Prodigy Gold NL reported assay results from RC drilling at the Euro JV Project which is part of a farm-in agreement with Newcrest. Newcrest are to sole fund up to $12 million over seven years to ultimately earn up to a 75% interest in the project. The project area (`Euro JV Project') hosts key targets along strike or parallel to the Trans-Tanami Trend which have seen limited or no previous exploration. Two targets have been drilled at the Dune Prospect. The targets have coincident geochemical anomalism and IP geophysical anomalies. Limited previous aircore drilling intersected 3m @ 0.3g/t Au . The recently completed program of 8 holes for a total of 1,466m is the first bedrock drilling into these targets. The holes were not drilled to the planned depth of 300m due to the intersection of water in the holes. The planned diamond program will complete the drilling of the target position. Gold mineralisation has now been defined over 800m of strike by the recent RC drilling. Alteration and quartz sulphide veins were intersected within sediments and felsic intrusions . Highlights include: 8m @ 1.9g/t Au from 94m (EUR0003), 2m @ 0.7g/t Au from 116m (EUR0004). Mineralised intervals of up to 37m of quartz sulphide veining and alteration have been intersected including 37m @ 0.15g/t Au from 123m in EUR0004. Gold anomalism has now been defined over 1,000m of strike intersecting quartz sulphide veins within siltstones and felsic intrusions (Figure 3). Highlights from the recent program include: 2m @ 12g/t Au from 105m (EUR0006), 2m @ 3.0g/t Au from 117m (EUR0008), 3m @ 1.5g/t Au from 153m (EUR0001), 3m @ 1.0g/t Au from 59m (EUR0001) was intersected in the transported cover.