precipitate handling.

amcconsultants.com196

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Zinc precipitate filter cake will be removed from the precipitate filter presses at a rate of roughly 10 tonnes (wet) per 3-day cycle, assuming a 75% silver+copper grade and a 30% ~ 50% moisture content. As the precipitate will very likely contain significant quantities of copper, the flowsheet allows for an oxidative sulphuric acid leaching stage, which will preferentially leach copper into solution but not silver. This is standard operating practice when copper levels become problematic for precious metal doré production. The sulphuric acid leaching area will be very well ventilated due to the risk of HCN generation. Likewise, the acid solution storage / reticulation will be closely monitored and strictly contained within a small area of the refinery.

As copper levels in the sulphuric leach circuit rise, then a bleed will be necessary. When required, the bleed stream will be neutralized with lime and then pumped to the tailings thickener.

Sulphuric acid leached residues will be silver rich, and these will be filtered and dried in ovens prior to transportation to the doré smelting area. Residues will be mixed with fluxes in a flux mixing area, and then added to an induction furnace for smelting. Once smelting is completed, slag is removed and the molten metal is poured from the furnace into moulds and the resultant doré bars are stored within the refinery vault.

Filtrate from the zinc precipitation pressure filter will still contain high-level cyanide, but only traces of silver (i.e. the Merrill Crowe process is expected to be ~99% efficient). This barren solution will be directed to a 1,600 m3 barren solution surge tank - sized to give almost 1 hour of surge capacity after Merrill Crowe. From the surge tank, pumps will distribute barren solution back into the grinding, leaching and CCD process areas to ensure efficient use of cyanide and retain any residual dissolved silver.

17.3.5Tailing treatment

As a result of the relatively high cyanide concentrations required for effective silver dissolution, the solution within residue slurry that will exit the CCD circuit will contain a reasonable amount of free cyanide. This residue slurry is pumped as underflow from the final CCD thickener to the tailing thickener, where a high percentage of residue solution is recovered and recycled. The tailing thickener will be a high-compression design and will utilize flocculant and coagulant to give a high % solids underflow product (roughly 66% solids) and a higher rate of solution recycling.

The tailing thickener underflow slurry will be withdrawn from the cone area and pumped at 60% solids to the tailing filtration area for the final stage of dewatering before disposal. Two agitated tailing filter feed tanks provide over 1-hour of surge capacity between the tailing thickener and pressure filter plant.

Thickened slurry from the filter feed tanks will be pumped via distribution manifolds to one of nine tailings pressure filters for further dewatering. Each tailing filter will use high pressure feed pumping, followed by membrane squeezing and air blowing to drive remaining moisture levels down to give a filter cake product (cake) with less than 20% moisture. Each filter will discharge automatically using plate shifters to allow a rapid cycle time and high throughput rates. Cake will drop onto a dedicated belt filter which in turn feeds onto a common cake transfer conveyor.

Cake from the transfer conveyor will discharge onto an overland conveyor which will move the cake over to the tailing storage area, some 1,000 m away. The overland conveyor will discharge onto a radial stacking conveyor which will deposit the cake onto the storage facility. The radial stacking arrangement allows for safe cake removal and distribution using bulldozers.

Filtrate extracted by the pressure filters will be collected and pumped back to the tailing thickener feed box, where it will subsequently be recycled back into the plant via the thickener overflow system.

amcconsultants.com197

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The combined dewatering of thickening and pressure filtration reduces the concentration of cyanide-bearing solutions within the tailing filter cake to 20% or less. This cake is conveyed to the fully lined tailing storage area for permanent storage. The process plant does not use cyanide detoxification processes to further reduce tailings cyanide content.

17.3.6Reagents

Offloading, storage, mixing, and dosing facilities will be provided for the following chemicals:

·Hydrated lime

·Sodium Cyanide

·Caustic (NaOH)

·Lead Nitrate

·Flocculant

·Coagulant

·Sulphuric acid

·Hydrogen peroxide

·Antiscalent

·Zinc powder

Where practical, dry reagents (flocculant, lead nitrate, zinc powder, etc.) will be offloaded and stored within the dedicated reagents storage area. Lime will be offloaded into and stored in a lime silo adjacent to the plant. Lime slaking, slurry storage, and distribution will be located inside the building, within the reagents area.

A ventilated storage and mixing area will be provided for sodium cyanide and this will be kept apart from other reagent areas. Fixed HCN (hydrogen cyanide) gas detectors will be located within the building at strategic points, and personnel will wear appropriate personal protective equipment and portable HCN monitors.

Flocculant and Coagulant will be mixed in vendor packaged mixing / dosing systems that will include mixing / hydration tanks and storage tanks.

Acid, caustic, hydrogen peroxide and antiscalent will be delivered in 1,000 L FIBC containers and the reagents will be dosed directly from these as required using reagent dosing pumps.

17.3.7Services and water

Raw water will be pumped to site (by others) and stored within several storage tanks and earth impoundments, to ensure that sufficient water will always be available for processing. Raw water and process water pumps will distribute water as required throughout the process plant. Process water is recovered from the tailing thickener and recycled within the plant.

A significant volume of pregnant and barren solutions will also add to the volume of water stored and recycled within the process plant.

Instrument grade compressed air will be distributed throughput the plant for actuation of control valves and operation of other instruments.

Oxygen will be generated using vacuum pressure swing technology and piped to spargers on leach tanks at roughly 600 kPa. The spargers allow rapid oxygenation of slurry within the early stages of leaching.

amcconsultants.com198

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

17.4Major equipment list

The following Table 17.2 lists the major equipment items by process area, together with installed power ratings (where applicable).

Table 17.2Equipment list summary

Plant area

No. Of

Equipment description

Installed power (kW)

Unit

Total

Crushing

1

Vibrating Grizzly Feeder

30

30

1

Primary Jaw Crusher

200

200

1

Dust Extraction

11

11

1

Sacrificial Conveyor

30

30

1

Magnets / Metal Detectors

5

5

1

Stockpile Feed Conveyor

75

75

Ore Storage

3

SAG Mill apron feeders

30

90

1

Dust Extraction

7.5

7.5

1

SAG Mill Feed Conveyor

45

45

Grinding

1

SAG Mill

4,500

4,500

1

Ball Mill

7,500

7,500

1

Scalping Screen

55

55

2

Cyclone Feed Pumps

600

1,200

1

Cyclone Pack

-

-

1

Cyclone Overflow Sampler

11

11

2

Grinding Area Sump Pumps (2 off)

22

44

1

Misc. minor Items

100

100

Pebble Crushing

3

Pebble Crusher Conveyors

15

45

1

Magnets / Metal Detectors

7.5

7.5

1

Feeder and Pebble Crusher

145

145

Leaching & CCD

2

Trash Screens

15

30

1

Pre-Leach Thickener

15

15

2

Pre-Leach Thickener U/F Pump

250

500

10

Leaching Tanks, 4,000 m3

-

-

10

Leaching Tank Agitator

150

1,500

2

Samplers

11

22

4

CCD Thickener

11

44

8

CCD Thickener U/F Pumps

110

880

2

CCD Area Sump Pump

11

22

amcconsultants.com199

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Tailings

2

Tailings Thickener Feed Pump

75

150

1

Tailings Thickener

15

15

2

Tails Thickener U/F Pump

75

150

9

Tailings Filter Press

75

675

5

Cake discharge Feeder

11

55

1

Filtrate Tank

-

-

2

Filtrate Pump

45

90

2

Tailings Filter Press Feed Tank

-

-

2

Filter Press Feed Tank Agitator

37

74

2

Tailings Filter O/Land Conveyors

55

110

3

Tailings Filter Press Feed Pump

75

225

1

Misc. minor Items

40

40

Merrill Crowe + Smelting

1

Pregnant Solution Tank

-

-

2

Pregnant Solution Pump

150

300

2

Merrill Crowe: Leaf Filters

75

150

1

Merrill Crowe: Crowe Tower

55

55

2

Merrill Crowe: Zinc Precipitation

30

60

1

Precoat / Body Coat System

30

30

1

Merrill Crowe Smelting / Refining Package

1,250

1,250

1

Acid leaching and filtration package

55

55

1

Misc. minor Items

40

40

Reagents

1

Cyanide Mixing & Dosing System

50

50

1

Lime Vendor Package

120

120

2

Lime Dosing Pump

45

90

1

NaOH mixing & dosing package

22

22

1

Surfactant mixing & dosing package

10

10

1

Flocculant mixing & dosing package

30

30

1

Coagulant mixing & dosing package

30

30

1

Lead Nitrate mixing / dosing package

22

22

1

Oxygen Plant Package

600

600

2

Reagent Storage area ventilation fans

15

30

1

Misc. minor Items

40

40

Services

1

Process Water Tank

-

-

2

Process Water Pump

250

500

2

Gland Water Pump

30

60

2

Fresh Water Pump

90

180

1

Fire Water System

15

15

1

Misc. minor Items

40

40

2

Compressors

300

600

The process plant equipment includes an installed power rating of approximately 23.2 megawatts (MW). Initial estimates of power consumption for this equipment under normal operating conditions gives an applied power of 35.0 kWh/t.

17.5Process control philosophy

A control philosophy will be implemented for the Project that is typical of those used in similar modern processing operations.

amcconsultants.com200

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Field instruments will provide analog and digital inputs to a group of Programmable Logic Controllers (PLCs). Process control cubicles will be located within the local Motor Control Centers (MCCs) and will contain the PLC hardware, power supplies and I/O cards for instrument monitoring and loop control.

The PLCs assist the plant operators with process control functions by providing the following services:

·Communicating the status information of all drives, instruments, and vendor packages.

·Allowing remote drive control (stop / start) and process interlocking.

·Providing proportional-integral-derivative (PID) control for various control loops.

The main Human-Machine Interface (HMI) will be in the Main Control Room (MCR) and the Crusher Control Room (CCR), consisting of PC-based terminals with industrial keyboards and mice. The Supervisory Control and Data Acquisition (SCADA) system architecture will be configured to provide outputs to alarms, control the function of process equipment, and provide logging and trending facilities to assist in analysis of plant operations.

The control rooms would typically be purpose-built structures. Much of the plant will be controlled from the MCR, to be located adjacent to the grinding area. Operator control stations are fully redundant so that the failure of one station does not affect the operability of the other station or control of the plant. Control stations are supplied from an Uninterruptible Power Supply unit (UPS) with 20 - 30 minutes standby capability.

Drives that form part of a vendor package are controlled from the vendor's control panel. As a minimum, 'Run' and 'Fault' signals from each vendor control panel are made available to the SCADA system via the PLC.

The general control strategy adopted for the Project will be as follows:

·Integrated control via the Process Control System (PCS) for areas where equipment requires sequencing and process interlocking.

·Hard-wired interlocks for personnel safety.

·Motor controls for starting and stopping of drives at local control stations via the PCS or hard-wired, depending on the drive classification. All drives can always be stopped from the local control station. Local and remote starting is dependent on the drive class and control mode.

·Control loops via the PCS except where exceptional circumstances apply.

·Monitoring of all relevant operating conditions on the PCS and recording selected information for data logging or trending.

Trip and alarm inputs to the PCS will be failsafe in operation, i.e., the signal reverts to the de-energized state when a fault occurs.

amcconsultants.com201

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

18Project infrastructure

18.1Overview

As a comprehensive greenfield project, the Silver Sand project will require the development of supporting infrastructure. This would include the following items:

·A process plant that will include crushing, conveying, grinding, leaching, counter current decantation (CCD), leach residue dewatering and disposal, zinc precipitation (Merrill Crowe), and doré smelting.

·An assay lab in close proximity to the process plant.

·A warehouse, maintenance shop, administration offices, and supporting infrastructure.

·Filtered TSF and structural earth dams, initial waste rock piles.

·A network of access and on-site roads.

·Fresh water reservoir and water treatment plant.

·A fresh water supply and distribution system.

·Power supply and distribution, including a power transmission line, a substation at the plant site, and power distribution lines throughout the site.

·Owners mine camp.

·Contractors camp and facilities.

Tentative locations have been identified for the above facilities. The final location of these facilities is dependant on further exploration drilling program to ensure there is no sterilization of Mineral Resources as well as accessibility. All facilities will be located close to the plant site in an elevated and dry area.

18.2Site location

Figure 18.1 shows the location of the Property in relation to city of Potasi and principal supporting infrastructure. As there is no rail access to the mine / concentrator site, delivery of all supplies and services, and reagents to the site will be by truck.

amcconsultants.com202

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 18.1Silver Sand site location

Source: Silver Sand, 2022.

Figure 18.2 shows the proposed site layout with open pits, waste dumps, process plant, Filtered TSF, ore stockpile area, crusher, site access road, and haul roads. The section line (A-A'), identified across the WD dump and the TSF, is shown in Figure 18.4.

amcconsultants.com203

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 18.2Preliminary site infrastructure layout

amcconsultants.com204

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

18.3Road access

The Property is situated in the Colavi District of Potosí Department in southwestern Bolivia, 25 km north-east of Potosí city, the department capital. The current access road is shown in the above figure.

