EKJV Exploration Report
September 2016 QuarterASX ANNOUNCEMENT
31 October 2016
Australian Securities Exchange Code: RND
Board of Directors:
Mr Otakar Demis
Chairman and Joint Company Secretary
Mr Anton Billis
Managing Director
Mr Gordon Sklenka
Non-Executive Director
Mr Roland Berzins
Joint Company Secretary
Suite G1, 49 Melville Parade South Perth WA 6151
T: +61 8 9474 2113
F: +61 8 9367 9386
E:info@randmining.com.au
W: www.randmining.com.au ABN: 41 004 669 658
Rand Mining Ltd (ASX code: RND) has pleasure in providing the Quarterly EKJV Exploration Report dated 31 October 2016.
For further information, please contact:
Roland Berzins
E:rberzins@gcpcapital.com.au
Ph: +61 8 9474 2113
EASTKUNDANAJOINTVENTURE September 2016 Quarterly EKJV Exploration ReportFor distribution to JV Partners:
Northern Star Resources Limited
Tribune Resources Limited
Rand Mining Limited
CONTENTS
FUTURE WORK 4
APPENDIX 1 5
TABLES AND FIGURES
Table 1 - EKJV exploration activity for the September Quarter.3
SUMMARY
No exploration drilling was undertaken on the EKJV tenements in the September quarter of FY1617. Exploration focus moved from near mine activity to longer term generative development of the tenure.
A large geophysical survey covering the western part of the tenement package was the completed during the quarter. This will assist in the generation of exploration targets away from the main operating mines.
Project
Prospect
Tenement
SAM Geophysical Surveys
EKJV
Far Kundana West
M16/421
789 Ha
EKJV
M15/1413
17 Ha
EKJV
M15/993
129 Ha
TOTAL
935 Ha
Table 1 - EKJV exploration activity for the September Quarter.
EXPLORATION ACTIVITY
Far Kundana West Geophysics
A sub-audio magnetics (SAM) geophysical survey was undertaken over EKJV tenements M15/1413, M16/421 and M15/993 through the latter part of August. The survey was designed to complement and combine with a 2014 survey on the WKJV tenement M16/213.
Results for the survey received in September have identified several linear structures. These structures are orientated NW-SE (304-360), slightly oblique to stratigraphy and sub- parallel to regional significant structures such as the Zuleika shear zone, located 5km to the east. Future RAB drilling will test the target areas identified in the SAM survey.
Figure 1 - Far Kundana West SAM survey results.
Rand Mining Ltd. published this content on 31 October 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 31 October 2016 08:52:05 UTC.
Original documenthttp://randmining.com.au/wp-content/uploads/2016/10/Quarterly-EKJV-Exploration-Report.pdf
Public permalinkhttp://www.publicnow.com/view/1B83947A231621AAAE78C819C46AF285C4F16D25