TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

In accordance with the requirements of National Instrument 43-101 "Standards of Disclosure for Mineral Projects" of the Canadian Securities Administrators

Effective date: June 30, 2022

Prepared By:
M. Wafforn, P.Eng.
C. Emerson, FAusIMM
A. Delgado, P.Eng.


TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


1SUMMARY
1.1Introduction
This Technical Report has been prepared by Pan American Silver Corp. (Pan American or PAS), in accordance with the disclosure requirements of National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101), to disclose relevant information about the Dolores Property (Property or Dolores). The report is an update to and replaces the "Technical Report for the Dolores Property, Chihuahua, Mexico", which had an effective date of December 31, 2016, and was prepared by Pan American (the 2016 PAS Technical Report). The main purpose of this report is to provide an update on the Property, the Dolores mine operation and report the current Mineral Resources and Mineral Reserves.
The effective date of this Technical Report is June 30, 2022. The effective date of the Mineral Resource and Mineral Reserve estimates is June 30, 2022. The Mineral Resources and Mineral Reserves were depleted for mining and adjusted for stockpile inventories up to June 30, 2022.
1.2Property description and ownership
The Property on which the Dolores mine is located is in the state of Chihuahua, Mexico, approximately 250 kilometers (km) west of the city of Chihuahua, at 29°00' North, 108°32' West. Pan American has 100% ownership of the Dolores mine and the mining concessions, through its wholly-owned subsidiary Compañía Minera Dolores S.A. de C.V. The Property mineral rights are held under three contiguous mining concessions with a total area of 27,700 hectares (ha).
Ejido Huizopa owns the majority of the surface rights on the Property. Pan American has surface rights agreements with Ejido Huizopa which allows for irrevocable access and the right to carry out exploration and mining activities for a term of 15 years with a right to extend for a further 15 years. The initial 15-year period extends until 2024. Discussions on the terms of the 15-year extension are already in progress
Water for the operations is sourced from wells in the pit, the nearby Tutuaca River, and the Chabacan dam, depending on the year and requirements. Water extraction permits are in place to ensure water requirements are met. A 115 kilovolts (kV), 98 km long power line is connected to the Mexican national grid supplies power to the mine and is sufficient for the current needs of the operation. Back-up power is available on site by six 1,800 kilowatt (kW) Cummins and two 1,200 kW Caterpillar diesel generators. Infrastructure includes the typical components of an operating open pit, including the mine workings, the processing facilities, heap leach pads, medium grade ore stockpiles, waste rock storage facilities, workshops, laboratories, storage facilities, offices, drill core and logging sheds, water and power lines, access roads, a light aircraft landing strip, an employee and construction camp, and recreational facilities.
1.3Geology and mineralization
The Property is located within the Sierra Madre Occidental volcanic belt, an arc formed by eastward subduction of the Pacific Plate. The Sierra Madre is a metallogenic terrane well known for its epithermal precious metal deposits. The lower part of the arc comprises late Cretaceous to early Tertiary calc-alkaline batholiths and equivalent volcano sedimentary rocks referred to as the 'Lower Volcanic Series'. They represent magmatic activity about 80 to 40 million years ago and were followed by two periods of major ignimbrite eruption in the early Oligocene and early Miocene. Collectively these constitute the 'Upper Volcanic Series'.
The most important faults on the Property, from west to east, are the Chupacabras, San Francisco and East Faults. The San Francisco Fault and its footwall host most of the mineralization on the Property. The immediate footwall and hangingwall of the San Francisco Fault form a 500 metre (m) wide northwest-striking corridor of igneous intrusions broadly following the fault.
The principal and most important alteration is silicification, which increases with the presence of mineralization, and ranges from weak to strong, pervasive, massive, residual, and pseudo-vuggy.
PAN AMERICAN SILVER CORP. 2
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Silver and gold mineralization at Dolores is hosted in north-northwest trending hydrothermal breccias and sheeted vein zones in the order of 5 m to 10 m wide. Most high-grade mineralization occurs along three major structures that provided the conduit for metal-bearing fluids. Silver and gold mineralization identified on the surface at Dolores lies over an area 4,000 m long and up to 1,000 m wide. Hydrothermal breccias carry the highest silver and gold grades and pass outward into vein stock works. The veins are thin, rarely over 30 millimetres (mm), and tend to occur as sheeted swarms. Economically mineable grades occur where the veins are sufficiently closely spaced.
Dolores is a low sulphidation epithermal deposit with strong structural control.
1.4Drilling, sampling, and verification
Since Pan American acquired the Property, staff and consulting structural geologists have carried out near mine surface geological and structural mapping, and surface sampling on the continuity of the San Francisco and Alma Maria structures.
Most of the drilling on the Property centers over the strike length of the currently defined Mineral Resources and Mineral Reserves. A total of 1,820 drillholes for approximately 433,600 m, of which over 359,000 m consists of diamond drilling, have been drilled on the Property. Pan American drilled 693 drillholes (approximately 145,000 m) representing 38% of diamond drilling and 33% of the total drillholes on the Property. All underground drilling (275 diamond drillholes for 43,700 m) has been carried out by Pan American.
Drillhole collar locations for both diamond and reverse circulation (RC) methods are set up by the mine survey department prior or to drilling. Final collar coordinates are surveyed by the mine surveyors using total station methods on completion of the drillhole. Downhole surveys are carried out using a Reflex Multi-shot instrument on average every 25 m down the hole.
Diamond drillholes are logged, photographed, halved, and sampled in a secure core logging facility at the Property. The drill core is cut in half with a diamond bladed saw, and samples are selected with respect to geological features, in 2 m intervals or less.
RC drillhole samples are taken using a rig-mounted automatic cyclone sampling system which ensures a representative sample split for assay. In addition to the sample for assay a chip sample is also taken from each sample interval and stored in a chip box for geological identification and record.
Samples are collected weekly from site by laboratory staff and driven to SGS at Durango or Actlabs at Zacatecas for sample preparation and analysis.
Since acquiring the Property in 2012, Pan American has implemented an industry standard quality assurance / quality control (QA/QC) program which includes the submission of certified reference materials (CRMs), blanks, and duplicate samples to the laboratory. QA/QC results are reviewed regularly to ensure that appropriate and timely action is taken in the event of a failure. The insertion rate for QA/QC samples is 5% each of blanks, CRMs, and duplicate samples.
Data verification is undertaken by the Qualified Persons (QPs) who visit the Property regularly and undertake reviews of the processes and practices in their respective discipline.

PAN AMERICAN SILVER CORP. 3
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


1.5Metallurgical testwork
Following acquisition of the mine in April 2012, Pan American established a metallurgical test program. Pan American selected 521 drill core samples that represented the deposit in terms of grade, ore type (oxidation state), and lithology in the proportions expected to be processed during the life-of-mine (LOM). Test work included cyanidation column leach tests, grinding and comminution studies, filtration tests, compaction and permeability tests. In addition, monthly production composites of the heap leach material and pulp agglomerates are collected, and column leach test are carried out as part of the metallurgical test-work quality control.
1.6Mineral Resources
Pan American updates Mineral Resources on an annual basis following reviews of metal price trends, operational performance and costs experienced in the previous year, and forecasts of production and costs over the LOM. Infill and near-mine drilling is conducted as required through the year. The drillhole data cut-off date for the commencement of the current geological interpretation was April 30, 2022 and the effective date of the Mineral Resource estimate is June 30, 2022.
The Mineral Resource estimate was prepared by Pan American staff under the supervision of, and reviewed by Christopher Emerson, FAusIMM, Vice President, Business Development and Geology of Pan American, who is a "Qualified Person" as that term is defined by NI 43-101 (QP). They have been estimated in accordance with the CIM Estimation of Mineral Resources and Mineral Reserves, Best Practice Guidelines (2019), and reported according to the CIM Definition Standards (2014).
Table 1.1 tabulates a summary of the total Mineral Resources for the Property as at June 30, 2022. This total includes contributions from the open pit, underground and stockpile locations and are also a sum of direct heap leach and pulp agglomeration material which have different modifying factors discussed in Section 14.11. The cut-off value applied varies according to mining type and process route. These are listed in the footnotes to the table.
There are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the potential development of the Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources reported here are in addition to Mineral Reserves.

PAN AMERICAN SILVER CORP. 4
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 1.1 Summary of Mineral Resources as at June 30, 2022
Classification Tonnes
Grade
Contained metal
Mt Ag g/t Au g/t Ag Moz Au koz
Measured 2.1 30 0.53 2.1 36.5
Indicated 0.8 57 1.13 1.5 29.7
Measured + Indicated 3.0 38 0.70 3.6 66.2
Inferred 2.5 29 0.92 2.4 74.4
Notes:
•CIM Definition Standards (2014) were used for reporting the Mineral Resources.
•Mineral Resources exclude those Mineral Resources converted to Mineral Reserves.
•Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
•Mineral Resource estimates were prepared under the supervision of or were reviewed by Christopher Emerson, FAusIMM, Vice President, Business Development and Geology of Pan American.
•Cut-off values use a value/tonne calculation. The value/tonne is based on a combination of metal price and individual metal recoveries which are variable throughout the deposit.
•Mineral Resources have been reported using pulp agglomeration and / or heap leaching metal recovery and cost parameters.
•The cut- offs used to report the open pit are a value/tonne of $12.30 for Heap Leach and $26.50 for pulp agglomeration.
•The cut-off used to report the underground area is a value/tonne of $73.5, and all material is assumed to be processed through the pulp agglomeration plant.
•Metal prices used are $22 per ounce of silver and $1,700 per ounce of gold.
•Mineral Resources were constrained by designs and other modifying factors to demonstrate reasonable prospects of economic extraction.
•The drillhole database had a cut off date of April 30, 2022.
•Totals may not add up due to rounding.
1.7Mineral Reserves
Pan American updates Mineral Reserves annually following reviews of metal price trends, operational performance and costs experienced in the previous year, and forecasts of production and costs over the life of the mine. The Mineral Reserve is based on measured and indicated Mineral Resources estimated as at June 30, 2022. The effective date of the Mineral Reserve estimate is June 30, 2022. No other new material information has become available between the effective date and the signature date given on the certificates of the QPs.
Mineral Reserves were prepared by Pan American staff under the supervision of, and reviewed by Martin Wafforn, Senior Vice President, Technical Services and Process Optimization of Pan American, who is a QP. They have been estimated in accordance with the CIM Estimation of Mineral Resources and Mineral Reserves, Best Practice Guidelines (2019), and reported according to the CIM Definition Standards (2014). The Mineral Reserve estimates conform to CIM Definition Standards referred to in NI 43-101. All design and scheduling have been completed using the Mineral Resource model and estimate described in Section 14.
Mineral Reserve estimates are based on assumptions that include mining, metallurgical, infrastructure, permitting, taxation, and economic parameters. Increasing costs and taxation and lower metal prices will have a negative impact on the quantity of estimated Mineral Reserves. There are no other known factors that may have a material impact on the estimate of Mineral Reserves.
The estimated Proven and Probable open pit Mineral Reserves for the Dolores deposit are summarized in Table 1.2.
PAN AMERICAN SILVER CORP. 5
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 1.2 Dolores Mineral Reserves as at June 30, 2022
Location Category
Tonnes
Grade
Contained metal
Mt
Ag g/t
Au g/t
Ag Moz
Au koz
Open pit Proven
9.2
22
0.70
6.4
205.3
Probable
4.1
18
0.60
2.4
77.7
Total
13.2
21
0.66
8.8
283.0
Stockpiles Proven
3.7
18
0.25
2.2
30.0
Probable



-
-
Total
3.7
18
0.25
2.2
30.0
Total Proven
12.9
21
0.57
8.6
235.4
Probable
4.1
18
0.60
2.4
77.7
Total Reserves
17.0
20
0.57
11.0
313.1
Notes:
•CIM Definition Standards (2014) were used for reporting the Mineral Reserves.
•Mineral Reserves are in addition to Mineral Resources.
•Figures in the tables may not compute exactly due to rounding.
•Metal prices used are $19.00 per ounce of silver and $1600 per ounce of gold.
•Mineral Reserves are reported on a 100% ownership basis. Pan American owns 100% of Dolores.
•Cut-off values use a value/tonne calculation. The value/tonne is based on a combination of metal price and individual metal recoveries which are variable throughout the deposit.
•The cut-offs used to report the open pit are a value/tonne of $12.30 for Heap Leach and $26.50 for pulp agglomeration.
1.8Mining
Mining at Dolores has been ongoing since 2008 using conventional open pit methods with excavators, shovels, loaders, and haul trucks. Ore grade control drilling is carried out using angled RC drilling to provide closer spaced sample data for a grade control estimate, which is used to mark out the ore and waste mining boundaries. The grade control holes are oriented perpendicular to the strike of the deposit on sections spaced every 15 m along strike and every 10 m to 15 m across strike. Drillholes are approximately 43 m long, which results in a nominal vertical span of 30 m, equal to four bench heights. The drillhole pattern is offset with 25% of the holes drilled from each bench to provide full coverage. The RC drillholes are logged for lithology and oxidation and sampled every 2 m.
Ore and waste material is drilled and blasted using 135 mm diameter holes, drilled in a nominal pattern of 8.5 m deep blast holes spaced 4.5 m along strike and 4.5 m across strike. Explosives used are ammonium nitrate fuel oil (ANFO). Ore and waste are usually blasted separately, and a blast movement monitoring system is used to manage ore loss, dilution, and material misclassification.
The underground mine, which was operating concurrently with open pit mining until April 30, 2022 utilizing longhole open stoping, is now in care and maintenance.
1.9Mineral processing and recovery methods
Run-of-mine (ROM) ore is trucked to a crushing plant and crushed to a particle size of 80% passing (P80) 6.7 to 9.2 mm at a nominal rate of 15,860 tonnes per day (tpd). The crushed ore product is conveyed to the leach pads via an overland conveyor system and placed on the pad using portable grasshopper conveyors and a radial stacking system. Drip and sprayer systems apply sodium cyanide solution to the heap leach pads for precious metal leaching.
ROM high-grade ore is delivered to the pulp agglomeration circuit where it is crushed in a separate two-stage crushing circuit followed by two-stage grinding to P80 425 microns (µm) at an average rate of 5,440 tpd. Pebble lime and sodium cyanide solution are added at the milling circuit to initiate leaching. The milled slurry is filtered and blended with crushed material from the heap leach circuit along with cement
PAN AMERICAN SILVER CORP. 6
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

before being drum agglomerated and combined with the heap leach material for additional metal recovery at the heap. Filtrate from the filters is clarified and pumped to the Merrill-Crowe plant along with pregnant leach solution from the heap.
The pregnant leach solution containing the dissolved silver and gold is processed through the Merrill-Crowe circuit to precipitate the silver and gold, and then the precipitate is pressed and dried. The dried material is melted in a furnace to form doré bars. The mine operates a closed-circuit processing system without tailings facilities.
1.10Infrastructure
The mine infrastructure comprises the open pit, processing facilities, heap leach pads, medium grade ore stockpiles, waste storage facilities, conveyor systems, ponds, a power generation plant, a 115 kV power line connection to the national grid, and maintenance shops and warehouses. The pulp agglomeration plant comprises of crushing, grinding, thickening, filtration, mixing, agglomeration, reagent, and auxiliary facilities. The operating mine is mature and site infrastructure including site roads are fully developed to support the existing mine production of 34 million tonnes per annum (Mtpa).
1.11Environmental
The most significant environmental issues at Dolores include surface disturbance, heap leach pad and waste dump stability, and reclamation liabilities associated with routine mine operations. Issues related to the stability and containment system of heap leach Pad 1, which developed prior to Pan American's acquisition of the Property, have been resolved by re-constructing the pad. The new heap leach Pad 1 was placed into operation in 2021.
An extensive program of community engagement activities is in place, including information sessions, infrastructure works, and educational and training programs for local people that have resulted in the establishment of several small businesses. Unskilled workers are sourced from nearby small villages, and the company has recruiting and training programs in place to develop the mining skills of the local workforce.
There are no known environmental or social issues that could materially impact the mine's ability to extract the Mineral Resources or Mineral Reserves.
1.12Capital and operating costs
The estimated operating costs are based on experience at the Dolores mine. Sustaining capital expenditures include pre-stripping, equipment replacement and heap leach pad expansions. Further capital may be required if economically justified or if there are substantial increases to the Mineral Reserves. Pan American estimates that sustaining capital expenditures in 2022 will be $28.5 million primarily for pre-stripping of phase 10a and the construction of heap leach pad capacity. Future sustaining capital costs will be dependent on requirements and reserve growth, if any. The cost of constructing heap leach pad capacity is estimated to average $2.62 per tonne over the remainder of the Mineral Reserves. For ROM heap leach ore, the cost of processing is estimated to average $6.20 per tonne plus $3.47 per tonne for General and Administration (G&A). For Pulp agglomeration ore, the cost of processing is estimated to average $20.40 per tonne plus $3.47 per tonne for G&A. Open pit mining costs are estimated to average $2.05 per tonne with some variations due to haulage distances for the different phases and elevations.

PAN AMERICAN SILVER CORP. 7
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


1.13Conclusions and recommendations
There are no known significant risks and uncertainties that could reasonably be expected to affect the reliability or confidence in the Mineral Resource and Mineral Reserve estimates. Pan American routinely conducts reconciliation of the reserve model to the grade control model and to the heap leach feed conveyor weight meter and sampler to monitor actual mine versus model performance. Reconciliation results are within acceptable tolerance limits for grade, tonnage, and metal.
The mining operations are established with a good understanding of the mining parameters and cost structure.
Overall, modelled recoveries for gold and silver at Dolores are being achieved. Modeled recoveries, monthly quality column composites, and actual production are largely in agreement.
The most significant environmental liabilities include surface disturbance and reclamation liabilities and issues related to the stability and containment system of the heap leach pads. Only a small portion of the waste is potentially acid generating and no specific measures to manage waste or ore deposition are required.
There are no known environmental or social issues that could materially impact the mine's ability to economically extract the Mineral Resources or Mineral Reserves.
In the way of recommendations, Pan American intends to continue with annual drilling programs and updates to the geological interpretation. Reviews of the geological interpretation against grade control drilling will continue to be undertaken on a regular basis to verify the reliability of the Mineral Resource and Mineral Reserve estimate.
Pan American will continue to optimize blasting patterns, and monitoring blast movements and pit slope stability. Recommendations have been made for additional geotechnical work (Walker, 2017), including:
•Operationally minimize the blasting overbreak and continue work to achieve design bench face angles.
•Continually observe the orientation, length, and location of continuous major structures as mining progresses and extend the geological and geotechnical model beyond the ultimate pit crest to understand the behaviour of the overall slopes.
In addition, Pan American plans to:
•Continue monthly composites leaching and load / permeability tests;
•Review higher cyanide consumption from material mined in recent years and impact in long term cost of leaching; and
•Conduct an independent review of the geotechnical performance and designs relating to the heap leach facilities.

PAN AMERICAN SILVER CORP. 8
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

TABLE OF CONTENTS
1SUMMARY
2
1.1Introduction
2
1.2Property description and ownership
2
1.3Geology and mineralization
2
1.4Drilling, sampling, and verification
3
1.5Metallurgical testwork
4
1.6Mineral Resources
4
1.7Mineral Reserves
5
1.8Mining
6
1.9Mineral processing and recovery methods
6
1.10Infrastructure
7
1.11Environmental
7
1.12Capital and operating costs
7
1.13Conclusions and recommendations
8
2INTRODUCTION
19
2.1General and terms of reference
19
2.2The Issuer
19
2.3Report authors
19
2.4Sources of information
20
2.5Other
20
3RELIANCE ON OTHER EXPERTS
22
4PROPERTY DESCRIPTION AND LOCATION
23
4.1Location
23
4.2Mineral tenure and title
23
4.3Royalties, back-in rights, payments, agreements, and encumbrances
26
4.4Environmental liabilities
26
4.5Permits
26
PAN AMERICAN SILVER CORP. 9
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

4.6Significant factors and risks
27
5ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE, AND PHYSIOGRAPHY
28
5.1Accessibility, local resources, population centres, and transport
28
5.2Physiography and climate
28
5.3Surface rights
28
5.4Power and water
28
5.5Infrastructure
29
6HISTORY
30
6.1Ownership
30
6.2Work carried out
30
6.3Historical Mineral Resource and Mineral Reserve estimates
30
6.4Production
31
7GEOLOGICAL SETTING AND MINERALIZATION
32
7.1Regional geology
32
7.2Local geology
33
7.3Property geology
34
7.3.1Lithostratigraphy
34
7.3.2Intrusions
36
7.3.3Structure
37
7.3.4Alteration
37
7.4Mineralization
37
8DEPOSIT TYPES
39
9EXPLORATION
40
10DRILLING
41
10.1Drilling summary and database
41
10.2Drilling procedures
42
10.2.1Drilling by Minefinders from 1996 to 2012
42
10.3Drilling by Pan American from 2012 to 2016
43
10.4Drilling by Pan American from 2016 to 2022
43
PAN AMERICAN SILVER CORP. 10
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

10.5Field procedures
43
10.5.1Diamond drilling
43
10.5.2Reverse circulation (RC) drilling
44
10.6Material impact on the accuracy and reliability of drilling results
44
10.7Conclusions and recommendations
44
11SAMPLE PREPARATION, ANALYSES, AND SECURITY
45
11.1Sampling method
45
11.1.1Minefinders (1996 - 2012)
45
11.1.2Pan American (2012 - present)
45
11.2Sample storage and security
45
11.3Sample preparation and analysis
46
11.3.1Minefinders (1996 - 2012)
46
11.3.2Pan American (2012 - mid 2022)
46
11.4Bulk density
47
11.5Quality assurance and quality control (QA/QC)
47
11.5.1Minefinders (1996 - 2012)
47
11.5.2Pan American (2012 - mid 2022)
47
11.6Summary statement and recommendations
60
12DATA VERIFICATION
61
12.1Geology data reviews
61
12.2Mine engineering data reviews
61
12.3Metallurgy data reviews
61
12.4Data adequacy
61
13MINERAL PROCESSING AND METALLURGICAL TESTING
62
13.1Introduction and previous work
62
13.2Pulp agglomeration study
63
13.2.1Cyanide leaching tests
64
PAN AMERICAN SILVER CORP. 11
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

