Metals Creek Resources Corp. announced diamond drill results for drill holes DL21-018 and DL21-019 from the phase III diamond drill program at the Dona Lake Gold project. Drill hole DL21-019 intersected the Main Zone stratigraphy at approximately 424m below surface and returned a core length intercept of 6.0 grammes per ton (g/t) gold (Au) over 4.75 meters(m) (448.55 - 453.30m).

This was a part of a broader zone of mineralization of 3.0 g/t Au over 24.5m (438.00 - 462.50m). Mineralization is hosted within silicate-sulfide iron formation and characterized by stringer to disseminated pyrrhotite ranging from 3 to 7% with local pyrite. Abundant sections of silicate-oxide iron formation with associated magnetite is also present in this intercept.

Alteration consists of moderate to strong hornblende, grunerite and garnets with locally strong folding. This intercept is located between the 360 and 455 level and south of the mine workings and continues to further define the high- grade gold mineralization south of the mine workings. Drill hole DL21-018 intersected the Main Zone at approximately 505m below surface and returned a core length intercept of 1.3 grammes per ton (g/t) gold (Au) over 11.50 meters(m) (516.00 - 527.50m).

Drilling to date has successfully extended high grade gold mineralization 151m below the lower most mine working (445m below surface) or 596m below surface along with further defining high-grade mineralization 50m south of the Dona Lake mine workings. Drilling is ongoing and will continue to target the down plunge extension of the mine stratigraphy as well as test peripheral targets which include the North West Zone and the East Iron Formation. The Dona Lake Gold Project was optioned from Newmont Corporation (previously Newmont Goldcorp - see news release dated 13 June 2019) and is located in the Pickle Lake Greenstone Belt which is hostto several historic mines including the Dona Lake mine, the Central Patricia mine and the Pickle Crow mine.

Dona Lake is accessible by an all-weather road southeast from the Town of Pickle Lake. The Project consists of 32 patented and leased mining claims and 35 map staked claims totaling approximately 1,122 hectares and covers the past producing Dona Lake Mine. Ogden Gold Project The Company is awaiting final results from the recently completed 6 hole drill program at Ogden.

Results are expected soon and will be released once received and compiled. The deep-section induced polarization (IP) ground geophysical survey have resumed. Upon completion of the IP survey and compilation of data is complete, priority targets will be generated utilizing the recently identified SGH gold soil anomalies (See News Release December 13, 2021), the deep section IP results as well as incorporating the structural data from the oriented core from the recently completed drill program.

Michael MacIsaac, P.Geo and VP Exploration for the Corporation and a qualified person as defined in National Instrument 43-101, is responsible for this release, and supervised the preparation of the information forming the basis for this release.