The Property is accessible from Potosi via a 54 km long road made up of a 27 km stretch of the paved Bolivia National Highway 5 and an all-season gravel road built for mining in the Colavi District.

Plant roads will be constructed in and around the process plant area to provide access to buildings and equipment for deliveries, operation, and maintenance access. These roads will be two-way unsealed roadways nominally 10.0 m wide to accommodate highway trucks and other site equipment as required.

18.4Power

The Silver Sand project is estimated to require approximately 25 to 35 MW of power annually.

New Pacific has engaged Bolivia's national power supply companies CNDC and ENDE. A preliminary power supply plan for the Silver Sand future operations was discussed and agreed upon. The Company has submitted a power supply application to the Bolivia Ministry of Energy following the formal procedure in the country. The Ministry of Energy issued an official letter to the Company acknowledging the application.

There are three major national power lines going through the area between Betanzos and Silver Sand project. These lines are powered at 230 kilovolts (kV), 115 kV, and 69 kV. The 115 kV power line is the most feasible power line to supply power to Silver Sand according to ENDE. A transmission line connects to the Potosi existing ENDE substation, and a substation on the Silver Sand site needs to be constructed. CNDC and ENDE requested a Silver Sand project technical study to finalize the construction plan. When the Company commits to building the power supply infrastructure, ENDE will be responsible for permitting and constructing the transmission line and the substation at the Silver Sand site. It is estimated that the permitting and construction of the transmission line and the substation will take up to 2 years.

Figure 18.3 shows the location of three major powerlines around the Silver Sand Property.

Bolivia is a country with an abundant quantity of energy. There are many suppliers of power. National grid power supply for the Silver Sand project has been determined to be the most suitable choice for the project. However, the Company is also very active in pursuing green mine concept and is studying the use of solar and windmill energies.

amcconsultants.com205

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 18.3Power lines in the vicinity of property

Source: New Pacific, 2022.

18.5Supply water

Water has not been a concern at the Property. Water for domestic use can be obtained from a small lake, approximately 3.5 km north-west of the Property. Water for drilling can be sourced from nearby drainages.

A hydrological and hydrogeological conceptual study was completed by Itasca Chile in October 2022. 3 piezometers were also installed in the main open pit area to monitor the groundwater flow.

A water dam will be built up stream from the mine in the narrowest part of the creek to hold the water in a reservoir with a capacity of about 2.6 million cubic metres. This will provide water for the mineral processing plant and mining camp and could supply downstream residents for farming and daily life water requirement if required.

The water requirement for the process plant is estimated at about 3,000 to 4,000 m3 per day, that is equivalent to the maximum water usage per year of the project estimated at 1.5 million m3. This is below the capacity of the reservoir of 2.6 million m3. However, Silver Sand project area has about 8 months of dry season every year. In case the reservoir does not contain enough water for the mining operation, an alternative water supply pipeline is planned to take water from downstream of the Siporo river. A few wells could be built at the Siporo river, at the location where the river exits and goes into the steep mountainous area, where there is no farming.

Most of the processing water will be recycled and reused, except the moisture trapped in the dry tailings that is going nowhere but evaporation. No processing water will be discharged without treatment.

18.6Fuel storage

A small fuel storage facility will be needed to supply fuels to the onsite light vehicles and mill maintenance equipment. Mining will be contracted to third-party companies. They will build their own fuel storage facilities onsite.

amcconsultants.com206

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

18.7Offices and warehouse

Offices and warehouses are planned to be built onsite, close to the processing plant.

18.8Equipment maintenance workshop

Heavy equipment maintenance workshop is planned to be built and used by the mining contractor.

18.9Explosives magazine

Explosive and accessory depots will be built, with all the standards and specifications required by the Ministry of Defense, for the use and handling of explosives.

18.10Communications

The Silver Sand site has an excellent cell phone signal. Most mobile phones can receive 3G / LTE signal on site. However, a radio communication system is planned to be constructed for everyday operations communication.

18.11Gate house / security

Security gates and fences are planned to be built around the mine operations area.

18.12Office building

Office buildings are envisaged to be built close to the processing plant.

18.13Accommodations

Accommodations are envisaged to be built close to the processing plant.

18.14Filtered Tailings Storage Facility

The Filtered TSF will be integrated within the waste rock storage area. The TSF will be fully lined to provide protection against release of potentially contaminated water to the local surface and groundwater systems. A leachate collection system will be installed below the liner system to collect any seepage that may occur through small holes in the TSF liner system.

The TSF will be developed at the south end of the waste rock storage facility, as show in Figure 18.2. An initial starter berm of mine waste rock will be constructed on the downstream end of the facility to provide structural support for the tailings and liner system. A starter TSF cell will be developed along the western perimeter of the waste rock storage facility, with sufficient capacity to store tailings from the first three years of operations. The perimeter of the TSF will be raised as waste rock becomes available from mining operations and the liner system extended vertically over the operating life of the mine. A section view of the waste dump and TSF is shown in Figure 18.4. This northwest-southeast section view is identified as section A-A' in Figure 18.2.

amcconsultants.com207

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 18.4TSF sectional view

amcconsultants.com208

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Filtered tailings will be transported approximately 1,000 m from the process plant to the Filtered TSF via an overland conveyor. The overland conveyor will discharge the tailings onto a radial stacking conveyor which will discharge the tailings into the lined facility. Tailings discharged from the radial stacking conveyor will be spread and nominally compacted using a bulldozer. As containment of the tailings will be provided through the placement of waste rock to the south and east of the TSF, safe operation of the TSF will only require sufficient compaction to provide a safe working surface for the mobile equipment.

As the tailings will be filtered, there will be no excess tailings transport water which will require management throughout operations. The main source of excess water will be runoff from precipitation events during the wet seasons at the site.

To reduce the volume of water that will contact the placed tailings and waste rock during precipitation events, a series of diversion ditches will be excavated around the perimeter of the TSF. The diversion ditches will direct non-contact runoff around the TSF to natural drainage courses downstream of the facility. Contact run-off will be collected in a seepage and runoff collection pond which will be constructed at the south end of the facility. Water collected within the pond, will be pumped back to the process plant for use as process water. It is anticipated that the seepage and runoff collection pond will be dry for at least four months of the year.

A site wide water balance was developed for the project. Based on the available climate and operational data, it is estimated that the operation will require approximately 1,400 m3/day of freshwater on average over the operating life of the mine. The remainder of the process water requirements will come from recycle from the thickeners and filter plant, as well as seepage and runoff recycled from the seepage and runoff collection pond.

18.15Process plant

For further detailed description refer to Section 17. The selected flowsheet represents a very conventional, low-risk approach to silver extraction, and consists of the following unit operations:

·ROM receiving, crushing, and crushed rock storage.

·Stockpile discharge, grinding via SAG milling, and ball milling.

·SAG mill pebble crushing via SAG mill pebble ports, scalping screen, recycle conveyors, and cone crusher.

·Pre-leach thickening and cyanide leaching using stirred, oxygen sparged tanks.

·Liquid / solid separation using counter-current decantation (thickeners).

·Recovery of silver from pregnant leach solution using a zinc precipitation process followed by drying and smelting with fluxes to produce silver doré bars.

·Thickening and filtration of leach residues.

·Conveying of filter cake and long-term storage at the tailing storage area.

·Crusher and conveyor locations shown in plant layout below.

There is currently no infrastructure on site.

The plant layout is shown in Figure 18.5.

amcconsultants.com209

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 18.5Topography and infrastructure plant layout

amcconsultants.com210

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

19Market studies and contracts

19.1Markets

Silver is the sole metal to be marketed from the proposed Silver Sand operation. This will be in the form of doré bars containing approximately 90% silver and, the balance being gold copper and other minor metals. Gold credits are received from the refiner. The doré will be shipped to refiners either domestically or internationally by a secure transportation provider for refining. Responsibility for the gold changes hands at the gold room gate.

As of the effective date, there are no long term contracts in place. An estimate of the refining costs is $0.50 payable ounce of silver.

The costs above are subject to some variation depending on the amount of ounces per shipment, and there may be some losses and penalties would be applied in the refining contract for any impurities.

The market for silver doré is well established. Market predictions and discussions for silver are beyond the scope of this document. The impacts of silver price volatility on the mine plan and process operation are well understood.

19.2Commodity price

Silver pricing used for the PEA was agreed upon based on consideration of various metal price sources. These sources included review of consensus price forecasts from banks and financial institutions, three-year trailing average of spot prices, and current spot prices.

A summary of five-year historical silver prices and the forecast prices for 2022 - 2025 is provided in Figure 19.1. Note that the three-year trailing average silver price at the effective date is $22.27/ounce.

Based on a review of forecast and current pricing, the silver pricing for the base case economic model in the PEA is $22.50/troy oz payable.

amcconsultants.com211

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Figure 19.1Historical silver price and projections

Source: S&P Capital IQ; sell-side brokerage research.

19.3Contracts

While there are a number of short-term contracts in relation to exploration and support of those activities, no long term contracts are in place.

amcconsultants.com212

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

20Environmental studies, permitting and social or community impact

20.1Introduction

In order to obtain an environmental license for the Silver Sand mining project, New Pacific is preparing different types of studies and activities that will allow it to have a comprehensive Analytical Environmental Impact Assessment Study (EEIA-AI) in accordance with current environmental legislation in Bolivia. This study is prepared by an independent engineering firm registered with the State of Bolivia (www.tierralta.org).

There are currently sources of contamination in the area that come from other activities such as mining developed by local community members and / or mining cooperatives, as well as other agricultural and livestock activities. In addition, there is evidence of abandoned mining operations in the area with environmental liabilities that in some cases are current sources of contamination because they generate Acid Mine Drainage (AMD) and / or Acid Rock Drainage (ARD).

20.2Environmental legislation and applicable procedures

In accordance with the model of living well, in harmony, balance, care, and protection of Mother Earth, the Project is subject to compliance with Bolivian environmental laws and regulations, it is important to note:

·The purposes and goals of the Political Constitution of the State (CPE, Constitución Política del Estado), decreed on 7 February 2009, are to constitute a just and harmonious society, to guarantee the well-being, to preserve, as historical and human heritage, the plurinational diversity and to promote the responsible and planned use of natural resources preserving the environment for the benefit of current and future generations.

·The purpose of Law 071, the Law on the Rights of Mother Earth, enacted on 21 December 2010, is to recognize the rights of Mother Earth, as well as the obligations and duties of the Plurinational State and the society as a whole, to ensure respect for these rights.

·Law 300, the Framework Law of Mother Earth, and the integral development for Living Well, enacted on 15 October 2012, establishes the vision and foundations of integral development in harmony and balance with Mother Earth for Living Well, within the framework of the complementarity of rights, obligations, and duties of all sectors of the central level of Bolivia and the autonomous territorial entities.

·Law No. 1333 "Environmental Law" promulgated on 27 April 1992, is the fundamental axis of the national environmental policy and marks the formal beginning of the Bolivian environmental regulatory process. The main objective of this law is to protect and conserve the environment without hindering the country's development. This law includes aspects related to renewable and non-renewable natural resources, environmental education, citizen participation, sanctions, and others.

·The Environmental Law Regulations, promulgated by Supreme Decree 24176 of 8 December 1995, issued six regulations related to:

¾General Environmental Management Regulation (Reglamento General de Gestión Ambiental; RGGA).

¾Environmental Prevention and Control Regulation (Reglamento de Prevención y Control Ambiental; RPCA).

¾Regulation on Atmospheric Contamination (Reglamento en materia de Contaminación Atmosférica; RMCA).

¾Water Pollution Regulation (Reglamento en materia de Contaminación Hídrica; RMCH).

¾Regulation for Handling of Hazardous Substances (Reglamento para Manejo de Sustancias Peligrosas; RMSP).

amcconsultants.com213

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

¾Regulation for Solid Waste Management (Reglamento de Gestión de Residuos Sólidos; RGRS).

·The Environmental Regulations for Mining Activities, (Reglamento Ambiental para Actividades Mineras; RAAM), enacted by Supreme Decree 24782 in 1997. The RAAM expressly states the need for comprehensive environmental management of mining activities from the beginning, from the exploration phase to the closure and abandonment of mining activities.

·Law No. 535, The Mining and Metallurgy Law, enacted on 28 May 2014, aims to regulate mining-metallurgical activities by establishing principles, guidelines, and procedures for the development and continuity of activities in a responsible, planned, and sustainable manner.

Additionally, related regulations are to be considered for the preparation of the studies, which include Law No. 530 of the Bolivian Archaeological Heritage and its regulations, Ministerial Resolutions, Administrative Resolutions issued by national, departmental, and / or municipal authorities, environmental guidelines, among others.

According to legal procedure the review of the Environmental Categorization Form (Formulario de Categorización Ambiental; FNCA) and the EEIA-AI will be executed by:

·The competent sectoral agency (organismo sectorial competente; OSC): Environment Unit of the Environment and Public Consultation Directorate of the Ministry of Mining and Metallurgy (MMM).