13.32012 to 2021 quality control test work - production composites
64
13.3.1Production composite column leach tests
64
13.3.2Production compacted permeability tests
65
13.4Metallurgical recovery models
66
13.5Material issues and deleterious elements
67
14MINERAL RESOURCE ESTIMATES
68
14.1Introduction
68
14.2Available data, preparation, and validation
69
14.3Geological interpretation and modelling
72
14.4Geostatistics
75
14.5Variograms and grade interpolation
75
14.5.1Open pit
75
14.5.2Underground
75
14.6Block model
76
14.6.1Open pit
76
14.6.2Underground
76
14.7Bulk density
76
14.8Estimation validation
76
14.9Classification
77
14.10Planned dilution and loss
77
14.11Value estimates and mining constraints
77
14.12Mineral Resource tabulation
79
14.13Recommendations
80
15MINERAL RESERVE ESTIMATES
81
15.1Disclosure
81
15.2Dilution and ore loss
81
15.3Value estimates
82
15.4Geotechnical parameters
82
15.5Pit design and schedule
82
15.6Equipment and labour
83
PAN AMERICAN SILVER CORP. 12
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

16MINING METHODS
84
16.1Open pit operations
84
16.1.1Mining methods
84
16.1.2Geotechnical and hydrological parameters
84
16.1.3Production and process rates and expected mine life
85
16.1.4Waste mining
85
16.1.5Mining fleet and machinery
85
16.1.6Recommendations
86
16.2Underground operations
86
17RECOVERY METHODS
87
17.1Heap leach crushing and conveyor stacking
87
17.2Pulp agglomeration
87
17.3Merrill-Crowe recovery plant and refinery
90
17.4Power and water
91
18PROJECT INFRASTRUCTURE
92
18.1Transportation and logistics
93
18.2Processing facilities
93
18.3Auxiliary facilities
93
18.4Waste storage and stockpile facilities
94
18.5Power supply
94
18.6Water supply
94
18.7Mine communication system
94
18.8Explosive's magazines
94
18.9Tailings management facilities (TMF)
94
19MARKET STUDIES AND CONTRACTS
95
19.1Contracts and marketing
95
19.2Review by the QP
95
20ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT
96
20.1Environmental factors
96
20.2Environmental studies
96
20.3Permitting factors
96
PAN AMERICAN SILVER CORP. 13
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

20.4Waste disposal
96
20.5Site monitoring
97
20.6Water management
97
20.7Environmental certification
97
20.8Social and community factors
97
20.9Project reclamation and closure
98
20.10Expected material environmental issues
98
21CAPITAL AND OPERATING COSTS
99
21.1Capital costs
99
21.2Operating costs
99
22ECONOMIC ANALYSIS
100
23ADJACENT PROPERTIES
101
24OTHER RELEVANT DATA AND INFORMATION
102
25INTERPRETATION AND CONCLUSIONS
103
25.1Mineral Resources and Mineral Reserves
103
25.2Mineral processing, metallurgical testing, and recovery methods
103
25.3Mining and financial
103
25.4Environment and community
103
26RECOMMENDATIONS
104
26.1Mineral Resources and Mineral Reserves
104
26.2Mineral processing, metallurgical testing, and recovery methods
104
26.3Mining and financial
104
27REFERENCES
105
28QP CERTIFICATES
106

PAN AMERICAN SILVER CORP. 14
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Tables
Table 1.1Summary of Mineral Resources as at June 30, 2022
5
Table 1.2Dolores Mineral Reserves as at June 30, 2022
6
Table 2.1Responsibilities of each QP
19
Table 2.2Other experts who have assisted the QPs
20
Table 4.1Mining concession details
24
Table 10.1Drillhole summary
41
Table 10.2Drillholes by type 2017 - 2022
43
Table 11.1Laboratories used by Pan American 2012-mid 2022
46
Table 11.2Summary of QA/QC samples 2012 - mid 2022
48
Table 11.3Summary of QA/QC insertion rates 2012 - mid 2022
48
Table 11.4Summary of CRMs submitted for analysis by PAS 2012 - 2022
49
Table 11.5Summary of CRMs submitted by PAS - 2012-2022 categorized by year
50
Table 11.6Summary of CRM performance from 2012-mid 2022
52
Table 11.7Summary of blanks performance
53
Table 11.8Summary of field duplicate performance for Au - 2014 - 2022
54
Table 11.9Summary of field duplicate performance for Ag - 2014 - 2022
55
Table 11.10Summary of pulp duplicate performance for Au - 2014 - 2022
57
Table 11.11Summary of pulp duplicate performance for Ag - 2014 - 2022
58
Table 13.1Dolores test work programs summary (1997 - present)
62
Table 13.2Monthly composite leach test summary
64
Table 13.3Monthly composite partially leached pulp agglomerated and heap leach material - leach test summary
65
Table 13.4Compacted Permeability Test Summary
66
Table 13.5Heap leach metallurgical recovery model
66
Table 13.6Pulp agglomeration metallurgical recovery model
66
Table 13.7Heap leach metallurgical recovery kinetic model
67
Table 13.8Pulp agglomeration metallurgical recovery kinetic model
67
Table 14.1Summary of Mineral Resources at June 30, 2022
68
Table 14.2Reconciliation results 2020 - 2022
77
Table 14.3Metallurgical recoveries by material type and process route
78
PAN AMERICAN SILVER CORP. 15
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Table 14.4Economic parameters
78
Table 14.5Cost parameters
78
Table 14.6Cut-off values
78
Table 14.7Dolores Mineral Resources as at June 30, 2022
79
Table 15.1Dolores Mineral Reserves as at June 30, 2022
81
Table 16.1Open pit mining fleet
86
Figures
Figure 4.1Property location map
23
Figure 4.2Mining concessions and surface rights
25
Figure 7.1Tectono-stratigraphic terranes of Mexico
32
Figure 7.2Local geology map
33
Figure 7.3Stratigraphic and structural relations cartoon
34
Figure 7.4Simplified Property geological map
35
Figure 10.1Drillhole location map
42
Figure 11.1Performance for silver and gold CRMs from 2012 - 2022
51
Figure 11.2RPD and scatter plot of field duplicates Au - 2014 - 2022
55
Figure 11.3RPD and scatter plot of field duplicates Ag - 2014 - 2022
56
Figure 11.4RPD and scatter plot of pulp duplicates Au - 2014 - 2022
58
Figure 11.5RPD and scatter plot of pulp duplicates Ag - 2014 - 2022
59
Figure 13.1Agglomerates at the heap leach pad
63
Figure 14.1Reference plan showing section lines overlain on the open pit outline
70
Figure 14.2Section 1975
71
Figure 14.3Section 3250
71
Figure 14.4Plan of open pit mineralized domains trends
73
Figure 14.5Plan of underground mineralized domains trends
74
Figure 15.1Reserve pit design
83
Figure 17.1Pulp agglomeration flow sheet
89
Figure 17.2Pulp agglomeration plant
90
Figure 18.1Mine infrastructure plan
92

PAN AMERICAN SILVER CORP. 16
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


ABBREVIATIONS AND ACRONYMS

Abbreviations & acronyms Description
$ United States dollar
$/oz Dollar per ounce
$M Million dollars
% Percentage
° Degree
°C Degree Celsius
µm Micron
Actlabs Actlabs at Zacatecas
AMC AMC Mining Consultants (Canada) Ltd.; AMC Consultants Pty Ltd
ANFO Ammonium nitrate fuel oil
AuEq Gold equivalent
COG Cut-off grade
cm/s Cubic meters per second
CRM Certified reference material
DE Diatomaceous Earth
DSO Deswik Stope Optimizer
Echo Bay Echo Bay Mines
FW Footwall
g Gram
g/t Grams per tonne
G&A General and Administration
ha Hectare
ID2
Inverse distance squared
kg Kilogram
kg/t Kilograms per tonne
km Kilometre
km2
Squared kilometre
koz Thousand ounces
kV Kilovolt
kVA Kilovolt-ampere
kW Kilowatt
LLD Lower limit of analytical detection
LOM Life-of-mine
m Metre
m3
Cubic metre
m3/h
Cubic meters per hour
mg/L Milligram per litre
MIA Environmental Impact Study or Manifestation
Minefinders Minefinders Corporation Ltd.
MLI McClelland Laboratories Inc.
PAN AMERICAN SILVER CORP. 17
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Abbreviations & acronyms Description
mm Millimetre
Moz Million ounces
Mt Million tonnes
Mtpa Million tonnes per annum
MW Megawatt
NI 43-101 National Instrument 43-101
NSR Net Smelter Return
OK Ordinary kriging
OP Open pit
P80
80% Passing
PAS, Pan American Pan American Silver Corp.
ppm Parts per million
PROFEPA Mexican Federal Environmental Protection Authority
Property Dolores Property
QA/QC Quality assurance and quality control
QP Qualified Person
RC Reverse circulation drilling
ROM Run-of-mine
RPD Relative paired difference
RPEEE Reasonable prospects for eventual economic extraction
RQD Rock quality designation
SD Standard deviation
SEMARNAT Mexican Secretariat of Environment and Natural Resources
SGS SGS at Durango
SRCE Standardized Reclamation Cost Estimator
t Tonne
TMF Tailings Management Facility
tpd Tonnes per day
UG Underground
USA United States of America
PAN AMERICAN SILVER CORP. 18
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

2INTRODUCTION
2.1General and terms of reference
This Technical Report has been prepared by Pan American, in accordance with the disclosure requirements of NI 43-101, to disclose relevant information about the Property. The report is an update to and replaces the 2016 PAS Technical Report. The main purpose of this report is to give an update on the Property, the Dolores mine operation and report the current Mineral Resources and Mineral Reserves.
The effective date of this Technical Report is June 30, 2022. The effective date of the Mineral Resource and Mineral Reserve estimates is June 30, 2022. The Mineral Resources and Mineral Reserves were depleted for mining and include updates for stockpile inventories up to June 30, 2022. No new material information has become available between these dates and the signature date given on the certificates of the Qualified Persons (QPs).
2.2The Issuer
Pan American is a silver mining and exploration company listed on the Toronto (TSX:PAAS) and NASDAQ (NASDAQ:PAAS) stock exchanges. It has a diversified portfolio of mining and exploration assets located throughout the Americas, which include 10 operating mines.
2.3Report authors
Table 2.1 provides the names, details, and responsibilities of the QPs (as defined by NI 43-101) who prepared this Technical Report. The QPs are not independent of Pan American.
Table 2.1 Responsibilities of each QP
Qualified Persons responsible for the preparation and signing of this Technical Report
Qualified Person Position Employer Independent of Pan American Date of last site visit Professional designation Sections of report
Martin Wafforn Senior Vice President, Technical Services and Process Optimization Pan American Silver Corp. No October 19, 2021 P.Eng. 2 - 5, 15, 16, 19, 20, 21, 22, 24, and 1.1, 1.7, 1.8, 1.11, 1.12, 12.2, 25.1, 25.3, 25.4, 26.3
Christopher Emerson Vice President, Business Development and Geology Pan American Silver Corp. No October 19, 2021 FAusIMM 6 - 11, 14, 23, 27 and 1.2, 1.3, 1.4, 1.6, 1.13, 12.1, 12.4, 26.1,
Americo Delgado Vice President, Mineral Processing, Tailings & Dams Pan American Silver Corp. No April 26-28,2022 P.Eng. 13, 17, 18, and 1.5, 1.9, 1.10, 12.3, 25.2, 26.2
PAN AMERICAN SILVER CORP. 19
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Those who have assisted the QPs in the preparation of this report are listed in Table 2.2.
Table 2.2 Other experts who have assisted the QPs
Expert Position Employer Independent of Pan American Visited site Sections of report
Mo Molavi Director / Principal Mining Engineer AMC Yes No All
Mort Shannon General Manager / Principal Geologist AMC Yes No 2 - 12, 14
James Stoddart Principal Mining Engineer AMC Yes No 13, 15 - 17
Dante Juarez Director of Geology, Mexico and Central America Pan American Silver Corp. No Yes 2 - 12, 14
Mathew Andrews Vice President, Environment Pan American Silver Corp. No Yes 20
Carl Defilippi Engineering Manager KCA Yes Yes 13, 17
Caleb Cook Project Engineer/ Project Manager KCA Yes No 13, 17
Note: AMC refers to AMC Mining Consultants (Canada) Ltd. or AMC Consultants Pty Ltd in the case of James Stoddart. KCA refers to Kappes, Cassiday & Associates.

2.4Sources of information
Unless otherwise stated, information, data, and illustrations contained in this report or used in its preparation have been provided by Pan American for the purpose of this report. The prior Technical Report for the Property is the "Technical Report for the Dolores Property, Chihuahua, Mexico", with an effective date of December 31, 2016, prepared by Pan American (2016 PAS Technical Report).
2.5Other
Inspections of the Property are carried out regularly by the following QPs.
Mr. Wafforn visits the Property two or three times annually as part of his duties with Pan American. His most recent site visits were on August 13-14, 2021, and October 19, 2021. During these visits, Mr. Wafforn reviewed the operational open pit mine plan, actual mine operation data, the development advance and plans for the underground mine, consultant's geotechnical reports, mine budget plans, reserve to grade control to actual reconciliations, the site layout and logistics for mining and processing, safety protocols and indicators, the environmental layout, and general business performance.
Mr. Emerson most recently visited the Property on August 13-14, 2021, August 23, 2021, and October 19, 2021. During these visits Mr. Emerson reviewed the exploration drilling, sampling, and sample security protocols, drill core and the core cutting and storage facilities, bench and surface mapping, cross sections, the operational mine plan, actual mine operation data, grade control protocols, mining leases, site access, surface rights information, and general business performance.
PAN AMERICAN SILVER CORP. 20
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Mr. Delgado conducts regular visits, and visited the Property on April 26-28, 2022, March 9-11, 2020, and February 28, 2018, and March 1-2, 2018. During those visits, Mr. Delgado inspected the heap leach facilities and water dam, and reviewed stacking plans, irrigation rates, pulp agglomeration performance, agglomerates, permeabilities, Merrill-Crowe production rates, monthly composites, metallurgical balance, inventory, operational data, metallurgical lab testing, and general business performance.
Unless otherwise stated, all units are metric and currencies are expressed in United States dollars. Property data coordinates are in a local coordinate based on a transformation relative to the Mexico 97 geoid.
This report has an effective date of June 30, 2022.
PAN AMERICAN SILVER CORP. 21
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


3RELIANCE ON OTHER EXPERTS
The QPs responsible for this report have relied on the following internal expert within the organization for input to certain sections of this report for which they do not have specific expertise and have taken appropriate steps, in their professional judgement, to ensure that the work, information, or advice that they have relied upon is sound:
Mathew Andrews, Vice President Environmental, Pan American has contributed to Sections 4.4, 4.5, and 20 by providing information and opinions relating to environmental details that are described in those sections. The information and opinions are believed to be current, accurate and complete as of the effective date of this report.
PAN AMERICAN SILVER CORP. 22
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


4PROPERTY DESCRIPTION AND LOCATION
4.1Location
The Property within which the Dolores mine is located is in the state of Chihuahua, Mexico, approximately 250 kilometres (km) west of the city of Chihuahua, at 29°00' North, 108°32' West. Pan American has 100% ownership of the Dolores mine and the mining concessions, through its wholly owned subsidiary, Compañía Minera Dolores S.A. de C.V. A map of the Property location is shown in Figure 4.1.
Figure 4.1 Property location map
Source: Google (2021).

4.2Mineral tenure and title
The Property mineral rights are held under three contiguous mining concessions with a total area of 27,700 hectares (ha) covering the entire Mineral Resources and Mineral Reserves and surface infrastructure of the Dolores mine. Pan American makes the required payments to maintain the mining concessions and has agreements in place granting surface rights and legal access to the mining operations. To Pan American's knowledge, all obligations required for the conduct of mining operations at Dolores are currently in good standing.

PAN AMERICAN SILVER CORP. 23
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Ejido Huizopa owns the majority of the surface rights on the Property. An ejido is an area of communal land registered with the National Agrarian Registry of Mexico and parceled out to community members for

agricultural use. Pan American has surface rights agreements with Ejido Huizopa and with several individual members of the Ejido Huizopa dating from November 2006, which allows for irrevocable access and the right to carry out exploration and mining activities for a term of 15 years with a right to extend for a further 15 years. The agreement was renegotiated in 2009 so the initial 15-year period extends until 2024. Discussions on the terms of the 15-year extension are already in progress.
Details of the mining concessions are shown in Table 4.1. A plan of the mining concessions and surface rights relative to the pit outline at December 31, 2021 is shown in Figure 4.2.
Table 4.1 Mining concession details
Claim name
Claim number
Area (ha)
Expiry date
Silvia
217587
2,866
August 20, 2052
Unificacion Real Cananea
227028
1,920
December 12, 2039
Dolores
221593
22,914
March 3, 2054
PAN AMERICAN SILVER CORP. 24
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 4.2 Mining concessions and surface rights
Source: PAS (2022).
PAN AMERICAN SILVER CORP. 25
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


4.3Royalties, back-in rights, payments, agreements, and encumbrances
A Net Smelter Return (NSR) of 2% on silver production and 3.25% on gold production is payable to RG Mexico Inc. (RG), a subsidiary of Royal Gold Inc. There are no other known back-in rights, payments, agreements, or encumbrances in place.
4.4Environmental liabilities
The most significant environmental issues at Dolores include surface disturbance, heap leach pad and waste dump stability, and reclamation liabilities associated with routine mine operations. Issues related to the stability and containment system of heap leach Pad 1, which developed prior to Pan American's acquisition of the Property, have been resolved by re-constructing the pad. The new heap leach Pad 1 was placed into operation in 2021.
Pan American has implemented additional contingency measures in and around its three heap leach pads, including installation of well riser type over-liner solution collection systems, additional under drain and leak collection systems, and a network of containment, monitoring, and demonstration wells. Pan American also engages in construction and expansion of the pads after application of rigorous quality control to both the design and construction of the facilities.
The surface disturbance and reclamation liabilities are addressed under Pan American's project reclamation and closure plan, which is discussed in Section 20.9.
4.5Permits
Pan American holds all necessary environmental and operating permits for the development and operation of the mine and is in compliance with Mexican law in all material aspects.
The Mexican Secretariat of Environment and Natural Resources (SEMARNAT) approved permit applications for the construction and operation of Dolores, including an Environmental Impact Study or Manifestation (MIA), a Technical Justification Study for Change of Land‐Use, and an Environmental Risk Study in April 2006. These studies include a full assessment of the environmental and social impacts of the mine and environmental management plans, which describe the ongoing management and environmental monitoring programs. Subsequent permits were obtained for the expansion of Dolores in 2016 and 2017 which include the pulp agglomeration plant, an additional waste dump and underground mine. The MIA permit was updated in April 28, 2022 to cover phase 11 of the pit and the remaining mine life.
Other principal permits include an Accident Prevention Program, a Surface Water Extraction Authorization, an MIA for an underground exploration ramp, and a Waste Management Plan. A permit for the construction and operation of the pulp agglomeration plant was obtained in 2016.
There are some minor boundary differences between the MIA and Change of Land Use permits that occur in various areas of the Dolores site, including the location of the pulp agglomeration plant. The resolution of the boundary differences will be the subject of a "regularization" process that is not anticipated to have a material impact on the operation of the pulp agglomeration plant. A permit valid until 2029 is in place for the operation of the underground mine, however, the operation is currently in care and maintenance. These permits are renewed regularly and as far as Pan American is aware, all of the permits required for the mine and processing operations are in good standing.
PAN AMERICAN SILVER CORP. 26
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Modifications to the existing permits will be necessary to obtain authorization for future activities such as adjustments to the LOM open pit operations, waste rock facilities, and leach pads. Any modification application for these activities will require an updated MIA, Environmental Risk Assessment, and Technical Justification Study for Land Use Change. The required technical baseline studies and impact assessment for these updates would be based on the extensive monitoring database that has been developed and conducted by an independent environmental consultant. Due to the minor changes in footprint and the overall impacts that these changes imply, as well as the current good standing of the existing permits, it is expected that the necessary permit modifications could be completed within standard regulatory timeframes of five to eight months.
4.6Significant factors and risks
There are no known significant factors or risks that may affect access, title, or the right or ability to conduct mining, processing, and exploration at Dolores.
PAN AMERICAN SILVER CORP. 27
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


5ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE, AND PHYSIOGRAPHY
5.1Accessibility, local resources, population centres, and transport
The main road access to the Property is via 92 km of unpaved roads leading north from Federal Highway 16, near Yepachic, Chihuahua. An unpaved landing strip suitable for light aircraft is located about 8 km from the mine and provides access for personnel. The nearest major population centre is the city of Chihuahua, located 250 km to the east. Employees travel to the mine either by road or by light aircraft, while materials come by road.
The local economy is based on logging, ranching, and subsistence farming. The company sources unskilled workers from nearby small villages and has recruiting and training programs in place to develop the local workforce. Much of the mine workforce is sourced from the town of Ciudad Madera located 50 km east of Dolores, the city of Chihuahua, and the city of Hermosillo in the state of Sonora, located 350 km to the west, see Figure 4.1. Both Sonora and Chihuahua states have an established mining culture and provide a pool of experienced workers, as well as vendors and contractors who provide services to the site.
5.2Physiography and climate
The topography at the mine site is rugged, with elevations ranging from 1,200 m to 2,000 m above sea level. The vegetation ranges from thorn scrub and cactus to oak and pine forests at higher elevations. Average annual temperatures are 18°Celsius (C), with annual lows of -10°C and highs of 45°C. Annual precipitation averages around 250 mm, with much of it occurring between July and September as brief heavy rainstorms. Short-lived snowfall is common in December and January. Mining and exploration work may be carried out year-round.
5.3Surface rights
Ejido Huizopa owns the majority of the surface rights on the Property. An ejido is an area of communal land registered with the National Agrarian Registry of Mexico and parceled out to community members for agricultural use. Pan American has surface rights agreements with Ejido Huizopa and with several individual members of the Ejido Huizopa dating from November 2006, which allows for irrevocable access and the right to carry out exploration and mining activities for a term of 15 years with a right to extend for a further 15 years. The agreement was renegotiated in 2009 so the initial 15-year period extends until 2024. Discussions on the terms of the 15-year extension are already in progress.
5.4Power and water
Water for the operations is sourced from wells, the open pit mine, nearby Tutuaca River, and the Chabacan dam. Depending on the year, the water supply from mine dewatering and precipitation on the leach pads and Chabacan Dam catchment is often sufficient for process needs. When additional water is required, it is pumped from the Tutuaca River. The Chabacan dam reservoir has a capacity of 1.2 million cubic metres (m3) and provides storm water control as well as primary water storage. The permitted water usage from the Tutuaca River is 2.0 million m3 per annum at a maximum rate of 64 litres per second and the water extraction permit remains in good standing should it be required in the future.
A 115 kV, 98 km long power line connected to the Mexican national grid in 2016 supplies power to the mine and is sufficient for the current needs of the operation. Back-up power is available on site by six 1,800 kW Cummins and two 1,200 kW Caterpillar diesel generators. The total power requirement for the operations including the open pit and processing facilities is approximately 11.5 megawatts (MW).

