Chakana Copper Corp. has now completed thirty-two drill holes over its Soledad Copper Gold Property, Peru, optioned from Condor Resources Inc., for a total of 7,962.7 m out of its original plan of 16,660m. The drill program was initiated in August 2017 and is ongoing with a single drill rig. The program is currently ahead of schedule and under budget. All other results are currently embargoed pending closing of the Proposed Transaction. Samples are being assayed by ALS, a compliant full-service analytical provider to the global mining industry. Drilling to date has focused on Breccia Pipes #1 and #5 designed to establish the geometry and grade profile of the mineralization hosted within the pipes. Additionally, Chakana has submitted its application for a Semi-Detailed Environmental Impact Assessment (Estudio de Impacto Ambiental Semidetallado - EIA-SD) to allow for an expended exploration program that will include drilling a number of additional mineralized breccia pipes identified at surface, detailed petrography and initial geo-metallurgical testing. A second drill rig will be added to the project upon receipt of the EIA-SD.