Altiplano Minerals Ltd. updates the status of its Farellon Project in Chile. At Farellon, during mid to late November 100 tonnes of low grade Cu-Au-Fe material was collected from the Hugo Tunnel crosscut into the Farellon Vein system at 295m. The results of the 100 tonne sample is reported in 4 batches of about 25 tonnes each below. At this location the 395M level horizontal drift commenced collection of a 2,000 tonne bulk sample of Cu-Au-Fe material. To date, at least 1,250 tonnes of this vein material from the drift has been moved to the stockpiles ready for delivery for toll milling during the early part of January 2018. The company expects to release the drift sampling results in the near future.