Imperial Helium Corp. announce it has signed an agreement with ON2 Solutions for the construction and delivery of a Prototype Plant for producing 99.999% pure (Grade A) Helium. The Prototype Plant is the Pilot Plant referenced in the Strategic Alliance Agreement among Imperial Helium, ON2 Solutions Inc., and Uniper Trading Canada Ltd. announced by Imperial Helium on March 22, 2021. The Prototype Plant, as stated in the Strategic Alliance Agreement is intended “to expedite the development, production and monetization of Imperial Helium projects in Canada.” Imperial Helium has observed that the gas mixtures associated with helium are unique to each resource accumulation. The Prototype Plant has been designed to accept a broad range of gas compositions and produce pure helium. In doing so, the Company will be able to confirm the preferred plant design for producing Grade A Helium before fabrication and installation for both the Steveville asset and other future assets. The plant will be capable of creating a synthetic gas composition resembling the dry gas composition in a particular field or a discovery. It will also be capable of processing either a synthetic gas, or a dry gas from a field or a discovery and produce 99.999% pure helium. Fabrication of the Prototype Plant will begin immediately and is anticipated to be complete by December 31, 2021, at a cost of $400,000.