For personal use only
ASX Announcement
www.cullenresources.com.au | ASX:CUL | 10 January 2022 |
Drilling commenced at Wongan Hills
WONGAN HILLS PROJECT, WA - targeting Volcanic-Hosted Massive Sulphide (VHMS) Cu-Zn-Ag-Au and Ni-Cu-PGE mineralisation
Cullen Resources Limited ("Cullen" or "the Company") is pleased to announce that a Reverse Circulation (RC) and an Air Core (AC) drilling program has commenced at the Wongan Hills Project.
- RC drilling is targeting the nickel sulphides observed in petrological samples (ASX: CUL, 16-9-21) from a 30m downhole zone of ultramafics in drill hole RC6 at the Rupert Prospect which tested a strong ground EM conductor (C3).
- AC drilling is targeting Copper-Nickel-Gold or Palladium soil anomalies that comprise four main targets outlined at Rupert, Rupert South and Rupert North (2) prospects - see ASX: CUL:5-10-2021,25-11-2021.
Fig.1 Location of Cullen's Wongan Hills Project
Exploration Update - January 10 2022
For personal use only
NORTH TUCKABIANNA PROJECT, W.A. E20/714 (Cullen 100%), centered
~30km east of Cue, in the Murchison Region, gold and base metals
AC drilling is also planned to commence this week to target immediately NE of the Hollandaire Cu-Au Resource (ASX: CYM) and the Eelya Felsic complex / greenstone contact striking NE-SW at intersection with N-S faults - see ASX: CUL:25-11-2021.
Fig.2 Interpreted key structural lineaments overlain on magnetics image with
priority target trend highlighted along NE-SW lithological boundary.
2
Exploration Update - January 10 2022
For personal use only
Fig. 3 Wongan Hills Ni-Cu-PGE Prospects on regional magnetics image.
3
Exploration Update - January 10 2022
For personal use only
Figs. 4-5 (ASX: CUL, 21-10-2021)
4
Exploration Update - January 10 2022
For personal use only
Fig. 6. Bedrock geology interpretation map
Pd soil analyses derived by Mobil Metal Ion
leach technology as reported in WAMEX 71944.
(Annual Report, 2005, Red River Resources Ltd, Appendix 2)
5
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Cullen Resources Limited published this content on 09 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 09 January 2022 22:27:06 UTC.