PAN AMERICAN SILVER CORP. 28
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


5.5Infrastructure
The infrastructure includes the typical components of an operating open pit mine, including the mine workings, the processing facilities, heap leach pads, medium grade ore stockpiles, waste rock storage facilities, surface ventilation fans servicing the underground workings, workshops, laboratories, storage facilities, offices, drill core and logging sheds, water and power lines, access roads, a light aircraft landing strip, an employee and construction camp, and recreational facilities. A plan of the infrastructure on the Property is shown in Section 16.
PAN AMERICAN SILVER CORP. 29
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

6HISTORY
6.1Ownership
After some earlier work consisting of Placer mining, which began in the region of the Dolores mine in the 1860s, followed by lode mining in 1898, the Property lay idle until Minefinders acquired the Property in 1993.
Pan American acquired the Property from Minefinders at the end of March 2012 and assumed control of open pit mining operations in April 2012. Pan American has operated the mine since then, has built increased heap leach pad capacity, connected the mine to the Chihuahua electrical grid with a power line and constructed a pulp agglomeration plant. In addition, Pan American commenced underground mining in 2016 and after nearly 6 years of mining put the operation in care and maintenance in April 2022.
6.2Work carried out
After Minefinders acquired the Property in 1993, it began a reconnaissance surface exploration program, assisted by aerial photographs taken in 1995, a 3 m resolution digital topography map sourced from air photographs covering 20 square kilometres (km2), and satellite imagery. Staff geologists carried out surface mapping and sampling, and contractors completed the geophysical programs.
Four mapping campaigns defining the general structural and geological trends of the mineralized systems were completed, including an initial 1:5000 scale map covering 12 km2, followed up by more detailed mapping at 1:2000 scale covering 3 km2, and two structural mapping campaigns covering over 4 km2 at 1:1000 and 1:500 scales.
Over 13,000 rock samples were taken from surface outcrops, including 9,882 samples taken as 5 m long continuous samples along road cuts or sample lines cut perpendicular to the strike of the deposit. Channel samples were taken in the accessible portions of the underground workings. In workings parallel to the strike of the deposit, samples were selected from across the backs at 5 m intervals at lengths averaging 2 m wide and up to 4 m wide. For other areas of the workings, 2 m long continuous samples were taken along the ribs.
Geophysical surveys undertaken for Minefinders by Quantech Consulting Inc. of Reno, Nevada included 14,900 m of induced polarization / resistivity surveys and total field magnetic surveys, run across the strike of the deposit.
Minefinders commenced drilling in September 1996. In July 1996, Minefinders granted Echo Bay Mines (Echo Bay) an option in the Property, and Echo Bay commenced drilling, sampling, environmental data collection, and metallurgical testing. Minefinders bought back the option, including the information collected by Echo Bay, in October 1997.
The results of the surface exploration work as well as ore microscopy, metal ratio studies, and petrographic analyses were used to identify potential drill targets.
6.3Historical Mineral Resource and Mineral Reserve estimates
A number of historical Mineral Resource estimates have been prepared for the Property since 1997. In 2003, Minefinders commenced a feasibility study to evaluate various process options and in June 2005 disclosed a Mineral Reserve estimate and the results of a technically and financially feasible operation involving open pit mining operations and heap leaching of silver and gold. Minefinders then undertook detailed engineering and optimization of the mine plan as well as updates to the Mineral Resource and Mineral Reserve estimates. None of these estimates were reported under NI 43-101 and have not been quoted here as they are not relevant to the current operation.

PAN AMERICAN SILVER CORP. 30
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


6.4Production
A power line from the town of Madera was installed in 1915, and a 25 tpd stamp mill began treating the Dolores ore until the mill was destroyed by fire in early 1929. Only sporadic production occurred from 1929 to 1931, after which there are no records of any historical production. Incomplete mining records from between 1922 and 1931 indicate that approximately 372,000 tonnes of ore containing over 116,000 ounces of gold and 6 million ounces (Moz) of silver were produced from several operations, including Dolores.
Construction of the mine by Minefinders began at the end of 2006, with the commissioning period completed in January 2009. The processing facilities included a crushing plant, conveying and stacking facilities, leach pads, solution ponds, and Merrill-Crowe and refining facilities. The first doré was produced in November 2008 and commercial production began in May 2009.
During the 2008 to 2011 period, Minefinders mined 25.5 million tonnes (Mt) and stacked 18.3 Mt of ore on the leach pads, producing 210,660 ounces of gold and 6.2 Moz of silver. The remaining medium grade material is stored in stockpiles for later treatment.
From its acquisition of the Property in 2012 to June 30, 2022, Pan American have stacked 66.6 Mt of ore on the leach pads, producing 1,042.5 koz of gold and 38.8 Moz of silver.
PAN AMERICAN SILVER CORP. 31
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


7GEOLOGICAL SETTING AND MINERALIZATION
7.1Regional geology
Pre-Tertiary rocks in northern and mid-Mexico comprise a jigsaw of oceanic and island arc terranes (Campa and Coney, 1983). Figure 7.1 shows a regional map of the northwest trending tectono-stratigraphic terranes of Mexico, as redrawn from Campa and Coney (1983). Strike-slip movement played an important role in assembling the terranes and continue to the present day.
The Property is located within the Sierra Madre Occidental volcanic belt, an arc formed by eastward subduction of the Pacific Plate. The Sierra Madre is a metallogenic terrane well known for its epithermal precious metal deposits. The lower part of the arc comprises late Cretaceous to early Tertiary calc-alkaline batholiths and equivalent volcano sedimentary rocks referred to as the 'Lower Volcanic Supergroup' or 'Lower Volcanic Series'. They represent magmatic activity during the Laramide orogeny (about 80 to 40 million years ago) and were followed by two periods of major ignimbrite eruption in the early Oligocene and early Miocene. Collectively these constitute the 'Upper Volcanic Supergroup' or 'Series'. Minor andesite / basalt flows and rhyolitic domes accompanied the ignimbrites. Many Mexican low sulphidation epithermal deposits probably developed during the first ignimbrite phase, in a window between 40 and 27 million years ago (Camprubí et. al., 2003).
Figure 7.1 Tectono-stratigraphic terranes of Mexico
Source: Redrawn from Campa and Coney (1983).
PAN AMERICAN SILVER CORP. 32
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


7.2Local geology
The local geology shown in Figure 7.2 is based on the 1:250,000 Madera (H12-9) and Tecoripa (H12-12) sheets produced by the Servicio Geológico Mexicano.
Bedding dips are mostly sub horizontal and gently undulating. The maps show a strong north-northwest structural grain defined by many faults, some with apparent normal offsets. Some of these regional faults likely had a syn-depositional history, controlling local basins.
Dolores lies about 42 km north-northeast of the Mulatos high sulphidation epithermal gold deposits and 82 km north-northwest of Pinos Altos. Pinos Altos, a low sulphidation epithermal vein system, lies on the northeast rim of the Ocampo Caldera. This 30 km diameter caldera hosts a district of epithermal gold-silver deposits, including the Ocampo mine.
Figure 7.2 Local geology map
Source: Servicio Geológico Mexicano (2000).
PAN AMERICAN SILVER CORP. 33
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


7.3Property geology
7.3.1Lithostratigraphy
Field observations indicate that the contacts between the Lower and Upper Volcanic Series comprise mostly faults, as shown in Figure 7.3 (not to scale). The most important faults, from west to east, are the Chupacabras, San Francisco and East Faults. The San Francisco Fault and its footwall host most of the mineralization on the Property.
Figure 7.3 Stratigraphic and structural relations cartoon
Source: Pratt (2013).

7.3.1.1Lower Volcanic Series
A simplified geological map of the Property is shown in Figure 7.4. The Lower Volcanic Series consists of a lower andesitic sequence overlain by latites. The main andesitic outcrop forms a wide strip of alternating dark and light green units between the San Francisco and East Faults. It is the main host for mineralization and is cut by a swarm of north-northwest striking dikes. Dark green units comprise massive, porphyritic andesite and basaltic andesite with feldspar and clinopyroxene phenocrysts. The light units are either strongly amygdaloidal andesite or monomict andesitic breccias (autobreccias and transported volcanic breccias). Peperite forms at the bases of some andesite by the interaction of igneous rock and wet sediments. Other rock types in the Lower Volcanic Series include thin acid welded and crystal-rich tuffs, as well as bedded sandstones between andesite lava flows.
PAN AMERICAN SILVER CORP. 34
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 7.4 Simplified Property geological map
Source: PAS (2021).
The andesitic sequence is overlain by several massive porphyritic latites, with minor tuffaceous sediments. Their geometry is tabular and stratiform and likely formed as lava flows and / or sills. The main outcrop forms a wide strip between the Chupacabras and San Francisco Faults. The latites are about 250 m thick and the base is apparently conformable. Latite outcrops extensively around the heap leach pads and forms cliffs at Cerro
PAN AMERICAN SILVER CORP. 35
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Colorado (shown in Figure 7.3). It also occurs widely on the west side of the San Francisco Fault, up to the Chupacabras Fault and forms most of the high west wall of the open pit.
Fresh latite is purplish grey and comprises isolated feldspar phenocrysts within a very fine grained groundmass. The rock is locally flow banded, but to a much lesser extent than the latite dikes. The latites are widely hydrothermally altered and weather like a plutonic rock, with onionskin form, or are friable and crumbly, with a red colour caused by extensive hematite alteration of disseminated pyrite. The source of the latite is unclear. There is no obvious 'root' to indicate a volcanic neck or eruptive center. However, they are texturally identical to the swarm of latite dikes. Overbay et al. (2001) suggests they may have been erupted from a diorite-diatreme complex present in the pit.
7.3.1.2Upper Volcanic Series
The Upper Volcanic Series comprises a bimodal sequence of rhyolite / obsidian, basalt, pumice-rich lapilli tuffs and volcaniclastic rocks of possible caldera margin origin. It is well exposed on the two main access roads to the mine and is preserved west of the Chupacabras Fault. The tabular or lens-shaped rhyolites show widespread, flat-lying flow banding. Scattered perlitic obsidian layers in the rhyolite contain large spherulites with drusy zeolites, quartz, and minor amethyst.
The amygdaloidal and oxidized basalts are probably thin lava flows, and have peperitic bases. The geological map shown in Figure 7.4 shows all other lithologies as volcaniclastics (labelled "Volc"). These comprise crystal tuffs, green non-welded pumice-rich lapilli tuffs, crystal-rich sandstones, and conglomerates with a mostly sub horizontal orientation.
The topographically, and stratigraphically, highest rocks comprise a thick porphyritic andesite flow (labelled "UAnd" in Figure 7.4), which is overlain by a basalt underlying the Dolores airstrip.
The Baucarit Formation comprises polymict conglomerates, sandstones, and scattered basalts. To the east of the East fault, the formation sits directly on latites of the Lower Volcanic Series, and the Upper Volcanic Series appears to be absent, an indication of the importance of fault control on sedimentation and volcanism at Dolores.
7.3.2Intrusions
The immediate footwall and hangingwall of the San Francisco Fault form a 500 m wide northwest-striking corridor of igneous intrusions broadly following the fault. However, there is a tendency for dikes to strike slightly clockwise and there are also some splits and north-northeast jogs.
There is a great variety of intrusive types and field relations indicate intrusions occurred both pre- and post-mineralization. There are no isotopic dates, but the intrusions are probably of Eocene to Oligocene age and are broadly contemporaneous with mineralization. The rocks with the most plutonic character occur in the central area of the deposit, where a steep-sided barren microdiorite stock, 500 m in diameter, straddles the San Francisco Fault. Coinciding with high-grade mineralization, it comprises weakly porphyritic diorite and marginal parts comprise porphyritic quartz diorite with potassium feldspar-rich aplitic groundmass. Age relations are not clear, but it appears to be cut by latite dikes. Exposures in the pit walls show very complex intrusive relationships, including diorite chilled against possibly intrusive andesite. Deep drilling shows intrusive types present in this area include porphyritic granodiorite and an unusual amygdaloidal porphyritic andesite. Probable diatreme occurs in drillholes, but does not appear to outcrop. Overbay et al. (2001) suggests that some of the intrusions pass upwards into flow-domes.
The dike swarm at Dolores is dominated by latite. This phase cuts the plutonic and sub volcanic rocks and is clearly younger. It comprises strongly flow-banded rock, with isolated feldspar phenocrysts, oriented parallel to the dike contacts, generally dipping steeply west. The latite dikes are visually indistinguishable from the latite lavas of the Lower Volcanic Series, which is an obstacle to geological interpretation. There were clearly several pulses of intrusion as evidenced by the presence of xenoliths of early latite varieties within later latites. The latite is in turn cut by late andesite dikes with a strong trachytic texture.
PAN AMERICAN SILVER CORP. 36
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


7.3.3Structure
The sequence at Dolores is broadly flat lying and suffered no significant compressional deformation after the Late Cretaceous. The major faults show large post-Pliocene (post-Baucarit) normal offsets. However, complications in the stratigraphic sequence indicate an older history. Subtle changes in dip, internal angular unconformities, wedges, and missing strata all imply that the major faults have controlled sedimentation and volcanism.
The Chupacabras Fault throws down rocks to the west by about 200 m to 400 m while the East Fault drops the Baucarit Formation down to the east by about 350 m. The San Francisco Fault throws down latite lavas by about 300 m to 500 m to the west and is marked by a corridor of dikes and stocks. The overall geometry is therefore horst-like. The Upper Volcanic Series appears much thicker to the west of Chupacabras (Figure 7.3).
Although each major fault has an apparent normal offset, there is also evidence of strike-slip movement. The clockwise orientation of dikes relative to faults, along with north-northeast dike jogs, suggests a component of dextral strike-slip during intrusion and mineralization. All of the principal faults suffered major post-mineral (post-Pliocene) reactivation. The San Francisco Fault shows smectite-rich gouge with milled vein fragments, locally with amethyst. Fabrics within the foliated gouge confirm mostly normal offsets.
7.3.4Alteration
The andesitic rocks of the Lower Volcanic Series show widespread, locally intense, propylitic alteration (chlorite + epidote + calcite + pyrite). Epidote is locally abundant (>15%), giving rocks a skarn-like appearance. The wide distribution of propylitic alteration suggests it is semi-regional, perhaps due to burial metamorphism. Propylitic alteration also affects the dioritic rocks of the stock-diatreme complex.
In contrast, the low sulphidation system created advanced argillic (pyrite + clay) alteration of the latite lavas of the Lower Volcanic Series. Pyrite commonly replaces original biotite phenocrysts. The suite of clay minerals include montmorillonite, smectite, kaolinite, sericite, and illite. Advanced argillic alteration is directly correlated to the distance of the mineralized structures as a function of structure size, vein widths, and the presence of hydrothermal breccias. The alteration dies out abruptly in the west, probably along a steep front, between the Chupacabras and San Francisco Faults. At deeper levels, light green sericite haloes occur around veins and hydrothermal breccias.
The principal and most important alteration is silicification, which increases with the presence of mineralization, and ranges from weak to strong, pervasive, massive, residual, and pseudo-vuggy.
7.4Mineralization
Silver and gold mineralization at Dolores is hosted in north-northwest trending hydrothermal breccias and sheeted vein zones in the order of 5 m to 10 m wide. Most high-grade mineralization occurs along three major structures that provided the conduit for metal-bearing hydrothermal fluids. Silver and gold mineralization identified on the surface at Dolores lies over an area 4,000 m long and up to 1,000 m wide, at elevations ranging between 1,100 m to 1,700 m above sea level.
The highest grade mineralization occurs within the San Francisco Breccia, a well-defined and continuous hydrothermal breccia and stockwork zone that occurs in the immediate footwall of the post-mineralization San Francisco Fault. The breccia trends further away from the fault towards the north until it joins a second major breccia zone known as the Alma Maria Breccia. Other high-grade zones split and re-join, forming diamond-shaped structures and steeply pitching mineralization shoots. The San Francisco Fault marks a profound drop in grade and the hangingwall is mostly devoid of silver and gold mineralization.
A sub-vertically pitching mineralization shoot occurs where the San Francisco and Alma Maria Breccias meet, parallel to the intersection. Clearly, this was a site of increased permeability for hydrothermal fluids. High grades also occur in the diorite stock-diatreme complex in the pit. The diorite formed an ideal brittle host for fracture,
PAN AMERICAN SILVER CORP. 37
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

allowing more extensive brecciation and stock working. It may also have been the main upflow centre for hydrothermal fluids.
Mineralization is generally associated with quartz and may be composed primarily of iron oxides, silver sulphosalts, electrum, and native gold in the oxidized zone and with pyrite, silver sulphides, native silver, visible gold, galena, and sphalerite deeper in the sulphide zone. Local acanthite and visible gold occur in a variety of settings, including hydrothermal crackle breccias and in thin quartz-dominated veins. Hydrothermal breccias carry the highest silver and gold grades and vary from crackle to very milled types. Crackle types were more permeable, and they commonly show coarse quartz + sulphide (pyrite, sphalerite, and galena) + fluorite gangue. They pass outward into vein stock works. Hydrothermal breccias commonly include veins of quartz, quartz-calcite, fluorite, and anhydrite and mostly developed after the sheeted vein swarms. Some diffuse areas of sugary, silicified rock with coarse adularia and high silver and gold grades also occur.
Most veins at Dolores are relatively simple, with only weak crustiform texture. They comprise euhedral comb quartz and commonly show aggregates of very fine-grained drusy quartz. They are thin, rarely over 30 mm, and tend to occur as sheeted swarms. Economically mineable grades occur where the veins are sufficiently closely spaced.
Vein fill progresses from high temperature (>200°C) minerals, such as epidote, to low temperature (150°C to 200°C) minerals such as colloform chalcedony, adularia, amethyst, laumontite, and other zeolites. Geopetal structures occur in some veins and indicate high levels in the epithermal system. The proximity of high and low temperature minerals suggests rapid cooling of fluids, perhaps due to uplift or a rapidly waning hydrothermal system. The presence of zeolites indicates very alkaline fluids.
Base metal sulphides appear to increase at depth, with widespread coarsely crystalline sphalerite, galena, and minor chalcopyrite. Base metal sulphides are particularly abundant in the deeper parts of the stock-diatreme complex in the pit. The most dominant sulphide mineral accompanying the mineralization is pyrite, in concentrations of between 1% and 2%, with intense pyritization of approximately 6% at the lithological contacts.
PAN AMERICAN SILVER CORP. 38
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


8DEPOSIT TYPES
Information in this section is referenced from the 2016 PAS Technical Report where Pratt (2013) is acknowledged. It has been reviewed by the QP and holds true.
Dolores is a low sulphidation epithermal deposit with strong structural control. Northeast-striking faults, perpendicular to the structural grain, locate many mineral deposits in the Sierra Madre Occidental. However, regional controls at Dolores are unclear where mineralized faults are north-northwest striking. There is no transverse structure apparent on geological maps or satellite imagery. The mineralized structures have a typical Sierra Madre, or Laramide, trend, a direction probably inherited from the basement of elongate terranes.
Local structural controls are better understood. Sometime after eruption of the Upper Volcanic Series, there was a northeast-southwest extensional regime, with a component of dextral strike-slip, creating dilation on northwest-striking faults. It also caused local dilational jogs that allowed emplacement of dikes, hydrothermal breccias, and sheeted veins. It is likely that the diorite stock-diatreme complex was the main heat engine that drove the hydrothermal system and provided the source of metals. It may have also been emplaced into a space created by a dilational jog. Geopetal structures and low temperature minerals suggest Dolores developed close to the original surface and has not been strongly eroded.
High silver and gold grades occur over a wide vertical interval at Dolores. This is unusual for most low sulphidation epithermal deposits, which tend to have narrow vertical intervals of high grade.
Lithology was important for localizing high grade. Although the principal control on fluids was semi-regional faults (San Francisco and Alma Maria), some host rocks were ideal for fracturing. Others were ductile and less amenable to mineralization. For example, historic workings in the East Dike targeted a hydrothermal breccia hosted by a latite dike that disappears where the structure passes into country rocks. This, and many other examples, highlights the importance of brittle host rocks. Latite dikes were ideal while the surrounding andesites were a poorer host.
Vein textures, the occurrence of adularia, and the simple sulphide mineralogy confirm Dolores is a low sulphidation epithermal deposit although it lacks the typical complex crustiform banding found in most low sulphidation veins (e.g. Hishikari in Japan and Kupol in Russia). This implies relatively few mineralizing and boiling events in the conduits. Local advanced argillic alteration along the East fault suggests the potential presence of high sulphidation-type mineralization. There are examples of high sulphidation gold deposits in the area, for example, Mulatos, located about 42 km south-southwest (Staude, 2001).
Major post-mineralization offsets of up to 500 m occurred on the principal faults at Dolores. Mineralization effectively sealed the San Francisco structure. Therefore, the focus of post-mineralization movement jumped west by up to 100 m. This resulted in a major fault zone, dominated by milled and foliated smectitic rock.
PAN AMERICAN SILVER CORP. 39
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


9EXPLORATION
Exploration by Minefinders from 1993 to 2012 is discussed in Section 6. Only data from the exploration drilling carried out by Minefinders has been used in the estimation of the current Mineral Resources and Mineral Reserves (no underground drilling information was included in the estimate).
Since Pan American acquired the Property, staff and consulting structural geologists have carried out near mine surface geological and structural mapping, and surface sampling on the continuity of the San Francisco and Alma Maria structures.
Dolores has been an operation for some time and exploration has not been a focus. Mapping and sampling adjacent to the deposit has assisted in demonstrating continuity of the structures and aided in interpretation.
Approximately 33,000 m of drill core has been re-logged by Pan American to better define the controls on mineralization, alteration, and to update the geological interpretation.
Pan American has also completed over 145,000 m in surface and underground diamond drilling focusing on exploration and infill as discussed in Section 10.
PAN AMERICAN SILVER CORP. 40
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


10DRILLING
10.1Drilling summary and database
Most of the drilling on the Property centres over the strike length of the currently defined Mineral Resources and Mineral Reserves. A summary of the drillholes completed on the Property by all operators up to June 30, 2022 is shown in Table 10.1. Note that only drilling carried out by Minefinders that was used in the Mineral Resource estimate has been described here.
Table 10.1 Drillhole summary
Year
Company
Diamond Surface
Reverse Circulation
Diamond UG
Total
# of holes
Metres
# of holes
Metres
# of holes
Metres
# of holes
Metres
1996
Minefinders
30
6,599




