Corella Resources Ltd. advised that resource definition drilling is due to commence at the Company's 100% owned flagship Tampu kaolin project, located near Beacon in Western Australia. The drill program will total ~1000m and consist of 50 to 80 sonic drill core holes, to an average depth of ~15m to a drill spacing of 80 x 80m in select locations. The Company has secured a sonic drill rig for the 50 to 80 hole program (~1,000m).

A field team is currently mobilising to site to prepare for the drilling program expected to commence in the coming weeks. The program has been specifically designed to upgrade the existing 24.7Mt of Inferred Mineral Resource into Indicated and Measured Resources for conversion into Reserves. These Reserves will be used to underpin a Pre-Feasibility Study for the Tampu Project and have the deposit in mineable classifications.

The Company also intends to complete additional aircore holes at the project towards the conclusion for the sonic drilling program aimed at extending known resources and test further locations for further potential resources of bright white kaolin. The Company is in discussions with a RC/Aircore drilling contractor working on the timing of the program's commencement.