Recharge Metals Limited reported further drill results from the company's Brandy Hill South Project located within the Archaean Gullewa Greenstone Belt in Western Australia. These are the final assays from the extensive field program completed during 2022 and have encouragingly extended the known limits of the copper mineralisation delineated to date at the Brandy Hill South Prospect. The strike length of copper mineralisation intersected to date exceeds 500 metres.

Mineralisation remains open in all directions. Drillholes BHRCD027 and BHRCD028 were collared to the west of the Salt Creek Shear Zone and were designed to test the conductor modelled from earlier drillhole BHD026. The zones of sulphide mineralization within BHRCD027 broadly coincided with the location of the position of the high-order conductor (~7,000 siemens) BHD026-3. BHRCD027 returned the following significant assays: 22.5m at 1.02% Cu, 6.8g/t Ag, 32ppm Mo, 654ppm W from 375.50m including 7.5m at 1.65% Cu, 11g/t Ag, 15ppm Mo, 929ppm W from 375.50m; 20.96m at 0.37% Cu, 3.2g/t Ag, 19ppm Mo, 343ppm W from 404.04m; No assays of note were returned from BHRCD028.

Drillholes BHRCD029 and BHRCD030 were designed to test the modelled DHTEM conductor referred to as BHD026-2. The zones of sulphides broadly coincided with the location of the modelled position of the high-order conductor (~2,400 siemens). BHRCD029 returned the following significant assays: 12m at 0.30% Cu, 1.3g/t Ag, 29ppm Mo, 450ppm W from 130m; 15m at 0.33% Cu, 2.9g/t Ag, 38ppm Mo, 181ppm W from 300m; 23m at 0.33% Cu, 2.8g/t Ag, 15ppm Mo, 209ppm W from 339m; 10.93m at 0.27% Cu, 2.1g/t Ag, 20ppm Mo, 253ppm W from 373m. BHRCD030 returned the following significant assays: 42m at 0.46% Cu, 4.7g/t Ag, 29ppm Mo, 340ppm W from 90m Including 5m at 1.56% Cu, 18.5g/t Ag, 28ppm Mo, 258ppm W from 91m; 15m at 0.26% Cu, 1.4g/t Ag, 20ppm Mo, 239ppm W from 214m; 35m at 0.32%, 2.8g/t Ag, 23ppm Mo, 323ppm W Cu from 278m; 12m at 0.26% Cu, 2.4g/t Ag, 25ppm Mo, 182ppm W from 370m.

BHRCD034 was the most southern hole completed to date along the Salt Creek Shear and was designed to target a DHTEM conductor modelled from earlier drillhole BHRC017. Intense zones of sulphide mineralisation broadly coincided with the projected location of the modelled conductor BHD017A. BHRCD034 returned the following significant assays: 3m at 0.38% Cu, 4.9g/t Ag, 14ppm Mo, 380ppm W from 196m; 4m at 0.25% Cu, 1.4g/t Ag, 41ppm Mo, 528ppm W from 233m; 13m at 0.37% Cu, 2.4g/t Ag, 1182ppm Mo, 238ppm W from 306m.