30
6,599
1997
Echo Bay


68
12,949


68
12,949
1997
Minefinders
80
19,382




80
19,382
1998
Minefinders
26
5,997
45
10,301


71
16,298
2000
Minefinders
5
847
34
5,038


39
5,886
2002
Minefinders
59
19,433
33
6,201


92
25,634
2003
Minefinders
101
31,867
31
5,046


132
36,913
2004
Minefinders
67
18,849




67
18,849
2005
Minefinders
51
15,301




51
15,301
2006
Minefinders
58
19,997
94
17,013


152
37,010
2007
Minefinders
19
9,900
54
9,590


73
19,490
2009
Minefinders
11
4,710
29
4,304


40
9,014
2010
Minefinders
49
24,598
8
1,116


57
25,714
2011
Minefinders
68
20,453




68
20,453
2012
Minefinders
30
10,147




30
10,147
2012
PAS
47
19,111




47
19,111
2013
PAS
76
30,879




76
30,879
2014
PAS
57
24,798
60
5,229


117
30,027
2015
PAS
15
4,266
14
1,342


29
5,608
2016
PAS
30
8,466
5
854
57
9,432
92
18,752
2017
PAS
7
6,242


161
25,524
168
31,766
2018
PAS
1
1,119
36
3,008
36
5,852
73
9,979
2019
PAS


5
982
12
1,542
17
2,524
2020
PAS




5
564
5
564
2021
PAS
14
4,284


1
284
15
4,569
2022
PAS
11
3,576
29
1,844
3
549
43
5,969
Total

1,000
315,089
545
84,817
275
43,747
1,820
443,653
A plan showing the location of the drillholes completed to June 30, 2022, is shown in Figure 10.1. Cross sections showing the relative orientation and spacing of drillholes on a typical section are shown in Figure 14.2 and Figure 14.3.
PAN AMERICAN SILVER CORP. 41
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 10.1 Drillhole location map
Source: PAS (2022).
10.2Drilling procedures
10.2.1Drilling by Minefinders from 1996 to 2012
Drilling by Minefinders used a combination of RC and diamond drilling methods, with holes mostly oriented perpendicular to the strike of the deposit and spaced roughly 25 m apart.
PAN AMERICAN SILVER CORP. 42
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


The diameter of the diamond drillholes was either HQ or NQ. The diameter of the RC holes was not well documented but appears to be either 4 ½ or 5 ½ inches. The majority of collar surveys were taken with a total station or multi-station GPS survey instrument, while the remaining drillholes were surveyed relative to previously surveyed collars using a tape measure and Brunton compass. Approximately 70% of the drillholes were surveyed down the hole using a Tropari single shot camera tool for RC holes and an Ausmin or Sperry-Sun single shot camera for diamond drillholes, at downhole intervals of around 50 m. The remainder of the drillholes were not surveyed.
10.3Drilling by Pan American from 2012 to 2016
From 2012 to 2014, Pan American used two Boart Longyear LF90 diamond drill rigs and one hybrid diamond drill rig. Later in 2014 to two Sandvik DE710 diamond drill rigs were introduced. Underground drilling began in 2016 using two Boart Longyear LM-75 machines. The drilling contractor was Rock Drill Mining of Aguascalientes, Mexico. PQ, HQ, and NQ hole diameters were used. Drilling recovery is good, approximately greater than 95%, and additives such as bentonite are used whenever necessary to improve core recovery and to regulate drilling pressure. The RC drilling programs were carried out by CMD drilling.
10.4Drilling by Pan American from 2016 to 2022
From September 2016, the cut-off date for data for the 2016 PAS Technical Report, until June 2022, Pan American have carried out both surface and underground drilling. In the calendar years 2017 to 2022, as seen from Table 10.1, the majority of the holes were underground diamond drillholes, consisting of 62% of the total metres. Table 10.2 shows the breakdown of the drilling in 2017 to 2022 by type and metres.
Table 10.2 Drillholes by type 2017 - 2022
Year
Diamond surface
RC
Diamond UG
Total
# of holes
Metres
# of holes
Metres
# of holes
Metres
# of holes
Metres
2017 - 2022
33
15,221
70
5,834
218
34,315
321
55,370
Split by type
10%
27%
22%
11%
68%
62%
100%
100%
From 2017 to 2022 multiple drilling contractors were used by Pan American, such as Rock Drill Mining, Techmin Services, CMD, and Major Drilling.
For the underground drilling, which was the major activity, two Boart Longyear LM-75 machines and the drilling contractor continued to be Rock Drill Mining of Aguascalientes, Mexico. On surface Boart Longyear LF90 diamond drill rigs and one hybrid diamond drill rig were used, the latter for the RC work. Later in 2014 to two Sandvik DE710 diamond drill rigs were introduced. PQ, HQ, and NQ hole diameters were used. Drilling recovery is good, approximately greater than 95%, and additives such as bentonite are used whenever necessary to improve core recovery and to regulate drilling pressure.
10.5Field procedures
10.5.1Diamond drilling
Planned drillhole collar locations are set up in the field prior to drilling by the mine survey department using total station survey equipment or a differential GPS when necessary, and by laying out the front and back sights with stakes and flagging tape. Final collar coordinates are surveyed by the mine surveyors using total station methods, and downhole surveys are taken with a Reflex Multi-shot instrument on average every 25 m down the hole. The bearing and dip at the collar are determined by the mine survey department using total station survey equipment to survey a point at the collar and another point along the drill rod.
PAN AMERICAN SILVER CORP. 43
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


10.5.2Reverse circulation (RC) drilling
The drill set up procedure is similar to the surface diamond drilling. However, the sample is taken and prepared at the rig, after being collected in a rig-mounted automatic cyclone sampler system which ensures a representative sample is collected for assay. No sample is collected in the first two metres where there is broken ground. In addition to the sample for assay a chip sample is also taken from each sample interval and stored in a chip box for geological identification and record. Duplicate samples are taken in the field and blanks and CRMs are inserted at appropriate intervals.
10.6Material impact on the accuracy and reliability of drilling results
Pan American is aware of a number of potential issues with the drilling protocols for some of the drillholes in the database. These include the use of RC drilling, which may result in a less reliable sample than diamond drillholes, particularly when the sample is wet; the orientation of some of the drillholes down the dip of mineralization; and absent or insufficiently spaced downhole surveys in some of the drillholes.
However, Pan American believes these potential issues are unlikely to have a material impact on the accuracy and reliability of the drilling results and the Mineral Resource and Mineral Reserve estimates. There are a large number of drillholes present over the deposit, and reliable drillholes confirm the results of potentially biased drillholes. There is only a negligible difference in the silver and gold grades and thicknesses of the mineralized zones encountered by RC and diamond drillholes drilled in close proximity to each other. The removal of down dip drillholes from the geological interpretation and the grade estimation technique has mitigated the effect of poorly oriented drillholes, and there appears to be no significant difference in the location of the mineralized zones encountered by surveyed and by un-surveyed drillholes.
Regular reconciliation reviews comparing close spaced grade control drillhole data against the Mineral Resource and Mineral Reserve estimates have reasonably confirmed the location, orientation, and grades of the mineralized zones as defined by the exploration drillholes. These factors relating to the reliability of the sample data have been considered when applying confidence categories to the current Mineral Resource and Mineral Reserve estimates.
Since acquiring the Property, Pan American has undertaken measures to ensure the data used for the estimation of Mineral Resources and Mineral Reserves is reliable and collected using industry best practice. This includes orienting holes perpendicular to mineralization and taking downhole surveys at frequent intervals down every hole.
10.7Conclusions and recommendations
There are no known drilling, sampling, or recovery factors that could materially impact the reliability of the drilling results. Pan American will continue to explore the deposit at depth testing the down dip extensions of the currently defined mineralization.
PAN AMERICAN SILVER CORP. 44
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


11SAMPLE PREPARATION, ANALYSES, AND SECURITY
11.1Sampling method
11.1.1Minefinders (1996 - 2012)
For RC drillholes, Minefinders selected one sample over the interval of each 5-foot drill rod length. For holes drilled under dry conditions, the broken rock fragments were collected in a bucket, divided into two equal sample pairs with a splitter, and bagged. Under wet conditions, the broken rock fragments were divided with a wet splitter into two equal sample pairs in two buckets. Flocculant was added to the buckets and the buckets were placed in tubs to settle the fine material and then bagged. The weight of the dry and wet samples varied from 10 kilograms (kg) to 13 kg.
One sample was sent to the laboratory for analysis and the other pair was retained on site for reference. A portion of the reference sample was stored in plastic chip trays and logged for geological features. The geological logging included codes for lithology, colour, and breccia type. Strength ratings were assigned for brecciation, fractures, vein composition, alteration type, oxidation nature, and oxide and sulphide minerals.
Diamond drillholes were logged, photographed, split in half, and sampled in a secure core logging facility at the Property. The geological log included all the same information as collected for RC holes as well as core recovery, rock quality designation (RQD), and structural features. Core was split in half with a manual core splitter, with one half sent to the laboratory for preparation and analysis and the other half retained in the core tray for reference. The sampling length was frequently 2 m.
11.1.2Pan American (2012 - present)
Diamond drillholes are logged, photographed, halved, and sampled in a secure core logging facility at the Property. The drill core is cut in half with a diamond bladed saw, and samples are selected with respect to geological features, at 2 m lengths or less.
RC drill samples are collected at the rig and the field procedures are described in Section 10.5.2.
11.2Sample storage and security
For Minefinders, samples were collected by truck from the Property by the commercial sample preparation laboratory in use at the time, which included Bondar-Clegg (since acquired by ALS) of Chihuahua, Mexico, ALS of Hermosillo, Mexico, or Inspectorate of Hermosillo, Mexico.
For Pan American, the samples were collected weekly from site by the Durango laboratory of SGS until 2019. Currently samples for offsite analysis are collected by Actlabs laboratories located in Zacatecas. This alternates with PAS own internal laboratory. Offsite samples are taken to the laboratory for sample preparation and analysis, and the handover is at the mine site. The core is kept in a secure core storage area where all historical and Pan American core is stored.
All underground and exploration data is stored in the SQL-based DH Logger database. This database contains appropriate internal validations and checks to ensure data security.

PAN AMERICAN SILVER CORP. 45
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


11.3Sample preparation and analysis
11.3.1Minefinders (1996 - 2012)
Samples were dried and crushed to 70% passing minus 2 mm in either jaw or roll crushers, then reduced to 1 kg weight by splitting in a riffle splitter, then pulverized to 85% passing less than 75 microns (µm). The pulverized material was then split to a 150 gram (g) pulp sample weight.
Between 1996 and 2002, the pulverized samples were sent for geochemical analyses by air to ALS of Vancouver, Canada (ALS) and from 2002 onwards, the period covering the majority of the drillholes in the database, to Inspectorate of Reno, USA (Inspectorate). ALS is an accredited laboratory that conforms to the requirements of CAN-P-1579, CAN-P-4E (ISO/IEC 17025:2005) and Inspectorate conforms to the requirements of ISO-9001:2008. Both ALS and Inspectorate are commercial laboratories and independent of Minefinders.
At the analytical laboratory, a 30 g subset was assayed for gold using fire assay with atomic absorption finish. Any sample with a grade greater than 1 part per million (ppm) gold was re-assayed using fire assay with gravimetric finish.
Prior to 2001, samples were assayed for silver using Aqua Regia digestion with atomic absorption finish, until metallurgical test work at McClelland Laboratories Inc. (MLI) found that the Aqua Regia digestion technique may have been under-reporting silver values, likely because of poor digestion of silver halide minerals. Minefinders implemented a campaign to re-assay approximately 9,000 retained pulps from drillhole and underground channel samples for silver using multi-acid digestion with atomic absorption finish, which resulted in a grade increase of 59% for oxidized samples, 22% in mixed oxide-sulphide samples, and 19% in sulphide samples. The database prioritizes assays by analytical method first by fire assay with gravimetric finish, then fire assay with atomic absorption finish, then multi-acid digest with atomic absorption finish, and finally Aqua Regia digest with atomic absorption finish.
11.3.2Pan American (2012 - mid 2022)
The laboratories used by Pan American over the 2012 to mid 2022 period are shown in Table 11.1. Note the current lab is Actlabs. Note where 2022 or mid 2022 is referred to, this means up to June 30, 2022.
Table 11.1 Laboratories used by Pan American 2012-mid 2022
Assay Lab
# of samples
% per laboratory
Certification
Actlabs, Zacatecas
19,421
23.5
ISO 9001:2015
Dolores Internal Lab
8,618
10.1
ISO 9001:2015
SGS, Durango
57,348
67.2
ISO/IEC 17025:2017
Total
85,387
100.0

Both Actlabs and SGS, Durango are commercial laboratories and independent of Pan American.
As seen in the table the majority of samples were assayed at SGS. Only a small percentage of the samples were assayed at site.
At Actlabs, the samples are crushed to 2 mm in size and split with a riffle splitter to obtain a 250 g sub-sample, then pulverized to 75 µm. Samples are analyzed for gold (Au) using fire assay with atomic absorption finish, and any sample with a grade greater than 10 ppm Au is re-assayed using fire assay with gravimetric finish. Silver (Ag) is assayed using three acid digest with atomic absorption finishing methods, and any sample with a grade greater than 100 ppm Ag is re-assayed by fire assay with gravimetric finish.
PAN AMERICAN SILVER CORP. 46
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


11.4Bulk density
Minefinders measured bulk density using the water immersion method from 296 paraffin sealed drill core samples. Since 2012, Pan American has selected samples from geologically and spatially representative locations. The samples were measured for bulk density by ALS of Vancouver using the water displacement method on wax-coated samples. To date, 1,741 bulk density measurements are available, and the results are discussed in Section 14.
11.5Quality assurance and quality control (QA/QC)
11.5.1Minefinders (1996 - 2012)
Minefinders submitted CRMs and blank material to the laboratory to independently test for accuracy and contamination of the assays determined by the laboratory. No duplicates were submitted. CRMs were submitted at a frequency that varied from between one CRM per every two drillholes up to 16 standards per drillhole, for an overall frequency of approximately one CRM per 20 samples.
From 1997, Minefinders submitted three CRMs comprised of mineralized material sourced from the Property, which were prepared and certified for gold by Bondar-Clegg. In 2002, Minefinders used four CRMs comprised of mineralized material from site that were prepared and certified for both silver and gold by Inspectorate.
Blanks, comprised of material believed to be unmineralized and sourced from overburden or the upper parts of drillholes, were submitted in 1997 and from between 2004 and 2009, at a frequency of approximately 1 blank per 80 samples.
The results of the data are problematic to assess, as record keeping and CRM identification numbering on the log sheets was poor, no coherent QA/QC database was maintained, and no regular QA/QC reports are available for review. Pan American's review of the results of the silver and gold CRMs shows unacceptably wide grade variation, likely the result of poor CRMs preparation. Blanks failed in the order of 4% for gold and 3% for silver.
11.5.2Pan American (2012 - mid 2022)
Since acquiring the Property in 2012, Pan American has implemented an industry standard QA/QC program including the submission of CRMs, blanks, and duplicate samples to the laboratory and reviewing the results regularly to ensure that appropriate and timely action is taken in the event of a QA/QC failure. The insertion rate for QA/QC samples is 5% each of blanks, CRMs, and duplicate samples.
The QA/QC compliance over the 2012 to mid 2022 period is shown in Table 11.2. This is slightly below the accepted norms stated above for the whole period.
PAN AMERICAN SILVER CORP. 47
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 11.2 Summary of QA/QC samples 2012 - mid 2022
Year
CRMs
Blanks
Pulp duplicates
Field duplicates
Total QA/QC
Total samples
2012
217
291
-
291
508
8,892
2013
703
728
-
569
1431
16,895
2014
592
607
230
586
2015
17,109
2015
103
126
66
40
335
3,535
2016
340
347
34
23
744
8,274
2017
639
639
-
-
1278
15,499
2018
429
415
164
394
1402
9,378
2019
63
68
147
42
320
1,240
2020
45
49
39
44
177
573
2021
60
74
24
57
244
1,454
2022
41
83
-
91
251
3,279
Total
3,232
3,427
704
1,568
8,705
86,128
Source: PAS (2022).
The compliance or insertion rates for the various streams are shown below based on the total number of samples submitted.
Table 11.3 Summary of QA/QC insertion rates 2012 - mid 2022
Year CRMs Blanks Pulp duplicates Field duplicates
2012 2.4% 3.3% - -
2013 4.2% 4.3% - -
2014 3.5% 3.5% 1.3% 3.4%
2015 2.9% 3.6% 1.9% 1.1%
2016 4.1% 4.2% 0.4% 0.3%
2017 4.1% 4.1% - -
2018 4.6% 4.4% 1.7% 4.2%
2019 5.1% 5.5% 11.9% 3.4%
2020 7.9% 8.6% 6.8% 7.7%
2021 4.1 % 5.1 % 1.7% 3.9%
2022 1.25% 2.5% 2.8% 7.7%
Source: PAS (2022).
11.5.2.1Certified Reference Material
CRMs contain standard, predetermined concentrations of material (silver and gold in this case) which are inserted into the sample stream to check the analytical accuracy of the laboratory. CRMs should be monitored on a batch-by-batch basis and remedial action taken immediately if required. For each economic mineral it is recommended the use of at least three CRMs with values:
•At the approximate cut-off grade (COG) of the deposit.
•At the approximate expected grade of the deposit.
•At a higher grade.
PAN AMERICAN SILVER CORP. 48
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Industry best practice is to investigate, and where necessary re-assay batches where two consecutive CRMs in a batch occur outside two standard deviations (warning), or one CRM occurs outside of three standard deviations (fail) of the expected value described on the assay certificate.
From 2012 to end 2022, 3,427 CRMs from 27 different CRMs were submitted to the laboratory with the drill samples. The CRMs have been prepared for Pan American from material obtained from the Dolores project. The CRMs for Dolores have been prepared by SGS and Actlabs where the samples were pulverized and homogenized and sent to five laboratories for determinations each as a round robin exercise. A report is supplied to Pan American with the statistical analysis. The CRMs used in the drilling programs since 2012 and their grades are shown in Table 11.4.
Table 11.4 Summary of CRMs submitted for analysis by PAS 2012 - 2022
CRM
Ag (g/t)
Au (g/t)
CRM
Ag (g/t)
Au (g/t)
Grade Standard deviation
Grade
Standard deviation
Grade Standard deviation Grade Standard deviation
Blanco
0.00
0.30
0.00
0.03
SGS14A-14A
24.90
2.00
0.27
0.02
SGS1-1A
6.35
1.13
0.12
0.02
SGS15A-15A
55.00
3.20
0.68
0.09
SGS2-2A
30.35
3.96
0.51
0.05
SGS16-16A
25.20
2.10
0.41
0.03
SGS3-3A
267.40
16.47
1.74
0.14
SGS17A-17A
56.20
2.84
1.29
0.06
SGS4-4A
36.96
4.35
0.16
0.02
SGS18A-18A
34.10
5.60
0.50
0.02
SGS5-5A
23.64
1.50
0.17
0.02
SGS19A-19A
16.40
1.11
0.26
0.02
SGS6-6A
45.72
2.80
0.35
0.05
SGS20A-20A
9.90
0.96
0.25
0.03
SGS7-7A
12.92
1.00
0.07
0.01
Actlabs 21-21A
91.50
1.11
0.88
0.04
SGS8-8A
92.10
5.40
1.75
0.11
Actlabs 22-22A
104.60
3.18
1.08
0.04
SGS9-9A
101.00
5.70
1.57
0.08
Actlabs 23-23A
89.70
2.62
1.06
0.05
SGS-10-10A
41.20
3.87
0.53
0.04
Actlabs 24-24A
28.30
1.48
0.42
0.02
SGS11-11A
41.10
5.07
0.51
0.03
Actlabs 26-26A
16.30
1.11
0.24
0.02
SGS-12-12A
66.70
6.10
0.81
0.05
SGS27-27A
16.80
1.00
0.77
0.05
SGS-13-13A
26.80
2.40
0.31
0.02
SGS 29-29A
25.00
0.90
1.74
0.12
SGS-31-31A
137.20
3.50
1.27
0.04
Actlabs 33-33A
20.00
1.00
0.44
0.03
SGS-32-32A
31.60
1.20
0.74
0.03





Source: PAS (2022).
The insertion number by year for each CRM used is shown in Table 11.5. The rates of insertion vary for each CRM, this is due using different CRMs with the same grade ranges at different times during the year. Generally, a reasonable number (five or so), is used every year. This allows for a meaningful number of results for statistical analysis.
PAN AMERICAN SILVER CORP. 49
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 11.5 Summary of CRMs submitted by PAS - 2012-2022 categorized by year
CRM name
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
Total
Total CRMs
2
4
9
5
8
6
12
5
5
5
3

