Moneta Gold Inc. announced assay results from the sampling of historically drilled, but never assayed, core from fifty-five (55) drill holes on the Windjammer and 903 deposits at the Tower Gold project, located in the Timmins Gold camp, Ontario. The sampling was conducted in addition to 76,000 metres ("m") of infill and resource upgrade drilling completed on the 4.5 million ("M") ounces ("oz") indicated gold ("Au") and 8.3 Moz inferred Au mineral resource estimate at the Tower Gold project in 2022. Drilling Highlights: 903: 903-13-05 intersected 21.75 m @ 1.23 grams per tonne "g/t" Au, including 4.50 m @ 3.85 g/t Au, including 1.50 m @ 6.20 g/t Au; OSK-G16-305 intersected 27.70 m @ 0.82 g/t Au, including 10.00 m @ 1.28 g/t Au, including 2.00 m @ 2.92 g/t Au; 903-13-05 intersected 24.00 m @ 0.73 g/t Au, including 14.00 m @ 1.09 g/t Au, including 2.00 m @ 2.44 g/t Au; 903-13-04x intersected 21.00 m @ 0.55 g/t Au, including 2.00 m @ 1.94 g/t Au; GE88-14 intersected 6.00 m @ 1.27 g/t Au, including 2.00 m @ 2.29 g/t Au; and GE88-14 intersected 1.37 m @ 5.20 g/t Au. Windjammer: MWJ08-14x intersected 28.00 m @ 0.51 g/t Au, including 10.00 m @ 0.71 g/t Au, including 1.50
m @ 2.00 g/t Au; MWJ11-59 intersected 28.00 m @ 0.50 g/t Au, including 1.60 m @ 5.93 g/t Au; MWJ11-59 intersected 44.00 m @ 0.32 g/t Au, including 18.00 m @ 0.47 g/t Au; MWJ12-79 intersected 8.00 m @ 1.00 g/t Au, including 2.00 m @ 3.65 g/t Au; WJ88-18x intersected 8.00 m @ 0.62 g/t Au, including 1.50 m @2.87 g/t Au; MI-91-148x intersected 5.50 m @ 0.79 g/t Au, including 2.00 m @ 1.37 g/t Au.