Kingsrose Mining Limited announced high- grade gold and silver intercepts from four core drill holes totalling 436.1 metres on the Maul Vein target at the Way Linggo project, Indonesia. Maul Vein Drilling Results Four diamond drill holes totalling 436.1 metres were completed in May and June 2022. These holes were designed to explore for shallow mineralisation in the southeast part of the project area under thin cover, up-dip from deeper intercepts in previous drilling and confirm grade and thickness continuity in the central part of the project area.

A total of fourteen holes for 2241.1 metres have now been completed at the Maul Vein target since it's discovery by Kingsrose in 2021. Drilling at the Maul Vein target has confirmed mineralisation over a strike length of 550 metres and toat least 200 metres below surface. Mineralisation remains open along strike in both directions, and potential remains to discover plunging shoots extending to depth.