ASX Announcement

16 January 2017

YAMARNA RESOURCE AND RESERVE UPDATE

Gold Road Resources Limited (Gold Road or the Company) is pleased to present its updated Mineral Resource Estimate and Ore Reserve Statement post completion of the sale and joint venture arrangements for the Gruyere Gold Project with Gold Fields Ltd (ASX announcement dated 13 December 2016). The Company retains 50% of all assets in the Gruyere Project Joint Venture, including all previously declared Mineral Resources and Ore Reserves. The updated figures are presented in the tables below.

Gruyere Project Joint Venture 100% basis

Gold Road 50%

Project Name / Category

Tonnes

Grade

Contained Metal

Tonnes

Grade

Contained Metal

(Mt)

(g/t Au)

(Moz Au)

(Mt)

(g/t Au)

(Moz Au)

Gruyere Total (0.5 g/t Au)

147.71

1.30

6.16

73.85

1.30

3.08

Measured

13.86

1.18

0.53

6.93

1.18

0.26

Indicated

91.12

1.29

3.79

45.56

1.29

1.89

Inferred

42.73

1.35

1.85

21.36

1.35

0.92

Central Bore Total (1.0 g/t Au)

0.63

9.02

0.18

0.32

9.02

0.09

Measured

0.04

26.55

0.04

0.02

26.55

0.02

Indicated

0.40

9.01

0.12

0.20

9.01

0.06

Inferred

0.19

5.04

0.03

0.09

5.04

0.02

Attila Trend Total (0.7 g/t Au)

5.30

1.59

0.27

2.65

1.59

0.14

Measured

0.66

1.96

0.04

0.33

1.96

0.02

Indicated

3.85

1.52

0.19

1.93

1.52

0.09

Inferred

0.79

1.59

0.04

0.39

1.59

0.02

Total

153.64

1.34

6.61

76.82

1.34

3.31

Measured

14.57

1.29

0.60

7.28

1.29

0.30

Indicated

95.37

1.33

4.09

47.69

1.33

2.05

Inferred

43.70

1.37

1.92

21.85

1.37

0.96

Table 1: Mineral Resource Estimate for the Yamarna Leases

ASX Code GOR

ABN 13 109 289 527

COMPANY DIRECTORS

Tim Netscher

Chairman

Ian Murray

Managing Director & CEO

Justin Osborne Executive Director, Exploration & Growth

Martin Pyle

Non-Executive Director

Sharon Warburton

Non-Executive Director

Kevin Hart

Company Secretary

CONTACT DETAILS

Principal & Registered Office Level 2, 26 Colin St

West Perth WA 6005

www.goldroad.com.au perth@goldroad.com.au

T +61 8 9200 1600

F +61 8 9481 6405

Notes:

  • All Mineral Resources are completed in accordance with the 2012 JORC Code

  • The Gruyere Project Joint Venture is a 50:50 joint venture between Gold Road and Gruyere Mining Company Pty Limited, a wholly owned Australian subsidiary of Gold Fields Ltd.

  • Gruyere Mineral Resource reported at 0.5 g/t Au cut‐off, constrained within an A$1,700/oz Au optimised pit shell based on mining and processing parameters from the PFS and geotechnical parameters from the previous Mineral Resource estimate (ASX announcement dated 22 April 2016)

  • Central Bore Mineral Resource reported at 1.0 g/t Au cut‐off (2014 Annual Report)

  • Attila Trend (Attila and Alaric) Mineral Resource reported at 0.7 g/t Au cut‐off, constrained within an A$1,600/oz Au optimised pit shell (ASX announcement dated 16 September 2015)

  • All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur due to rounding

  • Mineral Resources are inclusive of Ore Reserves

Table 2: Ore Reserve Statement for the Gruyere Project

Gruyere Project Joint Venture 100% basis

Gold Road 50%

Category

Tonnes

Grade

Contained Metal

Tonnes

Grade

Contained Metal

(Mt)

(g/t Au)

(Moz Au)

(Mt)

(g/t Au)

(Moz Au)

Total

91.57

1.20

3.52

45.78

1.20

1.76

Proved

14.87

1.09

0.52

7.44

1.09

0.26

Probable

76.70

1.22

3.00

38.35

1.22

1.50

Notes:

  • The Ore Reserve is completed in accordance with the 2012 JORC Code

  • The Gruyere Project Joint Venture is a 50:50 joint venture between Gold Road and Gruyere Mining Company Pty Limited, a wholly owned Australian subsidiary of Gold Fields Ltd

  • Gold Road holds an uncapped 1.5% net smelter return royalty on Gold Fields Ltd's share of production from the Gruyere Project Joint Venture once total gold production exceeds 2 million ounces

  • The Ore Reserve is evaluated using a gold price of A$1,500/oz (ASX announcement dated 19 October 2016)

