Jacobs Engineering Group Inc. through its joint venture with Aurecon, has been selected by John Holland and CPB Contractors consortium to carry out the engineering design for the $5.1 billion (AUD 6.7 billion) West Gate Tunnel Project that is now proceeding after receipt of all environmental and planning approvals. The project is located in Melbourne’s inner west and will become Melbourne’s alternative to the West Gate Bridge. The design consists of two new three-lane tunnels, the widening of the West Gate Freeway from eight to 12 lanes, 14 kilometers of new and upgraded cycling and walking paths – including a 2.5 kilometer raised veloway for cyclists – and nine hectares of open space and wetlands. The project features a safer road design that includes express lanes to and from the West Gate Bridge, along with high-quality noise walls to reduce noise and protect privacy for the local community. Once completed, the project will deliver quicker and safer journeys, while removing thousands of trucks from local roads. Construction is expected to begin in early 2018 and the new tunnels are expected to open in 2022.