Siemens Energy recently completed the commissioning of one feed and sales gas train and one refrigeration compression train for the Pipestone Processing Facility in Grand Prairie, Alberta, Canada. The Pipestone Processing Facility is owned by Keyera Partnership, a subsidiary of Keyera Corp. DATUM centrifugal compressors and a gearbox, driven by a 40-megawatt SGT-750 industrial gas turbine. The refrigeration train consists of a gearbox and an electric motor-driven DATUM compressor with a variable frequency drive. The project is the first application of this generation of gas turbine for a gas processing plant in North America. The dry-low emissions (DLE) combustion system of the SGT-750 turbine offers world-class emission performance and fuel flexibility over a wide load range. The turbine can achieve single-digit NO? emission levels down to a 20% load. The compression train also includes a waste heat recovery unit, which will enhance processing efficiency and further contribute to reducing the plant’s carbon footprint. The facility has a total sour gas processing capacity of 200 million cubic feet per day (with acid injection capabilities), along with 24,000 barrels per day of raw condensate processing capacity and associated water disposal facilities. A flexible long-term service contract is in place between Siemens Energy and Keyera Partnership. As part of the agreement, Siemens Energy will provide tailored maintenance services to Keyera Partnership for the SGT-750 installation.