Sacyr : Valoriza Conservación de Infraestructuras consolidates its drilling division with its first external projects
September 28, 2016 at 04:45 pm IST
Share
22/09/2016
Work carried out for different marble quarries and metal ore mining companies
After one and a half years of activity, the Drilling Division of Valoriza Conservación de Infraestructuras has been awarded several contracts in the mining sector for work in different marble quarries and metal ore mining companies, in addition to the activities already carried out by Valoriza Minería.
The activities being carried out include drilling with core recovery (wireline system) in different diameters, from P through to N, and in depths of up to 900 meters in any type of soil and any slant, including horizontal drilling.
With these new contracts, Valoriza Conservación de Infraestructuras consolidates its position as a leading company in this type of drilling, and bolsters its presence in Extremadura, Galicia and Andalusia.
Sacyr SA published this content on 22 September 2016 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 28 September 2016 11:15:11 UTC.
Original documenthttp://www.sacyr.com/es_en/Channel/News-Channel/news/Press-Releases/2016/20160922-VCI-Sondeos.aspx
Public permalinkhttp://www.publicnow.com/view/0CF1625D5984E0D9D7714334384C64BA1068DDC6
Sacyr, S.A. is a building and public works group. Net sales (including intragroup) break down by activity as follows:
- industrial site,s infrastructure and building construction (49.4%);
- management of infrastructure under concession (32.3%): airports, roads, hotels, offices, shopping malls, etc.;
- services (17.1%): maintenance and cleaning of buildings, construction and installation of water pipeline systems and gas emission reduction systems, waste and wastewater collection and treatment, etc.;
- other (1.2%).
66.1% of sales are abroad.