This document contains certain forward-looking information that is subject to a number of factors that may influence the accuracy of the statements and the projections upon which the statements are based. There can be non assurance that the projections or forecasts will ultimately prove to be accurate; accordingly, the Company makes no representation or warranty as to the accuracy of such information or the likelihood that the Company will perform as projected.

AGENDA

  • A Successful Journey
  • ERG Tomorrow
  • Moving towards an infrastructural Business Model
  • With ESG in our DNA
  • 2020 ESG Key Figures
  • 2021-2025Financial Strategy
  • 2021-2025Targets
  • 2021 Guidance & Final Remarks

A Successful Journey

A LONG HISTORY…

ERG Power's combined cycle power plant (480MW) fuelled by natural gas enters operation.

Production commences at the San Quirico Refinery in Genoa.

ERG enters the

The ERG share

renewables sector

TotalERG is established, a

is listed on the

with the acquisition of

joint venture for the sale of

Stock Exchange.

EnerTAD.

oil products.

ERG transfers the ISAB Energy plant and the fuel network of ERG Oil Sicily.

ERG enters the wind market in the United Kingdom with a 47.5MW project.

At the end of 2016, installed wind capacity is 1,720MW.

ERG enters the solar power sector (30 photovoltaic plants acquired, 89MW in operation).

Definitive exit from Oil with the sale of TotalERG.

ERG enters the solar sector in Germany: co-development agreement with AREAM (600 MW)

Installed wind power at the end of 2020 totals 1,967 MW.

1947

1997

2006

2010

2014

2016

2018

2020

1938

1975

2000

2008

2013

2015

2017

2019

Edoardo Garrone

ERG - through ISAB

founds ERG in Genoa.

Energy - starts to

produce and sell

electricity from the

gasification of the

heavy residues from

refinement.

Production commences at the ISAB Refinery in Priolo.

ERG sells 49% of the ISAB Refinery to

LUKOIL.

ERG becomes the leading wind operator in Italy with an installed capacity of 1,087MW and among the top ten in Europe, and acquires a company for wind farm O&M activities.

ERG transfers the ISAB Refinery and completes its exit from refining.

ERG enters the hydroelectric sector with plants in Umbria, the Marches and Lazio (527MW).

ERG acquires 6 wind farms in France (64MW) and constructs 3 wind farms in Poland for a total of 82MW.

At the end of 2015, installed wind capacity is 1,506MW.

ERG's growth in the wind sector continues: 48MW in operation in Germany; 16MW in operation in France. At the end of 2017, installed wind capacity in Europe is 1,814MW.

ERG closed the acquisition of Andromeda (51MW) assets, increasing its PV total capacity up to 141MW.

Wind: ERG acquired 52MW in France and 34MW in Germany.

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original document
  • Permalink

Disclaimer

ERG S.p.A. published this content on 28 June 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 28 June 2021 06:46:05 UTC.