·National Competent Environmental Authority (Autoridad Ambiental Competente Nacional; AACN): General Directorate of Environment and Climate Change, under the Ministry of Environment and Water protection (Ministerio de Medio Ambiente y Agua; MMAYA).

Since the Project is not located within a protected area, the National Protected Areas Service (or Servicio Nacional de Areas Protegidas; SERNAP) does not participate in the review of the studies.

20.3Baseline conditions

20.3.1Introduction

The description and socio-environmental characterization of the area include studies of the abiotic, biotic, and socioeconomic environments that could potentially be positively or negatively affected by the mining project.

From the environmental point of view, the preliminary and definitive areas of influence (direct and indirect) have been defined taking into consideration the guidelines established in the Methodology for the Identification of Environmental Impacts published by the Ministry of Environment and Water, a document that is not restrictive and was complemented with contributions from a multidisciplinary team of professionals in environmental sciences, social sciences, and other specialties.

These sections are a summary from the EEIA-AI.

20.3.2Baseline of surface water, groundwater, water for human consumption

Sampling has been carried out since the 2019 management, prioritizing a monitoring network design, which is constantly updated, that allows the establishment of evaluation sites with a basin approach, prioritizing the collection of monthly data and the collection of data in representative periods of the dry season (September) and the rainy season (March).

Within the study area, and for the purposes of the surface water baseline, 3 basins have been identified, in which 20 evaluation sites have been defined, this evaluation allows establishing, on a monthly basis, the current conditions of the watercourses, specifically water quality and flow.

amcconsultants.com214

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

For water quality, 62 parameters were analyzed monthly, including physical, chemical, and microbiological parameters at 20 evaluation sites. The 20 sites are listed in Table 20.1.

Table 20.1Surface water evaluation sites

Location

Number of sites

Machacamarca

4

El Fuerte

4

San Andrés de Huayllani

4

Kalimali

3

Villa Trapiche

2

Ancomarca

1

Canutillos

1

Orcko Cocha

1

The monitoring network for the surface water included data collection at the headwaters of the basin, an aspect that makes it possible to identify the environmental conditions of the project in these sectors.

The basins in which sampling was carried out are:

·Jancko Marca microbasin, with a total of 25 sampling points.

·Kalimali micro-watershed, with a total of 8 sampling points.

·Colavi micro-watershed, with a total of 3 sampling points.

·Challviri micro-watershed, with 1 sampling point.

In general, heavy metal and acid contamination was found (ARD and AMD) and the presence of heavy metals was identified especially in sectors of the Aullagas stream (Machacamarca sector), waters below San Andres de Huayllani, as well as in sectors of Canutillos and Ancomarca.

All data obtained have been compared with permissible limits established in the Water Contamination Regulations and with the RAAM as applicable.

In the specific case of groundwater, hydrological and hydrogeological studies have been carried out to determine the hydrogeological units: one alluvial aquifer unit and two fractured aquifers. Preliminary piezometry indicates that groundwater flow follows the topography and the main surface water directions, such as the Machacamarca River.

Hydrochemistry indicates that the surface water samples correspond to fresh water, close to the recharge area of the basin, with the exception of the samples located downstream, which have a different chemical composition, probably due to local mining activities, an aspect that coincides with the information obtained from surface water sampling.

Regarding drinking water quality, water samples have been taken from water supply sources for human consumption in the communities where the project has influence, to determine their quality, origin, storage, accessibility, in addition to other data collected in surveys or local interviews. The collection of water quality data from different water supply sources (public pools, home pools, wells, waterwheels, cisterns, springs, etc.) in the communities that are part of the areas of influence allows to determine the current situation with respect to a basic elementary service. For the purposes of interpreting the results, the normative compendium for drinking water published by the Ministry of the Environment and Water (NB 512, Regulation NB 512, NB 495, NB 496) was used as a reference.

amcconsultants.com215

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

20.3.3Air quality / environmental risk baseline

With respect to air quality, biannual monitoring has been considered for the 6 most representative parameters defined in the RMCA, prioritizing the collection of data in representative periods of the dry season and rainy season, in 6 evaluation sites that have been established in a monitoring program, prioritizing the location of the homes of communities present in the study area, existing roads and in sectors where infrastructure that will be part of the mining operation will be implemented in the future, in the same 6 evaluation sites environmental noise has been monitored (day and night).

20.3.4Soil and sediment baseline

With respect to the baseline for soil and sediment, Bolivia does not have environmental regulations that would allow to make comparisons to determine soil and sediment quality; however, the baseline makes comparisons based on environmental soil regulations in other countries as well as other guidelines prepared by institutions such as the Food and Agriculture Organisation (FAO).

Regarding soil / sediment quality, biannual monitoring has been considered for 42 parameters, prioritizing the collection of data in representative periods of dry and rainy seasons, in 10 evaluation sites that have been established in a monitoring program, prioritizing places such as: cultivated soils, uncultivated soils, special sectors, sediments of more representative watercourses or sectors with presence of contamination from other activities in the study area.

20.3.5Biological baseline

Following the main findings of the biological baseline study in dry season it can be concluded that:

Flora:

·1543 plant data and 538 physical records (stone, soil, stubble, and feces) have been recorded. Nineteen families, 39 genres and 47 species have been identified.

·Three threatened species have been recorded: Azorella compacta "yareta" and Polylepis tomentella "keñua", both in the Endangered (EN) category, and Trichocereus cf. tarijensis "cardón" in the Vulnerable (VU) category. All of the cacti species are listed in CITES Appendix II.

Large and small mammals:

·In the sites evaluated in the localities Huayllani, Calimali, El Fuerte and Ancomarca, a total of 15 species of mammals were identified during the dry season, these species are distributed in 5 orders, 11 families and 14 genres. The family with the highest number of species was Cricetidae with 4 species, the rest of the families with only one species, respectively.

·The locality with the highest number of records was Calimali with 12 species, followed by Ancomarca with 11, then Huayllani with 9 and finally El Fuerte, with 4 species.

·Of all the mammal species recorded, probably one species, the "Oskollo or titi" (Leopardus cf. jacobita), is threatened in the LRFSVB category of Critically Endangered (CR). And if it is L. geoffroyi or L. jacobita, both are in CITES I. From all the data obtained in the field, we presume that the conservation status of the species considered important / sensitive, such as Leopardus sp., local people indicate that this species still maintains stable populations in the vicinity (highlands) of the communities of Ancomarca and Calimali, so their food supply and habitats are probably also abundant.

·A species of wide global distribution and invasive was identified, Lepus europaeus (hare).

amcconsultants.com216

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Herpetology:

·A total of eight species were recorded, five amphibians and three reptiles, whose taxonomic identities require confirmation with scientific collections.

·Due to the presence of certain species and the per. comm. of community members that there are dead amphibians called kaira locally, shows that the fungus chitridium very probably existed or exists in the area, so it is important to conduct a study of chitridium in the area in order to take more precise measures for their conservation.

·The record of amphibian populations of the genus Telmatobius spp. is an important record for the conservation of these species in high threat categories and endemic of Bolivia, showing populations apparently in good condition in the area.

·In the case of reptiles, these have been recorded in areas with queñua groves for Liolaemus sp. nov. and grasslands for L. cf. puna, so it is suggested to take conservation measures that consider a non-extractive use of vegetation, since queñua is used as wood, charcoal, and fuel, and because extensive burned areas of grasslands, which are habitat for these species, were evidenced. In addition, all of the communities in the area have indicated the use of lizards as traditional medicine.

Ornithology:

·One evidence of disturbance identified is primarily due to mining activities, either by discharges into the tributaries and effluents of the various basins within the study area or also in the form of noise pollution, which causes many of the bird species to be discouraged from staying in the area, since they are very sensitive to disturbances in their environment.

·The diversity of birds as counted is low as expected, with a total of 16 Families with 10 Orders and 43 species. This is mainly due to the fact that the count was in the dry season, which regularly has a lower specific richness. In addition, the altitude which exceeds 3,000 masl, influences the diversity of birds.

·No species under the category of national or international extinction have been detected, however, there is a species endemic to Bolivia, the coal finch (Diglossa carbonaria), which is closely associated with Kewiña forests (Polylepis sp.), likewise during the evaluation 7 species were recorded as being reported within Appendix II of CITES, these being the horned owl (Bubo virginianus), Giant hummingbird (Patagona gigas), Variable Harrier (Geranoaetus polyosoma), Mountain Parakeet (Psilopsiagon aurifrons), Black-chested Eagle (Geranoaetus melanoleucus), Puna Hummingbird (Oreotrochilus estella), and Alkamari (Phalcoboenus megalopterus).

Aquatic life / ichthyology

·All of the aquatic systems analyzed present some degree of contamination, mainly from mining. In most of the systems analyzed there are biological communities with very low richness and diversity, with aquatic systems with a total absence of aquatic vegetation (filamentous algae and higher aquatic plants), as well as aquatic fauna (zooplankton, benthos, or aquatic macroinvertebrates), also resulting in the absence of fish communities.

·In the study area there is only one species belonging to the genus Trichomycterus. The species was captured in an aquatic system in the locality of Calimali, presenting an evidently low density.

·All the aquatic systems in the study area show evidence of material input, which increases the presence of dissolved solids that precipitate in the river and stream beds, mainly in the form of sand.

amcconsultants.com217

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

·The main source of contamination and disturbances is local mining activity, which is also associated with other activities related to mineral extraction and transport, and the construction of road and highway infrastructure that affects the aquatic systems, particularly with the construction of ditches that cross the rivers, affecting their structure and flow.

Aquatic life / macroinvertebrates

·The evaluation sites present a higher percentage of aquatic macroinvertebrates tolerant to contamination and this group is composed of abundant taxa. This situation may be due to three types of impacts in the study area, mining, human settlements, and agriculture. These impacts have repercussions on water quality, which was evidenced through the calculation of the BMWP/Bol index, categorizing the 16 evaluation sites in the biological condition of Doubtful, Critical, and Very Critical.

·In terms of The Ecological Integrity Index, which includes biological conditions, riverbank characteristics, fluvial habitat, and anthropogenic impact, resulted in two categories: Very Bad and Bad.

In the dry season baseline studies, it was concluded that the species accumulation curve indicates the probability of finding more species in the evaluation during the wet season.

20.3.6Social baseline

As stated in the "Methodology for the Identification of Environmental Impacts" document of the Bolivian Ministry of Environment and Water, the baseline describes "the current conditions of the area of influence (direct and indirect) of the activity, work or project (...)" (Bolivian Ministry of Environment and Water, 2018, p. 2).

The scope of the social baseline (LBS, línea base social) covers the surface territory of the communities of Machacamarca, San Andrés de Huayllani, El Fuerte, as part of the direct social influence area; and of Canutillos and Orko Cocha, as part of the indirect influence area. All of these are located in the municipality of Tacobamba. This municipality is in the province of Cornelio Saavedra, in the department of Potosí.

The characterization of the communities was carried out with different secondary sources, using quantitative and qualitative techniques. The following dimensions were addressed:

·Demographics: Total population, five-year age groups, population by sex, number of households, dwellings and household members, migration, and emigration.

·Housing: Type of tenure, type of ownership, property titles, construction materials, type of water supply, sanitation, lighting, energy sources for domestic use, solid waste management, main roads, and transportation.

·Culture: Mother tongue, religion, belonging to indigenous or native peoples.

·Education: Educational level, illiteracy rate, student rate, school attendance, school dropout, and school backwardness; access to basic, intermediate, and higher education and main professional careers.

·Health: Causes and rates of morbidity and mortality, available health centers, traditional practices, rate of doctors, promoters and beds per population, and average transport time to the health center.

·Economic activities: Working age population, economically active and inactive population, and occupation categories.

·Territory: Land use and natural resources, characteristics of agricultural production.

amcconsultants.com218

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The sources of information used are presented below. In addition to these, Alcira requested updated information from the education and health sectors with jurisdiction in the communities of the area of social influence.

·INE: National Population and Housing Census 2012.

·INE: Agricultural Census 2013.

·"Final Report: Socioeconomic Baseline, Risk Analysis and Community Relationship Recommendations for New Pacific Metals Corp - Silver Sands Project in the Department of Potosi-Bolivia, 2018."

·"Territorial Plan for Integral Development 2016-2020" of the Autonomous Municipal Government of Tacobamba.

In general terms, this is a mainly rural environment, with a slightly male-dominated population, which has migrated permanently or intermittently to nearby cities such as Potosí. As a result, the bulk of the population is mainly between the ages of 0 and 24. The houses are their own, although built with precarious materials (adobe walls, dirt floors, and thatched or tin roofs). Access to water, sanitation and lighting is limited. The population's native language is Quechua and they self-identify as Quechua indigenous people. Access to educational services within the communities is limited, with a high illiteracy rate and the highest level of education achieved is mainly at the primary level. Access to health services is through public facilities in Colavi and traditional doctors in their own communities. The main economic activity is agriculture, although mining cooperatives have also been identified in Machacamarca and San Andrés de Huayllani, which extract silver, which is sold to local mills, rescuers, or other informal buyers. However, in San Andrés de Huayllani it was also reported that silver was sold to formal traders. In terms of land use, most of the land is used for community members and other inhabitants housing, as well as for agriculture and cattle ranching, linked to the productive land given to each community member. The land is also used for educational units and local health facilities. Another important land-use activity is mining, with areas being exploited by cooperatives or independent miners. Breeding of large animals, mainly sheep and camelids, as well as small animals was registered.

