Defense Metals Corp. announced that it has completed all infrastructure geotechnical field data collection in support of the preliminary feasibility study ("PFS") for its 100% owned Wicheeda Rare Earth Element ("REE") Project located near Prince George, B.C., Canada. Highlights of the 2023 Wicheeda REE Project infrastructure geotechnical programs include: 16 helicopter and track sonic overburden geotechnical drill holes totaling 225.5 metres; 20 excavated overburden geotechnically test pits totaling 76.8 metres; 6 diamond drill holes totaling 1,182 metres within the Wicheeda REE deposit pit shell; inclusive of 4 open pit geochemical drill holes totaling 920 metres, and in pit exploration holes totaling 262 metres; Shipment of a 2,700 kg metallurgical sample, collected from drill core, to SGS Lakefield, Ontario for continued flotation and hydrometallurgical optimization test-work; Initiation of humidity cell testwork on 17 samples, and 250 kg sample selection for on-site kinetic leach (barrel) testing of samples representative of anticipated mine waste rock to assess metal leaching and acid rock drainage potential in support of environmental assessment.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
0.19 CAD | -2.56% | 0.00% | -2.56% |
Quarterly revenue - Rate of surprise
1st Jan change | Capi. | |
---|---|---|
-2.56% | 3.59Cr | |
-11.07% | 855.65Cr | |
-17.18% | 369.82Cr | |
+2.87% | 231.3Cr | |
-35.87% | 210.45Cr | |
-15.32% | 207.92Cr | |
+49.74% | 47Cr | |
+6.06% | 27Cr | |
-9.33% | 12Cr | |
-38.58% | 9.43Cr |
- Stock Market
- Equities
- DEFN Stock
- News Defense Metals Corp.
- Defense Metals Corp. Completes Geotechnical Field Data Collection for Wicheeda Rare Earth Element Project Preliminary Feasibility Study