Big Gold Inc. announced that, following a successful Phase 1 exploration, high-priority historical targets have been selected as part of the second phase of the 2023 exploration program at the Tabor Project located within the Shebandowan Greenstone Belt northwest of Thunder Bay, Ontario. Phase 2 exploration includes 32 targets recently identified through historical desktop work and located along trends with historical high-grade gold drilling results including drill hole RS-83-01, which intersected 0.76 m of 24.30 g/t Au, 65.10 g/t Ag, 0.82% Cu, and 3.68% Zn. Phase 2 Plan for Priority Targets.

Surface Exploration: Preparations are underway for field visits to defined targets for mapping and sampling of outcrops. Re-logging and Sampling Historic Core: Identified historic drill core will be reviewed and infill. sampled, providing high value at low cost.

IP Survey: Plans are in place to conduct IP surveys, aiding in further exploration and drill target definition. Drill Program: Leveraging data from the summer field program, the Company will refine drill targets and build a database to expedite exploration success.