Rail Vikas Nigam Limited announced that it has received LOA on January 10, 2023, for Construction of Elevated Viaduct (Approximate Length of 10 Km), Nine (9) Elevated Metro Stations at Sholinganallur Lake-I, Sri Ponniamman Temple (Sholinganallur Lake-II), Sathyabama University (Semmeancheri-I), Semmeancheri-II, Gandhi Nagar, Navallur, Siruseri, Siruseri SIPCOT-1 and Siruseri SIPCOT-2 and Stabling Viaduct at SIPCOT. The accepted contract amount is INR 11,341,142,182.00/- (including GST and provisional sum).Time period by which the order(s)/contract(s) is to be executed; 1,065 days.