SGS1-1A


34








34
SGS2-2A
154
203









357
SGS3-3A

206









206
SGS4-4A
63
120
10








193
SGS6-6A

174
59








233
SGS7-7A


24








24
SGS8-8A


17








17
SGS9-9A


325

9






334
SGS10-10


31

103
14
7




155
SGS11-11


10

10






20
SGS12-12



10

14
21




45
SGS13-13


82
76
3






161
SGS14-14



5

5
51




61
SGS15-15



3
4

37




44
SGS16-16



9
122

14




145
SGS17-17




45
285
39




369
SGS18-18






45




45
SGS19-19





21
71


6

98
SGS20-20




44
300
55




399
Actlabs 21-21






10
10

23

43
Actlabs 22-22






14
9

15

38
Actlabs 23-23






65
12

4

81
Actlabs 24-24







20
12
12

44
Actlabs 26-26







9
12


21
SGS-27-27A








11


11
SGS29-29







3
10


13
SGS 31-31










12
12
SGS 32-32










11
11
Actlabs-33-33A










18
18
Total inserted
217
703
592
103
340
639
429
63
45
60
41
3232
Source: PAS (2022).
Control charts are commonly used to monitor the analytical performance of an individual CRM over time. CRM assay results are plotted in order of analysis along the X-axis. Assay values of the CRM are plotted on the Y axis. Control lines are also plotted on the chart for the expected value of the CRM, two standard deviations above and below the expected value (defining a warning threshold), and three standard deviations above and below the expected value (defining a fail threshold). Control charts show analytical drift, bias, trends, and irregularities occurring at the laboratory over time.
Figure 11.1 shows the performance of all CRMs for both gold and silver. While most of them perform well, significant dispersion on CRMs SGS-3-3A and SGS-9-9A for silver and gold is evident in the plots. All samples associated with the failed standard were sent for re-analysis as part of the QA/QC protocol.
PAN AMERICAN SILVER CORP. 50
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Figure 11.1 Performance for silver and gold CRMs from 2012 - 2022
Source: PAS (2022).
PAN AMERICAN SILVER CORP. 51
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 11.6 shows a summary of the CRM performance over the 2012 to 2022 period where failures are determined as being ±3 standard deviations from the expected value.
Table 11.6 Summary of CRM performance from 2012-mid 2022
CRM name Ag fail Au fail Ag % fail Au % fail
SGS1-1A 0 1 0.00% 2.94%
SGS2-2A 8 27 2.24% 7.56%
SGS3-3A 0 0 0.00% 0.00%
SGS4-4A 0 2 0.00% 1.04%
SGS6-6A 5 0 2.15% 0.00%
SGS7-7A 0 0 0.00% 0.00%
SGS8-8A 0 0 0.00% 0.00%
SGS9-9A 20 4 5.99% 1.20%
SGS10-10 1 2 0.65% 1.29%
SGS11-11 0 0 0.00% 0.00%
SGS12-12 0 0 0.00% 0.00%
SGS13-13 0 1 0.00% 0.62%
SGS14-14 0 0 0.00% 0.00%
SGS15-15 0 0 0.00% 0.00%
SGS16-16 1 22 0.69% 15.17%
SGS17-17 0 2 0.00% 0.54%
SGS18-18 0 0 0.00% 0.00%
SGS19-19 0 0 0.00% 0.00%
SGS20-20 0 2 0.00% 0.50%
Actlabs 21-21 12 3 27.91% 6.98%
Actlabs 22-22 0 1 0.00% 2.63%
Actlabs 23-23 2 2 2.47% 2.47%
Actlabs 24-24 1 1 2.27% 2.27%
Actlabs 26-26 0 0 0.00% 0.00%
SGS-27-27A 1 0 9.09% 0.00%
SGS29-29 2 0 15.38% 0.00%
SGS 31-31 0 0 0.00% 0.00%
SGS 32-32 0 0 0.00% 0.00%
Actlabs-33-33A 0 0 0.00% 0.00%
Total 53 70 0.00% 0.00%
Source: PAS (2022).
Overall, the silver CRMs performed better than the gold CRMs. SGS2-2A, SGS-9-9A, SGS16-16, and Actlabs 21-21 displayed some failures. CRM Actlabs 21-21 was analyzed 43 times during the period 2018 - 2021, the silver failures are a mixture of high and low and do not show any bias. The gold failures mostly associated with the higher CRM gold grade. Pan American has implemented a program whereby any failures are noted immediately and re-analyzed where appropriate. Overall, the CRM performance shows acceptable laboratory accuracy.
PAN AMERICAN SILVER CORP. 52
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


11.5.2.2Blanks
Coarse blanks test for contamination during both the sample preparation and assay process. Pulp blanks test for contamination occurring during the analytical process. No pulp blanks have been submitted.
From 2012 to 2022, a total of 3,427 coarse blanks submitted. An upper limit of 5 g/t Ag and 0.1 g/t Au was used to assess failure of blanks, which represents 10 times the lower detection limit, and the performance for silver and gold is shown in Table 11.7.
Table 11.7 Summary of blanks performance
Year Number blanks Ag pass rate (%) Au pass rate (%)
2012 291 100 100
2013 728 100 99.7
2014 607 100 100
2015 126 100 100
2016 347 100 99.7
2017 639 100 100
2018 415 100 100
2019 68 100 100
2020 49 100 100
2021 74 100 100
2022 83 100 100
Total 3,344 100 99.9
Source: PAS (2022).
The performance of the coarse blanks indicates acceptable laboratory hygiene.
11.5.2.3Duplicates
Duplicate samples should be selected over the entire range of grades seen at the project to ensure that the geological heterogeneity is understood, however, the majority of duplicate samples should be selected from zones of mineralization. Unmineralized or very low-grade samples should not form a significant portion of duplicate sample programs as analytical results approaching the stated limit of lower detection are commonly inaccurate, and do not provide a meaningful assessment of variance.
Duplicate data can be assessed using a variety of approaches. The QP typically assesses duplicate data using scatter plots and relative paired difference (RPD) plots. These plots measure the absolute difference between a sample and its duplicate. For field duplicates it is desirable to achieve 80% to 85% of the pairs having less than 30% RPD between the original assay and check assay and for pulp duplicates 80% to 85% of samples should be less than 10% RPD. In these analyses, pairs with a mean of less than 15 times the lower limit of analytical detection (LLD) are excluded. Removing these low values ensures that there is no undue influence on the RPD plots due to the higher variance of grades expected near the lower detection limit, where precision becomes poorer (Long et al. 1997).
Field duplicates
Field duplicates monitor sampling variance, sample preparation variance, analytical variance, and geological variance. Prior to 2014 these samples were not taken by Pan American. From 2014 to 2022, a total of 2,137 field duplicates comprising the second half of the drill core or half of the RC sample. Table 11.8 and Table 11.9 summarizes the field duplicate performance from 2014 to 2022 for gold and silver. A lower detection limit of 0.01 Au ppm and 0.25 Ag ppm was used. The bias is measured based on the mean grade of the original sample
PAN AMERICAN SILVER CORP. 53
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


dataset versus the duplicate sample dataset. A positive bias result indicates that overall, the original samples are returning higher values than the duplicate samples. Looking at the results on a yearly basis is inappropriate as for most years there are very few samples recording values greater than 15 times the detection limit. The combined results over the period from 2014 - 2022 shows bias towards the duplicate samples.
Table 11.8 Summary of field duplicate performance for Au - 2014 - 2022
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2014 - 2022
Field sample pairs (Pairs > 15 x LDL) 586 (193) 40 (1) 23 (3) 0 394 (207) 42 (1) 44 (1) 58 (2) 91(3) 1,278 (411)
Field sample pairs < 30% RPD 74 N/A N/A N/A 60 N/A N/A N/A N/A 66
Original Mean (Au ppm) 0.37 0.04 0.17 N/A 0.35 0.06 0.05 0.03 0.17 0.16
Duplicate Mean (Au ppm) 0.32 0.04 0.24 N/A 0.40 0.05 0.04 0.03 0.18 0.163
Bias (%) 13 -7 -37 N/A -14 18 17 8 19 2.13
Note: Negative bias values = overall higher duplicate grades.
Source: PAS (2022).
Figure 11.2 shows the RPD and scatterplots of the field duplicates for Au from 2014 - 2022.

PAN AMERICAN SILVER CORP. 54
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 11.2 RPD and scatter plot of field duplicates Au - 2014 - 2022
Note: Scatterplot is limited to 5 Au ppm.
Source: PAS (2022).
Table 11.9 Summary of field duplicate performance for Ag - 2014 - 2022
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2014 - 2022
Field sample pairs (Pairs > 15 x LDL) 586 (218) 40 (4) 23 (9) 0 394 (231) 42 (4) 44 (5) 58 (2) 91(5) 1,278 (478)
Field sample pairs < 30% RPD 67 N/A 89 N/A 62 N/A N/A N/A N/A 65
Original Mean (Ag ppm) 11.09 2.56 14.03 N/A 17.21 1.69 2.15 0.61 10.15 7.43
Duplicate Mean (Ag ppm) 11.17 2.4 17.08 N/A 18.3 1.64 2.1 0.59 10.14 16.89
Bias (%) -1 6 -16 N/A -6 3 2 12 15 1.87
Note: Negative bias values = overall higher duplicate grades.
Source: PAS (2022).
Figure 11.3 shows the RPD and scatterplots of the field duplicates for Ag from 2014 - 2022.
PAN AMERICAN SILVER CORP. 55
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 11.3 RPD and scatter plot of field duplicates Ag - 2014 - 2022
Note: Scatterplot is limited to 100 Ag ppm.
Source: PAS (2022).
The field duplicate performance is reasonable, although lower than the expected results, with Au and Ag performing similarly. The bias for the Ag and Au duplicates is skewed by one extremely high value pair submitted in 2022. The bias varies between favoring the original or the duplicate sample for both Au and Ag. Regardless, the bias is not a significant issue. In general, while laboratory issues may be a potential contributor to lower precision noted in the field duplicate data, the highly variable nature of mineralization is considered to be the main cause.
Coarse duplicates
Coarse reject samples monitor sub-sampling variance, analytical variance, and geological variance. No coarse duplicates were submitted by Pan American between 2012 - 2022.
Pulp duplicates
Pulp duplicates monitor analytical and geological variance. From 2014 to 2022, a total of 891 pulp duplicates were submitted. Table 11.10 and Table 11.11 summarize the pulp duplicate performance from 2014 - 2022, for Au and Ag respectively. A lower detection limit of 0.01 Au ppm and 0.25 Ag ppm was used. The bias is measured based on the mean grade of the original sample dataset versus the duplicate sample dataset. A positive bias result indicates the overall the original samples are returning higher values than the duplicate samples.
PAN AMERICAN SILVER CORP. 56
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Figure 11.4 and Figure 11.5 show the RPD and scatterplots of the pulp duplicates for Au and Ag, respectively, over the period from 2014 - 2022.
Looking at the results on a yearly basis is inappropriate as for most years there are very few samples recording values greater than 15 times the detection limit. The combined results over the period from 2014 - 2022 shows a small bias towards higher grades in the duplicate samples. The magnitude of this bias is not considered material to the Mineral Resources or Mineral Reserves.
Table 11.10 Summary of pulp duplicate performance for Au - 2014 - 2022
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2014 - 2022
Field sample pairs (Pairs > 15 x LDL) 230 (35) 66 (12) 34 (6) 0 164 (40) 147 (11) 39 (1) 24 (1) 187 (2) 891 (108)
Pulp sample pairs < 10% RPD 94 100 83 N/A 93 82 N/A N/A N/A 91
Original Mean (Au ppm) 0.29 0.11 0.34 N/A 0.17 0.06 0.05 0.03 0.22 0.16
Duplicate Mean (Au ppm) 0.27 0.11 0.35 N/A 0.17 0.06 0.05 0.03 0.22 0.16
Bias (%) 4 0 -3 N/A -1 0 -3 2 3 2
Note: Negative bias values = overall higher duplicate grades.
Source: PAS (2022).

PAN AMERICAN SILVER CORP. 57
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 11.4 RPD and scatter plot of pulp duplicates Au - 2014 - 2022
Note: Scatterplot is limited to 5 Au ppm.
Source: PAS (2022).

Table 11.11 Summary of pulp duplicate performance for Ag - 2014 - 2022
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2014 - 2022
Field sample pairs (Pairs > 15 x LDL) 230 (76) 66 (19) 34 (11) 0 164 (61) 147 (19) 39 (8) 24 (1) 187 (1) 891 (196)
Pulp sample pairs < 10% RPD 97 100 73 N/A 86 95 75 N/A N/A 87
Original Mean (Ag ppm) 10.53 7.12 9.09 N/A 6.16 2.75 2.29 1.7 12.37 6.5
Duplicate Mean (Ag ppm) 10.35 7.08 8.72 N/A 6.12 2.73 2.35 1.7 12.37 6.43
Bias (%) 2 1 4 N/A 0 0 -3 0 2 1
Note: Negative bias values = overall higher duplicate grades.
Source: PAS (2022).
PAN AMERICAN SILVER CORP. 58
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 11.5 RPD and scatter plot of pulp duplicates Ag - 2014 - 2022
Note: Scatterplot is limited to 100 Ag ppm.
Source: PAS (2022).
The pulp duplicate performance is reasonable, with no appreciable bias observed. Pulp duplicates should be selected from material with higher grades, where possible. This will provide a larger database from which to further assess the duplicate performance.
Umpire (check-lab) duplicates
Umpire laboratory duplicates are pulp samples sent to a separate laboratory to assess the accuracy of the primary laboratory (assuming the accuracy of the umpire laboratory). Umpire duplicates measure analytical variance and pulp sub-sampling variance. No umpire duplicates were submitted by Pan American between 2012 - 2022.
PAN AMERICAN SILVER CORP. 59
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


11.6Summary statement and recommendations
Overall, the QA/QC performance is acceptable. The CRM performance indicates reasonable accuracy, and the blank performance indicates good laboratory hygiene. The field duplicates show less than ideal precision, however, this is to be expected given the type of mineralization.
Future QA/QC programs should ensure that duplicate samples are taken in mineralized areas so that there are enough samples above the detection limit to provide meaningful results on assaying precision. Coarse reject duplicates should be inserted to monitor sample preparation and analytical variance.
The QP responsible for this section of the report is of the opinion that the sample preparation, security, and analytical procedures are adequate for the estimation of Mineral Resources and Mineral Reserves at Dolores.
PAN AMERICAN SILVER CORP. 60
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


12DATA VERIFICATION
12.1Geology data reviews
Prior to and following the acquisition of the Property from Minefinders, Pan American undertook extensive geological data verification reviews. These reviews included compiling the available information and conducting reviews of downhole surveys in the database against the original photographic disks, visual reviews of the drillhole location in mining software, reviews of the drillhole collar coordinates against the surveyed topography, and extensive reviews of the assays in the database. The assay reviews included checking around 2,600 assays in the database against the original assay certificate, with particular attention paid to samples with relatively high silver and gold grades and unusual gold to silver ratios. A minor number of discrepancies were noted and corrected. Since acquiring the Property, Pan American routinely undertakes reviews of the assay and geology database and monitors reconciliation between the Mineral Reserve estimate, the grade control estimate, and mine production data.
In the opinion of the QP, the data used to estimate Mineral Resources and Mineral Reserves are sufficiently reliable for those purposes.
12.2Mine engineering data reviews
Pan American routinely undertakes reviews of the mine engineering data, including the mining fleet and mine operational and production data, grade control data including dilution and ore loss, geotechnical and hydrological studies, pit wall and underground stability data, waste disposal requirements, environmental and community factors, the heap leach operations and production data, the development of the LOM plan including production and recovery rates, capital and operating costs for the mine and processing facilities, transportation, logistics, power and water consumption and future requirements, taxation and royalties, and the parameters and assumptions used in the economic model.
In the opinion of the QP, the data, assumptions, and parameters used to estimate Mineral Resources and Mineral Reserves are sufficiently reliable for those purposes.
12.3Metallurgy data reviews
Pan American routinely undertakes reviews of metallurgical test work of monthly composites, operational data and performance, heap leach operations, and production data. In the opinion of the QP, the data and assumptions used to estimate the metallurgical recovery model for the Mineral Resource and Mineral Reserve estimates are sufficiently reliable for those purposes.
12.4Data adequacy
It is the opinion of the QPs responsible for the preparation of this Technical Report that the data used to support the conclusions presented here are adequate for the purposes of the Mineral Resource and Mineral Reserve estimates.
PAN AMERICAN SILVER CORP. 61
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


13MINERAL PROCESSING AND METALLURGICAL TESTING
13.1Introduction and previous work
Between 1996 and 2005, Minefinders completed test work and studies on Dolores ores. Column leach testing on a range of mineralization grades, lithologies, and ore types from the Dolores deposit yielded gold recoveries ranging between 51% and 94%, and silver recoveries between 23% and 74%, at a particle size of P80 6.3 mm. The flowsheet selected included three-stage crushing of ore in closed circuit to produce a final crushed product of P80 range of 6.7 to 9.2 mm, with conveyor stacking on the heap leach pad for leaching with sodium cyanide. Recovery of metals from the pregnant leach solution follows the Merrill-Crowe process with precipitation of metal ions using zinc dust followed by the removal of trace amounts of mercury in retort ovens and smelting of the precipitate to produce doré bars.
Following acquisition of the mine in April 2012, Pan American established a metallurgical test program and selected 521 drill core samples that represented the deposit in terms of grade, ore type (oxidation state), and lithology in the proportions expected to be processed during the LOM. Test work included cyanidation leach tests, grinding and comminution studies, filtration tests, compaction and permeability tests, and pilot work as part of an overall pulp agglomeration study.
A summary of historical test work completed on Dolores is summarized in Table 13.1 with select test work programs further discussed based on relevance to the current operation. No new metallurgical test work has been completed on the Property with the exception of ongoing column leach and compaction test work on production composites at site.
Table 13.1 Dolores test work programs summary (1997 - present)
Year
Laboratory
Test work type
Comminution
Leaching
Filtration
Permeability
Minerology
1997
McClelland Laboratories

X



1997
Hazen Research Inc




X
1997
Russell M Honea




X
1997
Small Bear Minerals




X
1999
McClelland Laboratories

X



2000
McClelland Laboratories

X



2004
McClelland Laboratories

X



2004
Pocock Industrial


X


2008
McClelland Laboratories

X



2009
SGS
X




2009
Delkor Solid Solutions


X


2012
Pocock Industrial


X


2013
Phillips Enterprises
X




2013
McClelland Laboratories

X



2013
Delkor Solid Solutions


X


2013
Bilfinger Water Technologies


X


2013
Pocock Industrial


X


2013
Pocock Industrial


X


2015
Geo-Logic Associates



X

2016
McClelland Laboratories

X



PAN AMERICAN SILVER CORP. 62
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

13.2Pulp agglomeration study
In mid-2012 Pan American completed a study of three alternative process options including pulp agglomeration followed by heap leaching, grinding and leaching in tanks, and flotation / cyanidation. Pulp agglomeration was selected as the most attractive treatment option based on higher metallurgical recoveries, lower capital and operating costs, and the absence of tailings.
Pulp agglomeration is the process of grinding high-grade ore (pulp), combining with cement, and tumbling to form round balls in the order of 12.5 mm to 25 mm in diameter. In this process, the filtered fine ore, crushed material from the heap leach circuit in ratio 1:1 and cement are tumbled together in a drum at a controlled moisture content and feed rate and begin to stick together, forming agglomerates. The cement acts as a binder to hold the particles together and gives the agglomerates strength to prevent them from crumbling under the weight of material stacked on top of them. This is important to prevent the fine material from being washed into the solution collection drains and to maintain good permeability for percolation of cyanide solution down through the heap. The agglomerates remain very porous, and the increased surface area of the ground particles allows for better contact of the cyanide solution on the surface of the precious metal-bearing minerals. This in turn results in increased metallurgical recoveries compared to only coarse crushing and heap leaching. A photograph of the pulp agglomerates is shown in Figure 13.1.
Figure 13.1 Agglomerates at the heap leach pad
Source: PAS (2021).
PAN AMERICAN SILVER CORP. 63
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


13.2.1Cyanide leaching tests
The 521 samples as well as 15 composite samples prepared for previous metallurgical test work by Minefinders were subjected to cyanide solubility tests and analysis of manganese, lead, zinc, total sulphur, and sulphide sulphur content at McClelland Laboratories Inc in Reno, Nevada, USA. The testing conditions were optimized using the composite samples with the objective of maximizing metal extraction with respect to leach time, cyanide concentration, and solids density. Shake tests were performed to measure the solubility of gold and silver by cyanide, which averaged 72% and 66%, respectively.
Column leach tests were conducted on each high grade and medium grade composite at a P80 6.3 mm feed size to determine baseline recoveries for the heap leach only process and on each high-grade composite representing the high-grade pulp agglomeration feed. For these tests, the high-grade composite was ground to P80 425 µm, pre-leached at 3,000 ppm sodium cyanide for one hour to simulate the cyanide solution contact time in the mills and during filtration, then agglomerated with 20 kilograms per tonne (kg/t) cement and leached at 1,000 ppm sodium cyanide. Column leach testing on the range of mineralization (including oxide and sulphide) from Dolores deposit yielded gold recoveries ranging between 84% and 90% and silver recoveries between 76% and 85% at a particle size of P80 425 µm. The results indicate that the extraction from pulp agglomerated composites relative to the baseline column leach test ranges from 12% to 14% higher in gold recovery and from 16% to 20% higher in silver recovery, and that sodium cyanide consumption of the agglomerated material compared with the baseline is around 50% lower.
13.32012 to 2021 quality control test work - production composites
13.3.1Production composite column leach tests
Monthly composite column leach tests on samples collected from the heap leach feed conveyor 503 have been conducted since 2012, with additional monthly composite column leach tests on partially leached pulp agglomerated material from the agglomeration drum discharge combined with the rest of the heap leach being conducted since 2017. Average annual column leach tests results for the production composites are summarized Table 13.2 and Table 13.3.
Table 13.2 Monthly composite leach test summary
Heap leach material monthly composites column leach tests
Year
Au (% Rec)
Ag (% Rec)
NaCN (kg/t)
P80 (mm)
2012
78
48
2.1
6.7
2013
79
53
3.8
7.9
2014
77
57
5.6
9.2
2015
76
56
5.5
8.4
2016
69
53
5.7
9.1
2017
69
53
6.6
8.7
2018
68
56
7.6
8.7
2019
68
58
9.0
8.4
2020
72
65
13.7
8.5
20211
73
61
15.0
8.1
Overall
73
56
7.5
8.3
Note: 1 Results available until September 2021. CLT leaching time 350 days.
PAN AMERICAN SILVER CORP. 64
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 13.3 Monthly composite partially leached pulp agglomerated and heap leach material - leach test summary
Year
CLT1 Au (% Ext)
CLT1 Ag (%Ext)
High grade- direct extraction2 Au
(%Ext)
High grade direct extraction2 Ag
(%Ext)
High grade Au Rec3, %
High grade Ag Rec3, %
NaCN (kg/t)
P80 (mm)
2017 72 58 55 37 92 86 9.8
8.4
2018 71 59 51 35 90 81 11.0
8.3
2019 74 67 44 31 89 85 9.1
8.1
2020 75 68 47 33 91 84 15.3
8.2
20214
76 67 48 32 89 89 16.5
7.3
Overall 74 64 49 33 90 84 12.3
8.0
Notes:
1 Partially leached high grade material + crushed ore from heap leach material.
2 Direct Extraction from high grade material at Pulp Agglomeration Plant (grind, filter feed tank and filtration) from Filtrate solution.
3 Back calculated recovery of high-grade material.
4 Results available until September 2021. CLT leaching time 350 days.
Average recoveries for heap leach feed material ranged between 68% and 79% with an overall average recovery of 73% for gold and between 48% and 65% with an overall average of 56% for silver. Average recoveries for partially leached pulp agglomerated material with heap leach feed material ranged between 71% and 76% with an overall average of 74% for gold and between 58% and 68% for silver with an overall average of 64%. Average direct extractions for high grade material at the pulp agglomeration plant ranged between 44% and 55% with an overall average of 49% for gold and between 31% and 37% for silver with an overall average of 33%. Average back calculated recoveries for high grade material ranged between 89% and 92% with an overall average of 90% for gold and between 81% and 89% for silver with an overall average of 84%. The monthly composite column leach test results for both the heap and pulp agglomerated material are in very good agreement with projected recoveries from the recovery model. Sodium cyanide consumption from the column leach tests averaged 7.5 kg/t for heap composites and 12.3 kg/t for partially leached pulp agglomerated material combined with the heap leach material, which is significantly higher than the actual LOM cyanide consumption of 0.86 kg/t.
13.3.2Production compacted permeability tests
Compacted permeability tests are conducted regularly on samples collected from the pulp agglomeration circuit. Each production sample is tested at staged ultimate heap heights and evaluated based on the hydraulic conductivity of the sample under load. Average compacted permeability test results by year are summarized in Table 13.4.
PAN AMERICAN SILVER CORP. 65
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 13.4 Compacted Permeability Test Summary
Year
Simulated heap height Number of times application rate Dry density
High grade P80 (um)
Low grade P80 (mm)
Conductivity (cm/s)
Ratio of low to high grade
Cement addition (kg/t)
2017
34
190
1.95
362
7.9
4.062
3.4
19
100
90
1.99
337
7.9
2.034