Regarding Alcira's community relations, it should be noted that the presence of the mining company in the communities dates back to the exploration stage of the Silver Sand project, from 2012 to 2015. Subsequently, in 2017 New Pacific acquired Alcira and began a new administration of the Silver Sand project, in order to initiate the exploitation stage. Since the beginning, Alcira has participated in multiple community assemblies, meetings with authorities and conversations with stakeholders and community members. Recently, New Pacific, through Alcira reached agreements with the five communities, which agreements propose several activities that will benefit the population, such as the construction of social infrastructure, education scholarships, water supply, hiring of community members, transportation services, among others.

Likewise, New Pacific, through Alcira has developed a Community Relations Plan specifically for the exploitation stage, which has three programs: Social Impact Management Program, Local Benefits Generation Program and Stakeholder Involvement Program. It has also made available to community members and authority's, various mechanisms for citizen participation, such as an information office in the city of Potosí, the preparation and delivery of informative material, and the holding of informative meetings. In order to achieve a successful process, Alcira will continue with its community relations strategy, expanding the mechanisms and spaces for dialogue.

20.3.7Archaeological baseline

An archaeological baseline study was generated in the study area of the future mining project. This research documented 32 historical, and ethnographic entities that group a total of 463 architectural and landscape features, which have been identified, recorded, and evaluated for their archaeological

amcconsultants.com219

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

importance, their heritage value and the potential impact that they could suffer from the project activity.

The results of the exploration activity, including drilling have not detected or found archaeological material evidence of the presence of pre-Hispanic settlements within the project area.

Only 10 of the 32 historic complexes recorded had a material history of occupation during the Colonial phase, but most of them were reconstructed and remodeled in later phases, mainly during the Republican Phase, between 1830 and 1920.

The archaeological evaluation of the recorded assemblages indicated that only 11 assemblages show historical interest and of these only 6 show high value, among which are Piquiza, Machacamarca Antiguo, the Camp of the surroundings of the Machacamarca Rescue Bank, and the mills and millers located in Huayllani and the creeks that converge in the town of Machacamarca.

The possibility of a potentially zero impact on 25 entities (78%), slight on 1 entity (3%), moderate on 1 unit (3%), severe on 1 entity (3%), and a potentially critical impact on 4 entities (13%) has been observed. These last 4 entities represent 60% of the architectural structures in the study area (ancient Machacamarca complexes, Machacamarca or San Jorge Rescue Bank, Aullagas and the upper zone of the Alalaypata creek).

The sites are regarded as being historic but not of archaeological significance, and plans will be put in place to preserve all sites. New Pacific will work with government officials to carry out this work.

20.4Public consultation process

Public Consultation is a mechanism for citizen participation that allows citizens, communities, and Indigenous Peasant Peoples to have a means of access to information on mining projects and undertakings.

Public consultation is mandatory and concludes when the operator submits its report to the competent environmental authority and can justify whether or not it has taken into account the criteria of the population affected by the mining operation.

It is fully established in the State Political Constitution and applies to activities involving the exploitation of natural resources, which may directly affect the affected population, and the use and exploitation of natural resources must be subject to compliance with technical regulations, Therefore, it is possible to implement complements to the methodology of public consultation for the EEIA as part of the application of the environmental impact assessment systems and environmental quality control, without exception and transversally to all activities of production of goods and services that use, transform or affect the natural resources and the environment, since non-compliance with the law will result in the reversion or annulment of the rights of use or exploitation in accordance with the provisions of Article 358 of the Magna Carta.

The participation of the social actors linked to the EEIA is established in current environmental regulations and establishes that during the review phase of the Environmental Category Level Form, the EEIA, or the granting of the Environmental License (DIA), any natural or collective person, through grassroots territorial organizations, may make, in writing, any observations, criticisms and proposals regarding a project, work or activity known before the Competent Environmental Authority, Competent Sectoral Body or Municipal Government, in the area of their jurisdiction, in a technical and legally supported manner.

amcconsultants.com220

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The regulations establish that in the impact identification phase to be considered in an EEIA, a Public Consultation must be carried out to take into account the observations, suggestions and recommendations of the benefited and / or affected population in the project's area of intervention, for which purpose there must be disclosure documentation complementary to the EEIA documentation that must be made known to the population through procedures established in the regulations.

Once the mining company has completed the preparation of its EEIA, it will promote the execution of the Public Consultation, in which a notarized document must be generated, i.e. a legal document that will contain the points and aspects of conformity and observations of the community on the mining operation in Public Consultation and the socio-environmental impact that it could generate.

20.5Regarding waste management

Based on mining environmental regulations, the accumulation of solid mining-metallurgical waste must be classified according to its volume and hazardousness. In this sense, according to the size of the facilities that will store solid and / or liquid waste, a large volume waste accumulation project (total projected volume greater than fifty thousand, 50,000 m3) is contemplated, which must consider technical guidelines established in the environmental regulations for the mining sector.

20.6Mine Closure Plan

The Closure Plan is an environmental management instrument that establishes guidelines to be followed in a mining operation in order to rehabilitate the intervened and impacted areas.

The Bolivian Mining Law establishes that a mining operator must establish an accounting provision to cover the cost of closing operations.

The Environmental Regulations for Mining Activities require the mining concessionaire or operator to close and rehabilitate the area of its mining activity when it totally or partially terminates its activities in accordance with its environmental license; or when it abandons its mining operations or activities for more than three years.

Closure plans should at least consider: (i) the objectives of closure and rehabilitation of the area; (ii) a program for closure of operations and rehabilitation of the area, (iii) control of contaminant flows and physical and chemical stabilization of tailings accumulations; (iv) rehabilitation of the area, surface drainage and erosion control; (v) post-closure actions, which are the control of the stability of the structure of tailings accumulations and monitoring of the flows of drains, deposit troughs, dams or closed fills and batteries of infiltration monitoring wells.

20.7Environmental guarantees

The Bolivian mining law establishes that a mining operator must establish an accounting provision to cover the cost of closing operations; however, it does not establish other environmental guarantees as is the case in other countries in the Andean region.

amcconsultants.com221

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

21Capital and operating costs

All currency is in US dollars ($) and are based on prices obtained during the fourth quarter of 2022 (4Q22).

21.1Operating cost estimate

The operating cost estimate allows for all labour, equipment, supplies, power, consumables, supervision, and technical services.

21.1.1Open pit

Open pit mining costs were estimated assuming a contractor mining operation. Estimated mining costs were sourced from recent silver projects PEA / PFS studies and benchmarked against knowledge of similar sized, local operations. Comparison to the AMC Consultants database (Figure 21.1) shows the estimated total mining unit costs for Silver Sand are within trend. The LOM average mining cost is approximately $2.24/t mined.

Figure 21.1Open pit benchmarking costs

Source: AMC Mining Consultants (Canada) Ltd.

amcconsultants.com222

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

A summary of the estimated open pit unit operating cost is provided in Table 21.1.

The open pit contractor operating cost estimate covers the following activities:

·Drill and blast.

·Load and haul to waste dumps, process plant, and stockpiles.

·Grade control.

·ROM re-handle.

·Auxiliary operations such as clearing of the open pits and waste dump footprint area, mine haul road construction, maintenance of benches, road and waste dumps, and dewatering.

·Maintenance of the mine fleet.

·Open pit contractor management and supervision.

·Mining and maintenance personnel.

·Consumables including fuel, parts, explosives, etc.

It is assumed that the management and technical staff will be part of the owner's team. Contractor personnel numbers were estimated for mine supervision, mine operations and maintenance. Management and technical staff were assumed to work on an 8 on 6 off roster while mining and maintenance labour is assumed to work on a two-weeks on one-week off basis. Two 12-hour shifts per day have been assumed.

Table 21.1Summary of estimated open pit operating cost

Category

%

Silver Sand estimate ($/t mined)

Loading

7.2

0.16

Hauling

33.3

0.74

Ancillary

16.2

0.36

Drilling

5.4

0.12

Blasting

10.9

0.24

Mine development

6.7

0.15

Owner fixed labour

12.0

0.27

Other

8.4

0.19

Total

100

2.24

Note: Totals may not add up exactly due to rounding.

Source: AMC Mining Consultants (Canada) Ltd.

Mine closure items comprise the following activities. Closure costs have been estimated by AMC Consultants and New Pacific Metals based on their understanding of the Bolivian mine closure guidelines under the mining and environmental law.

·Re-sloping the waste dumps, in-pit dumps, and ROM pad and placement of topsoil.

·Building and plant removal.

·Water dam deconstruction.

·Pit, stockpile, and road access rehabilitation.

·Revegetation.

·Post closure monitoring.

Mining-related closure costs have been estimated at $10M and are incurred at the end of operations in Year 15.

The estimated mining operating cost, by year, is presented in Table 21.2.

amcconsultants.com223

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 21.2Summary of open pit operating costs by year

Open pit cost ($M)

Total ($M)

Yr-1

Yr 1

Yr 2

Yr 3

Yr 4

Yr 5

Yr 6

Yr 7

Yr 8

Yr 9

Yr 10

Yr 11

Yr 12

Yr 13

Yr 14

Loading (ex-pit)

39.2

2.7

2.7

2.9

2.9

2.6

2.8

2.7

2.7

2.8

2.9

2.8

2.8

2.0

2.2

1.6

Hauling (ex-pit)

179.8

15.7

15.8

14.3

12.1

14.9

12.3

13.5

10.2

8.8

10.1

8.7

13.4

10.3

13.8

5.9

Loading (stockpile reclaim)

1.7

-

0.2

-

-

-

0.2

-

0.5

0.4

-

0.1

-

-

0.0

0.3

Hauling (stockpile reclaim)

10.0

-

1.1

-

-

-

0.9

-

3.0

2.2

-

0.6

-

-

0.0

2.1

Ancillary

92.5

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

5.5

5.5

Drilling

30.8

2.3

2.2

2.2

2.2

1.9

2.2

2.0

2.3

2.3

2.2

2.2

2.2

1.5

1.7

1.3

Blasting

62.3

4.5

4.4

4.5

4.5

4.0

4.5

4.1

4.5

4.5

4.5

4.5

4.5

3.1

3.4

2.6

Mine development

38.3

2.8

2.7

2.8

2.8

2.4

2.8

2.5

2.8

2.8

2.8

2.8

2.8

1.9

2.1

1.6

Owner fixed labour

68.6

4.7

4.7

4.7

4.7

4.5

4.7

4.5

4.7

4.7

4.7

4.7

4.7

4.2

4.2

4.2

Other

47.7

3.5

3.3

3.5

3.5

3.1

3.5

3.2

3.5

3.5

3.5

3.5

3.5

2.4

2.6

3.3

Total open pit ($M)

567.6

37.9

43.4

41.1

38.9

39.7

40.2

38.8

40.5

38.1

37.0

36.1

40.2

31.7

35.5

28.4

Note: Yr -1 period is a pre-strip period. Operating costs in this period will be capitalized.

amcconsultants.com224

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

21.1.2Processing

This cost estimate was generated by Halyard Inc. for the 4 Mtpa operation described within Section 17. A total operating cost of $56.8M p.a. or $14.20 per tonne has been estimated. The costs cover all plant operations from the ROM receiving and primary crushing through to doré truck loading and residue (tailings) deposition via overland conveyors.

Operating costs were determined using a combination of first principles work-up and vendor quotations. The estimate includes all operating / maintenance labour (including the laboratory), power costs, maintenance consumables, and reagents. Costs have been classified either as fixed or variable.

Table 21.3Summary of estimated mill operating cost

Category

Total $M per annum

($/t) milled

Fixed costs

Labour - salaried

0.24

Labour - hourly

0.80

Tools / equipment / safety supplies

0.02

Maintenance supplies

0.14

Assaying & general laboratory

0.03

Subtotal fixed

4.9

1.23

Variable costs

Power

1.86

Reagents

7.29

Wear steel (grinding media & liners)

2.12

Maintenance supplies

0.43

Tailings filtration

0.85

Misc contracts and supplies

0.33

Water usage

0.09

Subtotal variable

51.9

12.97

Total

56.8

14.20

Source: Halyard Inc., 2022.

To estimate the overall labour cost, a labour complement typical of operations of this size and complexity was prepared, and a range of local labour rates were used to adjust Halyard's cost database to account for local market conditions. Labour assumptions are summarized in Table 21.4.

amcconsultants.com225

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 21.4Labour details - Processing

#

Total $M p.a.

