Pensana Metals Ltd. reported more excellent drill results from the final batch of results of its 108 hole drill programme at the Longonjo NdPr Project in infrastructure rich Angola. All new intersections lie outside of the current Mineral Resource area and extend the NdPr mineralisation to the south, east and west. The high grade mineralisation starts at surface and remains open in the southern area. The new intersections also identify a new thick zone of particularly NdPr­ enriched mineralisation (LRC071, where NdPr makes up 36% of total rare earths) on the western margin of the carbonatite 1,200 metres from the limit of the current Mineral Resource estimate. The Company has now received all results from the 2018 drilling programme and has appointed SRK Consulting (Perth) to complete a revised Mineral Resource estimate, which is scheduled for completion in February 2019. Assay results from the remaining 41 wide spaced vertical drill holes have returned some of the thickest and higher grade received to date including: 50 metres at 5.63% REO including 1.00% NdPr from surface to end of hole in drill hole LRC089. Located outside of the current Mineral Resource area, they extend the zone of highgrade mineralisation to the east and south. The results also identify a new zone of particularly NdPr rich mineralisation in the west, 1,200 metres from the current Mineral Resource estimate boundary. Mineralisation remains open to the south.