FOR THE PERIOD ENDING 31 Mar 2017

CORPORATE

Cash and Cash Equivalents

As at 31 March 2017, the Company had cash of $ 5,011,125.

Joint Venture with Northern Star Resources Limited

As previously announced, the Company and Northern Star Resources Limited ("NST") have formed an unincorporated joint venture

("JV") to advance the Company's Central Tanami Project ("CTP").

In accordance with the JV, management of the exploration activities at the Company's CTP have been handed over to NST who will sole fund all JV expenditure including all CTP exploration and evaluation costs, assessment and development costs, mining of the JV tenements and refurbishing the CTP process plant and associated infrastructure, during the Sole Funding Period.

The Sole Funding Period will expire on the date on which the process plant at the CTP has been refurbished to operating condition and has operated for a continuous 30 day period or has produced 5,000 ounces of gold ore (whichever occurs first). On the expiry of the Sole Funding Period, NST will have earned a further 35% undivided interest in the CTP (taking NST's total JV Interest to 60%).

Northern Star Resources Limited Shares

As at 31 March 2017, the Company has 750,000 NST shares remaining.

EXPLORATION

Central Tanami Project (75% Tanami)

Field activities were limited due to the onset of the wet season conditions. An extensive remedial program covering legacy environmental and rehabilitation issues has continued.

Meetings with senior DPIR representatives in Darwin addressed outstanding issues for the CTP MMP including following multiple requests for additional documents and maps. At the end of the quarter, verbal approval of the CTP MMP was received pending a final determination of bonding requirements from the Security Board.

Compilation of historical data continued over the Tanami Mine Corridor Trend. All legacy GIS mapping datasets over the Tanami Mine Corridor have been compiled and aligned with the NST logging system. Geological mapping and sampling continued with the objective to validate existing bedrock mapping and to characterise the overlying regolith. A total of 777 samples were collected from historical drill holes for lithogeochemical analysis.

A review of historical gravity data was undertaken over the Tanami Mine Corridor to identify additional areas of interest. A significant proportion of raw gravity data acquired by Normandy/Newmont is missing however reprocessing of available data produced positive preliminary results and expansion of the regional gravity data coverage is planned.

Detailed geological pit mapping of the Jim's open pit was completed with the deposit interpreted to sit in a strike-slip duplex structure. This model will assist exploration on prospects along strike from the deposit, towards the Cave Hill (southeast) and Molech/Flores (northwest) areas.

FOR THE PERIOD ENDING 31 Mar 2017 Figure 1 Tanami region activities for March quarter

Regolith mapping over the Farrands Hill region was completed to optimise the design of a planned geochemical sampling program.

Western Tanami Project (100% Tanami)

Resampling of 3m composite samples from reverse circulation drilling completed during November 2016 at both Rabid South and the Nugget Patch have been completed and results received are listed in Tables 1 and 2. Note that a full listing of drilling locations and a JORC Code table for reporting of exploration results provided with the December 2016 Quarterly report so not repeated here.

Table 1 Rabid South RC Drill Intersections

(Coordinates and Azimuths are MGA94 zone 52 projection)

Hole ID

Easting

Northing

RL

Total Depth (m)

Azimuth (degrees)

Dip (Degrees)

3m composite (ppm)

1m re- sample

From Depth (metres down hole)

(ppm)

RSRC0001

488540

7789800

429

132

090

-60

3m @ 1.954

7.585

2.87

0.135

3

RSRC0002

488475

7789800

433

150

090

-60

3m @ 0.815

0.002

0.004

0.826

39

-60

3m @ 0.116

0.004

57

FOR THE PERIOD ENDING 31 MARCH 2017

Hole ID

Easting

Northing

RL

Total Depth (m)

Azimuth (degrees)

Dip (Degrees)

3m composite (ppm)

1m re- sample

From Depth

0.14

0.012

-60

3m @ 0.107

0.024

0.009

0.082

69

-60

3m @ 0.097

0.009

0.06

0.091

84

RSRC0003

488417

7789800

424

132

090

-60

3m @1.817

3.099

0.094

2.689

45

-60

3m @ 0.875

0.173

0.432

2.317

81

-60

3m @ 0.596

1.196

0.172

0.053

84

-60

3m @ 0.255

0.009

0.01

0.554

87

RSRC0007

488600

7789960

420

96

090

-60

3m @ 0.12

0.181

0.017

0.046

63

-60

3m @ 0.318

0.364

0.95

0.245

66

-60

3m @ 0.297

0.074

0.399

0.325

69

-60

3m @ 0.344

0.435

0.448

0.054

72

-60

3m @ 0.481

0.232

0.05

0.59

75

RSRC0009

488520

7789840

425

78

090

-60

3m @ 0.18

0.035

1.49

0.009

9

-60

3m @ 1.905

0.103

13.212

0.052

18

RSRC0010

488474

7789840

427

84

090

-60

3m @ 0.606

0.669

0.051

0.008

69

RSRC0011

488440

7789840

427

84

090

-60

3m @ 0.335

0.546

0.978

0.064

51

RSRC0012

488400

7789840

427

78

090

-60

3m @ 0.115

0.003

0.181

0.074

33

-60

3m @ 0.238

0.611

57

FOR THE PERIOD ENDING 31 MARCH 2017

Hole ID

Easting

Northing

RL

Total Depth (m)

Azimuth (degrees)

Dip (Degrees)

3m composite (ppm)

1m re- sample

From Depth

0.105

0.007

RSRC0013

488480

7789760

427

126

090

-60

3m @ 1.166

0.14

0.015

2.383

3

-60

3m @ 0.112

0.012

0.005

0.006

42

Table 2 Nugget Patch RC Drill Intersections

(Coordinates and Azimuths are MGA94 zone 52 projection)

Hole ID

Easting

Northing

RL

Total Depth (m)

Azimuth (degrees)

Dip (Degrees)

3m composite (ppm)

1m re- sample

From Depth (metres down hole)

(ppm)

NPRC0005

487360

7790800

416

90

090

-60

3m @ 0.096

0.003

0.065

0.122

48

3m @ 0.1

0.139

0.243

0.063

57

NPRC0008

487360

7790840

416

90

090

-60

3m @ 0.549

0.005

0.827

0.381

87

NPRC0010

487420

7790760

426

102

090

-60

3m @ 0.263

0.313

0.285

0.021

39

NPRC0011

487440

7790720

423

90

090

-60

3m @ 0.411

0.151

2.717

0.081

18

3m @ 0.179

0.016

0.191

0.007

54

NPRC0012

487400

7790720

424

108

090

-60

3m @ 0.156

0.065

0.089

0.099

42

NPRC0013

487320

7790720

424

126

090

-60

3m @ 0.575

0.005

1.116

0.093

99

3m @ 0.157

0.022

0.12

0.008

102

3m @

0.309

111

Tanami Gold NL published this content on 27 April 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 27 April 2017 00:07:17 UTC.

Original documenthttp://clients3.weblink.com.au/clients/tanami/headline.aspx?headlineid=6818271