2018
35
61
1.88
438
8.3
1.348
3.3
19
100
31
2.01
435
8.4
0.696


2019
34
48
1.90
415
8.5
1.072
3.3
19
90
47
1.98
442
8.2
1.045


2020
35
85
1.82
477
8.4
1.911
3.2
19
83
59
1.92
477
8.4
1.308


2021
35
119
1.84
468
7.7
2.646
3.2
18
84
86
1.93
468
7.7
1.902


2022
36
43
1.81
472
7.7
0.962
3.2
18
84
24
1.93
472
7.7
0.545


From the test work, the overall average pass rate for permeability tests is higher than the irrigation rate. In light of this, significant permeability issues are not expected.
13.4Metallurgical recovery models
Metallurgical recovery models used for the June 30, 2022 Mineral Resource and Mineral Reserve estimates are shown in Table 13.5 and Table 13.6 for the heap leach and pulp agglomeration circuits, respectively. The heap leach recovery model was developed using test work results of at a particle size of 6.3 mm and cyanide concentrations of 1.0 g of sodium cyanide per litre. The pulp agglomeration recovery model for the oxides was calculated by adding the difference in recoveries of the leach test results at 425 µm and the results of the same sample at 6.3 mm to the heap leach recovery model. The pulp agglomeration recovery model for the mixed and sulphides was updated based on the monthly composites column leach test results, the direct extraction at the pulp agglomeration plant and the back calculation.
Table 13.5 Heap leach metallurgical recovery model
Ore type
Gold recovery (%)
Silver recovery (%)
Tonnage distribution
Oxide
77.9
42.1
4%
Mixed and sulphide
67.6
54.9
96%
Weighted Avg.
68.0
54.4
100%
Table 13.6 Pulp agglomeration metallurgical recovery model
Ore type
Gold recovery (%)
Silver recovery (%)
Tonnage distribution
Oxide
90.0
58.7
2%
Mixed and sulphide
89.8
83.3
98%
Weighted Avg.
89.8
82.7
100
PAN AMERICAN SILVER CORP. 66
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


The metallurgical recovery models are supplemented with a silver and gold leaching kinetics model for both the heap leach and pulp agglomeration circuits which have been developed initially from the kinetics of column leach tests, the ratio of ore placed on the heap leach pad relative to the added solution, and metal recoveries. Based on the topography of the heap leach pads, the current treatment rate, the quantity of solution applied to heap leaching, and considering the actual metal production, a solid to liquid time schedule was estimated for use in the kinetic model equation. The kinetic models are shown in Table 13.7 and Table 13.8 for the heap leach and pulp agglomeration circuits, respectively.
Table 13.7 Heap leach metallurgical recovery kinetic model
Year
Oxide, mixed and sulphide combined
Au recovery (%)
Ag recovery (%)
1
86.87
57.25
2
13.08
20.72
3
0.05
7.49
4

5.09
5

3.86
6

2.70
7

2.56
8

0.33
Total
100.0
100
Table 13.8 Pulp agglomeration metallurgical recovery kinetic model
Year
Oxide, mixed and sulphide combined
Au recovery (%)
Ag recovery (%)
1
79.11
52.85
2
14.26
12.05
3
5.61
4.80
4
1.02
3.92
5

2.58
6

2.53
7

2.53
8

2.46
9

2.41
10

2.36
11

2.49
12

2.48
13

2.24
14

1.00
Total
100
100
13.5Material issues and deleterious elements
There are no known material issues, and the operation is not subject to any negative impact of deleterious elements. The mine operates a closed-circuit processing system without tailings facilities and produces a doré product.
PAN AMERICAN SILVER CORP. 67
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


14MINERAL RESOURCE ESTIMATES
14.1Introduction
Pan American updates Mineral Resources on an annual basis following reviews of metal price trends, operational performance and costs experienced in the previous year, and forecasts of production and costs over the LOM. Infill and near-mine drilling is conducted as required through the year. The drillhole data cut-off date for the commencement of the current geological interpretation was April 30, 2022 and the effective date of the Mineral Resource estimate is June 30, 2022.
Mineral Resources for the Dolores deposit were prepared by Pan American staff under the supervision of, and reviewed by Christopher Emerson, FAusIMM, Vice President, Business Development and Geology of Pan American, who is a QP. They have been estimated in accordance with the CIM Estimation of Mineral Resources and Mineral Reserves, Best Practice Guidelines (2019), and reported according to the CIM Definition Standards (2014).
Table 14.1 tabulates a summary of the total Mineral Resources for the Property as at June 30, 2022. This total includes contributions from the open pit, underground and stockpile locations and are also a sum of direct heap leach and pulp agglomeration material which have different modifying factors discussed in Section 14.11. The cut-off value applied varies according to mining type and process route. These are listed in the footnotes to Table 14.1.
Table 14.1 Summary of Mineral Resources at June 30, 2022
Classification Tonnes
Grade
Contained metal
Mt Ag g/t Au g/t Ag Moz Au koz
Measured 2.1 30 0.53 2.1 36.5
Indicated 0.8 57 1.13 1.5 29.7
Measured + Indicated 3.0 38 0.70 3.6 66.2
Inferred 2.5 29 0.92 2.4 74.4
Notes:
•CIM Definition Standards (2014) were used for reporting the Mineral Resources.
•Mineral Resources exclude those Mineral Resources converted to Mineral Reserves.
•Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
•Mineral Resource estimates were prepared under the supervision of or were reviewed by Christopher Emerson, FAusIMM, Vice President, Business Development and Geology of Pan American.
•Cut-off values use a value/tonne calculation. The value/tonne is based on a combination of metal price and individual metal recoveries which are variable throughout the deposit.
•Mineral Resources have been reported using pulp agglomeration and / or heap leaching metal recovery and cost parameters.
•The cut- offs used to report the open pit are a value/tonne of $12.30 for Heap Leach and $26.50 for pulp agglomeration.
•The cut-off used to report the underground area is a value/tonne of $73.5, and all material is assumed to be processed through the pulp agglomeration plant.
•Metal prices used are $22 per ounce of silver and $1,700 per ounce of gold.
•Mineral Resources were constrained by designs and other modifying factors to demonstrate reasonable prospects of economic extraction.
•The drillhole database had a cut off date of April 30, 2022.
•Totals may not add up due to rounding.
PAN AMERICAN SILVER CORP. 68
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


There are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the potential development of the Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources reported here are in addition to Mineral Reserves.
14.2Available data, preparation, and validation
The available drillhole data includes collar coordinates, downhole survey information, silver and gold assays, multi-element assays for a subset of the drillholes, and codes for lithology, structural features, alteration, mineralization, and oxidation, all in Microsoft Excel format exported from the SQL-based DH Logger sampling database. This data was imported into DatamineTM software and desurveyed into three dimensional drillhole traces. The drillhole data was reviewed and corrected as necessary for any errors.
Some of Minefinders' drillholes were drilled down the dip of the mineralized trends, which provides unreliable grade and intersection width information. Pan American removed the majority of these drillholes from the geological interpretation and the estimation of Mineral Resources and Mineral Reserves. Most of the early-stage RCs drillholes were also removed from the geological database and were not used in the geological interpretation or the estimation of the Mineral Resource and Mineral Reserves. This applies for both underground and open pit models.
A reference plan with section lines overlain on the open pit outline is shown in Figure 14.1. The typical intersection angle to the mineralization and drillhole spacing is shown in cross section in Figure 14.2 and
Figure 14.3.
PAN AMERICAN SILVER CORP. 69
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Figure 14.1 Reference plan showing section lines overlain on the open pit outline
Source: PAS (2022).
PAN AMERICAN SILVER CORP. 70
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Figure 14.2 shows Section 1975, located at the north end of the open pit and Figure 14.3 is a section located at the south end of the open pit and also shows the underground drilling. Both figures show current topography, design reserve pit, block model, and drillholes.
Figure 14.2 Section 1975
Source: PAS (2022).
Figure 14.3 Section 3250
Source: PAS (2022).
PAN AMERICAN SILVER CORP. 71
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


14.3Geological interpretation and modelling
Three-dimensional interpretations were made of the lithology and oxidation codes on the drillholes. These interpretations were wireframed and used to code the drillhole data and the block model for the respective features. Mineralization at the Property occurs in numerous structurally controlled parallel trends oriented to the northwest and mostly dipping steeply to the southwest.
Three dimensional mineralized envelopes for open pit Mineral Resources and Mineral Reserves were prepared around spatially continuous trends of composite samples greater than 0.30 g/t gold equivalent (AuEq), using a gold to silver ratio of 1:70. This resulted in the creation of 28 spatially distinct mineralized trends at four specific areas referred to as San Francisco, Alma Maria, Mid Zone, and the East Dike. These interpretations were wireframed and used to back-code the drillhole data and the block model for these mineralized grade estimation domains, as well as the surrounding unmineralized domain. A plan of the interpreted mineralized trends at the 1,400 m elevation is shown in Figure 14.4. The widths of the narrower zones are in the order of 5 m wide, while the wider zones are in the order of 25 m wide.
Three dimensional mineralized envelopes for the underground Mineral Resources were prepared around spatially continuous trends of mineralization based on composite samples greater than 1.25 g/t AuEq, using a gold to silver ratio of 1:70. This resulted in the creation of 38 spatially distinct mineralized trends at three specific areas referred to as San Francisco, Alma Maria, and the East Dike. These interpretations were wireframed and used to back-code the drillhole data in the same manner as for the open pit. A plan of the interpreted mineralized trends at the 1,400 m elevation is shown in Figure 14.5. The widths of the narrower zones are in the order of 2 - 3 m wide, while the wider zones are in the order of 25 m wide.
PAN AMERICAN SILVER CORP. 72
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 14.4 Plan of open pit mineralized domains trends
Source: PAS (2022).
PAN AMERICAN SILVER CORP. 73
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Figure 14.5 Plan of underground mineralized domains trends
Source: PAS (2022).
PAN AMERICAN SILVER CORP. 74
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


14.4Geostatistics
As the majority of the samples within the mineralized domains were selected at intervals of, or less than 2 m, all samples were composited to 2 m intervals to ensure equal weighting of sample grades during the grade estimate.
Mean composited grades within the 29 open pit estimation domains range from 0.22 g/t Au to 0.99 g/t Au, and from 7.09 g/t Ag to 53.31 g/t Ag. The mean composited grade of all composites in all domains is 0.68 g/t Au and 32.65 g/t Ag. San Francisco (SF100), Alma Maria (AM200), and Middle Structure (Mid 300) are the three volumetrically largest estimation domains and comprise 80% of the Mineral Resource.
Multiple indicator kriging was selected as the grade interpolation method for those three domains which have with sufficient numbers of sample composites to support the creation of multiple variograms at various grade bins. For all the other 19 domains ordinary kriging (OK) was selected and used as the estimation method.
Mean composited grades within the 30 underground estimation domains range from 0.1 g/t Au to 3.95 g/t Au, and from 3.95 g/t Ag to 154.57 g/t Ag. The mean of all composites in all domains is 0.863 g/t Au and 28.05 g/t Ag. Top cuts of extreme silver and gold grades were reviewed by domain, with respect to the log histogram, gold and silver scatter plots, and the spatial location of the extreme grades relative to neighbouring grades. Top cuts were applied where necessary to reduce the influence of high-grade values unsupported by similar surrounding sample grades.
14.5Variograms and grade interpolation
14.5.1Open pit
Experimental variograms were calculated on each grade estimation domain to assess whether sufficient drillhole intersections were present to produce reasonable multiple indicator variograms. In the open pit data set, reasonable multiple indicator variograms were obtained in the largest of the mineralized domains which are San Francisco, Alma Maria, and the Mid Zone. For the remainder of the mineralized domains, a single variogram for all samples in the largest of the domains in each trend was calculated and applied to the remainder of the domains in each trend planned for OK estimates. A single variogram was calculated and applied to the OK estimate in the waste domain.
The 12 indicator variograms parameters for silver and gold were applied to the multiple indicator kriging estimate for the three multiple indicator kriged grade estimation domains, and the ordinary kriged variogram parameters for silver and gold were applied to the remaining mineralized domains and the waste domain. Variogram models were oriented according to the strike and dip of each domain. The range and direction of continuity obtained from the 70th percentile Au indicator bin was used to define the search ellipse. Three searches were applied using a minimum of eight and a maximum of 24 composites to return an estimate to the parent block.
14.5.2Underground
Inverse distance squared (ID2) and OK was used to estimate grades for all the 30 underground domains. The largest domains are associated with San Francisco trend and most of the mineralization is next to, or south of the actual pit design. The estimation has been made individually for each domain considering a 5 m additional skin for the hanging wall and footwall of each structure. There is no lithological domaining applied to the interpretation of structures or grade interpolation as the structures lie in the same lithology or in the contact between two lithologies.
PAN AMERICAN SILVER CORP. 75
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

14.6Block model
14.6.1Open pit
An initial block size of 12.5 m x 12.5 m x 7.5 m was chosen with respect to the average drillhole spacing and bench height, using sub-cells of 1.25 m x 1.25 m x 0.75 m to obtain a suitable volumetric fit within the wireframes. The model was coded using the interpretation wireframes for lithology, grade estimation domain, and oxidation. The model then was regularized using 12.5 m x 12.5 m x 7.5 m block size with no subcells to count for internal dilution. The resulting block model was depleted for previous open pit mining as of June 30, 2022, as well as estimated volumes of historically mined underground material.
14.6.2Underground
A parent block size of 10.0 m x 10.0 m x 10.0 m was chosen with respect to the average drillhole spacing, using sub-cells of 0.25 m x 0.25 m x 0.50 m to obtain a suitable volumetric fit within the wireframes. The model was coded using the interpretation wireframes for lithology, grade estimation domain, and oxidation. The resulting block model was depleted for underground mining as of June 30, 2022.
14.7Bulk density
Bulk density values measured from the 1,741 samples range from 1.97 to 4.13 g/cm3 and have a mean of 2.55 g/cm3. The variability of the bulk density values is relatively low and there is no meaningful correlation between bulk density and any geological or spatial features, except for base metal content. Bulk density was applied to the block model using a nearest neighbour estimate to honour the local bulk density variability. The same bulk density database applied for open pit and underground models.
14.8Estimation validation
The estimates for both block models were validated by domain by comparing the global declustered mean composite grades with the mean of the estimated grades, and by comparing the local composite grade trends with estimated grade trends on slice or "swath" plots. These reviews show the estimated grades reasonably reflect the variability of the composite grades. Only a few small domains with few input sample grades showed poor comparisons, and this was considered in the classification.
Reconciliation of the Mineral Resource estimate to mine production is carried out monthly. This has been compiled for the open pit since 2012 when Pan American acquired the Property. Reconciliation of the underground mine production to the resource estimate commenced in 2018 as that was when significant production started. Mill to mine reconciliation is also recorded since 2012 and includes both Heap leach and agglomeration process. This is shown in Table 14.2 where the Mine to Reserve reconciliation is -5% difference in silver and -8% in in gold grades, and 4% less in tonnes overall. While underground tonnes are up, there is a deficit in the gold grade. Mine to process reconciliation is very much in line at around 1% to 2% difference.
Reconciliation for the period July 2020 to June 2022 with the differences for the various reconciliations are shown in Table 14.2.

PAN AMERICAN SILVER CORP. 76
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 14.2 Reconciliation results 2020 - 2022
Year Comparison
% Difference
Tonnes
Silver grade
Gold grade
Silver metal
Gold metal
2012-2022 Open pit (Mine - Reserves)
-4%
-5%
-7%
-9%
-11%
2018-2022 Underground (Mine - Reserves)
20%
-10%
-29%
8%
-14%
2012-2022 Total
-4%
-5%
-8%
-9%
-11%
2012-2022 Mine - Process
0%
-1%
-2%
-1%
-2%
Notes:
•Mine represented by the grade control models.
•Reserve represented by the reserve block model.
•Process is crusher feed from metallurgical balance.
14.9Classification
The estimate was classified into spatially continuous Measured, Indicated, and Inferred categories by preparing three-dimensional interpretation wireframes around the drillhole patterns and coding the estimate for classification category using the wireframes. Measured Mineral Resources were assigned at the central and upper zones of the deposit where drillhole spacing is in the order of 25 m or less, surrounded by Indicated Mineral Resources where drillholes are more widely spaced at the lower and outer regions of the deposit, in the order of 50 m or less, with Inferred Mineral Resources at depth and in regions with wide but regularly spaced drillholes demonstrating continuity. The interpretation of the mineralized zones is restricted to regions with drillhole data and with little projection of the interpretation beyond data.
14.10Planned dilution and loss
To address reasonable prospects for eventual economic extraction (RPEEE) as required in CIM Definition Standards (2014) certain adjustments and constraints were applied to both models.
For the open pit block model, the sub-celled model was re-blocked to 12.5 m x 12.5 m x 7.5 m using a process that eliminates sub-cells formed at the boundaries of the wireframe interpretation and incorporates the grade of sub-cells on the boundaries into the grade of the re-blocked cell. On the contact of the economically mineralized zones with the surrounding uneconomic material, this process dilutes the grades of any cells with a majority of the volume lying within the economic interpretation, by incorporating the estimated grade of the neighbouring uneconomic material into the re-blocked cell. The quantity of dilution added in this process is dependent upon the width and orientation of the mineralized zone relative to the block, and on average, resulted in the application of around 30% dilution. No ore loss was accounted for prior to the reserve pit design.
For the underground block model, a 3 m minimum mining width was assumed, and additional planned dilution of 0.25 m was applied to each of the hangingwall and footwall, using the estimated grade of the waste material. In stopes greater than 5 m wide, additional dilution was added to ensure a minimum total external dilution of 10%. Mining recovery of 92% was assumed to account for expected losses incurred during mining.
14.11Value estimates and mining constraints
For open pit Mineral Resources, a block value per tonne was applied to each block based on grade, metallurgical recovery, Mineral Resource metal prices, and costs including processing, refining, transportation, royalties, G&A, and leach pad sustaining capital. Processing costs and metallurgical recoveries were estimated using the combined heap leach / pulp agglomeration treatment process. Open pit Mineral Resources are reported inside the design pit considering anything below that limit as part of the underground Mineral Resources. The parameters applied are shown in Table 14.3 to Table 14.5.
PAN AMERICAN SILVER CORP. 77
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


For underground Mineral Resources, a block value was calculated for each block using the same assumptions used for the open pit. All underground material is assumed to be processed through the pulp agglomeration plant. Potentially mineable stope shapes were generated using Deswik stope optimizer (DSO) software based on geometrical, geotechnical, and economic cut-off value constraints.
The metallurgical recoveries used are shown in Table 14.3, the economic parameters for silver and gold are shown in Table 14.4, and the cost parameters are shown in Table 14.5.
Table 14.3 Metallurgical recoveries by material type and process route
Process route Ore type
Gold recovery (%)
Silver recovery (%)
Heap leach Oxide
77.9
42.1
Sulphide
67.6
54.9
Pulp agglomeration Oxide
90.0
58.7
Sulphide
89.8
83.3
Table 14.4 Economic parameters
Item Units
Silver
Gold
Mineral Resource sale price $ per ounce
22.00
1,700
Refining cost $ per ounce
0.25
0.50
Transportation cost $ per ounce
0.15
0.15
Refining recovery %
99.825
99.825
Royalty to RG and Mexico %
2.50
3.75
Table 14.5 Cost parameters
Item Units
Cost
Processing heap leach $ per tonne ore
6.20
Processing pulp agglomeration $ per tonne ore
20.40
Site G&A $ per tonne ore processed (heap or pulp)
3.47
Leach pad sustaining capital $ per tonne ore processed (heap or pulp)
2.62
Open pit mining cost $ per tonne mined
1.601
Underground mining cost $ per tonne mined
47.00
Note: 1Average mining cost. Costs vary for each block / bench in the pit by elevation and distance from the process plant.
The cut-off values applied to the reporting of the Mineral Resources are shown in Table 14.6. These are rounded from the totals in Table 14.3, Table 14.4, and Table 14.5.
Table 14.6 Cut-off values
Process Item Units
Value
Heap leach cut-off value $ per tonne ore
12.30
Pulp agglomeration cut-off value $ per tonne ore
26.50
Pulp agglomeration Underground cut-off value $ per tonne ore
73.50

PAN AMERICAN SILVER CORP. 78
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


14.12Mineral Resource tabulation
Mineral Resources for Dolores as at June 30, 2022, are shown in Table 14.7. This tabulation includes insitu and potentially economic stockpiled material at metal prices of $22 per ounce of silver and $1,700 per ounce of gold, classified as Measured, Indicated, and Inferred Mineral Resources. Mineral Resources are reported inside the Mineral Reserve pit design.
The underground Mineral Resources below the design pit have been assessed for mineability and constrained within stope designs.
The total Mineral Resources include previously mined low grade stockpiled material. The stockpile material is annually tested for its economics and the insitu Mineral Resources have been depleted for mining as of June 30, 2022. Stockpiles have been inventoried and tested for economic robustness also as of the same date. Hence there is stockpile material in the Mineral Resource which does not demonstrate positive economics using the Mineral Reserve modifying factors, while stockpile material in the Mineral Reserves does.
There are no known mining, metallurgical, environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other factors or risks that the QP is aware of that could materially affect the potential development of the Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources reported here are in addition to Mineral Reserves.
Table 14.7 Dolores Mineral Resources as at June 30, 2022
Location Classification Tonnes Grade Contained metal
Mt Ag g/t Au g/t Ag Moz Au koz
Open pit Measured 0.5 9 0.27 0.1 4.1
Indicated 0.2 9 0.27 0.1 1.9
Measured + Indicated 0.7 9 0.27 0.2 6.0
Inferred 1.7 17 0.55 0.9 30.4
Underground Measured 0.5 89 1.60 1.3 23.6
Indicated 0.6 74 1.44 1.4 27.8
Measured + Indicated 1.1 81 1.51 2.7 51.4
Inferred 0.8 56 1.72 1.4 44.0
Stockpiles Measured 1.2 16 0.23 0.6 8.8
Indicated - - - - -
Measured + Indicated 1.2 16 0.23 0.6 8.8
Inferred - - - - -
Total Measured 2.1 30 0.53 2.1 36.5
Indicated 0.8 57 1.13 1.5 29.7
Measured + Indicated 3.0 38 0.70 3.6 66.2
Inferred 2.5 29 0.92 2.4 74.4
Note: Footnotes beneath Table 14.1 apply.

