Royal BAM N : Dubai's Museum of the Future will open on 22 February 2022
February 18, 2022 at 05:22 pm IST
Share
[Link]
Gouda, the Netherlands, 18 February 2022 - The Museum of the Future in Dubai - delivered by BAM International bv, an operating company of Royal BAM Group nv - will open to the public on 22 February 2022.
The futuristic torus shaped, iconic building is Dubai Future Foundation's latest venture, which sits under the watchful eye of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai. It will explore the future trends and opportunities in science, technology and innovation.
As the main contractor BAM was responsible for all aspects of the construction execution and the complex contractors design elements such as the façade and landscape mound. BAM's experience in digital led projects and the project team's dedication to BIM and digital construction have enabled a high level of integrated design and construction, perhaps impossible to achieve with traditional methods.
The stainless steel facade, which extends over 17,000m2 , includes quotes from poetry by Sheikh Mohammed bin Rashid Al Maktoum, the calligraphy is illuminated by over 14,000m of LED lights. The Arabic calligraphy has been designed by the Emirati artist Mattar bin Lahej. Among the quotes is: 'The future belongs to those who can imagine it, design it, and execute it.'
Project manager Seamus O'Sullivan said: 'Delivering the vision of Dubai Future Foundation has been a great achievement by BAM, over more than 1,200 BAM employees on site, construction partners and sub-contractors. Together we have managed to overcome the numerous challenges, this building has pushed the boundaries of what we now believe is possible. We can be proud that given these difficult circumstances our continuous attention to safety has resulted in a very strong safety performance, with no major accidents.'
BAM International's managing director Wouter Remmelts added: 'Since last year BAM has gradually handed over parts of the Museum of the Future, allowing the client to start the fitting out of the interior and the setting up the exhibitions.'
Key project data Museum of the Future
Location
Dubai, United Arab Emirates
Client
Dubai Future Foundation
Developer
North25
Architect
Killa Design
Lead consultant
Buro Happold
Main contractor
BAM International
Construction period
June 2016 - September 2021
High
84 metres
Floors
30,545m2 over 9 floors
Structure
steel framework, comprising 2,400 diagonally intersecting steel members (completed in November 2018)
Platinum certification from LEED (as first Museum in the Middle East)
one of the most beautiful buildings on earth
one of the most advanced buildings in the world
the World's Most Complex Building
one of the most challenging construction projects ever attempted
One of Dubai's more creative architectural feats
a global architectural and engineering icon
Attachments
Original Link
Original Document
Permalink
Disclaimer
Royal BAM Group NV published this content on 18 February 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 18 February 2022 11:51:02 UTC.
Royal BAM Group N.V. is a building and public works group. Net sales break down by activity as follows:
- buildings and civil engineering infrastructure construction (88.3%): roads, highways, airports, tunnels, railways, residences, hospitals, schools, offices, businesses, etc. The group also develops subcontracted mechanical and electrical installations implementation activity;
- real estate development (8.7%);
- other (3%).
Net sales are distributed geographically as follows: the Netherlands (47.9%), the United Kingdom (42.7%), Ireland (7.4%), Belgium (1.9%) and other (0.1%).