Blue Earth Resources, Inc. reported the workover and perforation results of the Hunter Mannies #1, located in Desoto Parish, Louisiana. Hunter Mannies #1 was brought back online after a successful workover. The well has achieved initial peak production rate of 8 barrels per day, with a cut of 95% oil and 5% water after the perforation of the zone and two new zones.

The well also has gas pressure showing. After consulting with the company's advisory team, it is their opinion that the old perforations were blocked and not allowing the oil and water to reach the borehole. The company believes the strong result of Hunter Mannies #1 will appreciably enhance overall operations of the entire lease.