Norseman Silver Inc. announced that all drill access roads and sites have already been prepared and drilling is underway The four (4)- hole 800 metre drill program is expected to be completed in approximately three weeks. Work to date includes ground IP - resistivity survey that was completed earlier in the 2022 field season at the Silver Switchback project in the Omineca Mining Division, British Columbia. The survey covered the delineated multi-element anomaly zones from the previously completed soil
geochemistry evaluation in 2021. As a complement to the soil geochemistry data, the results of the IP-Resistivity survey were utilized to define the targets that will be probed by drilling. The ground geophysical survey program involved a layout of twelve (12) IP lines with varying lengths from 900 to 1,700 meters oriented along an E-W direction. The lines which are spaced 200 meters apart measure a total length of about 15 line-kilometers, and these cover an area of about 258 hectares. Effectively, the survey probe's vertical extent is down to 200 meters depth from surface.