  • The Ore Reserve is evaluated using variable cut off grades: Oxide 0.35 g/t Au, Transitional 0.39 g/t Au and Fresh 0.43 g/t Au

  • Ore block tonnage dilution averages 3.2%; Ore block gold loss is estimated at 1.4%

  • All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur due to rounding

    For further information, please visit www.goldroad.com.au or contact:

    Gold Road Resources

    Ian Murray

    Managing Director and CEO Telephone: +61 8 9200 1600

    Media and Broker Enquiries

    Warrick Hazeldine - whazeldine@canningspurple.com.au Cannings Purple

    Tel: +61 417 944 616

    About Gold Road

    Gold Road is pioneering development of Australia's newest goldfield, the Yamarna Belt, 200 kilometres east of Laverton in Western Australia. The Company holds interests in tenements covering 5,000 square kilometres in the region, which is historically underexplored and highly prospective for gold mineralisation. The Yamarna leases contain a gold resource of 6.6 million ounces, including 6.2 million ounces at the Gruyere deposit, of which the Company owns 50%.

    The Feasibility Study for Gruyere, which was completed in October 2016, indicated the Project's 3.5 million ounce Reserve could support average annualised production of 270,000 ounces for 13 years (ASX announcement dated 19 October 2016). In November 2016, Gold Road entered into a 50:50 joint venture with Gold Fields Ltd for the Gruyere Gold Project, with commencement of Project construction in January 2017.

    Gold Road continues to explore for similar‐scale deposits on its 100%‐owned North Yamarna tenements, its 50% owned Gruyere Project Joint Venture tenements (with Gold Fields Ltd) and its 50% owned South Yamarna Joint Venture tenements in conjunction with Sumitomo Metal Mining Oceania (a subsidiary of Sumitomo Metal Mining Co. Limited).

    Yamarna simplified Tenement Map with Mineral Resources and Ore Reserves on a Gruyere Project Joint Venture 100% basis (Gold Road 50%).

    Competent Persons Statements

    The information in this report which relates to Exploration Results or Mineral Resources is based on information compiled by Mr Justin Osborne. The information in this report which relates to Exploration Results is based on information compiled by Mr Justin Osborne, Executive Director for Gold Road. Mr Osborne is an employee of Gold Road, as well as a shareholder and share option holder, and is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM 209333). Mr Osborne has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Osborne consents to the inclusion in the report of the matters based on this information in the form and context in which it appears

    Mineral Resources

    The information in this report that relates to the Mineral Resource Estimation for Gruyere is based on information compiled by Mr Justin Osborne, Executive Director - Exploration and Growth for Gold Road and Mr John Donaldson, Geology Manager for Gold Road.

    The information in this report that relates to the Mineral Resource Estimation for Attila Trend is based on information compiled by Mr Justin Osborne, Executive Director for Gold Road, Mr John Donaldson, Geology Manager for Gold Road and Mrs Jane Levett, Senior Resource Geologist for Gold Road.

  • Mr Justin Osborne is an employee of Gold Road, as well as a shareholder and share option holder, and is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM 209333)

  • Mr John Donaldson is an employee of Gold Road as well as a shareholder, and is a Member of the Australian Institute of Geoscientists and a Registered Professional Geoscientist (MAIG RPGeo Mining 10147)

  • Mrs Jane Levett is an employee of Gold Road, and is a Member of the Australasian Institute of Mining and Metallurgy and a Chartered Professional (MAusIMM CP 112232)

Messrs Osborne and Donaldson and Mrs Levett have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as Competent Persons as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Messrs Osborne and Donaldson and Mrs Levett consent to the inclusion in the report of the matters based on this information in the form and context in which it appears.

The information in this report that relates to the Mineral Resource Estimation for Central Bore is based on geostatistical modelling by Ravensgate using sample information and geological interpretation supplied by Gold Road. The Mineral Resource estimates were undertaken by Mr Craig Harvey, previously Principal Consultant at Ravensgate and Mr Neal Leggo, Principal Consultant at Ravensgate.

Messrs Harvey and Leggo are both Members of the Australian Institute of Geoscientists. Messrs Harvey and Leggo have sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves." Messrs Harvey and Leggo consent to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Ore Reserves

The information in this report that relates to the Ore Reserve for Gruyere is based on information compiled by David Varcoe. Mr David Varcoe

is an employee of AMC Consultants and is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM).

Mr Varcoe has sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration and to the activity currently being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Varcoe consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

New Information or Data

Gold Road confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of estimates of Mineral Resources and Ore Reserves that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not materially changes from the original market announcement.

Gold Road Resources Limited published this content on 16 January 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 16 January 2017 01:40:00 UTC.

Original documenthttp://www.goldroad.com.au/document/yamarna-resource-reserve-update-january-2017/

Public permalinkhttp://www.publicnow.com/view/4D83F50F1EBDD7419E931D37F21358AD41FF6125