Salaried positions

Mill Superintendent

1

Admin assistant

1

Mill trainer

1

HSE trainer

1

Maintenance engineer

1

Electrical supervisor

1

Instrumentation / PLC supervisor

1

Mechanical supervisor

1

Planner

1

Snr. metallurgist

2

Metallurgist

2

Chemist

1

Total salaried

14

0.97

Hourly positions

Shift supervisor

5

Control room operator

4

Field operators

25

Artisans (mechanical / electrical)

9

Labourers

28

Laboratory technicians

3

Sample prep

6

Total hourly

80

3.19

Total

94

4.16

Source: Halyard Inc.

Power consumption for the specified plant was estimated using the mechanical equipment list, and a straight unit rate for power (i.e. no maximum demand tariff) of $53 per MWh was obtained from the local utility company in Bolivia. Power costs are summarized in Table 21.5.

Table 21.5Power consumption details - Processing

MWh p.a.

Total $M p.a.

Power consumption:

Process plant total

140,000

7.42

Source: Halyard Inc.

Vendor quotes were obtained for the reagents and grinding balls, and testwork consumption rates were used to calculate the required quantities of each. The estimate includes site delivery costs.

amcconsultants.com226

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 21.6Consumable details - Processing

Tonnes p.a.

Total $M p.a.

Reagents

Lime

2,200

Flocculant

240

Coagulant

120

Sodium Cyanide

8,000

Zinc powder

800

NaOH

20

H2SO4

40

H2O2

40

Fluxes

240

Lead Nitrate

160

Anti-scalant

240

Diatomaceous earth

1,200

Total reagents

13,300

29.18

Steel wear parts

Mill balls & liners

4,132

Crusher liners and chute liners

198

Total wear parts

8.48

Total

37.66

Source: Halyard Inc., 2022.

Maintenance costs were determined using a factored allowance - typical of similar projects and industry standards. The total annual budget for maintenance is $2.28M.

21.1.3Tailings storage facility (TSF)

The operating cost estimate for the TSF was generated by NewFields.

The operating costs for the Tailings storage is limited to the cost of spreading and nominally compacting the tailings within the tailings containment area of the overall waste storage facility following discharge from a planned conveyor / radial stacker. NewFields' estimate is $2.60M per year ($0.65/t ore).

21.1.4General and administration (G&A)

G&A costs generally cover site administration, accommodation, fights, and corporate costs. For Silver Sand, G&A costs also cover land use compensation for use of the communities' land for the LOM of the operation, and mine closure costs. An estimate of $1.86/t ore for G&A was estimated by New Pacific. This estimate was based on recent silver projects PEA / PFS studies and benchmarked against knowledge of similar sized, local operations.

21.2Total operating cost estimate

The total operating cost estimate is summarized in Table 21.7.

amcconsultants.com227

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 21.7Total operating cost estimate

Description

LOM average cost ($/t ore)

Total LOM cost ($M)

Mining cost

9.55

529.7

Processing cost

14.20

787.3

Tailings storage cost

0.65

36.0

G&A cost

1.86

103.1

Total operating cost

26.26

1,456.1

Note: Totals may not add up exactly due to rounding. G&A includes mine closure and land use compensation cost.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

21.3Capital cost estimate

The capital cost estimate is split into project capital over the first two years (Year -2 and Year -1) and sustaining capital (remainder of the mine life). Project capital includes the cost of the process plant, site infrastructure, tailings facility, and pre-production mine development.

21.3.1Open pit

Open pit mining costs were estimated assuming a contractor mining operation. All mining equipment are assumed to be provided by the open pit contractor. Estimated open pit capital costs total $39.2M, and consist of mine pre-production ($37.9M), and contractor mobilization costs ($1.3M). Pre-production period activities include waste stripping, some ore stockpiling, and haul road construction.

21.3.2Process plant

The process plant capital cost estimate was generated by Halyard Inc. for the 4 Mtpa processing operation described within Section 17. The process plant capital cost estimate is $185.6M, which includes $118.2M direct capital, and $35.5M of indirect capital. A high level breakdown of plant area capital is given in Table 21.8.

Table 21.8Mill area capital estimate

Description

Total cost ($M)

Direct capital

118.2

Indirect capital

35.5

Sustaining capital

5.9

Contingency

26.0

Total

185.6

Source: Halyard Inc., 2022.

The $118.2M direct capital budget is broken down by plant area in Table 21.9. The direct capital budget includes the estimated cost of civil and earthworks, the supply, delivery to site and installation of mechanical equipment, structural steel, platework, piping, and electrical / instrumentation items. It also includes any buildings and mobile equipment items (plant truck, forklift, skidsteer, etc.).

amcconsultants.com228

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 21.9Process plant direct capital breakdown by area

Plant area

Total cost ($M)

Crushing

5.0

Coarse ore storage

4.0

Grinding (SAG, ball & pebble crushing)

34.7

Pre-leach thickener

2.4

Leaching

8.9

CCD

9.9

Merrill Crowe

7.0

Refinery

2.9

Tailings (dewatering and overland conveyors)

17.7

Reagents

9.7

Services

1.9

Refinery building & laboratory

7.3

Transportation

6.3

Mobile equipment

0.7

Total

118.2

Source: Halyard Inc., 2022.

The same budget is broken down by engineering discipline in Table 21.10.

Table 21.10Process Plant direct capital breakdown by discipline

Discipline

Total cost ($M)

Civil and Earthworks

24.6

Mechanical Equipment

38.5

Structural Steel

14.8

Platework

9.6

Piping

8.9

Electrical and Instrumentation

16.0

Buildings / Architectural

5.8

Total

118.2

Source: Halyard Inc., 2022.

The direct capital cost estimate was developed using a number of data sources, including budget quotations from equipment vendors (Chinese and North American) and database costs from similar recent projects. Vendor quotations were obtained for all major equipment items, including large platework items such as leach tanks and large storage tanks. Budgets for civil construction, steel structures, platework items, pipework and electrical / instrumentation packages were estimated using plant area specific factoring from other similar gold / silver projects. The budgets include transportation to site, which is factored for North American supply and based on quotes for containerized and bulk shipping to site from Shanghai, PRC.

The costs of equipment and materials construction have been adjusted to account for the use of Chinese and local Bolivian contract labour.

The process plant will only be partially enclosed, with areas such as crushing, grinding, leaching and CCD being located outdoors. A building to enclose the high-security areas (Merrill Crowe and the furnace / refinery) has been included in the capital estimate and the cost for this includes the building shell, HVAC, and electrical.

amcconsultants.com229

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

21.3.3Tailings storage facility (TSF)

The TSF will be developed within the larger Waste Storage Facility which will contain waste rock and all tailings produced from the project. No trade-off studies were carried out at this stage to optimize the TSF.

Project capital expenditures include construction of a downstream buttress to provide support for the TSF including the liner system ($8.8M). The on-going construction of the liner system for the tailings containment ($12.2M) is considered sustaining capital.

The capital cost estimated for the TSF is $21M and is summarized in Table 21.11. This cost estimate was provided by NewFields.

Table 21.11Tailings storage facility estimate

Year

Total cost ($M)

-1

8.8

2

2.4

4

2.4

6

2.4

8

2.5

10

2.5

Total

21.0

Note: Totals may not add up exactly due to rounding.

Source: NewFields, 2022.

21.3.4Surface infrastructure

The project capital cost estimate for the surface infrastructure is based upon preliminary estimate from the Bolivian power authority, factored costs from previous projects, pricing in the public domain, factored published labour productivities, and experience regarding unit rates.

The project capital cost estimate for surface infrastructure, including surface ancillary equipment, is $32.7M, and is summarized in Table 21.12. The major components of this cost estimate are grid power, local electrical distribution, camp construction, water dam and site access roads. Other items include mine office, and light vehicle maintenance workshop. Water for the mine site and processing plant will be supplied from the water dam to be constructed.

Over the life of the mine the use of grid power appears to be advantageous to the value of the project.

amcconsultants.com230

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 21.12Surface infrastructure project capital cost estimate

Description

Total cost ($M)

Power to site and one mine site substation

12.00

Access roads and upgrading

4.15

Site prep and excavations for foundations

1.00

Water dam construction

2.91

Camp

3.00

Electrical distribution, communications

5.00

Fences, gates, fire alarm system yard lighting

1.00

Warehouse, light vehicle shop, tools, and lube oil

3.40

Fuel storage

0.20

Total

32.66

Source: AMC Mining Consultants (Canada) Ltd., 2022.

21.3.5Sustaining capital

Sustaining capital for the TSF ($12.2M) was estimated by NewFields and is detailed above in
Table 21.11.

Additional sustaining capital for the process plant and infrastructure is based on 5% of total project capital expenditure to cover equipment rebuilds / replacement, and repairs to fixed equipment and infrastructure.

Overall sustaining capex is minimal due to contract mining and therefore no mining equipment rebuilds / replacements, a relatively short mine life, and waste stripping of later phases is accounted for in opex.

The sustaining capital over the LOM is estimated to be $19.7M.

21.3.6Indirect capital

Indirect capital (owner's cost and EPCM) for the tails storage facility and infrastructure is assumed to be 10% of the project capital cost estimate and is estimated to be $4.1M.

Indirect capital for the process plant has been estimated by Halyard Inc. and includes preproduction and site costs, first fill of supplies (grinding media and reagents), strategic spares budgets and contract costs (EPCM and other external pre-production support contracts). Together, these items total $35.5M (Table 21.13).

Table 21.13Process plant indirect capital budget

Description

Total cost ($M)

Commissioning costs

1.5

Site costs

5.9

Mills first fill

0.7

Reagents & lubricants first fill

3.0

EPCM & other external contracts

14.5

Mechanical spares

1.4

Owners costs

8.5

Total

35.5

Source: Halyard Inc., 2022.

amcconsultants.com231

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Total indirect capital costs are estimated to be $39.6M.

21.3.7Contingency

Contingency is applied to the project capital only (not sustaining capital) at 20-30% of the capital expenditure. The estimated contingency for the project is $52.4M.

21.3.8Total capital cost estimate

The total capital cost is estimated to be $327M and is summarized in Table 21.14.

Table 21.14Total capital cost estimate

Description

Cost ($M)

Open pit pre-stripping

47

Contractor mobilization

1

Processing plant

186

Tailings facility

25

Site infrastructure

47

Owner's cost

21

Total capital cost

327

Of which:

Initial capital

308

Sustaining capital

20

Note: Totals include direct, indirect, and contingency costs. Totals may not add up exactly due to rounding.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com232

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

22Economic analysis

The PEA is preliminary in nature. It includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the results of the PEA will be realized.

An economic model was developed to estimate annual cash flows and sensitivities of the Silver Sand project. Pre-tax estimates of project values were prepared for comparative purposes, while after-tax estimates were developed and are likely to approximate the true investment value.

22.1Assumptions

All currency is in US$ unless otherwise stated. The cost estimate was prepared with a base date of the second half of Year -2 (1 July) and does not include any escalation beyond this date. For net present value (NPV) estimation, all costs and revenues are discounted at 5% from the base date. The economic model shows the Project under construction for 1.5 years (Year -2 and Year -1), which is considered development and then in production for the balance of the projected cash flows, which is considered operating (Years 1 to 14).

A regular Bolivian corporate income tax rate of 25% is applied. As a mining property, the Project is subject to an additional tax of 12.5%, with a 5% reduction for companies that produce pure metal products (as is the case with the Silver Sand project producing silver doré onsite). No tax planning has been applied, all historical tax attributes such as any loss carry forwards, recapture, mineral property, exploration costs or net tax basis of capital assets are ignored. Taxes are paid in the year they are incurred.

The estimates of capital and operating costs have been developed specifically for this project and are summarized in Section 21 of this report. The economic analysis has been run with no inflation (constant dollar basis).

Project revenue is derived from the sale of silver doré. Metal prices were selected after discussion with New Pacific and referencing current markets and forecasts in the public domain. Selling cost for the transport and refinery of silver doré ($0.50/oz) was selected after discussion with New Pacific.

Within the AMC a 6.0% royalty is paid based on gross sales. Most of the Mineral Resources lie within the AMC. Outside the AMC, an additional 6.0% royalty is to be paid to COMIBOL.

A discount rate of 5.0% was deemed appropriate for the project. Discount rates applied to projected cash flows also recognize the time value of money as well the risks and variables associated with the project, such as metal price fluctuation, marketability of the commodity, location of the project, stage of development, and experience of the owner.

It is assumed that silver doré produced each year are considered sold in the same period with no inventories of work-in-process or finished goods.

22.2Economic analysis

A high-level economic assessment of the proposed open pit operation of the Silver Sand deposit was conducted. The project is projected to generate approximately $1,106M pre-tax NPV and $726M post-tax NPV at 5% discount rate, pre-tax IRR of 52% and post-tax IRR of 39%.

amcconsultants.com233

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Project capital is estimated at $308M with a payback period of 1.4 years (discounted pre-tax cash flow from base date of 1 July, Year -2). Key assumptions and results of the economics are provided in the Table 22.1. The LOM production schedule, average metal grades, recovered metal, and cash flow forecast is shown in Table 22.2.

