Talisker Resources Ltd. announced high-grade drill results highlighted by 47.60 g/t Au over 1.20 metres within a broader interval of 8.99 g/t over 6.80 metres at its 100% owned flagship Bralorne Gold Project. Talisker initiated resource conversion drilling on October 17, 2023 with 15,000 metres of planned drilling. Hole SB-2023-003 intersected 47.60 g/t Au over 1.20 metres within a broader interval of 8.99 g/t Au over 6.80 metres on the Alhambra Vein.

Hole SB-2023-004 intersected 118.50 g/t Au over .50 metres within 27.48 g/ton Au over 2.25 metres on the BK Vein and 11.72 g/t Au over 1.50 metres on the Alhambra Vein. The resource conversion drill program is focused on increasing confidence in the Alhambra and BK Vein. SB-2023-003 Description: Partial results received; two samples pending re-run.

Located in the King block and intersected dioritic intrusive. Alhambra Vein intersected from 110.7 to 111.9m as a banded brecciated quartz vein hosting visible gold and arsenopyrite and pyrite mineralization and moderate silica alteration. SB-2023-004 Description: Complete preliminary results received.

Located in the King block and intersected dioritic intrusive. Alhambra Vein Splay intersected from 81.7 to 82.42m as a banded brecciated quartz vein hosting arsenopyrite and pyrite mineralization. Alhambra Vein intersected from 95.11 to 97.24m as a banded brecciated quartz vein hosting visible gold and arsenopyrite and pyrite mineralization and moderate silica /mariposite alteration.

Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica-sericite±mariposite alteration halos.