PAN AMERICAN SILVER CORP. 79
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


14.13Recommendations
No significant recommendations are made to improve the quality of the Mineral Resource estimate methodology. Pan American intends to continue with annual diamond drilling programs as required and to continue ongoing infill drilling, to collect closer spaced drillhole information. The geological interpretation and Mineral Resource estimate will continue to be updated annually to include additional resource definition drilling undertaken during the year and to deplete for the previous years' mining. Reviews of the geological interpretation against grade control drilling will continue to be undertaken on a regular basis to verify the reliability of the resource estimate.
PAN AMERICAN SILVER CORP. 80
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


15MINERAL RESERVE ESTIMATES
15.1Disclosure
The Mineral Reserve estimates conform to CIM Definition Standards (2014) referred to in NI 43-101. All design and scheduling have been completed using the Mineral Resource model and estimate described in Section 14.
Pan American updates Mineral Reserves annually following reviews of metal price trends, operational performance and costs experienced in the previous year, and forecasts of production and costs over the life of the mine. The Mineral Reserve is based on measured and indicated Mineral Resources estimated as at June 30, 2022. The effective date of the Mineral Reserve estimate is June 30, 2022. No other new material information has become available between the effective date and the signature date given on the certificates of the QPs.
Mineral Reserve estimates are based on assumptions that include mining, metallurgical, infrastructure, permitting, taxation, and economic parameters. Increasing costs and taxation and lower metal prices will have a negative impact on the quantity of estimated Mineral Reserves. There are no other known factors that may have a material impact on the estimate of Mineral Reserves.
The estimated Proven and Probable open pit Mineral Reserves for the Dolores deposit are summarized in Table 15.1.
Table 15.1 Dolores Mineral Reserves as at June 30, 2022
Location Category
Tonnes
Grade
Contained metal
Mt
Ag g/t
Au g/t
Ag Moz
Au koz
Open pit Proven
9.2
22
0.70
6.4
205.3
Probable
4.1
18
0.60
2.4
77.7
Total
13.2
21
0.66
8.8
283.0
Stockpiles Proven
3.7
18
0.25
2.2
30.0
Probable



-
-
Total
3.7
18
0.25
2.2
30.0
Total Proven
12.9
21
0.57
8.6
235.4
Probable
4.1
18
0.60
2.4
77.7
Total Reserves (Proven and Probable)
17.0
20
0.57
11.0
313.1
Notes:
•CIM Definition Standards (2014) were used for reporting the Mineral Reserves.
•Mineral Reserves are in addition to Mineral Resources.
•Figures in the tables may not compute exactly due to rounding.
•Metal prices used are $19.00 per ounce of silver and $1600 per ounce of gold.
•Mineral Reserves are reported on a 100% ownership basis. Pan American owns 100% of Dolores.
•Cut-off values use a value/tonne calculation. The value/tonne is based on a combination of metal price and individual metal recoveries which are variable throughout the deposit. The cut- offs used to report the open pit are a value/tonne of $12.30 for Heap Leach and $26.50 for pulp agglomeration.
15.2Dilution and ore loss
Planned dilution and loss were considered as described in Section 14.10.

PAN AMERICAN SILVER CORP. 81
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


15.3Value estimates
A dollar value per tonne was assigned to each block in the model based on grade, metallurgical recovery, Mineral Reserve metal prices, transport cost, refining costs and selling costs. G&A and leach pad sustaining capital were also included. Processing costs and metallurgical recoveries were assigned using the heap leach or pulp agglomeration treatment destinations. The metallurgical recoveries are shown in Table 14.3, the economic parameters for silver and gold are shown in Table 14.4, and the cost parameters are shown in Table 14.5.
15.4Geotechnical parameters
Golder Associates Inc. of Tucson, Arizona, USA, provided recommendations for the geotechnical parameters for the open pit design based on a review of the available data and the rock conditions (Golder, 2013b). This review is discussed in more detail in Section 16.1.2.
Surface weathering and / or intense argillic alteration occurs to a depth of around 30 m below surface. Following Golder's recommendation, benches in the weathered zone were designed with production bench heights of 7.5 m with a 6.2 m wide catch benches. The bench face angle is 60° resulting in an inter-ramp angle of 35°. Below the weathered zone, the final walls are excavated with a triple bench (22.5 m total height) and 9.1 m wide catch berms. Production benches are mined 7.5 m high within the pit limits.
A 24 m wide catch berm has been included in the design of the high west wall to mitigate the risk of failure. This results in an inter-ramp angle of the final pit wall and for the internal phases of 52°. Presplit blasting is used for final walls. Mine staff are monitoring the stability of the pit walls routinely with assistance from a geotechnical engineer. A laser scanner is continuously monitoring the northwest wall to manage any geotechnical risks in this area of the operation.
15.5Pit design and schedule
An optimized pit shell was selected after using Whittle software to generate a series of nested pits using the Measured and Indicated class only blocks in the Mineral Resource model. Inferred and waste class blocks were assigned no value. Using the selected pit shell as a basis, MineSight software was used to add in ramps, phases, and practical access to complete a pit design. The final pit design develops in a series of phased outward expansions using the geotechnical parameters described in Section 15.4.
The pit extends around 2,420 m in length trending to the northwest and is about 800 m wide. The deepest part of the pit was depleted in June 2021 and is now used as an in-pit waste dump. Remaining phases at end of June 2022 are at the North, South and East which contain the Mineral Reserves as at end June 30, 2022. A plan view of the ultimate pit is shown in Figure 15.1.
A mining schedule was prepared to detail the total materials movement for the LOM and to confirm that there was adequate capacity for stacking on the heap leach pads, and capacity for waste dumping for the LOM. The schedule also considered various options for stockpiling and phasing to maximize the value of the mining sequence.
PAN AMERICAN SILVER CORP. 82
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO

Figure 15.1 Reserve pit design
Source: PAS (2022).
15.6Equipment and labour
The QP has reviewed the equipment and labour numbers and, taking into account the Management initiatives, considers the projected increase in equipment and productivity to be reasonable and supports the selected cut-off value to meet the steady-state target production of 21,200 tpd. In addition, sustaining capital to access the Mineral Reserves through development as well as equipment maintenance and rebuilds has been considered and the provision is considered to be reasonable for the targeted production rate.
PAN AMERICAN SILVER CORP. 83
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


16MINING METHODS
16.1Open pit operations
16.1.1Mining methods
Mining at Dolores has been ongoing since 2008 using conventional open pit methods with excavators, shovels, loaders, and haul trucks. Ore grade control drilling is carried out using angled RC drilling to provide closer spaced sample data for a grade control estimate, which is used to mark out the ore and waste mining boundaries. The grade control holes are oriented perpendicular to the strike of the deposit on sections spaced every 15 m along strike and every 10 m to 15 m across strike. Drillholes are approximately 43 m long, which results in a nominal vertical span of 30 m, equal to four bench heights. The drillhole pattern is offset with 25% of the holes drilled from each bench to provide full coverage. The RC drillholes are logged for lithology and oxidation and sampled every 2 m.
Ore and waste material is drilled and blasted using 135 mm diameter holes, using a nominal pattern of 8.5 m deep blast holes spaced 4.5 m along strike and 4.5 m across strike. Explosives used are ANFO. Ore and waste are usually blasted separately, and a blast movement monitoring system is used to manage ore loss, dilution, and material misclassification.
16.1.2Geotechnical and hydrological parameters
Golder Associates Inc. of Arizona, USA, made recommendations for the geotechnical parameters for the open pit design, following their review of the rock conditions at site (Golder, 2013a). Golder supervised the drilling of three oriented diamond drillholes to extend the geotechnical database in the north and south of the southwest wall. This was later updated by geotechnical work done by Walker, in 2017.
Golder classified the rocks present in the mining area into two major lithology types including a latite group consisting of non-welded latite tuff, breccias, flows, dikes, and sills, and an andesitic group consisting of andesite volcanics, porphyry intrusives, and diorite intrusives. The structural model consists of a dominant structural fabric striking 330° and dipping steeply to the west that pre-dates mineralization and cuts through both major lithology groups. Faults following this trend typically comprise normal faults dipping to the southwest. Conjugate normal faults and reverse faults dipping to the northeast are also present. A weak orthogonal system of normal and wrench faults striking east-west are also part of the major structural model. Minor structures including joints and veins typically follow the major structural trends, and a joint set dipping to the northeast at a shallower angle than the overall fabric is present within the pit.
The geomechanical model includes the data collected from nine oriented diamond drillholes, 30 unconfined compression tests, six disk tension tests, 11 triaxial compression tests, 43 uniaxial compressive strength tests, and four direct shear tests of saw cut joints in the drill core. The tests on the drill core indicate good to very good rock quality. The structural conditions are generally favourable for the development of steep inter-ramp slopes in all sectors of the pit except within the upper weathered zone near surface (top 30 m) and other surface areas affected by intense argillic weathering.
Hydrogeological studies indicate generally low permeability of the rock mass with very steep groundwater gradients towards the steep sided drainage valleys, likely following faults, fractures, and other geological boundaries. The groundwater elevation varies from 1,400 m to 1,575 m above mean sea level.
Golder recommended bench heights of 7.5 m with 7.5 m wide catch benches located after each bench for mining areas within 30 m of the surface, and catch benches located each third bench or each 22.5 m vertically for mining areas below 30 m. For pre-split and trim mining, the recommended catch bench width is 9.1 m, with a bench face angle of 70° and an inter-ramp angle of 52°.
The mine conducts routine geotechnical monitoring and geological pit mapping, and has completed a program of oriented geotechnical drillholes targeted at the ultimate pit walls. A geotechnical consultant, W. K. Walker,
PAN AMERICAN SILVER CORP. 84
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


P.E. of Tucson, Arizona, USA, undertook geological pit mapping and a review of bench and inter-ramp slope stability in 2015, which confirmed Golder's findings.
16.1.3Production and process rates and expected mine life
The open pit LOM plan is based on the open pit Mineral Reserves presented in Section 15 at a nominal rate of 21,200 tpd. The material will follow either the pulp agglomeration process route or the heap leach only process route depending on ore grade and mining schedules. In the LOM plan, the annual total material mining rate is 34 Mt of ore and waste in 2022. The total material moved then decreases, with mining completed in 2024.
The pulp agglomeration plant started operating in the second half of 2017 and ramped up to its full capacity of 5,500 tpd by the end of that year. Stacking of crushed ore on the heap leach pads will be completed in 2024.
The open pit has three remaining phases. In 2022, the North phase is providing most of the ore for the heap and agglomeration processes. The schedule requires reduced waste movement over the final years, with excess production trucking capacity to be gradually transitioned to waste dumps rehabilitation and closure activities.
16.1.4Waste mining
Open pit waste mining averages 24.8 Mtpa through 2022, then declines until completed in 2024. Waste mining in the LOM plan totals 31.2 Mt from July 2022, for a strip ratio of 1 ore to 2.0 waste. The mining sequence will prioritize the higher-grade material in the north phases and therefore the waste in this area will be the priority also. All waste material will be dumped in the mined-out phases of the pit or used for rehabilitation, reshaping of dumps and other closure activities.
16.1.5Mining fleet and machinery
The mining fleet is comprised of nominal 90 t diesel haul trucks which are matched to hydraulic excavators and front-end loaders. Production drills bore 135 mm production blast holes. Wall control drilling is carried out by smaller rigs that drill up to 89 mm holes. Ancillary equipment consists of Dozers, graders, water carts, and lighting towers to support hauling, dumping, and other mine operations. Table 16.1 summarizes the fleet size.

PAN AMERICAN SILVER CORP. 85
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Table 16.1 Open pit mining fleet
Open Pit unit
2022
Haul trucks
17
Shovels
2
Loaders
5
Drills
7
Dozers
5
Water trucks
2
Motor grader
2
Total
40
In 2022 the mine is operated exclusively by Pan American and the mine schedule accounts for a reduction in equipment and capacity over the remaining mine life, and the current fleet will be sufficient to meet the production requirements.
16.1.6Recommendations
Pan American will continue to optimize blasting patterns, and monitoring blast movements and pit slope stability. Recommendations have been made for additional geotechnical work (Walker, 2017), including:
•Operationally minimize the blasting overbreak and continue work to achieve design bench face angles.
•Continually observe the orientation, length, and location of continuous major structures as mining progresses and extend the geological and geotechnical model beyond the ultimate pit crest to understand the behaviour of the overall slopes.
16.2Underground operations
The underground mine ended operations in April 2022.
PAN AMERICAN SILVER CORP. 86
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


17RECOVERY METHODS
The current operation considers a three-stage conventional crushed heap leach circuit operated in parallel with a pulp agglomeration circuit with a combined throughput of approximately 21,300 tpd. Ore for the heap leach is crushed to P80 6.7 to 9.2 mm at an average rate of 15,860 tpd. Pebble lime (CaO) is added to the crushed ore for pH control before being conveyor stacked onto a multiple-lift, single use leach pad and leached with a dilute sodium cyanide solution. Pregnant leach solution from the heap flows by gravity to a pregnant solution pond and is pumped to the Merrill-Crowe plant, where the pregnant leach solution is clarified, deaerated, and gold and silver values recovered by zinc cementation. The resulting precious metal sludge is filtered and treated in a mercury retort prior to smelting to produce the final doré product.
High-grade ore is delivered to the pulp agglomeration circuit where it is crushed in a separate two stage crushing circuit followed by two-stage grinding to P80 425 µm at an average rate of 5,440 tpd. Pebble lime and sodium cyanide solution are added at the milling circuit to initiate leaching. Milled pulp from the grinding circuit is filtered and blended with crushed material from the heap leach circuit along with cement before being drum agglomerated and combined with the heap leach material for additional metal recovery at the heap. Filtrate from the filters is clarified and pumped to the Merrill-Crowe plant along with pregnant leach solution from the heap. The mine operates a closed-circuit processing system without tailings facilities.
17.1Heap leach crushing and conveyor stacking
ROM ore is trucked to the crushing plant and crushed to a particle size of P80 range of 6.7 to 9.2 mm in a three-stage crushing circuit at an average rate of 15,860 tpd. The crushed ore is sampled at regular intervals by a sample tower, conveyed to the leach pads via an overland conveyor system, and placed on the pads using portable grasshopper conveyors and a radial stacking system; approximately 5,440 tonnes of crushed ore is scalped from the heap leach circuit prior to stacking for agglomeration with filtered high grade from the pulp agglomeration circuit. Pebble lime is added to the crushed product for pH control. Sodium cyanide solution is prepared in the Merrill-Crowe plant, pumped to the leach pads, and applied using drip and sprayer systems.
Metal recoveries are a function of solution flow rates, cyanide concentration, and time, and the metal leaching period can cover years, continuing as subsequent lifts are placed on the pads. Gravity collectors and / or vertical perforated steel pipes (well risers) fitted with internal pumps transfer the pregnant leach solution containing the dissolved silver and gold from the bottom of the leach piles to the pregnant solution pond and the Merrill-Crowe plant.
17.2Pulp agglomeration
A pulp agglomeration circuit was constructed at Dolores and has been operating successfully since commissioning in 2017. The pulp agglomeration plant operates in an integrated fashion with the heap leach processing facilities. High grade ore is stockpiled on the ROM pad, separated from the heap leach ore. The high-grade feed is reclaimed using front-end loaders at a rate of 5,440 tpd and fed to the primary crushing feed bin. The feed is recovered from the bin by a vibrating grizzly feeder and delivered to a primary jaw crusher with the crusher discharge being conveyed to a vibrating screen. Screen oversize passes through a secondary cone crusher in a closed circuit to produce a rod mill feed with a P80 size of 12.8 mm. The screen undersize is stockpiled using a radial stacker where it is reclaimed by feeders and a reclaim tunnel conveyor system to feed the rod mill.
The rod mill discharge is pumped in closed circuit to a Vertimill / vibrating wet screen circuit with the screen oversize being recycled back to the Vertimill and the screen undersize being pumped to a surge tank for feed to the pressure filters to produce a P80 0.425 mm (35 mesh) ground product. Cyanide and lime are fed into the rod mill to start the metals recovery process. Pregnant solution from the heap leach is used as process water for the rod mill and the entire area from the rod mill forward is on concrete pads for chemical and spill containment.

PAN AMERICAN SILVER CORP. 87
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


The milled slurry is pumped to a filter feed tank and then pumped to one of three horizontal pressure filters equipped with vertical plates, air blowers, and a membrane squeeze to produce a filter cake with approximately 15% moisture. The recovered filtrate solution is pumped to a pregnant solution holding tank; a pinned bed clarifier is used to remove suspended solids from the pregnant filtrate before eventual metal recovery in the Merrill-Crowe plant.
The dewatered filter cake discharges from the filter presses onto a belt conveyor. The filter cake is combined with cement at around 19 kg of cement per tonne of filter cake along with coarse medium grade ore in a mixer prior to being fed into the rotating agglomeration drum. Additional solution is sprayed onto the mixture within the drum as it tumbles in order to control the moisture content and formation of the agglomerate balls. The agglomerate balls are discharged from the drum and conveyed to the heap leach pad feed conveyor where they are combined with crushed medium grade heap ore to be stacked onto the heap leach pads.
Most of the pulp agglomeration process make-up water is sourced by diverting a portion of the pregnant solution flow from the heap leach pads on its way to the Merrill-Crowe plant. Additional cyanide solution is sourced from the sodium cyanide solution make-up plant in the Merrill Crowe plant. The heap leach pads, ponds, and cyanide circuit remain contained within a closed circuit and there is no tailings stream or release to the environment.
A flowsheet for the pulp agglomeration plant is presented in Figure 17.1. The general layout is presented in the photo in Figure 17.2.

PAN AMERICAN SILVER CORP. 88
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 17.1 Pulp agglomeration flow sheet
Source: KCA (2021).
PAN AMERICAN SILVER CORP. 89
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Figure 17.2 Pulp agglomeration plant
Source: PAS (2017).

17.3Merrill-Crowe recovery plant and refinery
The Merrill-Crowe recovery plant at Dolores is designed to recover gold and silver values from pregnant solution from the heap leach and pulp agglomeration circuits by zinc cementation. Pregnant solution at the nominal rate of 1,300 cubic meters per hour (m3/h) is clarified using pressure leaf type clarification filters which remove suspended solids down to levels of less than 1 mg/L before removal of oxygen in the deaeration tower. Diatomaceous Earth (DE) is used to pre-coat the clarification filters and is also metered into the pregnant solution.
The clear pregnant solution from the clarification circuit is sent to the deaeration tower for removal of oxygen. Clear pregnant solution then flows into the deaeration tower and passes through a bed of high surface area packing material. Liquid seal ring vacuum pumps provide sufficient degassing capacity to maintain oxygen levels in solution of less than 1 ppm.
PAN AMERICAN SILVER CORP. 90
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


Deaerated clarified pregnant solution then discharges from the tower and is pumped to the precipitate filter presses. Ultra-fine zinc is added at the press feed pump suction to precipitate gold and silver from the deaerated pregnant solution. Zinc cementation is performed at ambient temperatures. Precipitated gold and silver from the ultra-fine zinc is collected in the precipitate filter presses and the resulting solution discharging from the filter presses is returned to the leach system as barren leach solution.
Precipitate from the filter presses is treated in a mercury retort to remove trace amounts of mercury and is then smelted to produce doré. The doré bars typically contain between 6% and 9% gold and 91% to 94% silver, with generally less than 1% impurities.
17.4Power and water
Water for the operations is sourced from wells, pit, and underground dewatering activities, the nearby Tutuaca River, and from the Chabacan dam. Depending on the year, the water supply from mine dewatering and precipitation on the leach pads and Chabacan Dam catchment is often sufficient for process needs, when additional water is required, it is pumped from the Tutuaca River. The Chabacan dam reservoir has a capacity of 1.2 million m3 and provides storm water control as well as primary water storage. The permitted water usage from the Tutuaca River is 2.0 million m3 per annum at a maximum rate of 64 liters per second and the water extraction permit remains in good standing should it be required in the future.
A 115 kV, 98 km long power line connected to the Mexican national grid in 2016 supplies power to the mine and is sufficient for the current needs of the operation. Backup power is available on site by six 1,800 kW Cummins and two 1,200 kW Caterpillar diesel generators. The total power requirements of the operations including the open pit and processing facilities is estimated at 11.5 MW.
PAN AMERICAN SILVER CORP. 91
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


18PROJECT INFRASTRUCTURE
The Dolores mine is an open pit silver-gold mine located in Chihuahua state, Mexico, approximately 250 km west of the city of Chihuahua.
The mine infrastructure comprises the open pit and processing facilities, heap leach pads, medium grade ore stockpiles, waste storage facilities, conveyor systems, ponds, a power generation plant, a 115 kV power line connection to the national grid, and maintenance shops and warehouses.
The pulp agglomeration plant comprises of crushing, grinding, thickening, filtration, mixing, agglomeration, reagent, and auxiliary facilities.
The operating mine is mature and site infrastructure including site roads are fully developed to support the existing mine production of 34 Mtpa.
A plan of the current site facilities is shown in the photograph in Figure 18.1.
Figure 18.1 Mine infrastructure plan
Source: PAS (2022).