Table 22.1Silver Sand deposit - key economic input assumptions and cost summary

Unit

Value

Total plant feed

kt

55,441

Total waste production

kt

199,653

Silver grade

g/t

106.6

Silver recovery

%

91

Silver price

$/oz

22.50

Discount rate

%

5

Silver payable

%

99

Payable silver metal

Moz

171.2

Total net revenue

$M

3,510

Total capital costs

$M

327

Total operating costs

$M

1,456

Mine operating costs

$M

530

Process and tails storage operating costs

$M

823

General and administrative costs

$M

103

Operating cash cost

$/oz Ag

8.45

All in sustaining cost

$/oz Ag

10.42

Pre-tax payback period

Yrs

1.4

Post-tax payback period

Yrs

1.9

Pre-tax NPV

$M

1,106

Pre-tax IRR

%

52

Post-tax NPV

$M

726

Post-tax IRR

%

39

Notes:

·G&A costs include mine closure and land use compensation cost.

·Cash costs include all operating costs and transportation charges.

·All-in Sustaining Costs (AISC) include total cash costs, initial capital expenditures and sustaining capital expenditures.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com234

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Table 22.2Silver Sand production and cash flow forecast

Unit/yr

Total

Yr -2

Yr -1

Yr 1

Yr 2

Yr 3

Yr 4

Yr 5

Yr 6

Yr 7

Yr 8

Yr 9

Yr 10

Yr 11

Yr 12

Yr 13

Yr 14

Yr 15

Total mined - Mineralized rock

Mt

55.4

1.6

3.8

4.8

5.1

5.5

4.1

5.2

1.4

2

4.6

3.5

4.1

4

4

1.6

Total mined - waste

Mt

199.7

16.9

14.1

13.7

13.4

10.8

14.4

11.7

17.1

16.5

13.9

15

14.4

8.8

9.9

9.1

Total plant feed

Mt

55.4

4

4

4

4

4

4

4

4

4

4

4

4

4

3.4

Silver

g/t

106.6

135.3

135.6

131.5

139.1

103.4

96.6

74.8

72.7

102.3

93.3

113.6

113.3

102.3

74.2

Silver recovery

%

91%

91%

91%

91%

91%

91%

91%

91%

91%

91%

91%

91%

91%

91%

91%

Silver

Moz

172.9

15.8

15.9

15.4

16.3

12.1

11.3

8.8

8.5

12

10.9

13.3

13.3

12

7.5

Overall silver payable

%

99%

99%

99%

99%

99%

99%

99%

99%

99%

99%

99%

99%

99%

99%

99%

Total net revenue

$M

3,510

323.6

323.6

309.8

331.7

241.2

228.8

178.2

173.4

244.7

223

271.7

271.1

243.5

145.5

Mining

$M

530

43.4

41.1

38.9

39.7

40.2

38.8

40.5

38.1

37

36.1

40.2

31.7

35.5

28.4

Processing

$M

787

56.8

56.8

56.8

56.8

56.8

56.8

56.8

56.8

56.8

56.8

56.8

56.8

56.8

48.9

Tailings

$M

36

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.2

G&A

$M

103

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

5.9

10

Total operating cost

$M

1,456

109.5

107.3

105

105.8

106.3

104.9

106.6

104.2

103.1

102.2

106.3

97.8

101.6

85.4

10

Project capital

$M

308

130.2

177.4

Sustaining capital

$M

20

0.6

3

0.6

2.9

0.6

3

0.7

3.1

0.6

3

0.6

0.4

0.4

0.4

Total capital cost

$M

327

130.2

177.4

0.6

3

0.6

2.9

0.6

3

0.7

3.1

0.6

3

0.6

0.4

0.4

0.4

Undiscounted cash flows (pre-tax)

$M

1,727

-130.2

-177.4

213.5

213.3

204.3

223

134.3

121

70.9

66.1

141

117.8

164.8

172.9

141.6

59.7

-10

Undiscounted cash flows (post-tax)

$M

1,162

-130.2

-177.4

163.5

162.5

157.2

157.4

98.3

87.7

54.6

50.6

96.1

79.6

112.2

117.7

96.5

45.9

-10

Discounted cash flows (pre-tax)

$M

1,106

-127

-164.9

189

179.8

164

170.5

97.8

83.9

46.8

41.6

84.5

67.2

89.6

89.5

69.8

28

-4.5

Discounted cash flows (post-tax)

$M

726

-127

-164.9

144.7

137

126.2

120.3

71.6

60.8

36.1

31.8

57.6

45.4

61

60.9

47.6

21.5

-4.5

Note: Totals may not add up exactly due to rounding.

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com235

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

22.3Sensitivity analysis

Sensitivity analyses were performed for variations in metal prices, capital costs, and operating costs to determine their relative importance as project value drivers. The sensitivity analysis examined the impact on post tax NPV (at 5% discount rate) of a 20% positive or negative change. The results of the sensitivity analysis are summarized in Table 22.3.

The results show that the post-tax NPV is robust and remains positive for the range of sensitivities evaluated.

Post-tax NPV is most sensitive to changes in the silver price. The NPV is moderately sensitive to changes in total capital cost and changes in operating cost.

Table 22.3Silver Sand project NPV ($M) / IRR (%) economic sensitivity analysis - post tax

Input

Input factor

80%

90%

100%

110%

120%

Silver price ($/oz)

398 / 26%

562 / 33%

726 / 39%

890 / 45%

1,054 / 50%

Mine operating cost (per tonne mined)

774 / 40%

750 / 40%

726 / 39%

702 / 38%

678 / 37%

Process operating cost (per tonne milled)

796 / 41%

761 / 40%

726 / 39%

691 / 38%

656 / 37%

Capex (LOM)

776 / 47%

751 / 43%

726 / 39%

701 / 36%

676 / 33%

Figure 22.1Silver Sand project NPV economic sensitivity analysis - post tax

Source: AMC Mining Consultants (Canada) Ltd., 2022.

amcconsultants.com236

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

23Adjacent properties

COMIBOL, the state-owned Bolivian Mining Corporation, holds the exploration and mining rights of the adjacent areas surrounding the concessions owned by New Pacific. New Pacific acquired the exploration and mining rights of the direct neighbouring 57 km2 area around its concessions through an MPC (see Section 4.2) with COMIBOL, except for a few operating mines which are subleased to small operators by COMIBOL.

The Colavi mine to the north-west and the Canutillos mine to the west of the Property are two adjacent operating mines.

23.1Colavi Tin Polymetallic mine

The host rock in the Colavi mine area consists of Ordovician shale and sandstone, and Cretaceous sandstone and dacitic tuffs. Some dacitic intrusive rocks are found in Ordovician and Cretaceous sequences as stocks, sills, or dykes. Six manto-type mineralized horizons with thicknesses ranging from 0.8 to 1 m were concordantly developed in a horizon of calcareous sandstone within the Cretaceous red sandstone and tuffs sequence. The mineralized calcareous sandstone gently dips to the west and occupies an area of 2 km wide and 6 km long. Ore minerals are mainly composed of pyrite, hematite, and cassiterite. Sphalerite and galena are very rare, and quartz is absent. Volcanism and mineralization are closely related. Manto mineralization formed first associated with earlier magmatic intrusions, and dacite sills successively intruded the Cretaceous sedimentary sequence and displaced the manto-type mineralization. Later cassiterite veins occur in dacite (Rivas 1979; Sugaki et al., 1983).

Mining activities for tin at Colavi can be traced back to 1890. In 1912, the recorded production capacity of the mine was 100 tons per day and produced up to 5,000 tons of ore grading more than 3% Sn (Redwood, 2018). Production of the Colavi mine in June 1981 was 5,700 t ore grading 0.7% Sn. Mine workers hand-picked and screened the crude ore to produce 650 to 1,000 t semi-concentrate containing 2 - 3% Sn, per month (Sugaki et al., 1983).

The United Nations Development Program (UNDP) and Servicio Geologico de Bolivia (GEOBOL) jointly carried out a reconnaissance exploration for tin and silver at Colavi in 1989 and 1990 and estimated a potential resource of 3 to 5 million tons grading 0.5 to 0.9% Sn over a 4 km strike length (Redwood, 2018). The QP has been unable to verify the reported resource and the resource is not indicative of the mineralization on the Property that is the subject of the Technical Report.

23.2Canutillos Tin Polymetallic mine

Limited literature on Canutillos shows that COMIBOL began operation at the mine in 1964 and Empresa Minera Tirex Ltda began to conduct silver heap leach in 2010 (Redwood, 2018). No exploration and production data are available from public sources.

amcconsultants.com237

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

24Other relevant data and information

The QPs are not aware of any additional information or explanation that is necessary to make the Technical Report understandable and not misleading.

amcconsultants.com238

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

25Interpretation and conclusions

25.1General and geology

Indicative financial results indicate that the Project shows attractive potential and should be progressed to the next stage. The results of the economic evaluation estimate approximately $1,106M pre-tax NPV and $726M post-tax NPV at 5% discount rate, pre-tax IRR of 52% and post-tax IRR of 39%.

Silver mineralization at the Property occurs in ten areas: Silver Sand, El Fuerte, Snake Hole, North Plain, San Antonio, Esperanza, Jisas, El Bronce, Mascota, and Aullagas. The mineralization identified in the Property belongs to the Bolivian polymetallic vein-type deposits represented by the giant Cerro Rico de Potosí silver mine in Potosí.

Logging, mapping, sampling, and analyzing procedures of New Pacific's on-going exploration programs follow common industry practice. Results of QA/QC programs are deemed acceptable by the QP.

The Silver Sand deposit is defined by exploration drilling and has a conceptual pit-constrained Mineral Resource using a 30 g/t Ag cut-off of Measured and Indicated Mineral Resources of 54.26 million tonnes grading 116 g/t silver; and an Inferred Mineral Resource of 4.56 million tonnes grading 88 g/t silver. Ms Dinara Nussipakynova, P.Geo. of AMC Consultants takes responsibility for these estimates.

The deposit as currently defined remains open for expansion and there has been no modern district scale exploration. While it is understood that engineering work for the pre-feasibility study will be based on the current block model, there are some recommendations for future exploration. Some drilling pre-production may be required and this may take the form of grade control drilling and that has not been quantified at this stage.

25.2Metallurgy and processing

Two significant metallurgical testwork programs have provided a source of representative information on which the QP has based a scoping level process plant design. Testwork has been completed at reputable laboratories, and the QP is satisfied that the samples tested are sufficiently representative of the mineralization types found within the deposit. Geometallurgical definitions have been developed and these should continue to be studied as the project is developed. The scope of preliminary testing includes physical and chemical characterization of samples, assessment of preconcentration options (density separation and particle sorting with XRT), mineralogical examination, evaluation of froth flotation and cyanidation characteristics (including heap leaching), cyanide detoxification and environmental characterization of products.

Mineralization samples were found to be amenable to all processing options during the testwork. A high-level trade-off study was conducted as part of the PEA and this compared the economic viability of flotation, heap leaching, and tank cyanidation with carbon and Merrill Crowe variants. Using the trade-off study analysis as guidance, a cyanidation process with zinc precipitation was selected as the PEA base case process flowsheet.

The base case process plant design is based upon a primary crushing and ore storage front-end, a conventional SAG+Ball mill comminution circuit, cyanide leaching in agitated tanks, counter current decantation, zinc precipitation (Merrill Crowe), and a tailing dewatering circuit. Products include a silver doré for sale to international markets and a tailing filter cake material for storage on site in a lined facility.

amcconsultants.com239

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

An average silver recovery of 91% is indicated, assuming 92% dissolution in the leaching circuit and 99% efficiency in the CCD circuit.

The crushing circuit design incorporates a jaw crusher rather than a gyratory unit, which represents a significantly lower installed capital cost. It is important with this type of unit that an inclined static grizzly screen is installed above the feed hopper to prevent large, (+ 30"), rocks from reaching the crusher. A hydraulic rock breaker is installed adjacent to the grizzly screen to break these larger rocks or to manipulate them across and off the screen to a storage / reclaim area.

The grinding circuit is conventional, with one SAG mill, one ball mill and a cone crusher for SAG mill pebble crushing. A product size of 80% -75 µm is considered quite typical for precious metal projects. The mill circuit design takes comminution data for the harder oxide mineralization into consideration and could therefore be considered to be slightly conservative. As the mine plan and the grindability database size increases with additional sampling, the grinding circuit design can likely be optimized.

Cyanidation of silver is estimated to be sufficiently complete after 48 hours of residence time. Conditions within the leach circuit are important, with cyanide and dissolved oxygen concentrations of 3.0 g/L and 10-12 ppm respectively are considered necessary to achieve the predicted level of silver dissolution. A wash water to solids ratio of 3.0 within the CCD circuit helps to ensure good washing efficiency, but also increases the flowrate of pregnant solution to the zinc precipitation circuit. Zinc precipitation is a well-established process for silver recovery and the process plant includes a turnkey design for this area.

Cyanidation residue slurry is dewatered in two stages, using a high compression thickener followed by a group of plate / frame pressure filters. The dewatered residue is conveyed from the process plant to the permanent storage facility as a filter cake with ~18% moisture. The process facility does not include a cyanide detoxification circuit but relies on effective solution recovery and a fully lined, zero discharge TSF.

