Kingsrose Mining Limited provided a quarterly production report for the period ending September 30, 2013. Early development work reveals grades of up to 125 gpt gold at Talang Santo. Development on Level 3 at the Talang Santo mine in South Sumatra, Indonesia reveals exceptionally high grades of up to 125 gpt gold. Grades and widths uncovered on Level 3 exceed mine modelling. Composite face samples include 4.2 m at the rate of 26.1 g/t gold, including 0.6 m at the rate of 124.9 g/t Au.

For the quarter ending December 2013, the company excepts Production (gold poured) expected to be 1,000 ounces.

Production for fiscal year of 2014, (ending June 2014) still on track to reach 20,000 ounces of gold.