PAN AMERICAN SILVER CORP. 92
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


18.1Transportation and logistics
The main road access to the Property is via 92 km of unpaved roads leading north from Federal Highway 16, near Yepachic, Chihuahua. Access for personnel is provided by an unpaved landing strip suitable for light aircraft, located about 8 km from the mine.
18.2Processing facilities
The crushing facilities include ROM stockpiles of material awaiting crushing and a three-stage crushing plant. Crushing facilities at the pulp agglomeration plant include a ROM ore pad, a vibrating grizzly feeder, a primary jaw crusher, a secondary screen and a secondary cone crusher, a sample tower, belt conveyors, a dust suppression system, a tramp iron magnet, and feeders discharging to the crushed ore stockpile.
The infrastructure for the grinding area includes a stockpile reclaim and rod mill feed belt conveyor, a rod mill, a scalping screen, a Vertimill, mill discharge and associated pumps, a metal detector and magnet, piping, instrumentation, platforms and support structures, and control room.
The infrastructure for the filtration facilities includes a filter feed surge tank and agitator, filter feed pumps, three filter presses, filter cake conveyors, filtrate tank, automatic samplers, pinned bed clarifier, filtrate pump, piping, instrumentation, and platforms and support structures.
The infrastructure for the mixing facilities includes a mixer, cement silo, conveyors, instrumentation, platforms, a sampler, and support structures. The infrastructure for the agglomeration facilities includes an agglomeration drum, process solution sprayers, instrumentation, platforms, support structures, and conveyors.
A series of fixed and portable conveyor belts transport the crushed material to heap leach pads. An expanded pumping system is under construction to optimize the use of sodium cyanide.
The Merrill-Crowe plant includes clarifier filters, two vacuum towers, a zinc cone, filter presses, cyanide preparation area, cyanide storage area, pumps, piping, instrumentation, platforms, and support structures including control room, kitchenette, changing rooms, and washrooms. The smelting facility includes a retort, a furnace, ventilation system, security system, platforms, and support structures.
The infrastructure for the reagent facilities includes tanks, mixers, pumps, metering pumps, piping, instrumentation, platforms and support structures, storage facilities, two overhead travelling cranes, and splitters. The facilities have the capacity to store a two-day supply of cement and a one-month supply of lime and sodium cyanide.
18.3Auxiliary facilities
A power generation plant is located to the west of the ponds and maintenance shops and warehouses are located near the mine offices. A 115 kV, 98 km long power line connected to the Mexican national grid in 2016 supplies power to the mine and is sufficient for the current needs of the operation. Backup power is available on site by six 1,800 kW Cummins and two 1,200 kW Caterpillar diesel generators. The facilities also include compressed air, power supply, and process solution and water management systems.
PAN AMERICAN SILVER CORP. 93
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


18.4Waste storage and stockpile facilities
Four waste storage facilities are located to the north, west, south and East of the open pit mine workings. Approximately a five stockpiles of medium grade ore and four high grades stockpiles are located around the mine workings to allow for the preferential crushing and stacking of higher grade ore for heap and agglomeration process.
18.5Power supply
The electrical power is supplied via a 3,000 kilovolt-ampere (kVA) substation located outside the mine near the portal. Total Dolores site wide consumption is approximately 11.5 MW including the open pit and processing facilities.
18.6Water supply
The main source of water in the pit is from old phase 1. Approximately 490 m3 of water is provided per day for controlling dust, increasing visibility, and reducing the risk of accidents. A Komatsu water truck with a capacity of 74 m3 is utilized in the pit for dust control and for rotary drills consumption.
18.7Mine communication system
A standard radio communications system is used at Dolores. There is a control tower regulating the entry of small vehicles into the pit.
18.8Explosive's magazines
The main explosives magazine is located at the west side of the open pit. Explosives are delivered by a contractor (Hanka) using a special truck.
18.9Tailings management facilities (TMF)
There is no tailings management facility as this is a heap leach operation.
PAN AMERICAN SILVER CORP. 94
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


19MARKET STUDIES AND CONTRACTS
19.1Contracts and marketing
Pan American has contracts in place with Asahi Refining USA Inc. of Salt Lake City, Utah, Republic Metals Corporation of Miami, Florida, and Met-Mex Peñoles S.A. de C.V. of Torreon, Mexico, for refining the doré produced on site. The doré is transported to these facilities where it is refined to the London Good Delivery specification, which is defined as a minimum of 995.0 parts per thousand of fine gold and a minimum of 999.0 parts per thousand of silver. Once refined, the good delivery gold and silver is sold on the international market to bullion banks, financial institutions, and traders. To date, no issues have been encountered in securing the sale of the refined metal from Dolores or for the doré produced at Pan American's other two mines operating in Mexico. No forward sales or hedging takes place at this time.
In the opinion of the QP the contracts in place conform to industry norms.
19.2Review by the QP
Martin Wafforn, the QP responsible for this section of the technical report, has reviewed the contract terms, rates, and charges for the production and sale of the silver and gold produced at Dolores, and consider them sufficient to support the assumptions made in this technical report.
PAN AMERICAN SILVER CORP. 95
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


20ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT
20.1Environmental factors
The most significant environmental issues at Dolores include surface disturbance, heap leach pad and waste dump stability, and reclamation liabilities associated with routine mine operations. Issues related to the stability and containment system of heap leach Pad 1, which developed prior to Pan American's acquisition of the Property, have been resolved by re-constructing the pad. The new heap leach Pad 1 was placed into operation in 2021.
Pan American has implemented additional contingency measures in and around the three heap leach pads, including the installation of well riser type over-liner solution collection systems, additional under drain and leak collection systems, and a network of containment, monitoring, and demonstration wells. Pan American also engages in construction and expansions to the pads after application of rigorous quality control to both the design and construction of the facilities.
The surface disturbance and reclamation liabilities are addressed under Pan American's project reclamation and closure plan, which is discussed in Section 20.9.
20.2Environmental studies
A full suite of environmental baseline studies was completed by Minefinders as part of its original and subsequent permit applications for the construction of the mine and expansion. Pan American has continued routine environmental monitoring in and around the mine in accordance with the site environmental management plan and corporate standards. Pan American participates in the Mining Association of Canada's "Towards Sustainable Mining" program and has achieved Level A on environmental protocols.
20.3Permitting factors
Pan American holds all necessary environmental and operating permits for the development and operation of the mine and is in compliance with Mexican law in all material aspects.
The SEMARNAT approved permit applications for the construction and operation of Dolores, including a MIA, a Technical Justification Study for Change of Land‐Use, and an Environmental Risk Study in April 2006. These studies include a full assessment of the environmental and social impacts of the mine and environmental management plans, which describe the ongoing management and environmental monitoring programs. Subsequent permits were obtained for the expansion of Dolores in 2016 and 2017 which include the pulp agglomeration plant, an additional waste dump, and underground mine. The MIA permit was updated on April 28, 2022 to cover the phase 11 of the pit and the remaining mine life.
Other principal permits include an Accident Prevention Program, a Surface Water Extraction Authorization and a Waste Management Plan.
20.4Waste disposal
Mine waste is deposited in five constructed waste rock facilities located around the pit, one of which has reached full capacity. In-pit deposition of waste rock commenced in 2021.
The mine operates a closed circuit heap leach pad processing system without tailings facilities.
PAN AMERICAN SILVER CORP. 96
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


20.5Site monitoring
The mine operates an extensive monitoring program that includes surface and groundwater, waste, air quality, noise, flora and fauna, and socio-economics. There has been no material effect on the cost of any modifications to the existing, future, or post-closure monitoring programs as a result of the expanded operations.
20.6Water management
Water for the operations is sourced from wells, pit, and underground dewatering activities, the nearby Tutuaca River, and from the Chabacan dam. In recent years, the water supply from mine dewatering and precipitation on the leach pads and Chabacan Dam catchment has been generally sufficient for process needs without requiring any extraction from the Tutuaca River. The Chabacan dam reservoir has a capacity of 1.2 million m3 and provides storm water control as well as primary water storage. The permitted water usage from the Tutuaca River is 2.0 million m3 per annum at a maximum rate of 64 litres per second, and the water extraction permit remains in good standing should it be required in the future. No modification to the permits is anticipated to supply any mining and processing expansions. Process water is recycled, and the mine has essentially no discharge except for effluent from domestic waste water treatment plants servicing the offices and camp.
20.7Environmental certification
The Dolores mine voluntarily participates in the Mexican Federal Environmental Protection Authority's (PROFEPA) Clean Industry Program that involves independent verification of compliance with all environmental permits and the implementation of good practice environmental management procedures and practices.
20.8Social and community factors
The majority of the surface rights on the Property are owned by Ejido Huizopa. An ejido is an area of communal land registered with the National Agrarian Registry of Mexico and parceled out to community members for agricultural use. The Dolores mine has surface rights agreements with Ejido Huizopa and with several individual members of the ejido dating from November 2006 which allows for irrevocable access and the right to carry out exploration and mining activities for a term of 15 years with a right to extend for a further 15 years. These surface rights provide sufficient access to the mining operations, waste storage areas, heap leach pad areas, and other facilities. The agreement provided for relocation of the old village of Dolores, which formerly occupied an area directly over the southern end of the deposit. Construction of the new town and relocation of all families from within the Property area was completed by the end of 2009.
The Dolores community relations team implements an extensive program of community engagement activities including information sessions, infrastructure works, and educational and training programs for the local people that have resulted in the establishment of several small businesses. Unskilled workers are sourced from nearby small villages, and Pan American has recruiting and training programs in place to develop the mining skills of the local workforce. Dolores is recognized as a Socially Responsible Enterprise by the Mexican Center for Philanthropy.
Pan American, through its Corporate Social Responsibility Policy, has committed to operating all of its mines in harmony with the communities where they are located, and to continually improve standards of social responsibility and to make a positive difference in the surrounding communities by fostering sustainable development.

PAN AMERICAN SILVER CORP. 97
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


20.9Project reclamation and closure
A closure cost estimate for Dolores was prepared in 2012 according to Pan American's standard methodology, which employs the State of Nevada approved Standardized Reclamation Cost Estimator (SRCE) model. This estimate includes consideration of all surface disturbance and reclamation liability at the site and is updated on an annual basis. The Dolores current SRCE model includes demolition of all site infrastructure, re-grading of waste rock facilities, rinsing and covering leach pads, and complete re-vegetation of the site. The current SRCE model estimates the undiscounted value of reclamation costs or environmental liability for the Property to be approximately $64.1 million. Reclamation bonds are not currently a legal requirement in Mexico.
20.10Expected material environmental issues
There are no known environmental or social issues that could materially impact the mine's ability to extract the Mineral Resources or Mineral Reserves.
PAN AMERICAN SILVER CORP. 98
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


21CAPITAL AND OPERATING COSTS
The estimated operating costs are based on experience at the Dolores mine. Sustaining capital expenditures include pre-stripping, equipment replacement and heap leach pad expansions. Further capital may be required if economically justified or if there are substantial increases to the Mineral Reserves.
21.1Capital costs
Pan American estimates that sustaining capital expenditures in 2022 will be $33.4 million primarily for pre-stripping of phase 10a and the construction of heap leach pad capacity. Future sustaining capital costs will be dependent on requirements and reserve growth if any. The cost of constructing heap leach pad capacity is estimated to average $2.62 per tonne over the remainder of the Mineral Reserves.
21.2Operating costs
For ROM heap leach ore, the cost of processing is estimated to average $6.20 per tonne plus $3.47 per tonne for G&A.
For Pulp agglomeration ore, the cost of processing is estimated to average $20.40 per tonne plus $3.47 per tonne for G&A.
Open pit mining costs are estimated to average $2.05 per tonne with some variations due to haulage distances for the different phases and elevations.
Costs are further detailed in Table 14.4 and Table 14.5.
PAN AMERICAN SILVER CORP. 99
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


22ECONOMIC ANALYSIS
An economic analysis has been excluded from this Technical Report as Dolores is currently in production and this Technical Report does not include a material expansion of current production.
PAN AMERICAN SILVER CORP. 100
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


23ADJACENT PROPERTIES
There is no relevant information on adjacent properties to report.
PAN AMERICAN SILVER CORP. 101
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


24OTHER RELEVANT DATA AND INFORMATION
No additional information or explanation is necessary to make this Technical Report understandable and not misleading.
PAN AMERICAN SILVER CORP. 102
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


25INTERPRETATION AND CONCLUSIONS
Pan American acquired the Dolores mine in 2012 as part of the acquisition of Minefinders. Pan American has operated the mine since then and has engaged in investments including building heap leach pad capacity, connecting the mine to the Chihuahua electrical grid with a power line, the underground mine and building of the pulp agglomeration plant.
25.1Mineral Resources and Mineral Reserves
There are no known drilling, sampling, or recovery factors that could materially impact the reliability of the drilling results used to estimate Mineral Resources and Mineral Reserves.
There are no known significant risks and uncertainties that could reasonably be expected to affect the reliability or confidence in the Mineral Resource and Mineral Reserve estimates. Pan American routinely conducts reconciliation of the reserve model to the grade control model and to the heap leach feed conveyor weight meter and sampler in order to monitor actual mine versus model performance.
25.2Mineral processing, metallurgical testing, and recovery methods
Overall, modelled recoveries for gold and silver at Dolores have been achieved. Modeled recoveries, monthly quality column composites, and actual production are largely in agreement. The metallurgical recovery model created for the Mineral Resource and Mineral Reserve estimate assumes heap leach gold recoveries of 77.9% for oxide and 67.6% for mixed and sulphide ores, and silver recoveries of 42.1% for oxide and 54.9% for mixed and sulphide ores. The metallurgical recovery model for pulp agglomeration assumes gold recoveries of 90.0% for oxides and 89.8% for mixed and sulphides with, and silver recoveries of 58.7% for oxides and 83.3% for mixed and sulphides.
25.3Mining and financial
The mining operations are established with a good understanding of the mining parameters and cost structure.
25.4Environment and community
The most significant environmental liabilities include surface disturbance and reclamation liabilities and issues related to the stability and containment system of the heap leach pads. Only a small portion of the waste is potentially acid generating and no specific measures to manage waste or ore deposition are required.
There are no known environmental or social issues that could materially impact the mine's ability to economically extract the Mineral Resources or Mineral Reserves.
PAN AMERICAN SILVER CORP. 103
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


26RECOMMENDATIONS
26.1Mineral Resources and Mineral Reserves
Pan American intends to continue with annual diamond drilling programs and to continue ongoing infill drilling, to collect closer spaced drillhole information. Exploration diamond drilling is expected to be concentrated on defining the southern strike extent of the deposit and in improving the confidence in the estimate at depth. The geological interpretation will continue to be updated annually to include additional diamond drilling undertaken during the year. Reviews of the geological interpretation against grade control drilling will continue to be undertaken on a regular basis to verify the reliability of the Mineral Resource and Mineral Reserve estimate.
26.2Mineral processing, metallurgical testing, and recovery methods
Pan American will:
•Continue monthly composites leaching and load / permeability tests.
•Review higher cyanide consumption from material mined in recent years and impact in long term cost of leaching.
•Continue monthly reviews of the geotechnical performance and designs relating to the heap leach facilities by Golder.
26.3Mining and financial
Pan American will continue to optimize blasting patterns, and monitoring blast movements and pit slope stability. Recommendations have been made for additional geotechnical work (Walker, 2017), including:
•Operationally minimize the blasting overbreak and continue work to achieve design bench face angles.
•Continually observe the orientation, length, and location of continuous major structures as mining progresses and extend the geological and geotechnical model beyond the ultimate pit crest to understand the behaviour of the overall slopes.
PAN AMERICAN SILVER CORP. 104
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


27REFERENCES
Author
Title
Campa, M. F. and Coney P. J., 1983
Tectono-stratigraphic terranes and mineral resource distributions in Mexico. Canadian Journal of Earth Sciences, 20, 1040-1051.
Camprubí, A., Ferrari, L., Cosca, M. A., Cardellach, E., and Canals, À. 2003
Ages of epithermal deposits in Mexico: regional significance and links with the evolution of Tertiary volcanism. Economic Geology, 98, 1029-1037.
Golder, 2013b
Review of Inter-ramp Slope Angle, Dolores Mine, Chihuahua, Mexico. Internal report prepared for Pan American Silver, August 2013.
Long, S.D., Parker, H.M., and Françis-Bongarçon, D. 1997
Assay quality assurance-quality control programme for drilling projects at the pre-feasibility to feasibility report level, prepared by Mineral Resources Development Inc. (MRDI), August 1997.
Overbay, W., Page, T., Krasowski, D., Bailey, M., and Matthews, T., 2001
Geology, Structural Setting, and Mineralization of the Dolores District, Chihuahua, Mexico. In Special Publication No. 8 Society of Economic Geologists, 71-85.
Pratt, W., 2013
Internal report on Dolores geology and deposit types prepared for Pan American Silver, August 2013.
Staude, J-M., 2001
Geology, geochemistry and formation of Au-(Cu) mineralization and advanced argillic alteration in the Mulatos District, Sonora, Mexico. In: New Mines and Discoveries in Mexico and Central America. Special Publication No. 8. Society of Economic Geologists. 199-216.
Walker, W. K., 2017
Geologic pit mapping and bench and inter-ramp slope stability review for the Dolores open pit silver mine. Internal report prepared for Pan American Silver, December 2015.
PAN AMERICAN SILVER CORP. 105
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


28QP CERTIFICATES
CERTIFICATE of QUALIFIED PERSON
I, Martin Wafforn, Senior Vice President, Technical Services and Process Optimization of Pan American Silver Corp., 1500-625 Howe St, Vancouver, BC, V6C 2T6, Canada do hereby certify that:

1.I am the co-author of the technical report titled "Technical Report for the Dolores Property, Chihuahua, Mexico", with an effective date of June 30, 2022 (the "Technical Report").
2.I graduated with a Bachelor of Science in Mining degree from the Camborne School of Mines in Cornwall, England in 1980. I am a Professional Engineer in good standing with The Association of Professional Engineers and Geoscientists of the Province of British Columbia. I am also a Chartered Engineer in good standing in the United Kingdom. My experience is primarily in the areas of mining engineering, and I have worked as an engineer in the mining industry for a total of 40 years since my graduation from the Camborne School of Mines.
3.I have read the definition of 'qualified person' set out in National Instrument 43-101 (the "Instrument") and certify that by reason of my education, affiliation with a professional association and past relevant work experience, I fulfil the requirements of a 'qualified person' for the purposes of the Instrument.
4.I have visited the Property on October 19, 2021.
5.I am responsible for Sections 2 - 5, 15, 16, 19, 20, 21, 22, 24, and 1.1, 1.7, 1.8, 1.11, 1.12, 12.2, 21, 25.1, 25.3, 25.4, 26.3 of the Technical Report.
6.I am currently employed as the Senior Vice President, Technical Services and Process Optimization for Pan American Silver Corp., the owner of the Property, and by reason of my employment, I am not considered independent of the issuer as described in Section 1.5 of the Instrument.
7.I have had prior involvement with the Property that is the subject of the Technical Report; I am an employee of Pan American Silver Corp. and have conducted site visits to the Property, including as described in Section 2 - Introduction of the Technical Report.
8.I have read the Instrument and Form 43-101F1, and the Technical Report has been prepared in compliance with the Instrument and that form.
9.As of the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all the scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
Dated at Vancouver, British Columbia, this 2nd day of December, 2022.

"signed and sealed"
Martin Wafforn, P.Eng.

PAN AMERICAN SILVER CORP. 106
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


CERTIFICATE of QUALIFIED PERSON
I, Christopher Emerson, Vice President, Business Development and Geology of Pan American Silver Corp., 1500-625 Howe St, Vancouver, BC, V6C 2T6, Canada do hereby certify that:

1.I am the co-author of the technical report titled "Technical Report for the Dolores Property, Chihuahua, Mexico", with an effective date of June 30, 2022 (the "Technical Report").
2.I graduated with a Bachelor of Engineering in Industrial Geology from Camborne School of Mines, Exeter University, England, in 1998 and earned my Master of Science in Mineral Exploration from Leicester University in 2000. I am a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM) and a Fellow of the Geological Society of London (FGS). I have worked as a geologist in both mining and exploration for the past 22 years since my graduation from Leicester University.
3.I have read the definition of 'Qualified Person' set out in National Instrument 43-101 (the "Instrument") and certify that by reason of my education, affiliation with a professional association, and past relevant work experience, I fulfil the requirements of a 'Qualified Person' for the purposes of the Instrument.
4.I have visited the Property on October 19, 2021.
5.I am responsible for Sections 6 - 11, 14, 23, 27 and 1.2, 1.3, 1.4, 1.6, 1.13, 12.1, 12.4, 26.1 of the Technical Report.
6.I am currently employed as the Vice President, Business Development and Geology for Pan American Silver Corp., the owner of the Property, and by reason of my employment, I am not considered independent of the issuer as described in Section 1.5 of the Instrument.
7.I have had prior involvement with the Property that is the subject of the Technical Report; I am an employee of Pan American Silver Corp. and have conducted site visits to the Property, including as described in Section 2 - Introduction of the Technical Report.
8.I have read the Instrument and Form 43-101F1, and the Technical Report has been prepared in compliance with the Instrument and that form.
9.As of the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all the scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
Dated at Vancouver, British Columbia, this 2nd day of December, 2022.

"signed and sealed"
Christopher Emerson, FAusIMM

PAN AMERICAN SILVER CORP. 107
TECHNICAL REPORT FOR THE DOLORES PROPERTY, CHIHUAHUA, MEXICO


CERTIFICATE of QUALIFIED PERSON
I, Americo Delgado, Vice President, Mineral Processing, Tailings and Dams of Pan American Silver Corp., 1500-625 Howe St, Vancouver, BC, V6C 2T6, Canada, do hereby certify that:

1.I am the co-author of the technical report titled "Technical Report for the Dolores Property, Chihuahua, Mexico", with an effective date of June 30, 2022 (the "Technical Report").
2.I graduated with a Master of Science in Metallurgical and Material Engineering from the Colorado School of Mines in Golden, Colorado, in 2007, and with a Bachelor of Science in Metallurgical Engineering degree from the Universidad Nacional de Ingenieria, Lima, Peru, in 2000. I am a Professional Engineer in good standing with the Association of Professional Engineers and Geoscientists of the Province of British Columbia. My experience is primarily in the areas of metallurgy, mineral processing engineering, and tailings management and I have worked as a metallurgist and engineer in the mining industry for a total of 22 years since my graduation from the Universidad Nacional de Ingenieria.
3.I have read the definition of 'qualified person' set out in National Instrument 43-101 (the "Instrument") and certify that by reason of my education, affiliation with a professional association and past relevant work experience, I fulfil the requirements of a 'qualified person' for the purposes of the Instrument.
4.I have visited the Property on April 26-28, 2022.
5.I am responsible for Sections 13, 17, 18, and 1.5, 1.9, 1.10, 12.3, 25.2 - 26.2 of the Technical Report.
6.I am currently employed as the Vice President, Mineral Processing, Tailings and Dams for Pan American Silver Corp., the owner of the Property, and by reason of my employment, I am not considered independent of the issuer as describe in Section 1.5 of the Instrument.
7.I have had prior involvement with the Property that is the subject of the Technical Report; I am an employee of Pan American Silver Corp. and have conducted site visits to the Property, including as described in Section 2 - Introduction of the Technical Report.
8.I have read the Instrument and Form 43-101F1, and the Technical Report has been prepared in compliance with the Instrument and that form.
9.As of the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all the scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
Dated at Vancouver, British Columbia, this 2nd day of December, 2022.

"signed and sealed"
Americo Delgado, P.Eng.

PAN AMERICAN SILVER CORP. 108

Attachments

Disclaimer

Pan American Silver Corporation published this content on 02 December 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 02 December 2022 21:35:42 UTC.