25.3Mining and infrastructure

The Silver Sand project comprises four open pit areas - the Main pit, two small northern satellite pits, and one eastern satellite pit. The four pits are subdivided into seven phases.

The open pits are proposed to be mined using a conventional truck and excavator mining method using 140 t payload trucks and 200 t - 260 t excavators. A mining contractor operation is proposed, with ore and waste to be mined on 10 m benches.

Slope angles used for pit designs are steep and reflect the good condition of the surrounding rock but will require appropriate wall control blasting and mining practices to ensure that walls can be maintained at the proposed angle.

A single out-of-pit waste dump is proposed immediately south-west of the open pits in a natural depression in the topography. The waste dump has been designed to accommodate the totality of the waste mined from the pits, as well as the disposal of filtered tailings from the plant. Two in-pit dumps have also been designed in the main pit to provide flexibility and costs savings for waste placement.

The open pits contain approximately 55.4 Mt of mineralized material with a grade of 106.6 g/t Ag, and 199.7 Mt of waste material, with an overall waste to mineralized material strip ratio of 3.60 to 1. The open pit operation includes one year of pre-strip (Year -1) and fourteen-years of production. The production plan is based on delivering 4.0 Mtpa of ore to the processing plant. The total annual ex pit material mined peaks at 18.5 Mtpa, before dropping to approximately 13 Mtpa at the end of the open pit mine life.

amcconsultants.com240

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

There is currently no significant infrastructure on site, however Silver Sand has undertaken discussion with the power authorities in Bolivia to obtain grid power. There are 3 power lines that are in the vicinity of the project site. Water supply can be secured with construction of a small dam to create a reservoir to supply the mill and local community. A Filtered TSF within the waste rock storage area is a suitable choice for this climate. The infrastructure has been costed at a suitable level of accuracy for this type of study. Accommodations are envisaged to be built on site.

Risks and opportunities relating to this project are discussed below.

25.4Risks

·Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is a degree of uncertainty attributable to the estimation of Mineral Resources. Until resources are actually mined and processed, the quantity of mineralization and grades must be considered as estimates only.

·Mining risks include higher than expected dilution and ore loss. Higher than expected dilution can have a severe impact on project economics. The mine must ensure adequate drilling and blasting practices, and ore control processes, are implemented to minimize dilution from wall rock and other low grade mineralized zones.

·Other mining risks and control measures identified included a large number of typical mining risks such as heavy vehicle interaction with light vehicles and personnel, haul ramp failure, pit wall failure, excessive ore dilution, and waste dump failure. Controls to be implemented to mitigate these risks include development of a traffic management plan, targeted geotechnical drilling and investigation, development of a ground control management plan, surface water study, grade control drilling, and design of facilities to the required codes and standards.

·Engineering, geotechnical, and hydrogeological studies done at a sufficient level to convert Mineral Resources to Mineral Reserves are necessary before the impact of these risk and uncertainties to the project's potential economic viability can be reasonably quantified.

·In last three years Bolivia experienced a transition from social turmoil to stability. The government of the current President, elected at the end of 2020 supports and encourages private and foreign investments in the economic sectors of the country. New laws were approved by congress to encourage private investments in mining sector, for example, Law 1391 (Decree 4579) to waive value added tax for import of equipment and vehicles.

·Although the country is generally friendly to private and foreign investments in mining sector, risks associated with instability of government caused by political polarization and visible divisions in the governing party are noteworthy. In addition, local protests and blockages by various social groups may pose unforeseen instability from time to time. Overall, political and social risks are generally currently manageable in Bolivia.

·Should Silver Sand not be able to get access to grid power, diesel power generation must be considered, though this is considered low risk.

25.5Opportunities

·Longer term there is potential for expansion and upgrading of the Silver Sand deposit through additional drilling.

·Work to identify alternative dump locations with short hauls to provide flexibility and costs savings for waste placement. One potential area identified is the Machacamarca creek gully adjacent the main pit. Opportunities to backfill mined out pits should be considered whenever appropriate.

·Significant exploration potential within an emerging silver district which contains numerous showings and evidence of silver-rich, polymetallic mineralization including historic workings.

amcconsultants.com241

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

26Recommendations

26.1Introduction

The main recommendation is to advance the Silver Sand project to a pre-feasibility study level. This will require advancing the definition and engineering level of all of the mining, processing and infrastructural aspects. It is understood that no more drilling will be carried out in the near future and the current block model will form the basis for that study work. There are however some geology and exploration recommendations captured here so as to refer to them when more infill and delineation drilling is carried out. Some of this work may take the form of grade control drilling and that has not been quantified at this stage.

26.2Quality Assurance / Quality Control

There are a number of recommendations on all facets of QA/QC summarized below. These are expanded on in Section 11.

·Purchase an additional CRM at the average grade (116 g/t Ag) of the deposit which has been certified using similar digestion methodology.

·Investigate performance issues with CRMs CDN-ME-1603 and CDN-ME-1605 if these are to be used in future programs.

·If continue to use ME-MS41 analytical method going forward it is recommended that the OG46 over-limit threshold be dropped from 100 g/t Ag to a level below the anticipated COG.

·Continue to include blanks in every batch of samples submitted at a rate of at least 1 in every 20 samples (5%) and consistently monitor them in real time on a batch-by-batch basis and that remedial action is taken as issues arise.

·Ensure that all blank sample follow up is recorded.

·Implement investigative work to understand geological variance.

·Ensure that all future programs include 4 - 5% duplicate samples including field duplicates, coarse (crush) duplicates, and pulp duplicates to enable the various stages of sub-sampling to be monitored.

·In future programs, submit umpire duplicates, as was done for the October 2017 - 2019 programs.

·Submit pulp samples (rather than coarse reject) so that umpire samples only monitor analytical accuracy and variance.

·Include CRMs at the average grade and higher grades in umpire sample submissions.

26.3Mineral Resource

For future Mineral Resource modelling the following should be considered:

·At the next update of the model include all remaining drill data which missed the closing date.

·Incorporate geometallurgical attributes into the block model.

·Verify mined-out volumes by surveying historical waste dumps.

·Conduct structural analysis of available data and complete initial structural / geotechnical drilling as required.

·Update the 3D geological model to include detailed geology - deposit oxidation domaining and structures.

amcconsultants.com242

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

The Silver Sand deposit, as currently defined, remains open for expansion at depth. While it is understood that engineering work for the pre-feasibility study will be based on the current block model, it is recommended that future drilling on the deposit should consider the following:

·Infill drilling to upgrade areas of high-grade mineralization within the current Inferred resource area.

·Additional drilling around the current Mineral Resources, where the deposit remains open at depth.

The QP also notes that there has been no modern district scale exploration outside of Silver Sand deposit. It is recommended that additional drilling be completed at the other prospects to assess for the potential for Mineral Resources.

26.4Metallurgical testwork development

The following metallurgical activities are recommended, and these are expanded in Section 13.4.

·Further development of the current geometallurgical modelling.

·Further mineralization characterization studies, including quantitative mineralogy and comminution studies.

·Development of a particle sorting trade-off.

·Development of cyanidation parameters, on a more widespread sample set.

·Settling and filtration testwork, with more comprehensive study of slurry rheology, reagent selection and dosage.

·Further environmental testing, including a comprehensive set of static and kinetic (humidity cell) tests.

The cost of the advanced metallurgical program as suggested including further sorting tests, comminution tests, mineralogical characterization, and environmental testing, based on larger and more spatially diverse samples, is estimated to cost $200,000.

26.5Open pit mining

It is recommended that the following aspects are examined in the next study stage:

·It is recommended that a dilution study is conducted in the next stage of study to ascertain the anticipated mining dilution and ore recovery in combination with the most appropriate mining fleet and associated costs.

·The ongoing geotechnical program should be continued to collect additional data for pit wall angle stability analysis.

·It is recommended that quotes from Bolivian mining contractors are collected to firm up the mining costs estimates for the open pit operations.

·Further hydrological and hydrogeological studies should be conducted to better define dewatering requirements for the open pit. Recommendations from ITASCA Chile SpA (ITASCA) include:

¾to implement piezometers for groundwater table monitoring, at least in the future pit location.

¾Itasca recommends that the area where mining activities are developed is characterized in detail, to be used as a water quality baseline before the Silver Sand project starts to operate.

·Further work should be conducted to identify alternative dump locations to reduce haul distance i.e., backfill in-pit dumps, and dump in the creek gully. Further work should be undertaken to develop a detailed waste and tailings disposal plan.

amcconsultants.com243

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

26.6Infrastructure

·It is recommended that all technical and commercial aspects of site infrastructure are pursued to a higher level of accuracy.

·Location and placement of accommodation camp, waste dump, crusher and process plant be confirmed following drilling.

·Negotiation with Bolivian power authorities to continue to confirm there is capacity in the existing grid and that Silver Sand can get access to that.

26.7Environmental baseline studies

Complete the environmental baseline study, impact analysis and mitigation plans. Permitting has to be advanced.

26.8Community and social studies

It is recommended that community and social studies are continued and expanded to levels appropriate for the PFS.

26.9Pre-feasibility study

The above activities will be managed and collated as a PFS report.

26.10Costs

The costs for the recommended programs including contingency are tabulated below in Table 26.1.

Table 26.1Budget for the recommended programs

Account category

Budget totals ($)

Geometallurgical addition to block model

30,000

Metallurgical testwork

200,000

Mine engineering

500,000

Process design

200,000

Infrastructural engineering

100,000

Environmental studies and permitting

500,000

Community & Social Studies and Programs

500,000

Completion of PFS reporting

50,000

Contingency - 10%

208,000

Grand total

2,288,000

Source: AMC Mining Consultants (Canada) Ltd., 2022, with input from New Pacific.

amcconsultants.com244

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

27References

Aguirre, F.B. 2019, Bufete Aguirre Soc. Civ., Mining in Bolivia: overview, Practical Law Country Q&A w-010-2113.

AMC Mining Consultants (Canada) Ltd. 2020, "Silver Sand Deposit Mineral Resource Report (Amended) for New Pacific Metals Corp. Property Potosí, Bolivia", effective date 16 January 2020, amended date 3 June 2020.

Arce-Burgoa, O. & Goldfarb, R. 2009, Metallogeny of Bolivia, SEG Newsletter, No.79.

Birak, D.J. 2017, "NI 43-101 Technical Report on Silver Sand Project", Potosí Department, Bolivia, 15 August 2017.

Bolivian Ministry of Environment and Water 2018, Methodology for the Identification of Environmental Impacts, p. 2.

Bufete Aguirre Soc. Civ. 2017, Basics of Mining Law in Bolivia, GlobalMineTM Basics of Mining Law 2017, pp. 26-41.

Dietrich, A., Lehmann, B., & Wallianos, A. 2000, Bulk rock and melt inclusion geochemistry of Bolivian tin porphyry systems, Economic Geology, Vol. 95, 2000, pp. 313-326.

Itasca 2021, INF-Site Visit Report-en-R0 (2021-10-18), October 2021.

Itasca 2022a, 682-002-PPT-UGT-Structural Domains-Eng.R1.pdf, September 2022.

Itasca 2022b, MEM-682.002.03-Conceptual Open Pit IRA recommendations-Rev0 9.26, September 2022.

Itasca 2022c, INF-682.002.01-Hydrological and Hydrogeological Conceptual Study-R1, October 2022.

Lamb, S., Hoke, L., Kennan, L., & Dewey, J. 1997, "Cenozoic evolution of the Central Andes in Bolivia and northern Chile", Geological Society of London, Special Publications, Vol. 121, pp. 237-264.

Long, S.D., Parker, H.M., & Françis-Bongarçon, D. 1997, "Assay quality assurance quality control programme for drilling projects at the prefeasibility to feasibility report level", Prepared by Mineral Resources Development Inc. (MRDI) August 1997.

New Pacific Metals Corp 2017, News Release, 10 April 2017.

Pratt, W. & Francis-Smith, B. (2018). Structural Control on Mineralization at Silver Sands, Bolivia. Technical Report.

Redwood, S.D. 2018, New Pacific Internal Report, A review on the Silver Sand Project, Potosí, Bolivia, 27 December 2018.

Rivas, S. 1979, Geology of the principal tin deposits of Bolivia. Geological Society of Malaysia, Bulletin 11, December 1979, pp. 161-180.

amcconsultants.com245

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Sugaki, A., Ueno, H., Kitakaze, A., Hayashi, K., Shimada, N., Kusachi, I., & Sanjines, O. 1983, "Geological study on the polymetallic ore deposits in the Potosí district, Bolivia", The Science Reports of the Tohoku University, Series III, Vol. XV, No. 3.

U.S. Central Intelligence Agency (CIA) in 1971, map no. 78499 1971, available from the website of The University of Texas at Austin (https://legacy.lib.utexas.edu/maps/bolivia.html).

amcconsultants.com246

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

28QP Certificates

CERTIFICATE OF AUTHOR

I, John Morton Shannon, P.Geo., of Vancouver, British Columbia, do hereby certify that:

1I am currently employed as General Manager and Principal Geologist with AMC Mining Consultants (Canada) Ltd., with an office at Suite 202, 200 Granville Street, Vancouver, British Columbia V6C 1S4.

2This certificate applies to the Technical Report titled "Silver Sand Deposit Preliminary Economic Assessment" with an effective date of 30 November 2022 (the "Technical Report"), prepared for New Pacific Metals Corp. ("the Issuer") in respect of the Issuer's Silver Sand property (the "Property").

3I am a graduate of Trinity College Dublin in Dublin, Ireland (BA Mod Nat. Sci. in Geology in 1971). I am a member in good standing of the Engineers and Geoscientists British Columbia (Registration #32865) and the Association of Professional Geoscientists of Ontario (Registration #0198). I have practiced my profession continuously since 1971, and have been involved in mineral exploration and mine geology for over 45 years since my graduation from university. This has involved working in Ireland, Zambia, Canada, and Papua New Guinea. My experience is principally in base metals and precious metals, and have been Chief Geologist on two very large mines for major companies, with responsibility for all geological aspects of the operation.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4I have not visited the Property.

5I am responsible for Sections 2 - 6, 20, 23, 24 and parts of 1, 25, and 26 of the Technical Report.

6I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of the NI 43-101.

7I have had prior involvement with the Property in that I was a peer reviewer for the previous AMC Technical Report on the Silver Sand Property in 2020 (dated 25 May 2020, amended and restated on 3 June 2020 with an effective date of 16 January 2020).

8I have read NI 43-101 and the sections of the Technical Report for which I am responsible have been prepared in compliance with NI 43-101.

9As of the effective date of the Technical Report, to the best of my knowledge, information, and belief, the sections of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Effective Date: 30 November 2022

Signing Date: 14 February 2023

Original signed and sealed by

John Morton Shannon, P.Geo.

General Manager / Principal Geologist

AMC Mining Consultants (Canada) Ltd.

amcconsultants.com247

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

CERTIFICATE OF AUTHOR

I, Dinara Nussipakynova, P.Geo., of Vancouver, British Columbia, do hereby certify that:

1I am currently employed as a Principal Geologist with AMC Mining Consultants (Canada) Ltd., with an office at Suite 202, 200 Granville Street, Vancouver, British Columbia V6C 1S4.

2This certificate applies to the Technical Report titled "Silver Sand Deposit Preliminary Economic Assessment" with an effective date of 30 November 2022 (the "Technical Report"), prepared for New Pacific Metals Corp. ("the Issuer") in respect of the Issuer's Silver Sand property (the "Property").

3I am a graduate of Kazakh National Polytechnic University (Bachelor of Science and Master of Science in Geology in 1987). I am a member in good standing of the Association of Engineers and Geoscientists of British Columbia (Registration #37412) and the Association of Professional Geoscientists of Ontario (Registration #1298). I have practiced my profession continuously since 1987 and have been involved in mineral exploration and mine geology for a total of 35 years since my graduation from university. My experience is principally in Mineral Resource estimation, database management, and geological interpretation.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4I visited the Property from 28 - 29 May 2022 for 2 days.

5I am responsible for Sections 7 - 12, 14 and parts of 1, 25, 26, and 27 of the Technical Report.

6I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of the NI 43-101.

7I have had prior involvement with the Property in that I was a qualified person for previous AMC Technical Report on the Silver Sand Property in 2020 (dated 25 May 2020, amended and restated on 3 June 2020 with an effective date of 16 January 2020).

8I have read NI 43-101 and the sections of the Technical Report for which I am responsible have been prepared in compliance with NI 43-101.

9As of the effective date of the Technical Report, to the best of my knowledge, information, and belief, the sections of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Effective Date: 30 November 2022

Signing Date: 14 February 2023

Original signed by

Dinara Nussipakynova, P.Geo.

Principal Geologist

AMC Mining Consultants (Canada) Ltd.

amcconsultants.com248

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

CERTIFICATE OF AUTHOR

I, Andrew Holloway, P.Eng., do hereby certify that:

1I am currently employed as Process Director with Halyard Inc., with an office at 212 King St. West, Suite 501, Toronto, Ontario M5H 1K5.

2This certificate applies to the Technical Report titled "Silver Sand Deposit Preliminary Economic Assessment" with an effective date of 30 November 2022 (the "Technical Report"), prepared for New Pacific Metals Corp. ("the Issuer") in respect of the Issuer's Silver Sand property (the "Property").

3I graduated from the University of Newcastle upon Tyne, England, B.Eng. (Hons) Metallurgy, 1989. I am a registered member in good standing of the Association of Professional Engineers of Ontario (Membership #100082475). I have practiced my profession in the mining industry continuously since graduation.

4My relevant experience with respect to process plant engineering, precious metals metallurgy and metals marketing includes 33 years' experience in the mining sector, working for operating mining companies, engineering companies and mining consultancies.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

5I visited the Property from 14 - 16 January 2020.

6I am responsible for Sections 13, 17, 19 and parts of 1, 21, 25, 26, and 27 of the Technical Report.

7I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of the NI 43-101.

8I have had prior involvement with the Property in that I was a qualified person for previous AMC Technical Report on the Silver Sand Property in 2020 (dated 25 May 2020, amended and restated on 3 June 2020 with an effective date of 16 January 2020).

9I have read NI 43-101 and the sections of the Technical Report for which I am responsible have been prepared in compliance with NI 43-101.

10As of the effective date of the Technical Report, to the best of my knowledge, information, and belief, the sections of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Effective Date: 30 November 2022

Signing Date: 14 February 2023

Original signed by

Andrew Holloway, P.Eng.

Process Director, Halyard Inc.

amcconsultants.com249

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

CERTIFICATE OF AUTHOR

I, Wayne Rogers, P.Eng., of Vancouver, British Columbia, do hereby certify that:

1I am currently employed as a Principal Mining Engineer with AMC Mining Consultants (Canada) Ltd., with an office at Suite 202, 200 Granville Street, Vancouver, British Columbia V6C 1S4.

2This certificate applies to the Technical Report titled "Silver Sand Deposit Preliminary Economic Assessment" with an effective date of 30 November 2022 (the "Technical Report"), prepared for New Pacific Metals Corp. ("the Issuer") in respect of the Issuer's Silver Sand property (the "Property").

3I am a graduate of the University of Western Australia in Perth, Australia (Bachelor of Mining Engineering in 2005) and the University of Queensland in Brisbane, Australia (Master of Philosophy (MPhil) in Mining Engineering in 2014). I am a member in good standing of the Engineers and Geoscientists British Columbia (Registration #49953). I have worked as a Mining Engineer for a total of 18 years since my graduation from university and have relevant experience in project management, feasibility studies, and technical report preparations for mining projects. My expertise includes strategic and tactical mine planning, mine design, mine optimization, feasibility studies, and drill and blast.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4I have not visited the Property.

5I am responsible for Sections 15, 16, 22 and parts of 1, 21, 25, 26, and 27 of the Technical Report.

6I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of the NI 43-101.

7I have not had prior involvement with the Property.

8I have read NI 43-101 and the sections of the Technical Report for which I am responsible have been prepared in compliance with NI 43-101.

9As of the effective date of the Technical Report, to the best of my knowledge, information, and belief, the sections of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Effective Date: 30 November 2022

Signing Date: 14 February 2023

Original signed and sealed by

Wayne Rogers, P.Eng.

Principal Mining Engineer

AMC Mining Consultants (Canada) Ltd.

amcconsultants.com250

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

CERTIFICATE OF AUTHOR

I, Mo Molavi, P.Eng., of Vancouver, British Columbia, do hereby certify that:

1I am currently employed as a Director / Mining Services Manager / Principal Mining Engineer with AMC Mining Consultants (Canada) Ltd., with an office at Suite 202, 200 Granville Street, Vancouver, British Columbia V6C 1S4.

2This certificate applies to the Technical Report titled "Silver Sand Deposit Preliminary Economic Assessment" with an effective date of 30 November 2022 (the "Technical Report"), prepared for New Pacific Metals Corp. ("the Issuer") in respect of the Issuer's Silver Sand property (the "Property").

3I am a graduate from Laurentian University in Sudbury, Canada (Bachelor of Engineering in 1979) and McGill University of Montreal, Canada (Master of Engineering in Rock Mechanics and Mining Methods in 1987). I am a registered member in good standing of the Association of Professional Engineers and Geoscientists of Saskatchewan (License #5646), the Engineers and Geoscientists British Columbia (Registration #37594), and a Member of the Canadian Institute of Mining, Metallurgy and Petroleum. I have worked as a Mining Engineer for a total of 43 years since my graduation from university and have relevant experience in project management, feasibility studies, and technical report preparations for mining projects.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4I have not visited the Property.

5I am responsible for parts of Sections 1, 18, 25, and 26 of the Technical Report.

6I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of the NI 43-101.

7I have not had prior involvement with the Property.

8I have read NI 43-101 and the sections of the Technical Report for which I am responsible have been prepared in compliance with NI 43-101.

9As of the effective date of the Technical Report, to the best of my knowledge, information, and belief, the sections of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Effective Date: 30 November 2022

Signing Date: 14 February 2023

Original signed and sealed by

Mo Molavi, P.Eng.

Director / Mining Services Manager / Principal Mining Engineer

AMC Mining Consultants (Canada) Ltd.

amcconsultants.com251

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

CERTIFICATE OF AUTHOR

I, Leon Botham, P.Eng., of Saskatoon, Saskatchewan, do hereby certify that:

1I am currently employed as a Principal Engineer with NewFields Canada Mining & Environment ULC, with an office at 640 Broadway Avenue, Suite 204, Saskatoon, Saskatchewan S7N 1A9.

2This certificate applies to the Technical Report titled "Silver Sand Deposit Preliminary Economic Assessment" with an effective date of 30 November 2022 (the "Technical Report"), prepared for New Pacific Metals Corp. ("the Issuer") in respect of the Issuer's Silver Sand property (the "Property").

3I am a graduate of the University of Saskatchewan in Saskatoon, Canada (B.E. Civil Engineering in 1988) and Purdue University in Indiana, United States (MSCE Civil/Geotechnical Engineering in 1991). I am a registered member in good standing of the Association of Professional Engineers and Geoscientists of Saskatchewan (License #06604 ), the Engineers and Geoscientists British Columbia (License #35852), the Professional Engineers of Ontario (License #90325408), the Engineers Yukon (License #1482), the Northwest Territories and Nunavut Association of Professional Engineers and Geoscientists (License #L1194) and a Member of the Canadian Institute of Mining, Metallurgy and Petroleum. I have worked in the field of Mine Waste Management, Mine Water Management and Geotechnical Engineering for a total of 33 years since my graduation from University. I have relevant experience in tailings facility design, construction, feasibility studies and technical report preparation for projects in Canada and internationally.

I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

4I have not visited the Property.

5I am responsible for parts of Sections 1, 18, 21, 25, and 26 of the Technical Report.

6I am independent of the Issuer and related companies applying all of the tests in Section 1.5 of the NI 43-101.

7I have not had prior involvement with the Property.

8I have read NI 43-101 and the sections of the Technical Report for which I am responsible have been prepared in compliance with NI 43-101.

9As of the effective date of the Technical Report, to the best of my knowledge, information, and belief, the sections of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Effective Date: 30 November 2022

Signing Date: 15 February 2023

Original signed and sealed by

Leon Botham, P.Eng.

Principal Engineer

NewFields Canada Mining & Environment ULC

amcconsultants.com252

Silver Sand Deposit Preliminary Economic Assessment

New Pacific Metals Corp.

722010

Our offices

Australia

Adelaide

Level 1, 12 Pirie Street

Adelaide SA 5000 Australia

T+61 8 8201 1800

Eadelaide@amcconsultants.com

Brisbane

Level 21, 179 Turbot Street

Brisbane Qld 4000 Australia

T+61 7 3230 9000

Ebrisbane@amcconsultants.com

Melbourne

Level 29, 140 William Street

Melbourne Vic 3000 Australia

T+61 3 8601 3300

E melbourne@amcconsultants.com

Perth

Level 1, 1100 Hay Street

West Perth WA 6005 Australia

T+61 8 6330 1100

Eperth@amcconsultants.com

Canada

Toronto

140 Yonge Street, Suite 200

Toronto ON M5C 1X6 Canada

T+1 647 953 9730

E toronto@amcconsultants.com

Vancouver

200 Granville Street, Suite 202

Vancouver BC V6C 1S4 Canada

T+1 604 669 0044

Evancouver@amcconsultants.com

Singapore

United Kingdom

Singapore

9 Straits View
#05-07 Marina One (West Tower)

Singapore 018937

T+65 3157 9130

E singapore@amcconsultants.com

Maidenhead

Registered in England and Wales

Company No. 3688365

Building 3, 1st Floor

Concorde Park, Concorde Road

Maidenhead SL6 4BY United Kingdom

T+44 1628 778 256

E maidenhead@amcconsultants.com

Registered Office:

The Kinetic Centre

Theobald Street